1. CURRICULUM VITAE Samdoo JUNG
1
Mobile : +82‐10‐2300‐5895
Email : light3242@gmail.com
Nationality Korean
Residence Korea
Marital Status Married
Birthday Sep‐24‐1974
Essential Talents
14 years of experience in the engineering and the construction industry of
the power plant
Hugely experienced Process and Mechanical Engineer
Experienced on the large scale of power plants up to 1,800 MW
Experienced on the full turnkey projects
Experienced with the overseas developers as well as the domestic developers
Experienced as a lead engineer for covering performance design, process
engineering, mechanical engineering, control engineering, construction
supporting and commissioning assistance.
Experienced as a performance decision maker with a variety of the
performance insights and the capabilities of handling the powerful simulation
tools.
Education
Bachelor of Science in Mechanical Engineering, Feb. 2000
Kyunghee University, Seoul, Korea
Master of Science in Mechanical Engineering, Feb. 2002
Kyunghee University, Seoul, Korea
Job Summary
I am hugely experienced in the engineering and the construction industry with a
career covering a wide range of the power plant engineering such as
performance design, process engineering, mechanical engineering and control
engineering including the construction and the commissioning support at site.
Major projects of note include :
Pocheon LNG Combined Cycle Power Plant
Location : Korea
Capacity : 1,800 MW
GTG : MHPS 501GAC
2. CURRICULUM VITAE Samdoo JUNG
2
Configuration : 2 on 1 x 2 blocks
Position : Lead Engineer
Gwangyo Combined Heat and Power Plant
Location : Korea
Capacity : 175 MW + 360 Mcal/hr
GTG : Siemens SGT6‐3000E
Configuration : 1 on 1 + District Heater
Position : Lead Engineer
Songdo Combined Heat and Power Plant
Location : Korea
Capacity : 205 MW + 170 Mcal/hr
GTG : GE 6FA
Configuration : 2 on 1 + District Heater
Position : Sub‐Lead Engineer
Kwangyang LNG Combined Cycle Power Plant
Location : Korea
Capacity : 1,000 MW
GTG : GE 7FA
Configuration : 2 on 1 x 2 blocks
Position : Process and Mechanical Engineer
Boryeong Thermal Power Plant Unit 7 and 8
Location : Korea
Capacity : 1,000 MW
STG & Boiler : Doosan Heavy Industry
Configuration : 500 MW x 2 blocks
Position : Process and Mechanical Engineer
Jeju TPP Diesel Generator Facility
Location : Korea
Capacity : 40 MW
Configuration : Diesel Generator 1 block
Position : Process and Mechanical Engineer
BASF Combined Cycle Power Plant
Location : China
Capacity : 175 MW
STG & Boiler : GE 6B
Configuration : 3 on 1 x 1 block
Position : Process and Mechanical Engineer
3. CURRICULUM VITAE Samdoo JUNG
3
Job Experience Company: Daelim Industrial Company
Duration: May, 2002 to present as Senior Manager.
Job Function: Process and Mechanical Engineering
Responsibilities:
Feasibility Studies for the early set‐ups of the overall power plant before
the Owner starts working on the project.
Performance Engineering and Guarantee Control of the power plant based
on the contracts or RFPs
Process Engineering Works
Heat and Mass Balance Diagrams
Water Balance Diagrams
Process Flow Diagrams
Piping and Instrument Diagrams
Plant Control Philosophy
Plant Protection Philosophy
Performance Test Procedure
Design Criteria
System Descriptions
Function Descriptions
Plant Start‐up and Shutdown Procedures
Plant Start‐up Curves
Commissioning Procedures
Steam Blowout Procedures
Chemical Clean Procedures
Piping Design Conditions
Valve and Instrument Process Data
Mechanical Equipment Sizing and Calculations
Process Sizing and Calculation
Performance and Design Data for the equipment purchase
Gas Detector Process Data
Performing and analyzing of the performance test at site to meet the
performance guarantee
Dynamic and Transient Analysis
Mechanical Engineering Works
Preparing of Technical Specifications for the equipment purchase
Preparing of Request for Quotation
Performing of Technical Bid Evaluations for the vendor selection
4. CURRICULUM VITAE Samdoo JUNG
4
Performing of Technical Clarification with the manufacturers
Preparing of Engineering drawing of the field fabricated tanks
Preparing of Purchase Requisition for the contract with the
manufacturers
Review and approval of Vendor Print Drawing and Document
Preparing of Equipment List for the construction works
Preparing of Auxiliary Power List for the electric engineering
Preparing of Lubricant List for the procurement and construction works
Preparing of Painting List for the procurement and construction works
Preparing of insulation List for the procurement and construction works
Preparing of Spare part list for the procurement and construction works
Preparing of Chemical consumption list for the procurement and
construction works
Review of engineering schedules, monitoring, coordinating, drawing
and document in line with the target dates.
Preparing of Operation and Maintenance Manual
Preparing of the utility consumptions during the commissioning stage
such as raw water, fuel, the electricity for the Owner’s cost estimation
Control Engineering
Review and coordination of the control logic and loop diagrams for the
automatic plant regulation (APR)
Review and coordination of the control sequential diagrams for the
automatic plant start‐up and shut‐down (APS)
Review and coordination of the power output control logics (MW
Control)
Construction and Commissioning Supports
Assisting the construction work by controlling and supervising the
delivery, schedule and quality of the mechanical equipment including
any technical issues from the manufacturers at site
Coordination with site execution team to resolve design & engineering
issues during erection & commissioning at site
Review and Coordination with Technical Field Assistants (TFA) from the
manufacturers at site
Project Experience:
Pocheon LNG Combined Cycle Power Plant
Location : Korea
Period : OCT‐2011 ~ NOV‐2014
Owner : Pocheon Power
Capacity : 1,800 MW
5. CURRICULUM VITAE Samdoo JUNG
5
Main Characteristics
‐ Type : Combined Cycle Power Plant
‐ GTG : MHPS 501GAC, 265 MW
‐ STG : Doosan Heavy Industry, 260 MW
‐ HRSG : BHI, Subcritical
‐ Cooling Method : Cooling Tower
‐ Configuration : 2 on 1 x 2 blocks
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Construction support
‐ Commissioning support
‐ Warranty support
Gwangyo Combined Heat and Power Plant
Location : Korea
Period : DEC‐2009 ~ OCT‐2013
Owner : KDHC (Korea District Heating Corporation)
Capacity : 225 MW + 170 Mcal/hr
Main Characteristics
‐ Type : Combined Cycle Power Plant + District Heating
‐ GTG : Siemens SGT6‐3000E, 120 MW
‐ STG : Siemens, 55 MW
‐ HRSG : Sedae Enertech, Subcritical
‐ Cooling Method : District Heater
‐ Configuration : 1 on 1 + District Heater
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
‐ Construction support
‐ Commissioning support
‐ Warranty support
Songdo Combined Heat and Power Plant
Location : Korea
Period : MAR‐2007 ~ NOV‐2009
6. CURRICULUM VITAE Samdoo JUNG
6
Owner : INTECO (Incheon Total Energy Company)
Capacity : 205 MW + 170 Mcal/hr
Main Characteristics
‐ Type : Combined Cycle + District Heating
‐ GTG : GE 6FA, 75 MW
‐ STG : MHI, 55 MW
‐ HRSG : Sedae Enertech, Subcritical
‐ Cooling Method : District Heater and Air Cooled Condenser
‐ Configuration : 2 on 1 + District Heater
Roles :
The process and mechanical engineering as a sub‐lead engineer
‐ Assisting the lead engineer
‐ Performance Engineering with the heat and mass balance
diagrams
‐ Coordinating and integrating of the processing, mechanical,
control engineering internally
‐ In charge of the system and the equipment
Main Steam System
Main Condensate System
DH Condensate System
District Heating System
District Heating Economizer System
Circulating Water System
Closed Cooling Water System
Waste Water Transfer System
Heat Recovery Steam Generator
Steam Turbine Generator
Air Cooled Condensers
DH Condensate Pump
Main Condensate Pump
Closed Cooling Water Pump
Closed Cooling Water Cooler
District Heaters
DH Water Pumps
Sump Pumps
Boryeong Thermal Power Plant Unit 7 and 8
Location : Korea
Period : MAR‐2004 ~ DEC‐2008
Owner : Korea Midland Power Corporation
Capacity : 1,000 MW
Main Characteristics
‐ Type : Coal Fired Thermal Power Plant
7. CURRICULUM VITAE Samdoo JUNG
7
‐ Boiler : Doosan Heavy Industry, Supercritical
‐ STG : Doosan Heavy Industry, 500 MW
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 500 MW x 2 blocks
Roles :
The process and mechanical engineer
‐ In charge of the system and the equipment
Circulating Water System
Sea Water Intake System
Instrument and Service Air System
Waste Water Transfer System
Closed Cooling Water System
Circulating Water Pumps
Air Compressors
General Service Pumps
Cranes & Hoists
Sump Pumps
Kwangyang LNG Combined Cycle Power Plant
Location : Korea
Period : OCT‐2003 ~ JUN‐2006
Owner : K‐Power
Capacity : 1,000 MW
Main Characteristics
‐ Type : Combined Cycle Power Plant
‐ GTG : GE 7FA, 175 MW
‐ STG : Hitachi, 200 MW
‐ HRSG : Nooter Ericson, Subcritical
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 2 on 1 x 2 blocks
Roles :
The process and mechanical engineering as a process and system
engineer
‐ In charge of the system and the equipment
Closed Cooling Water System
Waste Water Transfer System
Heat Recovery Steam Generators
Shop Fabricated Tanks
Field Fabricated Tanks
General Service Pumps
Closed Cooling Water Heat Exchangers
Sump Pumps
Performing of the performance test at site
8. CURRICULUM VITAE Samdoo JUNG
8
Assisting of the turnover procedures at site
Jeju TPP Diesel Generator Facility
Location : Korea
Period : APR‐2004 ~ JUL‐2005
Owner : Korea Midland Power Corporation
Capacity : 40 MW
Main Characteristics
‐ Type : Diesel Generated Power Plant
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 40 MW x 1 block
Roles :
The process and mechanical engineer
‐ In charge of the system and the equipment
Sea Water Cooling Water System
Sea Water Intake System
Waste Water Transfer System
Sea Water Cooling Water Pumps
General Service Pumps
Sump Pumps
Cranes and hosts
BASF Combined Cycle Power Plant
Location : China
Period : May‐2002 ~ AUG‐2004
Owner : BASF‐YPC Company
Capacity : 50 MW
Main Characteristics
‐ Type : Combined Cycle + Process Steam
‐ GTG : GE 6B, 40 MW
‐ STG : Alstom, 55 MW
‐ HRSG : Daekyug Mechanical & Engineering
‐ Cooling Method : Cooling Tower
‐ Configuration : 3 on 1 x 1 block
Roles :
The process and mechanical engineer
‐ In charge of the system and the equipment
Performance Test Procedure
Plant Correction Curves
Plant Start‐up and Stop Procedure
Proposal Experience :
9. CURRICULUM VITAE Samdoo JUNG
9
Pospower Thermal Power Plant
Location : Korea
Period : JAN‐2016 ~ Present
Owner: Pospower (Posco)
Capacity : 2,100 MW
Main Characteristics
‐ Type : Coal Fired Thermal Power Plant
‐ Boiler : Doosan Heavy Industry, Ultra‐Supercritical
‐ STG : Doosan Heavy Industry, 1,050 MW
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 1,050 MW x 2 blocks
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Sumsel 10 Thermal Power Plant
Location : Indonesia
Period : JUN‐2013 ~ Present
Owner/ Developer : PLN / Mitsui + KEPCO
Capacity : 720 MW
Main Characteristics
‐ Type : Coal Fired Thermal Power Plant
‐ Boiler : MHPS, Ultra‐Supercritical
‐ STG : MHPS 720 MW
‐ Cooling Method : Cooling Tower
‐ Configuration : 720 MW x 1 block
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Topolobampo II Combined Cycle Power Plant
Location : Mexico
Period : AUG‐2014 ~ DEC‐2015
Owner / Developer : CFE / KEPCO
Capacity : 920 MW
10. CURRICULUM VITAE Samdoo JUNG
10
Main Characteristics
‐ Type : Combined Cycle
‐ GTG : MHPS 501J, 325 MW
‐ Configuration : 2 on 1 x 1 block
‐ Cooling Method : Air Cooled Condenser
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Topolobampo III Combined Cycle Power Plant
Location : Mexico
Period : DEC‐2014 ~ DEC‐2015
Owner / Developer : CFE / KEPCO
Capacity : 785 MW
Main Characteristics
‐ Type : Combined Cycle
‐ GTG : Siemens 8000H, 295 MW
‐ Configuration : 2 on 1 x 1 block
‐ Cooling Method : Air Cooled Condenser
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Oman Salalah 2 IPP
Location : Oman
Period : MAY‐2014 ~ DEC‐2014
Owner / Developer : OPWP / EDF
Capacity : 425 MW
Main Characteristics
‐ Type : Combined Cycle
‐ GTG : Ansaldo AE64.3A, 65 MW
‐ Configuration : 2 on 1 x 2 blocks
‐ Cooling Method : Sea Water Cooled Surface Condenser
Roles :
Planning and supervising the process and mechanical engineering as a
11. CURRICULUM VITAE Samdoo JUNG
11
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Rabigh V & VII Conversion Project
Location : KSA (Kingdom of Saudi Arabia)
Period : JAN‐2013 ~ APR‐2014
Owner: SEC (Saudi Electricity Company)
Capacity : 1,100 MW
Main Characteristics
‐ Type : Conversion from Simple to Combined Cycle
‐ GTG : GE 7EA (Existing Facility)
‐ STG : 280 MW x 4 sets
‐ Configuration : 7 on 1 x 4 blocks
‐ Cooling Method : Sea Water Cooled Surface Condenser
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Aramco Cogeneration IPP Project
Location : KSA (Kingdom of Saudi Arabia)
Period : AUG‐2012 ~ MAR‐2013
Owner/ Developer: Saudi Aramco / SEMCORP
Capacity : 400 MW + 180 MW + 400 MW
Main Characteristics
‐ Type : Cogeneration without STG, 3 different sites
‐ GTG : GE 7F5 (213 MW) and GE 7EA (90 MW)
‐ Configuration : 2 on 1 x 3 different sites
‐ Cooling Method : Not Applicable
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
12. CURRICULUM VITAE Samdoo JUNG
12
Jangmoon Combined Cycle Power Plant
Location : Korea
Period : SEP‐2013 ~ DEC‐2013
Owner: SK ENS
Capacity : 1,800 MW
Main Characteristics
‐ Type : Combined Cycle Power Plant
‐ GTG : Siemens SGT6‐8000H
‐ Configuration : 2 on 1 x 2 blocks
‐ Cooling Method : Cooling Tower
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Riyadh PP12 Combined Cycle Power Plant
Location : KSA (Kingdom of Saudi Arabia)
Period : MAR‐2011 ~ APR‐2012
Owner: SEC (Saudi Electricity Company)
Capacity : 2,000 MW
Main Characteristics
‐ Type : Combined Cycle Power Plant
‐ GTG : GE 7F5, 170 MW
‐ Configuration : 4 on 1 x 2 blocks
‐ Cooling Method : Air Cooled Condenser
Roles :
Planning and supervising the process and mechanical engineering as a
lead engineer
‐ Performance engineering
‐ Process engineering
‐ Mechanical engineering
‐ Control Engineering
Riyadh PP11 IPP Combined Cycle Power Plant
Location : KSA (Kingdom of Saudi Arabia)
Period : JUL‐2009 ~ FEB‐2010
Owner / Developer: SEC (Saudi Electricity Company) / ACWA
Capacity : 2,250 MW
Main Characteristics
‐ Type : Combined Cycle Power Plant
‐ GTG : MHI 501G, 260 MW
13. CURRICULUM VITAE Samdoo JUNG
13
‐ Configuration : 2 on 1 x 3 blocks
‐ Cooling Method : Air Cooled Condenser
Roles :
The process and mechanical engineering as a sub‐lead engineer
‐ Assisting the lead engineer
‐ Performance Engineering with the heat and mass balance
diagrams
‐ Coordinating and integrating of the processing, mechanical,
control engineering internally
‐ In charge of the system and the equipment
Performance Guarantee
Heat and Mass Diagram
Main Steam System
Condensate System
Heat Recovery Steam Generators
Air Cooled Condensers
Vacuum Pumps
Condensate Pumps
Gwangyo Combined Heat and Power Plant
Location : Korea
Period : MAY‐2009 ~ NOV‐2009
Owner : KDHC (Korea District Heating Corporation)
Capacity : 225 MW + 170 Mcal/hr
Main Characteristics
‐ Type : Combined Cycle Power Plant + District Heating
‐ GTG : Siemens SGT6‐3000E, 120 MW
‐ Cooling Method : District Heater
‐ Configuration : 1 on 1 + District Heater
Roles :
The process and mechanical engineering
‐ Performance Guarantee
‐ Heat and Mass Balance Diagram
‐ Auxiliary Power Guarantee
‐ Fuel Gas Supply Systems
‐ GTG Enclosure Vent Systems
‐ Gas Turbine Generator
‐ Fuel Gas Filter
‐ Fuel Gas Heater
‐ Fuel Gas Scrubber
‐ Fuel Gas Drain Tank
Godeok Combined Heat and Power Plant
Location : Korea
14. CURRICULUM VITAE Samdoo JUNG
14
Period : MAY‐2008 ~ SEP‐2009
Owner : SK ENS
Capacity : 940 MW
Main Characteristics
‐ Type : Combined Cycle Power Plant
‐ GTG : Siemens SGT6‐5000F, 205 MW
‐ Cooling Method : Cooling Tower
‐ Configuration : 3 on 1 x 1 block
Roles :
The process and mechanical engineering
‐ Circulating Water System
‐ Auxiliary Circulating Water System
‐ Condenser Air Removal System
‐ Steam Turbine Generator
‐ Condenser Vacuum Pumps
‐ Circulating Water Pumps
‐ Auxiliary Circulating Water Pumps
Songdo Combined Cycle Power Plant
Location : Korea
Period : APR‐2008 ~ OCT‐2009
Owner : Songdo Power
Capacity : 1,100 MW
Main Characteristics
‐ Type : Combined Cycle Power Plant
‐ GTG : GE 7FB, 185 MW
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 2 on 1 x 2 blocks
Roles :
The process and mechanical engineering
‐ Circulating Water System
‐ Auxiliary Circulating Water System
‐ Condenser Air Removal System
‐ Steam Turbine Generator
‐ Condenser Vacuum Pumps
‐ Circulating Water Pumps
‐ Auxiliary Circulating Water Pumps
Songdo Combined Heat and Power Plant
Location : Korea
Period : JUN‐2006 ~ FEB‐2007
Owner : INTECO (Incheon Total Energy Company)
Capacity : 205 MW + 170 Mcal/hr
Main Characteristics
15. CURRICULUM VITAE Samdoo JUNG
15
‐ Type : Combined Cycle + District Heating
‐ GTG : GE 6FA, 75 MW
‐ Cooling Method : District Heater and Air Cooled Condenser
‐ Configuration : 2 on 1 + District Heater
Roles :
The process and mechanical engineer
‐ Performance Engineering with the heat and mass balance
diagrams
‐ In charge of the system and the equipment
Main Steam System
Main Condensate System
DH Condensate System
District Heating System
District Heating Economizer System
Circulating Water System
Closed Cooling Water System
Waste Water Transfer System
Heat Recovery Steam Generator
Steam Turbine Generator
Air Cooled Condensers
DH Condensate Pump
Main Condensate Pump
Closed Cooling Water Pump
Closed Cooling Water Cooler
District Heaters
DH Water Pumps
Sump Pumps
Incheon Combined Cycle Power Plant Unit #2
Location : Korea
Period : AUG‐2006 ~ DEC‐2006
Owner : Korea Midland Power Corporation
Capacity : 500 MW
Main Characteristics
‐ Type : Combined Cycle
‐ GTG : GE 7FA, 175 MW
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 2 on 1 x 1 block
Roles :
The process and mechanical engineer
‐ In charge of the system and the equipment
Condensate System
Closed Cooling Water System
Condenser Air Removal System
16. CURRICULUM VITAE Samdoo JUNG
16
Surface Condenser
Condensate Pumps
Debris Filters
Condenser Tube Cleaning Package
General Service Pumps
Condenser Vacuum Pumps
Closed Cooling Water Pumps
Closed Cooling Water Coolers
CEBU Thermal Power Plant
Location : Philippines
Period : JUN‐2005 ~ NOV‐2005
Owner : KEPCO Philippines Corporation
Capacity : 200 MW
Main Characteristics
‐ Type : Coal Fired Thermal Power Plant
‐ Boiler : CFBC, Subcritical
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 100 MW x 2 blocks
Roles :
The process and mechanical engineer
‐ In charge of the system and the equipment
Closed Cooling Water System
Waste Water Transfer System
Closed Cooling Water Pump
Closed Cooling Water Cooler
Sump Pumps
Shop Fabricated Tanks
Tashe Cogeneration Thermal Power Plant
Location : Taiwan
Period : OCT‐2003 ~ DEC‐2003
Owner : Tashe United Co‐generation Corporation.
Capacity : 50 MW + 120 ton/hr Steam Supply
Main Characteristics
‐ Type : Thermal Power Plant + Steam Supply
‐ Boiler : CFBC, Subcritical
‐ Cooling Method : Cooling Tower
‐ Configuration : 50 MW x 1 block
Roles :
The process and mechanical engineer
‐ In charge of the system and the equipment
Closed Cooling Water System
Waste Water Transfer System
17. CURRICULUM VITAE Samdoo JUNG
17
Closed Cooling Water Pump
Closed Cooling Water Cooler
Sump Pumps
Shop Fabricated Tanks
Tanjung Kasam Coal Fired Power Plant
Location : Indonesia
Period : MAR‐2003 ~ JUL‐2003
Owner : PT PLN Batam
Capacity : 110 MW
Main Characteristics
‐ Type : Coal Fired Thermal Power Plant
‐ Boiler : PC, Subcritical
‐ Cooling Method : Sea Water Cooled Surface Condenser
‐ Configuration : 55 MW x 2 blocks
Roles :
The process and mechanical engineer
‐ In charge of the system and the equipment
Closed Cooling Water System
Waste Water Transfer System
Closed Cooling Water Pump
Closed Cooling Water Cooler
Sump Pumps
Shop Fabricated Tanks
Simulation Tools
Excellent capabilities to handle the essential simulation tools as a power user
such as ;
GTPRO / STPRO
GateCycle
Pipenet
PROTRAX
Additional
Information
Military Service as a combatant police, Oct.‐1994 to Dec.‐1996
Hansup MBA Academy (Company Special Training), APR‐2015 to SEP‐2015
Construction Management Academy (Company Special Training), APR‐2012 to
SEP‐2012
Awards
Daelim’s Employee of the year in 2014