Client Project Location Project Scope of service Primary role
Silangan Mining Philippines Process plant and Infrastructure
Definitive Feasibility Study for copper/ gold process plant,
infrastructure and services. Including:
• Feed preparation plant
• Milling circuit, , thickening and heating
• CCD circuits
• Flotation circuit and copper concentrate storage and handling
• Solvent extraction and EW plants
• CIL plant and Gold room
• Effluent treatment including tailings disposal
• Reticulation of all services and reagents including power, fire
water, potable and process water, flocculants, lime slurry etc.
• HCL and Sulphuric acid handling and storage
• Limestone and lime plant
Engineering Manager
Conquest Mining Queensland - Mount Carlton Mount Carlton Mine
Engineering and procurement for copper/ gold/silver process
plant, infrastructure and services. Including:
• Feed preparation plant
• Feed storage
• Milling circuit
• Flotation circuit and copper concentrate storage and handling
• Effluent treatment including tailings disposal
• Reticulation of all services and reagents including power, fire
water, potable and process water, flocculants, etc.
• Administration, maintenance and storage facilities.
Project Manager and
Principal Engineer
CST Mining Queensland - Lady Annie
Copper cathode stripping machine
installation
Integration of a new stripping machine into the cell house
Project Manager/
Engineering Manager
Western Metals
Copper
Queensland - Mount Gordon Grinding and flotation plant upgrade
Plant layout, design, procurement, construction management
and commissioning
Project Manager/
Engineering Manager
Base Metals
1
Project Experience Scott Bullock August 2016
Vale New Caledonia Goro Nickel
Plant layout, design and procurement for:-
• Port facilities
• Feed preparation plant
• Feed storage, thickening and heating
• HPAL
• CCD circuits
• Solvent extraction plants
• Effluent treatment including tailings disposal
• Reticulation of all services and reagents including fire water,
potable and process water, flocculants, caustic, lime slurry etc.
• Overland pipelines including tailings, raw water, feed slurry and
sea water outfall.
• HFO, HCL and Sulphuric acid handling and storage
• Limestone and lime plant
• Sulphur, limestone and coal stockyard, conveyors and stacker
• Accommodation camp
• Administration and maintenance facilities
Chief Mechanical and Piping
engineer, Senior Services
(Chief) engineer
Nicron Resources Northern Territory Woodcutters Mine shaft extension
Shaft extension, installation of new underground pumping
station, purchase of new underground equipment and expansion
of concentrate storage facilities
Project Manager
Pasminco - EZ Tasmania
Neutral leach, Weak acid leach and
pre-neutralisation plants for Zinc
process plant upgrade
Plant layout, design, procurement, construction management
and commissioning
Lead Engineer
2
Project Experience Scott Bullock August 2016
Australian
Solomon's Gold
Solomon Islands Gold Ridge Mine Expert advice, capital cost estimate Client Representative
Carpentaria Gold Queensland - Ravenswood Ravensworth mine upgrade
Installation of new crushing station, conveyors, cyclones,
concentrators and gold room
Project Manager/
Engineering Manager
Kennecott Mining USA Lihir Gold Mine Final feasibility study Design Engineer
Newcrest Mining Queensland - Cracow Klondyke Project Detailed design for surface mine infrastructure facilities Project Manager
Porgera Joint
Venture
PNG - Porgera Secondary crushing plant study Study of plant layout Study Manager
Rio Tinto Aluminium Queensland - Boyne Island Carbon Bake house replacement EPCM for Greenfield Anode Carbon Baking Furnace Project Director
Rio Tinto Aluminium Queensland - Boyne Island
Reduction Lines 1&2 Cranes
Optimisation
EPCM for optimising the existing Cranes, Rails and Alumina
Distribution systems
Project Director
Ampol Brisbane - Lytton refinery FCCU tail gas expansion project Mechanical design of pressure vessel, pipes and supports Mechanical designer
PGT Queensland - Roma
Fairview interconnect gas pipeline -
26km pipeline
Design, supply and commissioning
Project Director, Services
Engineer
Mimpex Queensland - Mt Isa
SW Queensland to Mt Isa - gas
pipeline.
Route selection and capital cost estimate Project Director
PGT Queensland
SW Queensland to Petrie in Brisbane -
gas pipeline
Route selection and capital cost estimate Project Director
CS Energy Queensland - Surat Basin Proposed Coal seam methane facility Route and line size selection. Capital cost and operating profile Study Manager
Shell Coal Queensland - German creek CSM gas power station study Preliminary design and capital cost estimate Study Manager
Shell Coal Queensland - German creek Goaf drainage system Detail design Project Manager
Dyno Nobel Queensland - Moranbah
Project Aurora – Ammonium Nitrate
Plant
Owners team. Re-estimate of project capital cost, contracts
administration
Project Director
WMC Fertilizers Queensland - Phosphate Hill Queensland Fertilizer project Product handling and project infrastructure EPCM
Project Manager/
Engineering Manager
Santos Queensland - Ballera Ballera airfield
Capital cost estimate, detail design and contract management
for a new airfield, roads and refuelling system
Project Director
Aluminium
Oil and Gas
Industrial
Precious Metals
3
Project Experience Scott Bullock August 2016
National Rail Brisbane, Melbourne, Perth Locomotive provisioning facilities Detailed design Project Director
Mackay Refined
Sugars
Mackay and Sydney
Sugar conditioning, storage and
handling plant
Detail design and procurement
Project Manager/
Engineering Manager
ESB County Clare, Ireland Moneypoint Power station EPCM Commissioning Engineer
CSR Queensland - New Farm Sugar packaging plant EPCM
Project Manager/
Engineering Manager
Queensland
Magnesia
Queensland - Rockhampton
Kunwarara Preconcentration and
Beneficiation Project
Detail design and procurement Lead Engineer
Queensland
Magnesia
Queensland - Rockhampton Electrofused magnesia plant Detail design, procurement and commissioning Lead Engineer
Mitsubishi Motors South Australia - Adelaide Core sand separation project
Detail design, fabrication, procurement installation and
commissioning - 7 automated machines
Lead Engineer
SECV Victoria - Taralgon Loy Lang Unit 2 Feed heating plant Detail design and supply of pressure vessels and piping
Design Engineer, Site
Engineer
SEQEB Queensland - Nanango Tarong Feed heating plant
Detail design and supply of pressure vessels, piping conveyors
and reclaimers
Design Engineer
Shell Coal Queensland - German creek Grasstree Infrastructure Study Capital cost estimate for underground coal mine development Study Manager
Shell Coal Queensland - Dartbrook
Dartbrook underground coal mine
infrastructure Study
Capital cost estimate for underground coal mine development
including surface infrastructure.
Study Manager
BHP Australia Coal Queensland - Gregory mine Overland conveyor
Preliminary design and pricing of crushing, stockpiling, reclaiming
and overland conveyor between Crinum and Gregory mines.
Study Manager
SEQEB Queensland - Nanango Tarong coal handling plant
Detail design and supply of pressure vessels, piping conveyors
and reclaimers
Design Engineer
4

More Related Content

What's hot

CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016timmy o'donoghue
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_MastDoug Mast
 
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1John Benson
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527Rob Smith
 
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1John Benson
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016Tony Martini
 
Fitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement ProjectFitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement Project
Metropolitan Area Planning Council
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayo
Mark Rannel Gamayo
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15ADAM DUKE
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2Brian Levitt
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul Jennings
 
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)
Eduardo Parisca
 

What's hot (20)

Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
 
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History Details
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016
 
Fitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement ProjectFitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement Project
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayo
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2
 
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 

Viewers also liked

i-nexus Case Study at Novartis
i-nexus Case Study at Novartisi-nexus Case Study at Novartis
i-nexus Case Study at Novartis
i-nexus
 
Actionable Insights Through Association Mining of Exchange Rates: A Case Study
Actionable Insights Through Association Mining of Exchange Rates: A Case StudyActionable Insights Through Association Mining of Exchange Rates: A Case Study
Actionable Insights Through Association Mining of Exchange Rates: A Case Study
ertekg
 
Budget execution - Eva Zver, Josar Dusan, Slovenia
Budget execution - Eva Zver, Josar Dusan, SloveniaBudget execution - Eva Zver, Josar Dusan, Slovenia
Budget execution - Eva Zver, Josar Dusan, Slovenia
OECD Governance
 
Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...
Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...
Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...
Muhammad Arslan
 
Capital Budgeting decision-making in telecom sector using real option analysis
Capital Budgeting decision-making in telecom sector using real option analysisCapital Budgeting decision-making in telecom sector using real option analysis
Capital Budgeting decision-making in telecom sector using real option analysis
Faculty of Economics Ljubljana in Skopje
 
Forbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbesandManhattan
 
Instrumentation projects
Instrumentation projectsInstrumentation projects
Instrumentation projects
Emirates Eminent, Texas
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation EngineerRoger Pelletier
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
L&T Demerger
L&T DemergerL&T Demerger
L&T Demerger
vivekvickygarg
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale
 
Cst4posted
Cst4postedCst4posted
Cst4posted
kodam2512
 
Graham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDF
Graham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDFGraham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDF
Graham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDFGraham Arvidson
 

Viewers also liked (20)

Hyperion PSB
Hyperion PSBHyperion PSB
Hyperion PSB
 
i-nexus Case Study at Novartis
i-nexus Case Study at Novartisi-nexus Case Study at Novartis
i-nexus Case Study at Novartis
 
Actionable Insights Through Association Mining of Exchange Rates: A Case Study
Actionable Insights Through Association Mining of Exchange Rates: A Case StudyActionable Insights Through Association Mining of Exchange Rates: A Case Study
Actionable Insights Through Association Mining of Exchange Rates: A Case Study
 
Budget execution - Eva Zver, Josar Dusan, Slovenia
Budget execution - Eva Zver, Josar Dusan, SloveniaBudget execution - Eva Zver, Josar Dusan, Slovenia
Budget execution - Eva Zver, Josar Dusan, Slovenia
 
Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...
Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...
Impact of Firm Size on Capital Budgeting Techniques: An Empirical Study of Te...
 
Capital Budgeting decision-making in telecom sector using real option analysis
Capital Budgeting decision-making in telecom sector using real option analysisCapital Budgeting decision-making in telecom sector using real option analysis
Capital Budgeting decision-making in telecom sector using real option analysis
 
Forbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate Presentation
 
Senior I&E
Senior I&ESenior I&E
Senior I&E
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
 
KARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUMEKARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUME
 
Instrumentation projects
Instrumentation projectsInstrumentation projects
Instrumentation projects
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
L&T Demerger
L&T DemergerL&T Demerger
L&T Demerger
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Cst4posted
Cst4postedCst4posted
Cst4posted
 
Graham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDF
Graham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDFGraham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDF
Graham Arvidson_CET Presentation Feb 2015_FINAL_PDF-3.PDF
 

Similar to Engineering Experience Scott Bullock August 2016

Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015Keith Vary
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
EPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability StatementEPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability Statement
djrobins
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015John Wood
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
Execution of Copper Rod Plant
Execution of  Copper Rod PlantExecution of  Copper Rod Plant
Execution of Copper Rod Plant
Pushkar Raj Chandna
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15
Kerry Polkinghorne
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME shortDuane Pooley
 
EL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptxEL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptx
Adolph7
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016Weifeng Li
 
Sten Johansson CV1 -2016
Sten Johansson CV1 -2016Sten Johansson CV1 -2016
Sten Johansson CV1 -2016Sten Johansson
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14Jim Benge
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
Werner Du Plooy
 

Similar to Engineering Experience Scott Bullock August 2016 (20)

Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
CV_Rockandel_08-2015
CV_Rockandel_08-2015CV_Rockandel_08-2015
CV_Rockandel_08-2015
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
EPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability StatementEPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability Statement
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Execution of Copper Rod Plant
Execution of  Copper Rod PlantExecution of  Copper Rod Plant
Execution of Copper Rod Plant
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15
 
Grahame Binks 11.16
Grahame Binks 11.16Grahame Binks 11.16
Grahame Binks 11.16
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME short
 
EL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptxEL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptx
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016
 
Sten Johansson CV1 -2016
Sten Johansson CV1 -2016Sten Johansson CV1 -2016
Sten Johansson CV1 -2016
 
Clough Booth Welsh Brochure
Clough Booth Welsh BrochureClough Booth Welsh Brochure
Clough Booth Welsh Brochure
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
 

Engineering Experience Scott Bullock August 2016

  • 1. Project Experience Scott Bullock August 2016 Client Project Location Project Scope of service Primary role Silangan Mining Philippines Process plant and Infrastructure Definitive Feasibility Study for copper/ gold process plant, infrastructure and services. Including: • Feed preparation plant • Milling circuit, , thickening and heating • CCD circuits • Flotation circuit and copper concentrate storage and handling • Solvent extraction and EW plants • CIL plant and Gold room • Effluent treatment including tailings disposal • Reticulation of all services and reagents including power, fire water, potable and process water, flocculants, lime slurry etc. • HCL and Sulphuric acid handling and storage • Limestone and lime plant Engineering Manager Conquest Mining Queensland - Mount Carlton Mount Carlton Mine Engineering and procurement for copper/ gold/silver process plant, infrastructure and services. Including: • Feed preparation plant • Feed storage • Milling circuit • Flotation circuit and copper concentrate storage and handling • Effluent treatment including tailings disposal • Reticulation of all services and reagents including power, fire water, potable and process water, flocculants, etc. • Administration, maintenance and storage facilities. Project Manager and Principal Engineer CST Mining Queensland - Lady Annie Copper cathode stripping machine installation Integration of a new stripping machine into the cell house Project Manager/ Engineering Manager Western Metals Copper Queensland - Mount Gordon Grinding and flotation plant upgrade Plant layout, design, procurement, construction management and commissioning Project Manager/ Engineering Manager Base Metals 1
  • 2. Project Experience Scott Bullock August 2016 Vale New Caledonia Goro Nickel Plant layout, design and procurement for:- • Port facilities • Feed preparation plant • Feed storage, thickening and heating • HPAL • CCD circuits • Solvent extraction plants • Effluent treatment including tailings disposal • Reticulation of all services and reagents including fire water, potable and process water, flocculants, caustic, lime slurry etc. • Overland pipelines including tailings, raw water, feed slurry and sea water outfall. • HFO, HCL and Sulphuric acid handling and storage • Limestone and lime plant • Sulphur, limestone and coal stockyard, conveyors and stacker • Accommodation camp • Administration and maintenance facilities Chief Mechanical and Piping engineer, Senior Services (Chief) engineer Nicron Resources Northern Territory Woodcutters Mine shaft extension Shaft extension, installation of new underground pumping station, purchase of new underground equipment and expansion of concentrate storage facilities Project Manager Pasminco - EZ Tasmania Neutral leach, Weak acid leach and pre-neutralisation plants for Zinc process plant upgrade Plant layout, design, procurement, construction management and commissioning Lead Engineer 2
  • 3. Project Experience Scott Bullock August 2016 Australian Solomon's Gold Solomon Islands Gold Ridge Mine Expert advice, capital cost estimate Client Representative Carpentaria Gold Queensland - Ravenswood Ravensworth mine upgrade Installation of new crushing station, conveyors, cyclones, concentrators and gold room Project Manager/ Engineering Manager Kennecott Mining USA Lihir Gold Mine Final feasibility study Design Engineer Newcrest Mining Queensland - Cracow Klondyke Project Detailed design for surface mine infrastructure facilities Project Manager Porgera Joint Venture PNG - Porgera Secondary crushing plant study Study of plant layout Study Manager Rio Tinto Aluminium Queensland - Boyne Island Carbon Bake house replacement EPCM for Greenfield Anode Carbon Baking Furnace Project Director Rio Tinto Aluminium Queensland - Boyne Island Reduction Lines 1&2 Cranes Optimisation EPCM for optimising the existing Cranes, Rails and Alumina Distribution systems Project Director Ampol Brisbane - Lytton refinery FCCU tail gas expansion project Mechanical design of pressure vessel, pipes and supports Mechanical designer PGT Queensland - Roma Fairview interconnect gas pipeline - 26km pipeline Design, supply and commissioning Project Director, Services Engineer Mimpex Queensland - Mt Isa SW Queensland to Mt Isa - gas pipeline. Route selection and capital cost estimate Project Director PGT Queensland SW Queensland to Petrie in Brisbane - gas pipeline Route selection and capital cost estimate Project Director CS Energy Queensland - Surat Basin Proposed Coal seam methane facility Route and line size selection. Capital cost and operating profile Study Manager Shell Coal Queensland - German creek CSM gas power station study Preliminary design and capital cost estimate Study Manager Shell Coal Queensland - German creek Goaf drainage system Detail design Project Manager Dyno Nobel Queensland - Moranbah Project Aurora – Ammonium Nitrate Plant Owners team. Re-estimate of project capital cost, contracts administration Project Director WMC Fertilizers Queensland - Phosphate Hill Queensland Fertilizer project Product handling and project infrastructure EPCM Project Manager/ Engineering Manager Santos Queensland - Ballera Ballera airfield Capital cost estimate, detail design and contract management for a new airfield, roads and refuelling system Project Director Aluminium Oil and Gas Industrial Precious Metals 3
  • 4. Project Experience Scott Bullock August 2016 National Rail Brisbane, Melbourne, Perth Locomotive provisioning facilities Detailed design Project Director Mackay Refined Sugars Mackay and Sydney Sugar conditioning, storage and handling plant Detail design and procurement Project Manager/ Engineering Manager ESB County Clare, Ireland Moneypoint Power station EPCM Commissioning Engineer CSR Queensland - New Farm Sugar packaging plant EPCM Project Manager/ Engineering Manager Queensland Magnesia Queensland - Rockhampton Kunwarara Preconcentration and Beneficiation Project Detail design and procurement Lead Engineer Queensland Magnesia Queensland - Rockhampton Electrofused magnesia plant Detail design, procurement and commissioning Lead Engineer Mitsubishi Motors South Australia - Adelaide Core sand separation project Detail design, fabrication, procurement installation and commissioning - 7 automated machines Lead Engineer SECV Victoria - Taralgon Loy Lang Unit 2 Feed heating plant Detail design and supply of pressure vessels and piping Design Engineer, Site Engineer SEQEB Queensland - Nanango Tarong Feed heating plant Detail design and supply of pressure vessels, piping conveyors and reclaimers Design Engineer Shell Coal Queensland - German creek Grasstree Infrastructure Study Capital cost estimate for underground coal mine development Study Manager Shell Coal Queensland - Dartbrook Dartbrook underground coal mine infrastructure Study Capital cost estimate for underground coal mine development including surface infrastructure. Study Manager BHP Australia Coal Queensland - Gregory mine Overland conveyor Preliminary design and pricing of crushing, stockpiling, reclaiming and overland conveyor between Crinum and Gregory mines. Study Manager SEQEB Queensland - Nanango Tarong coal handling plant Detail design and supply of pressure vessels, piping conveyors and reclaimers Design Engineer 4