Name : Saad O. Al-Chalabi
D.o.B : 12
th
Sep 1972
Nationality : Iraqi
Resident in : Amman - Jordan
Mobile No.: 00962 7964 11 212
Amman / Jordan
00961 76 70 58 09
Beirut / Lebanon
Email: Saadalchalabi@yahoo.com
Saad_alchalabi@hotmail.com
Marital Status: Married to Graphic Designer wife, Father for Three children
Aspiration:
Since my graduation from the university, I had been able to work as both an engineer as
well as on managerial and marketing activities. I have worked in Iraq and currently in
Amman/Jordan and my aspiration is to join an international company that has wide
activities worldwide particularly if they have branches and activities in the Arab World.
EDUCATION:
Sep /1990-Jun /1995 Bachelor of Mechanical Engineering
University of Technology– Baghdad / Iraq
Key subjects:
v Machine Theory.
v Electrical Engineering.
v Power Plant.
v Internal combustion Engineering.
v Fluid.
v Thermodynamics.
v Mechanical Design.
v Gas Dynamics.
v Vibration and Control.
v Heat Transfers.
v Engineering Management.
Page 2 of 13
WORK EXPERIENCE:
1 June 2013 – Till Today North Bank for Finance and Investment
Iraq / Baghdad – Data Center / Jordan / Amman
Job Title: Data Center Manager – Chief Technology Officer CTO .
Duties
1. Lead the execution of technology strategy for technology platforms, partnerships, and
external relationships.
2. Build and manage a top-flight technology team and oversee research and
development, as well as project management.
3. Taking an action through having propositional training on the security utilities and
special training on banking solution and card management systems.
4. Provide visible leadership for the Bank within the technology community.
5. Anticipate and react to major technology changes to ensure the maintenance of the
Bank leadership in the competitive landscape.
6. Establish technical standards and ensure adherence to them for product development
and the Bank operations.
1 December 2011 – 1 June 2013 International Contracting Engineering Group “ICE-
GROUP” (Partner with the ISO-AIR Building System™ of Innovative and cost
effective building system)
Job Title: Project Manager.
Duties
1. Evaluate the scientific feasibility of new product ideas.
2. Bring forward, to management, ideas for new products or value-added changes
to existing products.
3. Maintain professional development and industry knowledge to ensure that
development projects reflect best current technical practices.
4. Project manages and participates directly in technology transfer of analytical test
methods toQuality Control/Assurance.
5. Project manage and participate directly in manufacturing and on-line quality
assuranceaudits.
6. Perform trouble-shooting of compounded batches.
Page 3 of 13
27 October 2009 – 30 November 2011 Al Bayan Co. (Member of AGMEST Group)
Job Title: Development Manager
Duties:
1. Supervise the development of the field teams and project management skills.
2. Support Company Sales in the field of (OR & Image Diagnostic) by in the
form of supplying them with all the needed technical information, preparing
technical & commercial offers, Feasibility Study & technical comparison.
3. Support the contracts execution, in the field of (OR & Image Diagnostic) by:-
4. Implementation time schedule and following up with the related department in
The group.
5. Preparation of plans and drawings of sites and business to be implemented and
updated continuously.
6. Prepare lists of quantities and schedules for projects above and equipped to find
and affordable.
7. Prepare periodic reports on a weekly basis for the submission of project
implementation.
8. Represent the company in meetings and technical discussions for projects to be
implemented in Iraq.
9. Business Development for reaching groups target & vision.
Job Title: Project Manager and Quality Control Manager
Duties:
1. Review and discuss the feasibility studies for projects and contracts.
2. Follow up monthly projects and prepare the large project schedule.
3. Review and make analysis to the after sales services.
4. Receive the reports from work field.
5. Update and maintain the after sales services data base.
6. Follow up the project execution step by step and fix the problems.
15 April 2004-01 August 2009 Al- Multaka for General Trading and Investment
Job Title: Technical Manager
Duties:
1. Multi Project Managerfor sistercompanies.
2. Cost efficient design.
3. Assessment and design improvement.
Page 4 of 13
4. Creative design.
5. Manufacturing industry and Factories.
6. Leader of pin specimen project for water treatment plants “compact units for
drinking water for small villages”.
7. Providing the technical support for designing and manufacturing factories “
Detergent Factory for Liquids and powder detergents”
8. Coordinate with the materials managements and procurement companies.
9. Assisted the manufacturing engineers working with the projects.
10.Ensure proper process working from the starting of design till the final operation
of the factories.
15 Aug 2000-01 July 2004 AlITKAN SIEMENS MEDICAL AGENCY
Job Title: Project Manager
Duties:
I worked as Project Manager, Sales Director and Marketing and then as a Supervisor for
the new department of Siemens:- Automation and Driven , Fujitso Siemens, Bosh and
Siemens .
25 April 1997-15 Aug 2000 Al ITKAN SIEMENS MEDICAL AGENCY
Job Title: Sales & Marketing
Duties:
After the experience obtained in the field, I was promoted to work on sales and marketing
business in the Iraqi territory. I delivered several lectures and seminars to introduce our
projects. We get 85% of our forecast which equaled more than 55% of the market share.
01 July 95-25 April 1997 Al ITKAN SIEMENS MEDICAL AGENCY
Job Title: Field Service Engineer (FSE).
Duties:
UP TIME SERVICE as Field Service Engineer (FSE) for the Medical Equipments, also
starting with the installation for the Equipments (Turn Key Project) including Electrical
part( High Tension Generators ) and Cooling system ( chilled Water Cooling ).
OTHER:
v Languages: English: fluent.
v Computer Skills:
Page 5 of 13
Ø Microsoft (Project, Word, Excel, Power Point, Visio).
Ø Auto Cad.
Ø Photo Shop.
Ø 3D Max.
Training & Courses:
As in the attached files you can find the Training and courses certificates that I took it:
Ø Société Maghrebine de Monétique S2M/ Morocco / Casablanca.
• Card Management System.
Ø Space Data System / SDS Network Solution / Jordan / Amman.
• 201 - FortiGate Multi-Threat Security Systems I - Administration,
Content Inspection and SSL VPN
• 301 - FortiGate Multi-Threat Security Systems II - Secured Network
Deployment & Virtual Private Networks
Ø Method Building Capacity / Project Management Instituted / Jordan / Amman.
• Project Management.
Ø Prof. Jack Sabounji / Jordan Ahli Bank / / Jordan / Amman.
• UCP-600 Letter Credit Techniques
Ø SIEMENS Medical Division /Germany/ Erlangen.
• MRI Unite.
• Angio System.
• X-Ray Conventional.
• Ultrasound Comprehensive.
• Archiving Stand Alone Unites.
Ø SIEMENS Product Division / Germany / Erlangen.
• Magnetom Open. Impact. Vision.
• CT-Scan Somatom AR, Plus 4.
• Angio Units.
• X-Ray Units, Mammography, Surgical and Mobile Units.
• Lithotripsy.
• Ultrasound Units.
Page 6 of 13
• Electro medicalEquipment.
Ø SIEMENS Service Division / Germany / Erlangen.
• Ultrasound Factory , Repair of Transducers.
Ø SIEMENS SIRONA Dental Company /Germany / Bensheim.
• Sirona Dental Chair C2.
• Sirona Dental Chair C3.
• Sirona Dental Chair C4.
Ø SIEMENS Bosch HOME APPLIANCES GROUP / Turkey / Istanbul.
• Technical After Sales Services.
Ø KKT KRAUS manufacturer highly specialized cooling solutions / Germany
• Water Chiller KPC.
From all the above information about my quire life that start as field service engineer then
I took it step by step till I became a senior project manager , as general mechanical
engineering from offices, hospitals to factories.
Please, accept my best regards and thanks for your time.
Yours
Engineer Saad Al Chalabi
Mobile No.: + 96,79, 641, 1212
+ 96,79, 949, 1390
Email.: saadalchalabi@yahoo.com
Saad_alchalabi@hotmail.com
Page 7 of 13
Page 8 of 13
Page 9 of 13
Page 10 of 13
Page 11 of 13
Page 12 of 13
Page 13 of 13
SaadAlChalabi
201-FortiGateMulti-ThreatSecuritySystemsI-Administration,ContentInspectionandSSLVPN
28October–30October,2013
MohammadFawziAl-Zard
Saad Al Chalabi
301 - FortiGate Multi-Threat Security Systems II - Secured Network Deployment & Virtual Private Networks
4th
October – 7th
November, 2013
Mohammad Fawzi Al-Zard

Eng. Saad AL Chalabi C.V 2016

  • 1.
    Page 1 of13 Name : Saad O. Al-Chalabi D.o.B : 12 th Sep 1972 Nationality : Iraqi Resident in : Amman - Jordan Mobile No.: 00962 7964 11 212 Amman / Jordan 00961 76 70 58 09 Beirut / Lebanon Email: Saadalchalabi@yahoo.com Saad_alchalabi@hotmail.com Marital Status: Married to Graphic Designer wife, Father for Three children Aspiration: Since my graduation from the university, I had been able to work as both an engineer as well as on managerial and marketing activities. I have worked in Iraq and currently in Amman/Jordan and my aspiration is to join an international company that has wide activities worldwide particularly if they have branches and activities in the Arab World. EDUCATION: Sep /1990-Jun /1995 Bachelor of Mechanical Engineering University of Technology– Baghdad / Iraq Key subjects: v Machine Theory. v Electrical Engineering. v Power Plant. v Internal combustion Engineering. v Fluid. v Thermodynamics. v Mechanical Design. v Gas Dynamics. v Vibration and Control. v Heat Transfers. v Engineering Management.
  • 2.
    Page 2 of13 WORK EXPERIENCE: 1 June 2013 – Till Today North Bank for Finance and Investment Iraq / Baghdad – Data Center / Jordan / Amman Job Title: Data Center Manager – Chief Technology Officer CTO . Duties 1. Lead the execution of technology strategy for technology platforms, partnerships, and external relationships. 2. Build and manage a top-flight technology team and oversee research and development, as well as project management. 3. Taking an action through having propositional training on the security utilities and special training on banking solution and card management systems. 4. Provide visible leadership for the Bank within the technology community. 5. Anticipate and react to major technology changes to ensure the maintenance of the Bank leadership in the competitive landscape. 6. Establish technical standards and ensure adherence to them for product development and the Bank operations. 1 December 2011 – 1 June 2013 International Contracting Engineering Group “ICE- GROUP” (Partner with the ISO-AIR Building System™ of Innovative and cost effective building system) Job Title: Project Manager. Duties 1. Evaluate the scientific feasibility of new product ideas. 2. Bring forward, to management, ideas for new products or value-added changes to existing products. 3. Maintain professional development and industry knowledge to ensure that development projects reflect best current technical practices. 4. Project manages and participates directly in technology transfer of analytical test methods toQuality Control/Assurance. 5. Project manage and participate directly in manufacturing and on-line quality assuranceaudits. 6. Perform trouble-shooting of compounded batches.
  • 3.
    Page 3 of13 27 October 2009 – 30 November 2011 Al Bayan Co. (Member of AGMEST Group) Job Title: Development Manager Duties: 1. Supervise the development of the field teams and project management skills. 2. Support Company Sales in the field of (OR & Image Diagnostic) by in the form of supplying them with all the needed technical information, preparing technical & commercial offers, Feasibility Study & technical comparison. 3. Support the contracts execution, in the field of (OR & Image Diagnostic) by:- 4. Implementation time schedule and following up with the related department in The group. 5. Preparation of plans and drawings of sites and business to be implemented and updated continuously. 6. Prepare lists of quantities and schedules for projects above and equipped to find and affordable. 7. Prepare periodic reports on a weekly basis for the submission of project implementation. 8. Represent the company in meetings and technical discussions for projects to be implemented in Iraq. 9. Business Development for reaching groups target & vision. Job Title: Project Manager and Quality Control Manager Duties: 1. Review and discuss the feasibility studies for projects and contracts. 2. Follow up monthly projects and prepare the large project schedule. 3. Review and make analysis to the after sales services. 4. Receive the reports from work field. 5. Update and maintain the after sales services data base. 6. Follow up the project execution step by step and fix the problems. 15 April 2004-01 August 2009 Al- Multaka for General Trading and Investment Job Title: Technical Manager Duties: 1. Multi Project Managerfor sistercompanies. 2. Cost efficient design. 3. Assessment and design improvement.
  • 4.
    Page 4 of13 4. Creative design. 5. Manufacturing industry and Factories. 6. Leader of pin specimen project for water treatment plants “compact units for drinking water for small villages”. 7. Providing the technical support for designing and manufacturing factories “ Detergent Factory for Liquids and powder detergents” 8. Coordinate with the materials managements and procurement companies. 9. Assisted the manufacturing engineers working with the projects. 10.Ensure proper process working from the starting of design till the final operation of the factories. 15 Aug 2000-01 July 2004 AlITKAN SIEMENS MEDICAL AGENCY Job Title: Project Manager Duties: I worked as Project Manager, Sales Director and Marketing and then as a Supervisor for the new department of Siemens:- Automation and Driven , Fujitso Siemens, Bosh and Siemens . 25 April 1997-15 Aug 2000 Al ITKAN SIEMENS MEDICAL AGENCY Job Title: Sales & Marketing Duties: After the experience obtained in the field, I was promoted to work on sales and marketing business in the Iraqi territory. I delivered several lectures and seminars to introduce our projects. We get 85% of our forecast which equaled more than 55% of the market share. 01 July 95-25 April 1997 Al ITKAN SIEMENS MEDICAL AGENCY Job Title: Field Service Engineer (FSE). Duties: UP TIME SERVICE as Field Service Engineer (FSE) for the Medical Equipments, also starting with the installation for the Equipments (Turn Key Project) including Electrical part( High Tension Generators ) and Cooling system ( chilled Water Cooling ). OTHER: v Languages: English: fluent. v Computer Skills:
  • 5.
    Page 5 of13 Ø Microsoft (Project, Word, Excel, Power Point, Visio). Ø Auto Cad. Ø Photo Shop. Ø 3D Max. Training & Courses: As in the attached files you can find the Training and courses certificates that I took it: Ø Société Maghrebine de Monétique S2M/ Morocco / Casablanca. • Card Management System. Ø Space Data System / SDS Network Solution / Jordan / Amman. • 201 - FortiGate Multi-Threat Security Systems I - Administration, Content Inspection and SSL VPN • 301 - FortiGate Multi-Threat Security Systems II - Secured Network Deployment & Virtual Private Networks Ø Method Building Capacity / Project Management Instituted / Jordan / Amman. • Project Management. Ø Prof. Jack Sabounji / Jordan Ahli Bank / / Jordan / Amman. • UCP-600 Letter Credit Techniques Ø SIEMENS Medical Division /Germany/ Erlangen. • MRI Unite. • Angio System. • X-Ray Conventional. • Ultrasound Comprehensive. • Archiving Stand Alone Unites. Ø SIEMENS Product Division / Germany / Erlangen. • Magnetom Open. Impact. Vision. • CT-Scan Somatom AR, Plus 4. • Angio Units. • X-Ray Units, Mammography, Surgical and Mobile Units. • Lithotripsy. • Ultrasound Units.
  • 6.
    Page 6 of13 • Electro medicalEquipment. Ø SIEMENS Service Division / Germany / Erlangen. • Ultrasound Factory , Repair of Transducers. Ø SIEMENS SIRONA Dental Company /Germany / Bensheim. • Sirona Dental Chair C2. • Sirona Dental Chair C3. • Sirona Dental Chair C4. Ø SIEMENS Bosch HOME APPLIANCES GROUP / Turkey / Istanbul. • Technical After Sales Services. Ø KKT KRAUS manufacturer highly specialized cooling solutions / Germany • Water Chiller KPC. From all the above information about my quire life that start as field service engineer then I took it step by step till I became a senior project manager , as general mechanical engineering from offices, hospitals to factories. Please, accept my best regards and thanks for your time. Yours Engineer Saad Al Chalabi Mobile No.: + 96,79, 641, 1212 + 96,79, 949, 1390 Email.: saadalchalabi@yahoo.com Saad_alchalabi@hotmail.com
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
    Page 13 of13 SaadAlChalabi 201-FortiGateMulti-ThreatSecuritySystemsI-Administration,ContentInspectionandSSLVPN 28October–30October,2013 MohammadFawziAl-Zard Saad Al Chalabi 301 - FortiGate Multi-Threat Security Systems II - Secured Network Deployment & Virtual Private Networks 4th October – 7th November, 2013 Mohammad Fawzi Al-Zard