Ahmad Dorbayani
Objective To obtain a position as a Project Planning and Control Engineer
Experience 2010–Present Middle East Industrial Gas Turbines (MIGT ) Co. Shams Abad Industrial Zone
Project and Inventory Planning and Control Department Head
Scheduled and controlled projects to make industrial gas turbines of the gas boosting stations licensed by
SIEMENS for South Pars Gas Filed development contracted by POGC and Iran Gas Lines development contracted
by NIGC.
• Planned and controlled assembly and commissioning process based on long and medium term planning
horizons
• Planned and controlled labor resources to deal with workshop and sites’ needs efficiently and effectively
• Planned and controlled material and parts procurement to provide workshop and sites with on-time
delivery
• Implemented feasibility studies to evaluate and promote system capacity and capability to meet projects’
and customers’ needs
2005–2010 Oil Turbo Compressor Equipment (OTCE ) Co. Shams Abad Industrial Zone
Planning Department Expert
Scheduled and controlled projects to make industrial gas turbines of the gas boosting stations licensed by
SIEMENS for third and fifth lines of Iran Gas Lines, IGAT III and IGAT V Projects, respectively.
• Planned and controlled assembly and commissioning process based on long and medium term planning
horizons
• Planned and controlled material and parts procurement to provide workshop and sites with on-time
delivery
Managed quality management and HSE systems based on ISO 9001 and OHSAS 18001 standards
• Prepared and developed required procedures, instructions and processes in accordance with the standards
• Implemented periodic monitoring and measurement of the processes and issued corrective and preventive
actions
• Implemented surveillance and internal audits to assure system conformance to the standards
2004–2005 Pars Electric Corp. 11th
kilometer of Tehran-Karaj highway
Industrial Engineer Trainee
Scheduled and controlled project to establish the production line of a new product
Implemented SQC project in manufacturing the television main board
2004–2005 Kaveh Co. 14th
kilometer of Abali road
Industrial Engineer Trainee
Implemented project of planning and developing industries (Final Project)
Education 2011–2013 Tehran-South Islamic Azad University Tehran, Iran
M.S., Industrial Engineering, Industrial Engineering, GPA 18.20 out of 20
Thesis Generation production planning considering the strategic decisions of locating power plants by using the
hierarchical production planning method under uncertainty
Certified Papers in 3rd international conference of Energy Trends in Energy Conservation (2013) and 7th
international conference of operation research
Training Courses 2010 Novin Parsian MIGT Co.
Project Economic Assessment by Comfar III Expert
Project Risk Management by Primavera Pertmaster 8.0
2009 Tehran Technical Institute Karimkhan Zand Ave, Tehran
Project and Portfolio Management by Primavera Project Management 6.0
2008 Ariana Project Management Institute Fatemi Sq, Tehran
Project Management Course based on PMBOK 2004
2006 Rayan Quality OTCE Co.
ISO 9001:2000, Requirements & Internal Audit
OHSAS 18001:1999, Requirements, Risks Analysis & Internal Audit
2005 Cavendish College Tehran, Iran
Interchange English Course
Project Management Course by P3 3.1 and Microsoft Project
Language
Computer Skills
Specialized Skills
Fluent English, including main skills of Listening and comprehension, speaking, reading and comprehension and
writing
Computer Literate: Microsoft Office Suite 2013, Microsoft Project 2013, Primavera Project Planner 3.1, Primavera
Project Management 6.0, Primavera PERTMASTER 8.0 and COMFAR III
• Proficient in processes and knowledge areas of the Project Management Body of Knowledge based on
PMBOK 2013
• Proficient in enterprise project planning including preparing EPS, OBS, WBS, defining and scheduling
activities and relationships, defining, assigning and leveling human resources in the enterprise level, top-
down and bottom-up budgeting, defining and calculating weight factors and preparing project progress
curves (S-Curves)
• Proficient in enterprise project control including recording and updating baselines, calculating physical,
duration and cost percent complete, preparing analytical reports by comparing actual and planned project
progress curves, examining critical paths and developing corrective actions to compensate for delays
• Familiar with project risk management including identifying and categorizing risks and preparation of
RBS, risks quality and quantity analysis, prioritizing important risks and developing solutions to alleviate
them, probabilistic projects planning and calculations of PERT analysis using PERTMASTER
• Familiar with project economic feasibility studies using COMFAR III including preparing project cash
flow and calculating IRR
Page 2 of 3
Page 3 of 3

More Related Content

What's hot

Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
Juffrie Cuevas
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
John Raj BE, MBA
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
kalathil716
 
Devadas Deepu Industry CV
Devadas Deepu Industry CVDevadas Deepu Industry CV
Devadas Deepu Industry CV
Devadas Deepu
 
Curriculum Vitae_Samdoo JUNG
Curriculum Vitae_Samdoo JUNGCurriculum Vitae_Samdoo JUNG
Curriculum Vitae_Samdoo JUNG
Samdoo Jung
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
Omer Mohammed
 
Irfan Ali Current
Irfan Ali CurrentIrfan Ali Current
Irfan Ali Current
Irfan Ali
 
Resume of Ashkan Daghighi
Resume of Ashkan DaghighiResume of Ashkan Daghighi
Resume of Ashkan Daghighi
Ashkan Daghighi
 
QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CV
ZAIDI Djahid
 
Chemical Engineer
Chemical EngineerChemical Engineer
Chemical Engineer
Asad Ullah
 

What's hot (20)

Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
C.Rajesh-ICE
C.Rajesh-ICEC.Rajesh-ICE
C.Rajesh-ICE
 
CV
CVCV
CV
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
Devadas Deepu Industry CV
Devadas Deepu Industry CVDevadas Deepu Industry CV
Devadas Deepu Industry CV
 
Curriculum Vitae_Samdoo JUNG
Curriculum Vitae_Samdoo JUNGCurriculum Vitae_Samdoo JUNG
Curriculum Vitae_Samdoo JUNG
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 
Irfan Ali Current
Irfan Ali CurrentIrfan Ali Current
Irfan Ali Current
 
Saikaat Saha CV
Saikaat Saha CVSaikaat Saha CV
Saikaat Saha CV
 
Resume of Ashkan Daghighi
Resume of Ashkan DaghighiResume of Ashkan Daghighi
Resume of Ashkan Daghighi
 
resume paramatt
resume paramattresume paramatt
resume paramatt
 
Sumpun Paungplub Resume
Sumpun Paungplub ResumeSumpun Paungplub Resume
Sumpun Paungplub Resume
 
QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CV
 
Chemical Engineer
Chemical EngineerChemical Engineer
Chemical Engineer
 
Rajan_SG_CV (1)
Rajan_SG_CV (1)Rajan_SG_CV (1)
Rajan_SG_CV (1)
 

Similar to English Resume-Ahmad Dorbayani

CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
KHAJA Raheemuddin
 
Professional resume
Professional resumeProfessional resume
Professional resume
ayman adawy
 
SULE Planning Engineer -111
SULE Planning Engineer -111SULE Planning Engineer -111
SULE Planning Engineer -111
sule ayuba
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
Obinna Ezeifedi
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 

Similar to English Resume-Ahmad Dorbayani (20)

Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
Resume_P Prakosa 201605
Resume_P Prakosa 201605Resume_P Prakosa 201605
Resume_P Prakosa 201605
 
Planning Engineer
Planning EngineerPlanning Engineer
Planning Engineer
 
BASEEM
BASEEMBASEEM
BASEEM
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
 
Anand B S - CV
Anand B S - CVAnand B S - CV
Anand B S - CV
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Professional resume
Professional resumeProfessional resume
Professional resume
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Rakesh CV (4)
Rakesh CV (4)Rakesh CV (4)
Rakesh CV (4)
 
SULE Planning Engineer -111
SULE Planning Engineer -111SULE Planning Engineer -111
SULE Planning Engineer -111
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
Mep manager surendra yadav 26112016
Mep manager surendra  yadav 26112016Mep manager surendra  yadav 26112016
Mep manager surendra yadav 26112016
 
Hazem a.maher
Hazem a.maherHazem a.maher
Hazem a.maher
 
CV
CVCV
CV
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 

English Resume-Ahmad Dorbayani

  • 1. 4th floor, No.20, Safarian Toosi St., Park Blvd., Fallah-Zadeh Blvd., Poonak, Ashrafi Esfahani, Tehran, Iran Postal Code: 1469634743 0912-5951377 021-44448287 Dorbayani@gmail.com Ahmad Dorbayani Objective To obtain a position as a Project Planning and Control Engineer Experience 2010–Present Middle East Industrial Gas Turbines (MIGT ) Co. Shams Abad Industrial Zone Project and Inventory Planning and Control Department Head Scheduled and controlled projects to make industrial gas turbines of the gas boosting stations licensed by SIEMENS for South Pars Gas Filed development contracted by POGC and Iran Gas Lines development contracted by NIGC. • Planned and controlled assembly and commissioning process based on long and medium term planning horizons • Planned and controlled labor resources to deal with workshop and sites’ needs efficiently and effectively • Planned and controlled material and parts procurement to provide workshop and sites with on-time delivery • Implemented feasibility studies to evaluate and promote system capacity and capability to meet projects’ and customers’ needs 2005–2010 Oil Turbo Compressor Equipment (OTCE ) Co. Shams Abad Industrial Zone Planning Department Expert Scheduled and controlled projects to make industrial gas turbines of the gas boosting stations licensed by SIEMENS for third and fifth lines of Iran Gas Lines, IGAT III and IGAT V Projects, respectively. • Planned and controlled assembly and commissioning process based on long and medium term planning horizons • Planned and controlled material and parts procurement to provide workshop and sites with on-time delivery Managed quality management and HSE systems based on ISO 9001 and OHSAS 18001 standards • Prepared and developed required procedures, instructions and processes in accordance with the standards • Implemented periodic monitoring and measurement of the processes and issued corrective and preventive actions • Implemented surveillance and internal audits to assure system conformance to the standards 2004–2005 Pars Electric Corp. 11th kilometer of Tehran-Karaj highway Industrial Engineer Trainee Scheduled and controlled project to establish the production line of a new product Implemented SQC project in manufacturing the television main board 2004–2005 Kaveh Co. 14th kilometer of Abali road Industrial Engineer Trainee Implemented project of planning and developing industries (Final Project) Education 2011–2013 Tehran-South Islamic Azad University Tehran, Iran M.S., Industrial Engineering, Industrial Engineering, GPA 18.20 out of 20
  • 2. Thesis Generation production planning considering the strategic decisions of locating power plants by using the hierarchical production planning method under uncertainty Certified Papers in 3rd international conference of Energy Trends in Energy Conservation (2013) and 7th international conference of operation research Training Courses 2010 Novin Parsian MIGT Co. Project Economic Assessment by Comfar III Expert Project Risk Management by Primavera Pertmaster 8.0 2009 Tehran Technical Institute Karimkhan Zand Ave, Tehran Project and Portfolio Management by Primavera Project Management 6.0 2008 Ariana Project Management Institute Fatemi Sq, Tehran Project Management Course based on PMBOK 2004 2006 Rayan Quality OTCE Co. ISO 9001:2000, Requirements & Internal Audit OHSAS 18001:1999, Requirements, Risks Analysis & Internal Audit 2005 Cavendish College Tehran, Iran Interchange English Course Project Management Course by P3 3.1 and Microsoft Project Language Computer Skills Specialized Skills Fluent English, including main skills of Listening and comprehension, speaking, reading and comprehension and writing Computer Literate: Microsoft Office Suite 2013, Microsoft Project 2013, Primavera Project Planner 3.1, Primavera Project Management 6.0, Primavera PERTMASTER 8.0 and COMFAR III • Proficient in processes and knowledge areas of the Project Management Body of Knowledge based on PMBOK 2013 • Proficient in enterprise project planning including preparing EPS, OBS, WBS, defining and scheduling activities and relationships, defining, assigning and leveling human resources in the enterprise level, top- down and bottom-up budgeting, defining and calculating weight factors and preparing project progress curves (S-Curves) • Proficient in enterprise project control including recording and updating baselines, calculating physical, duration and cost percent complete, preparing analytical reports by comparing actual and planned project progress curves, examining critical paths and developing corrective actions to compensate for delays • Familiar with project risk management including identifying and categorizing risks and preparation of RBS, risks quality and quantity analysis, prioritizing important risks and developing solutions to alleviate them, probabilistic projects planning and calculations of PERT analysis using PERTMASTER • Familiar with project economic feasibility studies using COMFAR III including preparing project cash flow and calculating IRR Page 2 of 3