The document provides a summary of an individual's work experience, including positions held as Chief Engineer and Assistant Director of Engineering at various hotels in Bangkok from 1999-2015. Responsibilities included maintenance works, managing engineering teams, budgeting, and ensuring safety and regulatory compliance. Educational background includes an electronics diploma and bachelor's degree in computer science. References from past employers and English communication skills are also listed.
I have total of 12 years’ experience in oil and gas sector. I have attained Bachelor’s Degree in Mechanical Engineering from Mumbai University.
Given any opportunity that meets my experience and qualification to enhance my career I will work to my highest potential and thereby prove to be an asset to your organization, which will also ensure my career growth.
I have total of 12 years’ experience in oil and gas sector. I have attained Bachelor’s Degree in Mechanical Engineering from Mumbai University.
Given any opportunity that meets my experience and qualification to enhance my career I will work to my highest potential and thereby prove to be an asset to your organization, which will also ensure my career growth.
B.E in E.E.E With experience as a Asst. Engg. doing Engineering activities like creation of Material Master, BOM,ECN,New intimation,Customer Master etc., 1 yr exp as a production in charge for assembling of control panels for machines.
I have total of 12 years’ experience in oil and gas sector. I have attained Bachelor’s Degree in Mechanical Engineering from Mumbai University.
Given any opportunity that meets my experience and qualification to enhance my career I will work to my highest potential and thereby prove to be an asset to your organization, which will also ensure my career growth.
I have total of 12 years’ experience in oil and gas sector. I have attained Bachelor’s Degree in Mechanical Engineering from Mumbai University.
Given any opportunity that meets my experience and qualification to enhance my career I will work to my highest potential and thereby prove to be an asset to your organization, which will also ensure my career growth.
B.E in E.E.E With experience as a Asst. Engg. doing Engineering activities like creation of Material Master, BOM,ECN,New intimation,Customer Master etc., 1 yr exp as a production in charge for assembling of control panels for machines.
Facility management in Electircal in shopping mall and high rise buildingsShyam Venkat
Having 9 years of experience in Facility management in shopping mall high rise buildings in small power Electical,HVAC,Fire fighting and fire alarm system
I am an Engineer Looking for A hotel Engineering Job I have 33 years of Experience presently working for Crowne plaza Hotels Electronic city (Intercontinental Hotels Group)
Walsh construction Company sent me the Appointment letter and After that There is no Response
1. -
-
-
-
-
-
-
-
-
-
-
-
-
Excellent
Period: August 2014 - September 2015
Period: January 2016 until present
Job Description:
Sumpun Paungplub
1st
July 1971
45 years old
Thai
Buddhism
Married
Age:
Nationality:
Religion:
Marital Status:
Height:
Weight:
Workplace:
EXPERIENCES
EDUCATION
CONTACT DETAILS
PROFILE
Home Address:
Mobile Phone:
Email Address:
Name:
Date of Birth:
Arrange maintenance staff to provide support, logistics and resources for school events and functions
including set-up work and the returning or areas back to normal in good time.
Ensure the fire alarm and emergency systems of the school are fully functioning at all times including
carrying out regular testing and monitoring alarm logs and incidents for faults and taking appropriate
action promptly.
Perform special projects as assigned by Director of Business Services.
Position:
Workplace:
Job Description:
Chief Engineer
Shrewsbury International School
The Chief Engineer reports directly to the Director of Business Services at the school and
also has reporting line to Head Office.
Develop and operate the preventative maintenance programmes for buildings and equipment in the
school.
Manage effectively a team of maintenance staff, prioritise work according to health and safety
importance and the needs of the school and operate the work order control system to keep track of
jobs outstanding, in progress and completed.
Perform special projects as assigned by Director of Operation/General Manager.
Cluster Chief Engineer
Hilton Sukhumvit Bangkok (Soi 24 - 280 rooms)
DoubleTree by Hilton Hotel Sukhumvit Bangkok (Soi 26 - 177 Rooms)
Responsible for all maintenance issues within the hotel performing maintenance checks, and
overseeing the engineering team.
Require to manage renovation projects, develop emergency programs, diagnose,repair mechanical
equipment within the hotel.
Position:
1982 1985 Electronics from Chamnansamakkeewittaya School Electrical,
sumpun01@gmail.com/paungplubs@gmail.com
1986 1991 High Diploma Power Electric and Electronics Technology Computer from Thai-Austria
Technical Collage Institute
1999 2005 Faculty of Education, Majoring in Computer Science from Ramkhamheang University
Nampen Sub-district, Khao Cha Mao District, Rayong 21110
0989944246
Health:
175 cm.
90 Kg.
Develop and implement the energy conservation programs to minimize hotel expenses.
Coordinate renovation bidding, define the cost, scope of the project, and oversee the general
contractor and subcontractors to ensure quality work is performed cost effectively.
2. -
-
-
-
-
-
-
-
-
-
-
-
Job Description:
Job Description:
Maintenance works, organize the operations in ways of saving energy consumption and increasing
productivity, coordinate with other departments for smoothly operation.
DirectandmanagethedailyoperationsoftheEngineering&Maintenancedepartmentincluding staff and
facilities management.
Period: March 1999 - September 2006
Position: Assistant Chief Engineer
Workplace: JW Marriott Hotel Bangkok (Soi 2 - 442 rooms)
Period: September 2006 - June 2008
Chief Engineer
Zeavola Resort and Spa Phi Phi Island (52 Pool Suit Villa)
Position:
Workplace:
Position:
Workplace:
Job Description:
August 2010 - July 2011
Position:
Workplace:
Period: July 2008 - July 2010
Managesallmaintenanceoperations,includingmaintainingthebuilding,physicalplantwitha particular
attention towards safety, security and asset protection and Engineering budgets.
Job Description:
Period: May 2012 - August 2014
Position:
Assistant Director of Engineering (May - 12 to August - 13)
JW Marriott Hotel Bangkok (Soi 2 - 442 rooms)Workplace:
Period: August 2011 - May 2012
Job Description:
Position:
Workplace:
Acting Director of Engineering (September -13 to August - 14)
Assistant Director of Engineer
Siam Kempinski Hotel Bangkok (401 Rooms)
Job Description:
Assign tracks and follow up on status of work assigned to Engineer staff and contractors.
Aid to increase the guest and staff satisfaction through the effective communications and training.
Assist Director of Engineer to manage budget, capital expenditures, preventative maintenance and
energy conservation.
Be accountable for maintaining the building and grounds with particular attention towards safety,
security and asset protection.
Perform special projects as assigned by General Manager
Maintenance & Engineering Manager
Mode Sathorn Hotel Managed by Siam@Siam (201 Rooms)
Rembrandt Hotel Bangkok (407 Rooms)
Assist Director of Engineer to oversee the proper maintenance of the hotel physical facilities including
the mechanical and electrical plant, fire and life safety, physical security of the building, furniture,
fixtures and related equipment in accordance with energy conservation and preventative maintenanceEnsure that all legal requirements are complied with, and that budgetary goals are met and
responsible for the safety and security of guests and staff of the hotel.
Take overall charges for repairs, preventive maintenance of mechanical and electrical services,
general building maintenance and absolute priority fire prevention system.
Maintain equipment and hotel property and control energy consumption and coordinates this program
with all Head of departments.
Chief Engineer
Period:
3. -
-
-
-
-
-
-
-
-
-
-
-
-
1.
2.
3.
4.
5.
Marriott Executive Apartments Bangkok Sukhumvit 57. Tel. 02-797-0000
Khun Florian Hallermann, General Manager
Zeavola Resort and spa Phi Phi Island, Krabi. Tel. 075-627-000
Khun Naksith Kasempiriyapong, Director of Human Resources
Mode Sathorn Hotel Bangkok. Tel. 02-623-4555
REFERENCE
Khun Sawitree Vanaputi, Director of Human Resources
Hilton Sukhumvit Bangkok/DoubleTree by Hilton Hotel Sukhumvit Bangkok . Tel. 02-649-6666
Khun Khun Chanokporn Sintuvatin, Director of Human Resources
JW Marriott Hotel Bangkok. Tel. 02-656-7700
Khun Boonsong Wimolthamarangsri, Director Of Engineering
Fire Fighting, Fire Rescue ETC
Champion I, II, III Grand Champion – Marriott International
Train the trainer Certificate 1 , 2 – Marriott International
Essential Skill 10 Modules and Spirit to Serve – Marriott International
Foundations of Leadership – Marriott International
Navigating Through Change – Marriott International
Good English Communication skills both verbal and written.
Pre-opening and site project management experience.
CERTIFICATION AND TRAINING
Energy Conservation from Ministry Of Energy License for Building control - Ministry of Energy
First Aid Advance - Thai Red Cross Society
Rescue Diving PADI
Position: General Technician
Workplace: Novotel Rimpae Rayong
KNOWLEDGE AND SKILLS
Good computer skills in Microsoft Office, Dreamweaver, Packet Radio, Echo Link, eQSO, andUIView32.
Position: General Technician
Workplace: Novotel Tropicana Pattaya Chonburi
Period: November 1989 - October 1991
Position: Sound Technician
Workplace: Novotel Lotus Bangkok
Period: October 1991 - September 1993
Position: Engineering Supervisor
Workplace: President Park Executive Service Apartment (198 Rooms)
Period: September 1993 - April 1994
Position: Engineering Supervisor
Workplace: Imperial Queen Park Hotel (1 ,250 Rooms)
Period: April 1994 - May 1996
Job Description:
Accountablefortheoperationfacilities,supervisetheengineeringstafftoperformdutiesefficiently and ensure
all machines and equipment are in good working condition.
Period: May 1996 - November 1996
Period: November 1996 - February 1999
Position: Chief Engineer
Workplace: Chateau De Bangkok Executive Apartment (196 Rooms)