 CURRICULUM VITAE    Samdoo JUNG 
 
1
  Mobile  :         +82‐10‐2300‐5895 
Email     : light3242@gmail.com 
Nationality  Korean 
 
Residence  Korea 
Marital Status  Married 
Birthday  Sep‐24‐1974 
Essential Talents 
 14 years of experience in the engineering and the construction industry of 
the power plant 
 Hugely experienced Process and Mechanical Engineer 
 Experienced on the large scale of power plants up to 1,800 MW 
 Experienced on the full turnkey projects 
 Experienced with the overseas developers as well as the domestic developers 
 Experienced  as  a  lead  engineer  for  covering  performance  design,  process 
engineering,  mechanical  engineering,  control  engineering,  construction 
supporting and commissioning assistance. 
 Experienced  as  a  performance  decision  maker  with  a  variety  of  the 
performance insights and the capabilities of handling the powerful simulation 
tools. 
Education 
Bachelor of Science in Mechanical Engineering, Feb. 2000 
Kyunghee University, Seoul, Korea 
 
Master of Science in Mechanical Engineering, Feb. 2002 
Kyunghee University, Seoul, Korea 
Job Summary 
I am hugely experienced in the engineering and the construction industry with a 
career  covering  a  wide  range  of  the  power  plant  engineering  such  as 
performance design, process  engineering,  mechanical  engineering  and  control 
engineering including the construction and the commissioning support at site. 
 
Major projects of note include : 
 Pocheon LNG Combined Cycle Power Plant 
 Location : Korea 
 Capacity : 1,800 MW  
 GTG : MHPS 501GAC 
 CURRICULUM VITAE    Samdoo JUNG 
 
2
 Configuration : 2 on 1 x 2 blocks 
 Position : Lead Engineer 
 Gwangyo Combined Heat and Power Plant 
 Location : Korea 
 Capacity : 175 MW + 360 Mcal/hr  
 GTG : Siemens SGT6‐3000E 
 Configuration : 1 on 1 + District Heater 
 Position : Lead Engineer 
 
 Songdo Combined Heat and Power Plant 
 Location : Korea 
 Capacity : 205 MW + 170 Mcal/hr  
 GTG : GE 6FA 
 Configuration : 2 on 1 + District Heater 
 Position : Sub‐Lead Engineer 
  Kwangyang LNG Combined Cycle Power Plant 
 Location : Korea 
 Capacity : 1,000 MW  
 GTG : GE 7FA 
 Configuration : 2 on 1 x 2 blocks 
 Position : Process and Mechanical Engineer 
 
 Boryeong Thermal Power Plant Unit 7 and 8 
 Location : Korea 
 Capacity : 1,000 MW 
 STG & Boiler : Doosan Heavy Industry 
 Configuration : 500 MW x 2 blocks 
 Position : Process and Mechanical Engineer 
 
 Jeju TPP Diesel Generator Facility 
 Location : Korea 
 Capacity : 40 MW 
 Configuration : Diesel Generator 1 block 
 Position : Process and Mechanical Engineer 
 
 BASF Combined Cycle Power Plant 
 Location : China 
 Capacity : 175 MW 
 STG & Boiler : GE 6B 
 Configuration : 3 on 1 x 1 block 
 Position : Process and Mechanical Engineer 
 CURRICULUM VITAE    Samdoo JUNG 
 
3
Job Experience    Company:  Daelim Industrial Company 
Duration:  May, 2002 to present as Senior Manager. 
Job Function: Process and Mechanical Engineering 
Responsibilities:  
 Feasibility Studies for the early set‐ups of the overall power plant before 
the Owner starts working on the project. 
 Performance Engineering and Guarantee Control of the power plant based 
on the contracts or RFPs 
 Process Engineering Works 
 Heat and Mass Balance Diagrams 
 Water Balance Diagrams 
 Process Flow Diagrams 
 Piping and Instrument Diagrams 
 Plant Control Philosophy 
 Plant Protection Philosophy 
 Performance Test Procedure 
 Design Criteria 
 System Descriptions 
 Function Descriptions 
 Plant Start‐up and Shutdown Procedures 
 Plant Start‐up Curves 
 Commissioning Procedures 
 Steam Blowout Procedures 
 Chemical Clean Procedures 
 Piping Design Conditions 
 Valve and Instrument Process Data 
 Mechanical Equipment Sizing and Calculations 
 Process Sizing and Calculation 
 Performance and Design Data for the equipment purchase 
 Gas Detector Process Data 
 Performing and analyzing of the performance test at site to meet the 
performance guarantee 
 Dynamic and Transient Analysis 
 
 Mechanical Engineering Works 
 Preparing of Technical Specifications for the equipment purchase 
 Preparing of Request for Quotation 
 Performing of Technical Bid Evaluations for the vendor selection 
 CURRICULUM VITAE    Samdoo JUNG 
 
4
 Performing of Technical Clarification with the manufacturers 
 Preparing of Engineering drawing of the field fabricated tanks 
 Preparing  of  Purchase  Requisition  for  the  contract  with  the 
manufacturers 
 Review and approval of Vendor Print Drawing and Document 
 Preparing of Equipment List for the construction works 
 Preparing of Auxiliary Power List for the electric engineering 
 Preparing of Lubricant List for the procurement and construction works 
 Preparing of Painting List for the procurement and construction works 
 Preparing of insulation List for the procurement and construction works 
 Preparing of Spare part list for the procurement and construction works 
 Preparing  of  Chemical  consumption  list  for  the  procurement  and 
construction works 
 Review  of  engineering  schedules,  monitoring,  coordinating,  drawing 
and document in line with the target dates. 
 Preparing of Operation and Maintenance Manual 
 Preparing of the utility consumptions during the commissioning stage 
such as raw water, fuel, the electricity for the Owner’s cost estimation 
 
 Control Engineering 
 Review and coordination of the control logic and loop diagrams for the 
automatic plant regulation (APR) 
  Review  and  coordination  of  the  control  sequential  diagrams  for  the 
automatic plant start‐up and shut‐down (APS) 
 Review  and  coordination  of  the  power  output  control  logics  (MW 
Control) 
 
 Construction and Commissioning Supports 
 Assisting  the  construction  work  by  controlling  and  supervising  the 
delivery, schedule and quality of the mechanical equipment including 
any technical issues from the manufacturers at site 
 Coordination with site execution team to resolve design & engineering 
issues during erection & commissioning at site 
 Review and Coordination with Technical Field Assistants (TFA) from the 
manufacturers at site 
 
 
Project Experience: 
 Pocheon LNG Combined Cycle Power Plant 
  Location : Korea 
 Period : OCT‐2011 ~ NOV‐2014 
 Owner : Pocheon Power 
 Capacity : 1,800 MW 
 CURRICULUM VITAE    Samdoo JUNG 
 
5
 Main Characteristics 
‐ Type : Combined Cycle Power Plant 
‐ GTG : MHPS 501GAC, 265 MW 
‐ STG : Doosan Heavy Industry, 260 MW 
‐ HRSG : BHI, Subcritical 
‐ Cooling Method : Cooling Tower 
‐ Configuration : 2 on 1 x 2 blocks 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Construction support 
‐ Commissioning support 
‐ Warranty support 
 
 Gwangyo Combined Heat and Power Plant  
  Location : Korea 
 Period : DEC‐2009 ~ OCT‐2013 
 Owner : KDHC (Korea District Heating Corporation) 
 Capacity : 225 MW + 170 Mcal/hr 
 Main Characteristics 
‐ Type : Combined Cycle Power Plant + District Heating 
‐ GTG : Siemens SGT6‐3000E, 120 MW 
‐ STG : Siemens, 55 MW 
‐ HRSG : Sedae Enertech, Subcritical 
‐ Cooling Method : District Heater 
‐ Configuration : 1 on 1 + District Heater 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
‐ Construction support 
‐ Commissioning support 
‐ Warranty support 
 
 Songdo Combined Heat and Power Plant 
  Location : Korea 
 Period : MAR‐2007 ~ NOV‐2009 
 CURRICULUM VITAE    Samdoo JUNG 
 
6
 Owner : INTECO (Incheon Total Energy Company) 
 Capacity : 205 MW + 170 Mcal/hr 
 Main Characteristics 
‐ Type : Combined Cycle + District Heating 
‐ GTG : GE 6FA, 75 MW 
‐ STG : MHI, 55 MW 
‐ HRSG : Sedae Enertech, Subcritical 
‐ Cooling Method : District Heater and Air Cooled Condenser 
‐ Configuration : 2 on 1 + District Heater 
 Roles :  
The process and mechanical engineering as a sub‐lead engineer 
‐ Assisting the lead engineer 
‐ Performance  Engineering  with  the  heat  and  mass  balance 
diagrams 
‐ Coordinating  and  integrating  of  the  processing,  mechanical, 
control engineering internally 
‐ In charge of the system and the equipment 
 Main Steam System 
 Main Condensate System 
 DH Condensate System 
 District Heating System 
 District Heating Economizer System 
 Circulating Water System 
 Closed Cooling Water System 
 Waste Water Transfer System 
 Heat Recovery Steam Generator 
 Steam Turbine Generator 
 Air Cooled Condensers 
 DH Condensate Pump 
 Main Condensate Pump 
 Closed Cooling Water Pump 
 Closed Cooling Water Cooler 
 District Heaters 
 DH Water Pumps 
 Sump  Pumps 
 
 Boryeong Thermal Power Plant Unit 7 and 8 
  Location : Korea 
 Period : MAR‐2004 ~ DEC‐2008 
 Owner : Korea Midland Power Corporation 
 Capacity : 1,000 MW 
 Main Characteristics 
‐ Type : Coal Fired Thermal Power Plant 
 CURRICULUM VITAE    Samdoo JUNG 
 
7
‐ Boiler : Doosan Heavy Industry, Supercritical 
‐ STG : Doosan Heavy Industry, 500 MW 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 500 MW x 2 blocks 
 Roles :  
The process and mechanical engineer 
‐ In charge of the system and the equipment 
 Circulating Water System 
 Sea Water Intake System 
 Instrument and Service Air System 
 Waste Water Transfer System 
 Closed Cooling Water System 
 Circulating Water Pumps 
 Air Compressors 
 General Service Pumps 
 Cranes  & Hoists 
 Sump Pumps 
 
 Kwangyang LNG Combined Cycle Power Plant 
  Location : Korea 
 Period : OCT‐2003 ~ JUN‐2006 
 Owner : K‐Power 
 Capacity : 1,000 MW 
 Main Characteristics 
‐ Type : Combined Cycle Power Plant 
‐ GTG : GE 7FA, 175 MW 
‐ STG : Hitachi, 200 MW 
‐ HRSG : Nooter Ericson, Subcritical 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 2 on 1 x 2 blocks 
 Roles :  
The  process  and  mechanical  engineering  as  a  process  and  system 
engineer 
‐ In charge of the system and the equipment 
 Closed Cooling Water System 
 Waste Water Transfer System 
 Heat Recovery Steam Generators 
 Shop Fabricated Tanks 
 Field Fabricated Tanks 
 General Service Pumps 
 Closed Cooling Water Heat Exchangers 
 Sump Pumps 
 Performing of the performance test at site 
 CURRICULUM VITAE    Samdoo JUNG 
 
8
 Assisting of the turnover procedures at site 
 
 Jeju TPP Diesel Generator Facility 
  Location : Korea 
 Period : APR‐2004 ~ JUL‐2005 
 Owner : Korea Midland Power Corporation 
 Capacity : 40 MW 
 Main Characteristics 
‐ Type : Diesel Generated Power Plant 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 40 MW x 1 block 
 Roles :  
The process and mechanical engineer 
‐ In charge of the system and the equipment 
 Sea Water Cooling Water System 
 Sea Water Intake System 
 Waste Water Transfer System 
 Sea Water Cooling Water Pumps 
 General Service Pumps
 Sump Pumps
 Cranes and hosts
 
 BASF Combined Cycle Power Plant 
  Location : China 
 Period : May‐2002 ~ AUG‐2004 
 Owner : BASF‐YPC Company 
 Capacity : 50 MW 
 Main Characteristics 
‐ Type : Combined Cycle + Process Steam 
‐ GTG : GE 6B, 40 MW 
‐ STG : Alstom, 55 MW 
‐ HRSG : Daekyug Mechanical  & Engineering 
‐ Cooling Method : Cooling Tower 
‐ Configuration : 3 on 1 x 1 block 
 Roles :  
The process and mechanical engineer 
‐ In charge of the system and the equipment 
 Performance Test Procedure 
 Plant Correction Curves 
 Plant Start‐up and Stop Procedure 
 
 
Proposal Experience : 
 CURRICULUM VITAE    Samdoo JUNG 
 
9
 Pospower Thermal Power Plant 
 Location : Korea 
 Period : JAN‐2016 ~ Present 
 Owner: Pospower (Posco) 
 Capacity : 2,100 MW 
 Main Characteristics 
‐ Type : Coal Fired Thermal Power Plant 
‐ Boiler : Doosan Heavy Industry, Ultra‐Supercritical 
‐ STG : Doosan Heavy Industry, 1,050 MW 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 1,050 MW x 2 blocks 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 
 Sumsel 10 Thermal Power Plant 
 Location : Indonesia 
 Period : JUN‐2013 ~ Present 
 Owner/ Developer : PLN / Mitsui + KEPCO 
 Capacity : 720 MW 
 Main Characteristics 
‐ Type : Coal Fired Thermal Power Plant 
‐ Boiler : MHPS, Ultra‐Supercritical 
‐ STG : MHPS 720 MW 
‐ Cooling Method : Cooling Tower 
‐ Configuration : 720 MW x 1 block 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 
 Topolobampo II Combined Cycle Power Plant 
 Location : Mexico 
 Period : AUG‐2014 ~ DEC‐2015 
 Owner / Developer : CFE / KEPCO 
 Capacity : 920 MW 
 CURRICULUM VITAE    Samdoo JUNG 
 
10
  Main Characteristics 
‐ Type : Combined Cycle  
‐ GTG : MHPS 501J, 325 MW 
‐ Configuration : 2 on 1 x 1 block 
‐ Cooling Method : Air Cooled Condenser 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 
 Topolobampo III Combined Cycle Power Plant 
 Location : Mexico 
 Period : DEC‐2014 ~ DEC‐2015 
 Owner / Developer : CFE / KEPCO 
 Capacity : 785 MW 
  Main Characteristics 
‐ Type : Combined Cycle  
‐ GTG : Siemens 8000H, 295 MW 
‐ Configuration : 2 on 1 x 1 block 
‐ Cooling Method : Air Cooled Condenser 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 
 Oman Salalah 2 IPP  
 Location : Oman 
 Period : MAY‐2014 ~ DEC‐2014 
 Owner / Developer : OPWP / EDF 
 Capacity : 425 MW 
  Main Characteristics 
‐ Type : Combined Cycle  
‐ GTG : Ansaldo AE64.3A, 65 MW 
‐ Configuration : 2 on 1 x 2 blocks 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
 CURRICULUM VITAE    Samdoo JUNG 
 
11
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 
 Rabigh V & VII Conversion Project 
 Location : KSA (Kingdom of Saudi Arabia) 
 Period : JAN‐2013 ~ APR‐2014 
 Owner: SEC (Saudi Electricity Company) 
 Capacity : 1,100 MW 
  Main Characteristics 
‐ Type : Conversion from Simple to Combined Cycle  
‐ GTG : GE 7EA (Existing Facility) 
‐ STG : 280 MW x 4 sets 
‐ Configuration : 7 on 1 x 4 blocks 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 
 Aramco Cogeneration IPP Project 
 Location : KSA (Kingdom of Saudi Arabia) 
 Period : AUG‐2012 ~ MAR‐2013 
 Owner/ Developer: Saudi Aramco / SEMCORP 
 Capacity : 400 MW + 180 MW + 400 MW 
  Main Characteristics 
‐ Type : Cogeneration without STG,  3 different sites 
‐ GTG : GE 7F5 (213 MW) and GE 7EA (90 MW) 
‐ Configuration : 2 on 1 x 3 different sites 
‐ Cooling Method : Not Applicable 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 CURRICULUM VITAE    Samdoo JUNG 
 
12
 Jangmoon Combined Cycle Power Plant 
 Location : Korea 
 Period : SEP‐2013 ~ DEC‐2013 
 Owner: SK ENS 
 Capacity : 1,800 MW 
  Main Characteristics 
‐ Type : Combined Cycle Power Plant 
‐ GTG : Siemens SGT6‐8000H 
‐ Configuration : 2 on 1 x 2 blocks 
‐ Cooling Method : Cooling Tower 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 Riyadh PP12 Combined Cycle Power Plant 
 Location : KSA (Kingdom of Saudi Arabia) 
 Period : MAR‐2011 ~ APR‐2012 
 Owner: SEC (Saudi Electricity Company) 
 Capacity : 2,000 MW 
 Main Characteristics 
‐ Type : Combined Cycle Power Plant 
‐ GTG : GE 7F5, 170 MW 
‐ Configuration : 4 on 1 x 2 blocks 
‐ Cooling Method : Air Cooled Condenser 
 Roles :  
Planning and supervising the process and mechanical engineering as a 
lead engineer 
‐ Performance engineering 
‐ Process engineering 
‐ Mechanical engineering 
‐ Control Engineering 
 Riyadh PP11 IPP Combined Cycle Power Plant 
 Location : KSA (Kingdom of Saudi Arabia) 
 Period : JUL‐2009 ~ FEB‐2010 
 Owner / Developer: SEC (Saudi Electricity Company) / ACWA 
 Capacity : 2,250 MW 
 Main Characteristics 
‐ Type : Combined Cycle Power Plant 
‐ GTG : MHI 501G, 260 MW 
 CURRICULUM VITAE    Samdoo JUNG 
 
13
‐ Configuration : 2 on 1 x 3 blocks 
‐ Cooling Method : Air Cooled Condenser 
 Roles :  
The process and mechanical engineering as a sub‐lead engineer 
‐ Assisting the lead engineer 
‐ Performance  Engineering  with  the  heat  and  mass  balance 
diagrams 
‐ Coordinating  and  integrating  of  the  processing,  mechanical, 
control engineering internally 
‐ In charge of the system and the equipment 
 Performance Guarantee 
 Heat and Mass Diagram 
 Main Steam System 
 Condensate System 
 Heat Recovery Steam Generators 
 Air Cooled Condensers 
 Vacuum Pumps 
 Condensate Pumps 
 Gwangyo Combined Heat and Power Plant  
 Location : Korea 
 Period : MAY‐2009 ~ NOV‐2009 
 Owner : KDHC (Korea District Heating Corporation) 
 Capacity : 225 MW + 170 Mcal/hr 
 Main Characteristics 
‐ Type : Combined Cycle Power Plant + District Heating 
‐ GTG : Siemens SGT6‐3000E, 120 MW 
‐ Cooling Method : District Heater 
‐ Configuration : 1 on 1 + District Heater 
 Roles :  
The process and mechanical engineering 
‐ Performance Guarantee 
‐ Heat and Mass Balance Diagram 
‐ Auxiliary Power Guarantee 
‐ Fuel Gas Supply Systems 
‐ GTG Enclosure Vent Systems 
‐ Gas Turbine Generator 
‐ Fuel Gas Filter 
‐ Fuel Gas Heater 
‐ Fuel Gas Scrubber 
‐ Fuel Gas Drain Tank 
 Godeok Combined Heat and Power Plant  
 Location : Korea 
 CURRICULUM VITAE    Samdoo JUNG 
 
14
 Period : MAY‐2008 ~ SEP‐2009 
 Owner : SK ENS 
 Capacity : 940 MW 
 Main Characteristics 
‐ Type : Combined Cycle Power Plant  
‐ GTG : Siemens SGT6‐5000F, 205 MW 
‐ Cooling Method : Cooling Tower 
‐ Configuration : 3 on 1 x 1 block 
 Roles :  
The process and mechanical engineering 
‐ Circulating Water System 
‐ Auxiliary Circulating Water System 
‐ Condenser Air Removal System 
‐ Steam Turbine Generator 
‐ Condenser Vacuum Pumps 
‐ Circulating Water Pumps 
‐ Auxiliary Circulating Water Pumps 
 Songdo Combined Cycle Power Plant  
 Location : Korea 
 Period : APR‐2008 ~ OCT‐2009 
 Owner : Songdo Power 
 Capacity : 1,100 MW 
 Main Characteristics 
‐ Type : Combined Cycle Power Plant  
‐ GTG : GE 7FB, 185 MW 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 2 on 1 x 2 blocks 
 Roles :  
The process and mechanical engineering 
‐ Circulating Water System 
‐ Auxiliary Circulating Water System 
‐ Condenser Air Removal System 
‐ Steam Turbine Generator 
‐ Condenser Vacuum Pumps 
‐ Circulating Water Pumps 
‐ Auxiliary Circulating Water Pumps 
 Songdo Combined Heat and Power Plant 
 Location : Korea 
 Period : JUN‐2006 ~ FEB‐2007 
 Owner : INTECO (Incheon Total Energy Company) 
 Capacity : 205 MW + 170 Mcal/hr 
 Main Characteristics 
 CURRICULUM VITAE    Samdoo JUNG 
 
15
‐ Type : Combined Cycle + District Heating 
‐ GTG : GE 6FA, 75 MW 
‐ Cooling Method : District Heater and Air Cooled Condenser 
‐ Configuration : 2 on 1 + District Heater 
 Roles :  
The process and mechanical engineer 
‐ Performance  Engineering  with  the  heat  and  mass  balance 
diagrams 
‐ In charge of the system and the equipment 
 Main Steam System 
 Main Condensate System 
 DH Condensate System 
 District Heating System 
 District Heating Economizer System 
 Circulating Water System 
 Closed Cooling Water System 
 Waste Water Transfer System 
 Heat Recovery Steam Generator 
 Steam Turbine Generator 
 Air Cooled Condensers 
 DH Condensate Pump 
 Main Condensate Pump 
 Closed Cooling Water Pump 
 Closed Cooling Water Cooler 
 District Heaters 
 DH Water Pumps 
 Sump  Pumps
 Incheon Combined Cycle Power Plant Unit #2 
 Location : Korea 
 Period : AUG‐2006 ~ DEC‐2006 
 Owner : Korea Midland Power Corporation 
 Capacity : 500 MW 
 Main Characteristics 
‐ Type : Combined Cycle  
‐ GTG : GE 7FA, 175 MW 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 2 on 1  x 1 block 
 Roles :  
The process and mechanical engineer 
‐ In charge of the system and the equipment 
 Condensate System 
 Closed Cooling Water System 
 Condenser Air Removal System 
 CURRICULUM VITAE    Samdoo JUNG 
 
16
 Surface Condenser 
 Condensate Pumps 
 Debris Filters 
 Condenser Tube Cleaning Package 
 General Service Pumps 
 Condenser Vacuum Pumps 
 Closed Cooling Water Pumps 
 Closed Cooling Water Coolers 
 CEBU Thermal Power Plant 
 Location : Philippines 
 Period : JUN‐2005 ~ NOV‐2005 
 Owner : KEPCO Philippines Corporation 
 Capacity : 200 MW 
 Main Characteristics 
‐ Type : Coal Fired Thermal Power Plant 
‐ Boiler : CFBC, Subcritical 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 100 MW x 2 blocks 
 Roles :  
The process and mechanical engineer 
‐ In charge of the system and the equipment 
 Closed Cooling Water System 
 Waste Water Transfer System 
 Closed Cooling Water Pump 
 Closed Cooling Water Cooler 
 Sump  Pumps
 Shop Fabricated Tanks
 Tashe Cogeneration Thermal Power Plant 
 Location : Taiwan 
 Period : OCT‐2003 ~ DEC‐2003 
 Owner : Tashe United Co‐generation Corporation. 
 Capacity : 50 MW + 120 ton/hr Steam Supply 
 Main Characteristics 
‐ Type : Thermal Power Plant + Steam Supply 
‐ Boiler : CFBC, Subcritical 
‐ Cooling Method : Cooling Tower 
‐ Configuration : 50 MW x 1 block 
 Roles :  
The process and mechanical engineer 
‐ In charge of the system and the equipment 
 Closed Cooling Water System 
 Waste Water Transfer System 
 CURRICULUM VITAE    Samdoo JUNG 
 
17
 Closed Cooling Water Pump 
 Closed Cooling Water Cooler 
 Sump  Pumps
 Shop Fabricated Tanks
 Tanjung Kasam Coal Fired Power Plant 
 Location : Indonesia 
 Period : MAR‐2003 ~ JUL‐2003 
 Owner : PT PLN Batam 
 Capacity : 110 MW 
 Main Characteristics 
‐ Type : Coal Fired Thermal Power Plant 
‐ Boiler : PC, Subcritical 
‐ Cooling Method : Sea Water Cooled Surface Condenser 
‐ Configuration : 55 MW x 2 blocks 
 Roles :  
The process and mechanical engineer 
‐ In charge of the system and the equipment 
 Closed Cooling Water System 
 Waste Water Transfer System 
 Closed Cooling Water Pump 
 Closed Cooling Water Cooler 
 Sump  Pumps
 Shop Fabricated Tanks
Simulation Tools 
Excellent capabilities to handle the essential simulation tools as a power user 
such as ; 
 GTPRO / STPRO 
 GateCycle 
 Pipenet 
 PROTRAX 
 
Additional 
Information 
 
Military Service as a combatant police, Oct.‐1994 to Dec.‐1996 
Hansup MBA Academy (Company Special Training), APR‐2015 to SEP‐2015 
Construction  Management  Academy  (Company  Special  Training),  APR‐2012  to 
SEP‐2012 
Awards 
Daelim’s Employee of the year in 2014 
 

More Related Content

What's hot

KVR_Resume
KVR_ResumeKVR_Resume
KVR_Resume
K V RAO
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
mathavan2008
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
Reddy Premnath
 
Kaushik Patel Resume
Kaushik Patel ResumeKaushik Patel Resume
Kaushik Patel Resume
Kaushik Patel
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
Juffrie Cuevas
 
Resume AshokHasija 2016Oct
Resume AshokHasija 2016OctResume AshokHasija 2016Oct
Resume AshokHasija 2016Oct
Ashok Hasija
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
Stefanus Tanaya
 

What's hot (18)

nazeemres
nazeemresnazeemres
nazeemres
 
Beane James 040816
Beane James 040816Beane James 040816
Beane James 040816
 
KVR_Resume
KVR_ResumeKVR_Resume
KVR_Resume
 
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
IRJET-  	  Analysis of Pre-Engineered Building and Conventional Building usin...IRJET-  	  Analysis of Pre-Engineered Building and Conventional Building usin...
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
 
Resume Mahendharan Palani.f
Resume  Mahendharan Palani.fResume  Mahendharan Palani.f
Resume Mahendharan Palani.f
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Kaushik Patel Resume
Kaushik Patel ResumeKaushik Patel Resume
Kaushik Patel Resume
 
Fabio_CV 2014n
Fabio_CV 2014nFabio_CV 2014n
Fabio_CV 2014n
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
Resume AshokHasija 2016Oct
Resume AshokHasija 2016OctResume AshokHasija 2016Oct
Resume AshokHasija 2016Oct
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
 

Viewers also liked

Promania :
Promania : Promania :
Promania :
swadhaa
 
Goodhew Sustainable Construction Processes flyer
Goodhew Sustainable Construction Processes flyerGoodhew Sustainable Construction Processes flyer
Goodhew Sustainable Construction Processes flyer
Steve Goodhew
 
Workshop M-Learning von A-Z. Input.
Workshop M-Learning von A-Z. Input.Workshop M-Learning von A-Z. Input.
Workshop M-Learning von A-Z. Input.
Judith S.
 
Scalable Distributed Real-Time Clustering for Big Data Streams
Scalable Distributed Real-Time Clustering for Big Data StreamsScalable Distributed Real-Time Clustering for Big Data Streams
Scalable Distributed Real-Time Clustering for Big Data Streams
Antonio Severien
 
Energia eolica hnos urquia 1982 parte 1d4
Energia eolica   hnos urquia 1982 parte 1d4Energia eolica   hnos urquia 1982 parte 1d4
Energia eolica hnos urquia 1982 parte 1d4
Q'aqya Wayra
 
Como realizar tu azador o barbacoa.pdf
Como realizar tu azador o barbacoa.pdfComo realizar tu azador o barbacoa.pdf
Como realizar tu azador o barbacoa.pdf
home
 

Viewers also liked (20)

Promania :
Promania : Promania :
Promania :
 
Triana Paraíso Fiscal Dossier
Triana Paraíso Fiscal DossierTriana Paraíso Fiscal Dossier
Triana Paraíso Fiscal Dossier
 
CMD-Leads
CMD-LeadsCMD-Leads
CMD-Leads
 
PPS Excellenz – godesys ERP
PPS Excellenz – godesys ERPPPS Excellenz – godesys ERP
PPS Excellenz – godesys ERP
 
Just Lamps overview
Just Lamps overviewJust Lamps overview
Just Lamps overview
 
Registro marcas e patentes
Registro marcas e patentesRegistro marcas e patentes
Registro marcas e patentes
 
Toppan vMRC Slide Share
Toppan vMRC Slide ShareToppan vMRC Slide Share
Toppan vMRC Slide Share
 
Men s health_south_africa_july_2013
Men s health_south_africa_july_2013Men s health_south_africa_july_2013
Men s health_south_africa_july_2013
 
Goodhew Sustainable Construction Processes flyer
Goodhew Sustainable Construction Processes flyerGoodhew Sustainable Construction Processes flyer
Goodhew Sustainable Construction Processes flyer
 
Workshop M-Learning von A-Z. Input.
Workshop M-Learning von A-Z. Input.Workshop M-Learning von A-Z. Input.
Workshop M-Learning von A-Z. Input.
 
Snam Shareholder April 2015
Snam Shareholder April 2015Snam Shareholder April 2015
Snam Shareholder April 2015
 
Creating an affordable low carbon energy system for the UK - Mike Colechin, E...
Creating an affordable low carbon energy system for the UK - Mike Colechin, E...Creating an affordable low carbon energy system for the UK - Mike Colechin, E...
Creating an affordable low carbon energy system for the UK - Mike Colechin, E...
 
Carlos jerez cv
Carlos jerez cvCarlos jerez cv
Carlos jerez cv
 
Scalable Distributed Real-Time Clustering for Big Data Streams
Scalable Distributed Real-Time Clustering for Big Data StreamsScalable Distributed Real-Time Clustering for Big Data Streams
Scalable Distributed Real-Time Clustering for Big Data Streams
 
Historia del ciie en su 45º Aniversario
Historia del ciie en su 45º AniversarioHistoria del ciie en su 45º Aniversario
Historia del ciie en su 45º Aniversario
 
Productivity: Getting More Done Presentation by Krista Neher at NYT Small Bus...
Productivity: Getting More Done Presentation by Krista Neher at NYT Small Bus...Productivity: Getting More Done Presentation by Krista Neher at NYT Small Bus...
Productivity: Getting More Done Presentation by Krista Neher at NYT Small Bus...
 
20120306 virgulacao
20120306 virgulacao20120306 virgulacao
20120306 virgulacao
 
Escuela de ingeniería de mantenimiento
Escuela de ingeniería de mantenimientoEscuela de ingeniería de mantenimiento
Escuela de ingeniería de mantenimiento
 
Energia eolica hnos urquia 1982 parte 1d4
Energia eolica   hnos urquia 1982 parte 1d4Energia eolica   hnos urquia 1982 parte 1d4
Energia eolica hnos urquia 1982 parte 1d4
 
Como realizar tu azador o barbacoa.pdf
Como realizar tu azador o barbacoa.pdfComo realizar tu azador o barbacoa.pdf
Como realizar tu azador o barbacoa.pdf
 

Similar to Curriculum Vitae_Samdoo JUNG

Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
Umar Akbar
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
#win(ashwin) Work
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
Richard Kildea
 
ADHOZAKPO STANLEY EDITOR cvsr1
ADHOZAKPO STANLEY EDITOR cvsr1ADHOZAKPO STANLEY EDITOR cvsr1
ADHOZAKPO STANLEY EDITOR cvsr1
Stanley Adhozakpo
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
Santosh Singh
 

Similar to Curriculum Vitae_Samdoo JUNG (20)

Assistant Manager - Mechanical
Assistant Manager - MechanicalAssistant Manager - Mechanical
Assistant Manager - Mechanical
 
Koti (assistant manager mech)
Koti (assistant manager mech)Koti (assistant manager mech)
Koti (assistant manager mech)
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 
Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
FREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVEFREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVE
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
CV
CVCV
CV
 
LI, GUANGYA
LI,  GUANGYALI,  GUANGYA
LI, GUANGYA
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
Instrument Eng oil&gas
Instrument Eng oil&gasInstrument Eng oil&gas
Instrument Eng oil&gas
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
Resume
Resume Resume
Resume
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
ADHOZAKPO STANLEY EDITOR cvsr1
ADHOZAKPO STANLEY EDITOR cvsr1ADHOZAKPO STANLEY EDITOR cvsr1
ADHOZAKPO STANLEY EDITOR cvsr1
 
E&i engineer
E&i engineer E&i engineer
E&i engineer
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 

Curriculum Vitae_Samdoo JUNG

  • 1.  CURRICULUM VITAE    Samdoo JUNG    1   Mobile  :         +82‐10‐2300‐5895  Email     : light3242@gmail.com  Nationality  Korean    Residence  Korea  Marital Status  Married  Birthday  Sep‐24‐1974  Essential Talents   14 years of experience in the engineering and the construction industry of  the power plant   Hugely experienced Process and Mechanical Engineer   Experienced on the large scale of power plants up to 1,800 MW   Experienced on the full turnkey projects   Experienced with the overseas developers as well as the domestic developers   Experienced  as  a  lead  engineer  for  covering  performance  design,  process  engineering,  mechanical  engineering,  control  engineering,  construction  supporting and commissioning assistance.   Experienced  as  a  performance  decision  maker  with  a  variety  of  the  performance insights and the capabilities of handling the powerful simulation  tools.  Education  Bachelor of Science in Mechanical Engineering, Feb. 2000  Kyunghee University, Seoul, Korea    Master of Science in Mechanical Engineering, Feb. 2002  Kyunghee University, Seoul, Korea  Job Summary  I am hugely experienced in the engineering and the construction industry with a  career  covering  a  wide  range  of  the  power  plant  engineering  such  as  performance design, process  engineering,  mechanical  engineering  and  control  engineering including the construction and the commissioning support at site.    Major projects of note include :   Pocheon LNG Combined Cycle Power Plant   Location : Korea   Capacity : 1,800 MW    GTG : MHPS 501GAC 
  • 2.  CURRICULUM VITAE    Samdoo JUNG    2  Configuration : 2 on 1 x 2 blocks   Position : Lead Engineer   Gwangyo Combined Heat and Power Plant   Location : Korea   Capacity : 175 MW + 360 Mcal/hr    GTG : Siemens SGT6‐3000E   Configuration : 1 on 1 + District Heater   Position : Lead Engineer     Songdo Combined Heat and Power Plant   Location : Korea   Capacity : 205 MW + 170 Mcal/hr    GTG : GE 6FA   Configuration : 2 on 1 + District Heater   Position : Sub‐Lead Engineer    Kwangyang LNG Combined Cycle Power Plant   Location : Korea   Capacity : 1,000 MW    GTG : GE 7FA   Configuration : 2 on 1 x 2 blocks   Position : Process and Mechanical Engineer     Boryeong Thermal Power Plant Unit 7 and 8   Location : Korea   Capacity : 1,000 MW   STG & Boiler : Doosan Heavy Industry   Configuration : 500 MW x 2 blocks   Position : Process and Mechanical Engineer     Jeju TPP Diesel Generator Facility   Location : Korea   Capacity : 40 MW   Configuration : Diesel Generator 1 block   Position : Process and Mechanical Engineer     BASF Combined Cycle Power Plant   Location : China   Capacity : 175 MW   STG & Boiler : GE 6B   Configuration : 3 on 1 x 1 block   Position : Process and Mechanical Engineer 
  • 3.  CURRICULUM VITAE    Samdoo JUNG    3 Job Experience    Company:  Daelim Industrial Company  Duration:  May, 2002 to present as Senior Manager.  Job Function: Process and Mechanical Engineering  Responsibilities:    Feasibility Studies for the early set‐ups of the overall power plant before  the Owner starts working on the project.   Performance Engineering and Guarantee Control of the power plant based  on the contracts or RFPs   Process Engineering Works   Heat and Mass Balance Diagrams   Water Balance Diagrams   Process Flow Diagrams   Piping and Instrument Diagrams   Plant Control Philosophy   Plant Protection Philosophy   Performance Test Procedure   Design Criteria   System Descriptions   Function Descriptions   Plant Start‐up and Shutdown Procedures   Plant Start‐up Curves   Commissioning Procedures   Steam Blowout Procedures   Chemical Clean Procedures   Piping Design Conditions   Valve and Instrument Process Data   Mechanical Equipment Sizing and Calculations   Process Sizing and Calculation   Performance and Design Data for the equipment purchase   Gas Detector Process Data   Performing and analyzing of the performance test at site to meet the  performance guarantee   Dynamic and Transient Analysis     Mechanical Engineering Works   Preparing of Technical Specifications for the equipment purchase   Preparing of Request for Quotation   Performing of Technical Bid Evaluations for the vendor selection 
  • 4.  CURRICULUM VITAE    Samdoo JUNG    4  Performing of Technical Clarification with the manufacturers   Preparing of Engineering drawing of the field fabricated tanks   Preparing  of  Purchase  Requisition  for  the  contract  with  the  manufacturers   Review and approval of Vendor Print Drawing and Document   Preparing of Equipment List for the construction works   Preparing of Auxiliary Power List for the electric engineering   Preparing of Lubricant List for the procurement and construction works   Preparing of Painting List for the procurement and construction works   Preparing of insulation List for the procurement and construction works   Preparing of Spare part list for the procurement and construction works   Preparing  of  Chemical  consumption  list  for  the  procurement  and  construction works   Review  of  engineering  schedules,  monitoring,  coordinating,  drawing  and document in line with the target dates.   Preparing of Operation and Maintenance Manual   Preparing of the utility consumptions during the commissioning stage  such as raw water, fuel, the electricity for the Owner’s cost estimation     Control Engineering   Review and coordination of the control logic and loop diagrams for the  automatic plant regulation (APR)    Review  and  coordination  of  the  control  sequential  diagrams  for  the  automatic plant start‐up and shut‐down (APS)   Review  and  coordination  of  the  power  output  control  logics  (MW  Control)     Construction and Commissioning Supports   Assisting  the  construction  work  by  controlling  and  supervising  the  delivery, schedule and quality of the mechanical equipment including  any technical issues from the manufacturers at site   Coordination with site execution team to resolve design & engineering  issues during erection & commissioning at site   Review and Coordination with Technical Field Assistants (TFA) from the  manufacturers at site      Project Experience:   Pocheon LNG Combined Cycle Power Plant    Location : Korea   Period : OCT‐2011 ~ NOV‐2014   Owner : Pocheon Power   Capacity : 1,800 MW 
  • 5.  CURRICULUM VITAE    Samdoo JUNG    5  Main Characteristics  ‐ Type : Combined Cycle Power Plant  ‐ GTG : MHPS 501GAC, 265 MW  ‐ STG : Doosan Heavy Industry, 260 MW  ‐ HRSG : BHI, Subcritical  ‐ Cooling Method : Cooling Tower  ‐ Configuration : 2 on 1 x 2 blocks   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Construction support  ‐ Commissioning support  ‐ Warranty support     Gwangyo Combined Heat and Power Plant     Location : Korea   Period : DEC‐2009 ~ OCT‐2013   Owner : KDHC (Korea District Heating Corporation)   Capacity : 225 MW + 170 Mcal/hr   Main Characteristics  ‐ Type : Combined Cycle Power Plant + District Heating  ‐ GTG : Siemens SGT6‐3000E, 120 MW  ‐ STG : Siemens, 55 MW  ‐ HRSG : Sedae Enertech, Subcritical  ‐ Cooling Method : District Heater  ‐ Configuration : 1 on 1 + District Heater   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering  ‐ Construction support  ‐ Commissioning support  ‐ Warranty support     Songdo Combined Heat and Power Plant    Location : Korea   Period : MAR‐2007 ~ NOV‐2009 
  • 6.  CURRICULUM VITAE    Samdoo JUNG    6  Owner : INTECO (Incheon Total Energy Company)   Capacity : 205 MW + 170 Mcal/hr   Main Characteristics  ‐ Type : Combined Cycle + District Heating  ‐ GTG : GE 6FA, 75 MW  ‐ STG : MHI, 55 MW  ‐ HRSG : Sedae Enertech, Subcritical  ‐ Cooling Method : District Heater and Air Cooled Condenser  ‐ Configuration : 2 on 1 + District Heater   Roles :   The process and mechanical engineering as a sub‐lead engineer  ‐ Assisting the lead engineer  ‐ Performance  Engineering  with  the  heat  and  mass  balance  diagrams  ‐ Coordinating  and  integrating  of  the  processing,  mechanical,  control engineering internally  ‐ In charge of the system and the equipment   Main Steam System   Main Condensate System   DH Condensate System   District Heating System   District Heating Economizer System   Circulating Water System   Closed Cooling Water System   Waste Water Transfer System   Heat Recovery Steam Generator   Steam Turbine Generator   Air Cooled Condensers   DH Condensate Pump   Main Condensate Pump   Closed Cooling Water Pump   Closed Cooling Water Cooler   District Heaters   DH Water Pumps   Sump  Pumps     Boryeong Thermal Power Plant Unit 7 and 8    Location : Korea   Period : MAR‐2004 ~ DEC‐2008   Owner : Korea Midland Power Corporation   Capacity : 1,000 MW   Main Characteristics  ‐ Type : Coal Fired Thermal Power Plant 
  • 7.  CURRICULUM VITAE    Samdoo JUNG    7 ‐ Boiler : Doosan Heavy Industry, Supercritical  ‐ STG : Doosan Heavy Industry, 500 MW  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 500 MW x 2 blocks   Roles :   The process and mechanical engineer  ‐ In charge of the system and the equipment   Circulating Water System   Sea Water Intake System   Instrument and Service Air System   Waste Water Transfer System   Closed Cooling Water System   Circulating Water Pumps   Air Compressors   General Service Pumps   Cranes  & Hoists   Sump Pumps     Kwangyang LNG Combined Cycle Power Plant    Location : Korea   Period : OCT‐2003 ~ JUN‐2006   Owner : K‐Power   Capacity : 1,000 MW   Main Characteristics  ‐ Type : Combined Cycle Power Plant  ‐ GTG : GE 7FA, 175 MW  ‐ STG : Hitachi, 200 MW  ‐ HRSG : Nooter Ericson, Subcritical  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 2 on 1 x 2 blocks   Roles :   The  process  and  mechanical  engineering  as  a  process  and  system  engineer  ‐ In charge of the system and the equipment   Closed Cooling Water System   Waste Water Transfer System   Heat Recovery Steam Generators   Shop Fabricated Tanks   Field Fabricated Tanks   General Service Pumps   Closed Cooling Water Heat Exchangers   Sump Pumps   Performing of the performance test at site 
  • 8.  CURRICULUM VITAE    Samdoo JUNG    8  Assisting of the turnover procedures at site     Jeju TPP Diesel Generator Facility    Location : Korea   Period : APR‐2004 ~ JUL‐2005   Owner : Korea Midland Power Corporation   Capacity : 40 MW   Main Characteristics  ‐ Type : Diesel Generated Power Plant  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 40 MW x 1 block   Roles :   The process and mechanical engineer  ‐ In charge of the system and the equipment   Sea Water Cooling Water System   Sea Water Intake System   Waste Water Transfer System   Sea Water Cooling Water Pumps   General Service Pumps  Sump Pumps  Cranes and hosts    BASF Combined Cycle Power Plant    Location : China   Period : May‐2002 ~ AUG‐2004   Owner : BASF‐YPC Company   Capacity : 50 MW   Main Characteristics  ‐ Type : Combined Cycle + Process Steam  ‐ GTG : GE 6B, 40 MW  ‐ STG : Alstom, 55 MW  ‐ HRSG : Daekyug Mechanical  & Engineering  ‐ Cooling Method : Cooling Tower  ‐ Configuration : 3 on 1 x 1 block   Roles :   The process and mechanical engineer  ‐ In charge of the system and the equipment   Performance Test Procedure   Plant Correction Curves   Plant Start‐up and Stop Procedure      Proposal Experience : 
  • 9.  CURRICULUM VITAE    Samdoo JUNG    9  Pospower Thermal Power Plant   Location : Korea   Period : JAN‐2016 ~ Present   Owner: Pospower (Posco)   Capacity : 2,100 MW   Main Characteristics  ‐ Type : Coal Fired Thermal Power Plant  ‐ Boiler : Doosan Heavy Industry, Ultra‐Supercritical  ‐ STG : Doosan Heavy Industry, 1,050 MW  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 1,050 MW x 2 blocks   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering     Sumsel 10 Thermal Power Plant   Location : Indonesia   Period : JUN‐2013 ~ Present   Owner/ Developer : PLN / Mitsui + KEPCO   Capacity : 720 MW   Main Characteristics  ‐ Type : Coal Fired Thermal Power Plant  ‐ Boiler : MHPS, Ultra‐Supercritical  ‐ STG : MHPS 720 MW  ‐ Cooling Method : Cooling Tower  ‐ Configuration : 720 MW x 1 block   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering     Topolobampo II Combined Cycle Power Plant   Location : Mexico   Period : AUG‐2014 ~ DEC‐2015   Owner / Developer : CFE / KEPCO   Capacity : 920 MW 
  • 10.  CURRICULUM VITAE    Samdoo JUNG    10   Main Characteristics  ‐ Type : Combined Cycle   ‐ GTG : MHPS 501J, 325 MW  ‐ Configuration : 2 on 1 x 1 block  ‐ Cooling Method : Air Cooled Condenser   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering     Topolobampo III Combined Cycle Power Plant   Location : Mexico   Period : DEC‐2014 ~ DEC‐2015   Owner / Developer : CFE / KEPCO   Capacity : 785 MW    Main Characteristics  ‐ Type : Combined Cycle   ‐ GTG : Siemens 8000H, 295 MW  ‐ Configuration : 2 on 1 x 1 block  ‐ Cooling Method : Air Cooled Condenser   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering     Oman Salalah 2 IPP    Location : Oman   Period : MAY‐2014 ~ DEC‐2014   Owner / Developer : OPWP / EDF   Capacity : 425 MW    Main Characteristics  ‐ Type : Combined Cycle   ‐ GTG : Ansaldo AE64.3A, 65 MW  ‐ Configuration : 2 on 1 x 2 blocks  ‐ Cooling Method : Sea Water Cooled Surface Condenser   Roles :   Planning and supervising the process and mechanical engineering as a 
  • 11.  CURRICULUM VITAE    Samdoo JUNG    11 lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering     Rabigh V & VII Conversion Project   Location : KSA (Kingdom of Saudi Arabia)   Period : JAN‐2013 ~ APR‐2014   Owner: SEC (Saudi Electricity Company)   Capacity : 1,100 MW    Main Characteristics  ‐ Type : Conversion from Simple to Combined Cycle   ‐ GTG : GE 7EA (Existing Facility)  ‐ STG : 280 MW x 4 sets  ‐ Configuration : 7 on 1 x 4 blocks  ‐ Cooling Method : Sea Water Cooled Surface Condenser   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering     Aramco Cogeneration IPP Project   Location : KSA (Kingdom of Saudi Arabia)   Period : AUG‐2012 ~ MAR‐2013   Owner/ Developer: Saudi Aramco / SEMCORP   Capacity : 400 MW + 180 MW + 400 MW    Main Characteristics  ‐ Type : Cogeneration without STG,  3 different sites  ‐ GTG : GE 7F5 (213 MW) and GE 7EA (90 MW)  ‐ Configuration : 2 on 1 x 3 different sites  ‐ Cooling Method : Not Applicable   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering 
  • 12.  CURRICULUM VITAE    Samdoo JUNG    12  Jangmoon Combined Cycle Power Plant   Location : Korea   Period : SEP‐2013 ~ DEC‐2013   Owner: SK ENS   Capacity : 1,800 MW    Main Characteristics  ‐ Type : Combined Cycle Power Plant  ‐ GTG : Siemens SGT6‐8000H  ‐ Configuration : 2 on 1 x 2 blocks  ‐ Cooling Method : Cooling Tower   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering   Riyadh PP12 Combined Cycle Power Plant   Location : KSA (Kingdom of Saudi Arabia)   Period : MAR‐2011 ~ APR‐2012   Owner: SEC (Saudi Electricity Company)   Capacity : 2,000 MW   Main Characteristics  ‐ Type : Combined Cycle Power Plant  ‐ GTG : GE 7F5, 170 MW  ‐ Configuration : 4 on 1 x 2 blocks  ‐ Cooling Method : Air Cooled Condenser   Roles :   Planning and supervising the process and mechanical engineering as a  lead engineer  ‐ Performance engineering  ‐ Process engineering  ‐ Mechanical engineering  ‐ Control Engineering   Riyadh PP11 IPP Combined Cycle Power Plant   Location : KSA (Kingdom of Saudi Arabia)   Period : JUL‐2009 ~ FEB‐2010   Owner / Developer: SEC (Saudi Electricity Company) / ACWA   Capacity : 2,250 MW   Main Characteristics  ‐ Type : Combined Cycle Power Plant  ‐ GTG : MHI 501G, 260 MW 
  • 13.  CURRICULUM VITAE    Samdoo JUNG    13 ‐ Configuration : 2 on 1 x 3 blocks  ‐ Cooling Method : Air Cooled Condenser   Roles :   The process and mechanical engineering as a sub‐lead engineer  ‐ Assisting the lead engineer  ‐ Performance  Engineering  with  the  heat  and  mass  balance  diagrams  ‐ Coordinating  and  integrating  of  the  processing,  mechanical,  control engineering internally  ‐ In charge of the system and the equipment   Performance Guarantee   Heat and Mass Diagram   Main Steam System   Condensate System   Heat Recovery Steam Generators   Air Cooled Condensers   Vacuum Pumps   Condensate Pumps   Gwangyo Combined Heat and Power Plant    Location : Korea   Period : MAY‐2009 ~ NOV‐2009   Owner : KDHC (Korea District Heating Corporation)   Capacity : 225 MW + 170 Mcal/hr   Main Characteristics  ‐ Type : Combined Cycle Power Plant + District Heating  ‐ GTG : Siemens SGT6‐3000E, 120 MW  ‐ Cooling Method : District Heater  ‐ Configuration : 1 on 1 + District Heater   Roles :   The process and mechanical engineering  ‐ Performance Guarantee  ‐ Heat and Mass Balance Diagram  ‐ Auxiliary Power Guarantee  ‐ Fuel Gas Supply Systems  ‐ GTG Enclosure Vent Systems  ‐ Gas Turbine Generator  ‐ Fuel Gas Filter  ‐ Fuel Gas Heater  ‐ Fuel Gas Scrubber  ‐ Fuel Gas Drain Tank   Godeok Combined Heat and Power Plant    Location : Korea 
  • 14.  CURRICULUM VITAE    Samdoo JUNG    14  Period : MAY‐2008 ~ SEP‐2009   Owner : SK ENS   Capacity : 940 MW   Main Characteristics  ‐ Type : Combined Cycle Power Plant   ‐ GTG : Siemens SGT6‐5000F, 205 MW  ‐ Cooling Method : Cooling Tower  ‐ Configuration : 3 on 1 x 1 block   Roles :   The process and mechanical engineering  ‐ Circulating Water System  ‐ Auxiliary Circulating Water System  ‐ Condenser Air Removal System  ‐ Steam Turbine Generator  ‐ Condenser Vacuum Pumps  ‐ Circulating Water Pumps  ‐ Auxiliary Circulating Water Pumps   Songdo Combined Cycle Power Plant    Location : Korea   Period : APR‐2008 ~ OCT‐2009   Owner : Songdo Power   Capacity : 1,100 MW   Main Characteristics  ‐ Type : Combined Cycle Power Plant   ‐ GTG : GE 7FB, 185 MW  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 2 on 1 x 2 blocks   Roles :   The process and mechanical engineering  ‐ Circulating Water System  ‐ Auxiliary Circulating Water System  ‐ Condenser Air Removal System  ‐ Steam Turbine Generator  ‐ Condenser Vacuum Pumps  ‐ Circulating Water Pumps  ‐ Auxiliary Circulating Water Pumps   Songdo Combined Heat and Power Plant   Location : Korea   Period : JUN‐2006 ~ FEB‐2007   Owner : INTECO (Incheon Total Energy Company)   Capacity : 205 MW + 170 Mcal/hr   Main Characteristics 
  • 15.  CURRICULUM VITAE    Samdoo JUNG    15 ‐ Type : Combined Cycle + District Heating  ‐ GTG : GE 6FA, 75 MW  ‐ Cooling Method : District Heater and Air Cooled Condenser  ‐ Configuration : 2 on 1 + District Heater   Roles :   The process and mechanical engineer  ‐ Performance  Engineering  with  the  heat  and  mass  balance  diagrams  ‐ In charge of the system and the equipment   Main Steam System   Main Condensate System   DH Condensate System   District Heating System   District Heating Economizer System   Circulating Water System   Closed Cooling Water System   Waste Water Transfer System   Heat Recovery Steam Generator   Steam Turbine Generator   Air Cooled Condensers   DH Condensate Pump   Main Condensate Pump   Closed Cooling Water Pump   Closed Cooling Water Cooler   District Heaters   DH Water Pumps   Sump  Pumps  Incheon Combined Cycle Power Plant Unit #2   Location : Korea   Period : AUG‐2006 ~ DEC‐2006   Owner : Korea Midland Power Corporation   Capacity : 500 MW   Main Characteristics  ‐ Type : Combined Cycle   ‐ GTG : GE 7FA, 175 MW  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 2 on 1  x 1 block   Roles :   The process and mechanical engineer  ‐ In charge of the system and the equipment   Condensate System   Closed Cooling Water System   Condenser Air Removal System 
  • 16.  CURRICULUM VITAE    Samdoo JUNG    16  Surface Condenser   Condensate Pumps   Debris Filters   Condenser Tube Cleaning Package   General Service Pumps   Condenser Vacuum Pumps   Closed Cooling Water Pumps   Closed Cooling Water Coolers   CEBU Thermal Power Plant   Location : Philippines   Period : JUN‐2005 ~ NOV‐2005   Owner : KEPCO Philippines Corporation   Capacity : 200 MW   Main Characteristics  ‐ Type : Coal Fired Thermal Power Plant  ‐ Boiler : CFBC, Subcritical  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 100 MW x 2 blocks   Roles :   The process and mechanical engineer  ‐ In charge of the system and the equipment   Closed Cooling Water System   Waste Water Transfer System   Closed Cooling Water Pump   Closed Cooling Water Cooler   Sump  Pumps  Shop Fabricated Tanks  Tashe Cogeneration Thermal Power Plant   Location : Taiwan   Period : OCT‐2003 ~ DEC‐2003   Owner : Tashe United Co‐generation Corporation.   Capacity : 50 MW + 120 ton/hr Steam Supply   Main Characteristics  ‐ Type : Thermal Power Plant + Steam Supply  ‐ Boiler : CFBC, Subcritical  ‐ Cooling Method : Cooling Tower  ‐ Configuration : 50 MW x 1 block   Roles :   The process and mechanical engineer  ‐ In charge of the system and the equipment   Closed Cooling Water System   Waste Water Transfer System 
  • 17.  CURRICULUM VITAE    Samdoo JUNG    17  Closed Cooling Water Pump   Closed Cooling Water Cooler   Sump  Pumps  Shop Fabricated Tanks  Tanjung Kasam Coal Fired Power Plant   Location : Indonesia   Period : MAR‐2003 ~ JUL‐2003   Owner : PT PLN Batam   Capacity : 110 MW   Main Characteristics  ‐ Type : Coal Fired Thermal Power Plant  ‐ Boiler : PC, Subcritical  ‐ Cooling Method : Sea Water Cooled Surface Condenser  ‐ Configuration : 55 MW x 2 blocks   Roles :   The process and mechanical engineer  ‐ In charge of the system and the equipment   Closed Cooling Water System   Waste Water Transfer System   Closed Cooling Water Pump   Closed Cooling Water Cooler   Sump  Pumps  Shop Fabricated Tanks Simulation Tools  Excellent capabilities to handle the essential simulation tools as a power user  such as ;   GTPRO / STPRO   GateCycle   Pipenet   PROTRAX    Additional  Information    Military Service as a combatant police, Oct.‐1994 to Dec.‐1996  Hansup MBA Academy (Company Special Training), APR‐2015 to SEP‐2015  Construction  Management  Academy  (Company  Special  Training),  APR‐2012  to  SEP‐2012  Awards  Daelim’s Employee of the year in 2014