Mohammad Ashraf Mohammad
Beltan – Toukh - Al Qalyũbiyah
01061339340 - 00201003431822
mohammadelseaadaweiy@gmail.com
LinkedIn: https://eg.linkedin.com/in/mohammadelseaadaweiy
JOB TITLE
Electrical Engineer
SUMMARY
AutoCAD Certified Electrical designer and an Electrical Engineer.
Experienced in development and maintenance of EPC projects Design, shop drawing, as-built,
supervision and lead a site team
Experienced in development the Design of electrical systems of projects using AutoCAD, DIALux,
EVO, Excel, and development the Time line Schedules through the full project lifecycle using
Primavera P6.
Demonstrating strong skills in Construction Management, Project Control, Cost Control, Change
Management, Risk Management of new Constructions and the Technical office works.
Also experienced with FEED, Engineering and Target Cost Estimate studies Schedules.
EDUCATION
 Ain Shams University, Faculty of Engineering,
Researcher in “Masters of Science Electrical power Engineering and Control”
 Brooklyn Academy, Projects management
PMP Diploma with grade Excellent
 (P.H.I) pyramids Higher Institute for Engineering and Technology
Bachelor of Electrical Power and Control Engineering
With General Grade: Good and the Graduation project grade: Excellent (A+)
Experience
Electrical Engineer
Job Description:
(G.C.G) - Gira Consultant Group.
General consultant of the Ministry of Health and Population
Job Responsibilities:
Responsible for overseeing the implementation of the national development project for
Ministry of health hospitals in Egypt.
Electrical Power and Control Engineer Responsible for:
Planning for projects and prepare the time line and time schedule for project.
Design the Electrical system for hospitals and light current systems by using
AutoCAD and DIALux.
Prepare load schedule tables, BOQ, coordination and cost calculations.
Review Shop drawing and give approval or rejection.
Technical office work like inventory and extract.
Project Management and Supervision of the instillation process.
Projects:
Design,
(Malawi hospital, Helwan hospital, Ahnasya Hospital, Sidi Ghazi Hospital - Sun Mall)
Supervision,
(Tamiya, Sharm Elshikh Hospitals - Sharq Elowaynat Administrative building - Serums
and vaccines bank)
Work period: Full Time from (5/2015) till now.
THE PREVIOUS JOB
Electromechanical Site Engineer
Job Description:
United for Engineering and contracting Company
Working as site engineer performing HVAC and Firefighting systems.
Job Responsibilities:
Working in Company sites in 6th of October City
Projects:
1 - Chips October factory
2- Pepsi October factory
Responsible for:
- Shop-drawing works and tendering
- Leader of the team work in site
- Prepare the time schedule
- As-built Drawing
Work period:
Full Time from (25/7/2013) to (5/2015).
SESSIONS,COURSES & SUMMER TRAININGS
Classic Control in jelecom by graduation mark Excellent.
PLC basic, PLC advanced and HMI in jelecom by graduation mark Excellent.
Distribution system Course in jelecom by graduation mark Excellent.
AutoCAD 2D in (ISI) Institute for Information Systems armed forces.
Protection work shop in Jelecom.
AutoCAD Diploma from Autodesk Inc. in collaboration with the ministry of Commerce and Industry
in YAT
Safety Principles in PepsiCo
DR. Ibrahim Al-fikky training Centre of Human Development courses in:
o (PMP) project Management
o Time Management
o Leadership skills
o Sales diploma
o Art of effective Communication
Reference under request...
SKILLS
Computer Skills:
Excellent Knowledge in Autodesk Programs
Excellent Knowledge in DIALux
Excellent Knowledge in Microsoft Office
Very Good Knowledge in Primavera
Good Knowledge in Photoshop
Language Skills:
Very good command of both written and spoken English
Personal skills:
Ability to work in a team and able to lead a team work.
Team leader of the graduation project.
Ability to work under pressure and stress.
Flexibility to learning and development myself.
STUDENT ACTIVITIES
Scientific activities:
Participation in (MIE) Made In Egypt Competition
Cultural Activities:
Second place nationwide in the activity of creative authorship
Development activities:
Local radio announcer for the capital city
Leading activities:
University Students Union President
HOBBIES
Electricity Teaching Design Traveling Cooking Sports
PERSONAL INFORMATION
 Muslim
 Single
 18/11/1991 (25 years old)
 Exempted
 Notice Period for availability Immediately
 Website: https://people.bayt.com/mohammadelseaadaweiy/
 Online Connection: Wuzzuf.net/me/mohammadelseaadaweiy

EPE. Mohamed Ashraf

  • 1.
    Mohammad Ashraf Mohammad Beltan– Toukh - Al Qalyũbiyah 01061339340 - 00201003431822 mohammadelseaadaweiy@gmail.com LinkedIn: https://eg.linkedin.com/in/mohammadelseaadaweiy JOB TITLE Electrical Engineer SUMMARY AutoCAD Certified Electrical designer and an Electrical Engineer. Experienced in development and maintenance of EPC projects Design, shop drawing, as-built, supervision and lead a site team Experienced in development the Design of electrical systems of projects using AutoCAD, DIALux, EVO, Excel, and development the Time line Schedules through the full project lifecycle using Primavera P6. Demonstrating strong skills in Construction Management, Project Control, Cost Control, Change Management, Risk Management of new Constructions and the Technical office works. Also experienced with FEED, Engineering and Target Cost Estimate studies Schedules. EDUCATION  Ain Shams University, Faculty of Engineering, Researcher in “Masters of Science Electrical power Engineering and Control”  Brooklyn Academy, Projects management PMP Diploma with grade Excellent  (P.H.I) pyramids Higher Institute for Engineering and Technology Bachelor of Electrical Power and Control Engineering With General Grade: Good and the Graduation project grade: Excellent (A+) Experience Electrical Engineer Job Description: (G.C.G) - Gira Consultant Group. General consultant of the Ministry of Health and Population Job Responsibilities: Responsible for overseeing the implementation of the national development project for Ministry of health hospitals in Egypt. Electrical Power and Control Engineer Responsible for: Planning for projects and prepare the time line and time schedule for project. Design the Electrical system for hospitals and light current systems by using AutoCAD and DIALux. Prepare load schedule tables, BOQ, coordination and cost calculations. Review Shop drawing and give approval or rejection. Technical office work like inventory and extract. Project Management and Supervision of the instillation process. Projects: Design, (Malawi hospital, Helwan hospital, Ahnasya Hospital, Sidi Ghazi Hospital - Sun Mall) Supervision, (Tamiya, Sharm Elshikh Hospitals - Sharq Elowaynat Administrative building - Serums and vaccines bank) Work period: Full Time from (5/2015) till now.
  • 2.
    THE PREVIOUS JOB ElectromechanicalSite Engineer Job Description: United for Engineering and contracting Company Working as site engineer performing HVAC and Firefighting systems. Job Responsibilities: Working in Company sites in 6th of October City Projects: 1 - Chips October factory 2- Pepsi October factory Responsible for: - Shop-drawing works and tendering - Leader of the team work in site - Prepare the time schedule - As-built Drawing Work period: Full Time from (25/7/2013) to (5/2015). SESSIONS,COURSES & SUMMER TRAININGS Classic Control in jelecom by graduation mark Excellent. PLC basic, PLC advanced and HMI in jelecom by graduation mark Excellent. Distribution system Course in jelecom by graduation mark Excellent. AutoCAD 2D in (ISI) Institute for Information Systems armed forces. Protection work shop in Jelecom. AutoCAD Diploma from Autodesk Inc. in collaboration with the ministry of Commerce and Industry in YAT Safety Principles in PepsiCo DR. Ibrahim Al-fikky training Centre of Human Development courses in: o (PMP) project Management o Time Management o Leadership skills o Sales diploma o Art of effective Communication Reference under request... SKILLS Computer Skills: Excellent Knowledge in Autodesk Programs Excellent Knowledge in DIALux Excellent Knowledge in Microsoft Office Very Good Knowledge in Primavera Good Knowledge in Photoshop Language Skills: Very good command of both written and spoken English Personal skills: Ability to work in a team and able to lead a team work. Team leader of the graduation project. Ability to work under pressure and stress. Flexibility to learning and development myself.
  • 3.
    STUDENT ACTIVITIES Scientific activities: Participationin (MIE) Made In Egypt Competition Cultural Activities: Second place nationwide in the activity of creative authorship Development activities: Local radio announcer for the capital city Leading activities: University Students Union President HOBBIES Electricity Teaching Design Traveling Cooking Sports PERSONAL INFORMATION  Muslim  Single  18/11/1991 (25 years old)  Exempted  Notice Period for availability Immediately  Website: https://people.bayt.com/mohammadelseaadaweiy/  Online Connection: Wuzzuf.net/me/mohammadelseaadaweiy