1
Conceptual Design
COMMUNITY WORKSHOP
May 22, 2019
1
Outline
• Background
• Draft Preferred Concept Design
• Corridor-wide Improvements
• Streetscape, Art, and Green Infrastructure
• Improvements by Segment
• Multimodal Operations Analysis
• Preliminary Cost Estimate
• Next Steps
Outline
2
Outline
• General Plan and subsequent plans call for project
• Options were reviewed in fall of 2018
• Council directed staff to prepare design for 40th Street
from Adeline to IKEA entry
• Two-way separated bikeway on north side of street
• Bus-only lanes (one by converting westbound mixed-flow
lane to bus-only lane west of San Pablo Avenue)
• Elimination of parking and bus stops at Harlan Street
• Bicycle-pedestrian intersection improvements
• Bus stop improvements with passenger loading areas
• Streetscaping with green infrastructure and art
opportunities
• Transit agencies and Caltrans reviewed draft design
Background
3
Draft Preferred Concept Design
4
Outline
• Multimodal Treatments
• Two-way Separated (Class IV) Bikeway
Corridor-wide Improvements
Example of treatment at Shellmound/Christie intersection
5
Outline
• Multimodal Treatments
• East- and West-bound Bus-only Lanes
Corridor-wide Improvements
Bus-Only Lanes in San Francisco
Source: SFMTASource: NACTO
Concept Diagram
6
Outline
• Multimodal Treatments
• Multimodal Intersection Improvements
Corridor-wide Improvements
Diagram of Protected Intersection
Source: globaldesigningcities.org
7
Outline
• Bus Stops along Bikeway
Corridor-wide Improvements
Source: AC Transit Multimodal Corridor GuidelinesExample of Treatment on Shellmound
8
Outline
• Bus Stops West of San Pablo Avenue – North Side
Corridor-wide Improvements
9
Outline
• Bus Stops West of San Pablo Avenue – South Side
Corridor-wide Improvements
10
Outline
• Green Infrastructure
• Biofiltraton or Bioretention Planters
• Permeable Asphalt Bikeway
• Tree Wells
• Rain Gardens
Corridor-wide Improvements
11
Outline
• Streetscape Improvement at curb
reconfigurations
• Seating
• Bus Shelter
• Lighting
Corridor-wide Improvements
12
Outline
• Streetscape Improvement at curb
reconfigurations
• Bike Parking
• Public Art
• Wayfinding Signage
Corridor-wide Improvements
Source: belson.com 13
Segment-by-Segment Improvements
14
Outline
• 40th Street Bus Hub between Adeline and San Pablo
40th Street Bus Hub
15
Outline
• Adeline
Street
Intersection
• Protected
corner
• Signal
changes
• Visible
crosswalks
40th Street Bus Hub
16
Outline
• 40th Street Bus Hub Area – streetscape
40th Street Bus Hub
17
Outline
• 40th Street Bus Hub Area – near Adeline Street
40th Street Bus Hub
Section A: 40th Street bus stops at Adeline Street (looking west)
18
Outline
• 40th Street Bus Hub Area – Mid-Block
40th Street Bus Hub
Section B: 40th Street bus stops between Adeline and San Pablo Avenue (looking west)
19
Outline
• 40th Street Bus Hub Area – near San Pablo Avenue
40th Street Bus Hub
Section C: 40th Street at San Pablo Avenue (looking west)
20
Outline
• San Pablo
Avenue
Intersection
40th Street Bus Hub
21
Outline
• San Pablo Avenue to Emery Street
San Pablo Avenue to West of Emery Street
22
Outline
• San Pablo Avenue to Emery Street
San Pablo Avenue to West of Emery Street
Section D: 40th Street between San Pablo Avenue and Emery Street (looking west)
23
Outline
• Bus Stops at Emery Street
West of Emery Street to West of Holden Street
Section E: 40th Street Bus Stops at Emery Street (looking west)
24
• Watts Street to Holden Street
West of Emery Street to West of Holden Street
25
Outline
• Watts Street to Holden Street
Section F: 40th Street Typical mid-block Condition (looking west)
West of Emery Street to West of Holden Street
26
Outline
• Watts Street to Holden Street
Section G: 40th Street Typical Condition with Turn Lane at Intersections (looking west)
West of Emery Street to West of Holden Street
27
Outline
• Holden Street to Hubbard Street
West of Holden Street to West of Hubbard Street
28
Outline
• Holden Street to Hubbard Street
West of Holden Street to West of Hubbard Street
Section H: 40th Street at Eastbound Bus Stops at Horton Street (looking west)
29
Outline
• Hubbard Street to Halleck Street
West of Hubbard Street to IKEA Entry
30
Outline
• Hubbard Street to IKEA Entry
West of Hubbard Street to IKEA Entry
31
Outline
Section I: Shellmound Street Bridge (looking west)
• Hubbard Street to IKEA Entry – Shellmound Street Bridge
West of Hubbard Street to IKEA Entry
32
Outline
• Hubbard Street to IKEA Entry – IKEA Entry
Section J: Shellmound Street at IKEA Entry (looking west)
West of Hubbard Street to IKEA Entry
33
Multimodal Operations Analysis
34
Outline
• Change in travel time between Yerba Buena Avenue
east of Adeline Street and IKEA entrance
End-to End Travel Time
Change in End-to-End Travel Time with Project (minutes)
Morning
Eastbound
Morning
Westbound
Evening
Eastbound
Evening
Westbound
Bus -0.2 -0.2 -1.5 -0.3
Car +0.5 +1.0 +0.3 +1.2
35
Outline
• Travel time between Yerba Buena Avenue east of
Adeline Street and IKEA entrance
End-to End Travel Time
Buses Cars and Trucks
Existing 7.1 minutes 3.8 minutes
With Project 5.6 minutes 4.1 minutes
Eastbound Travel Time during Evening Rush Hour
36
Outline
LOS C:
• Stable flow
• Comfortable
• Efficiently close to capacity
• Posted speed maintained
• Common goal for highways
Vehicular Level of Service (LOS)
LOS D:
• Approaching unstable flow
• Less comfortable
• Approaching but not at
capacity
• Speeds decrease slightly as
volumes increase
• Common goal for urban
streets during peak hours
37
OutlineVehicular Level of Service (LOS)
Level of Service with Project
• No intersection exceeds LOS D
• LOS changes from C to D at
• Adeline/40th – morning rush hour
• Hollis/40th – evening rush hour
• Emery/40th – evening rush hour
38
OutlinePreliminary Cost Estimate
Construction $12,500,000
Design, Engineering, Land, Art $ 3,000,000
______________________________________
Total Project Cost $15,500,000
39
OutlineNext Steps
• Review
• Planning Commission – May 23
• Bicycle/Pedestrian Advisory Committee – June 3
• Public Art Committee – June 13
• Transportation Committee – June 20
• City Council – July 9
• Implementation
• Final Memorandum and Plans
• Final Operations Analysis and Cost Estimate
• Draft and Final Funding Strategy
• Grant Applications
40
Questions? Comments?
41

More Related Content

What's hot

Tantallon crossroads briefing
Tantallon crossroads briefingTantallon crossroads briefing
Tantallon crossroads briefing
Marcus Garnet
 
The Highline
 The Highline The Highline
The Highline
shruticharhate
 
Construction of the highline
Construction of the highlineConstruction of the highline
Construction of the highline
turnitover
 
Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014
knelischer
 
Carrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalizationCarrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalization
peterbraster
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue Update
PlanetCommunities
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
knelischer
 

What's hot (7)

Tantallon crossroads briefing
Tantallon crossroads briefingTantallon crossroads briefing
Tantallon crossroads briefing
 
The Highline
 The Highline The Highline
The Highline
 
Construction of the highline
Construction of the highlineConstruction of the highline
Construction of the highline
 
Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014
 
Carrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalizationCarrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalization
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue Update
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
 

Similar to Emeryville 40th and San Pablo Avenue Bus Hub Conceptual Design

Chicago lakeside developent lm 032414
Chicago lakeside developent lm 032414Chicago lakeside developent lm 032414
Chicago lakeside developent lm 032414
lmonterrubio Monterrubio Hernandez
 
West loop Parking Plan Community Meeting Presentation
West loop Parking Plan Community Meeting PresentationWest loop Parking Plan Community Meeting Presentation
West loop Parking Plan Community Meeting Presentation
West Central Association
 
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan GallagherRV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
Rail~Volution
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
Paul Schumann
 
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
Fairfax County
 
My thesis final presentation
My thesis final presentationMy thesis final presentation
My thesis final presentation
Shusei Kakimoto
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
VDOT Northern Virginia
 
CMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public MeetingCMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public Meeting
COTA BUS
 
Mobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for PeopleMobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for People
WRI Ross Center for Sustainable Cities
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
GardinerEast
 
September Proposed Changes Comment Meetings
September Proposed Changes Comment MeetingsSeptember Proposed Changes Comment Meetings
September Proposed Changes Comment Meetings
COTA BUS
 
Final public meeting presentation
Final public meeting presentationFinal public meeting presentation
Final public meeting presentation
Gunn Communications
 
Transit BRT In LA County
Transit BRT In LA CountyTransit BRT In LA County
Transit BRT In LA County
Zaki Mustafa
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
Crosstown TO
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
Crosstown TO
 
Ottawa fall construction season 2016
Ottawa fall construction season 2016Ottawa fall construction season 2016
Ottawa fall construction season 2016
Devyn Barrie
 
Urban Design Quality. Church Fields, Boston Spa, a case study.
Urban Design Quality. Church Fields, Boston Spa, a case study.Urban Design Quality. Church Fields, Boston Spa, a case study.
Urban Design Quality. Church Fields, Boston Spa, a case study.
Homes and Communities Agency (HCA)
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
Crosstown TO
 
Rethinking Urban Highways
Rethinking Urban HighwaysRethinking Urban Highways
Rethinking Urban Highways
sneapa
 
Design of the Marmion Way Corridor
Design of the Marmion Way CorridorDesign of the Marmion Way Corridor
Design of the Marmion Way Corridor
fredglick.1
 

Similar to Emeryville 40th and San Pablo Avenue Bus Hub Conceptual Design (20)

Chicago lakeside developent lm 032414
Chicago lakeside developent lm 032414Chicago lakeside developent lm 032414
Chicago lakeside developent lm 032414
 
West loop Parking Plan Community Meeting Presentation
West loop Parking Plan Community Meeting PresentationWest loop Parking Plan Community Meeting Presentation
West loop Parking Plan Community Meeting Presentation
 
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan GallagherRV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
 
My thesis final presentation
My thesis final presentationMy thesis final presentation
My thesis final presentation
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
 
CMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public MeetingCMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public Meeting
 
Mobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for PeopleMobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for People
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
September Proposed Changes Comment Meetings
September Proposed Changes Comment MeetingsSeptember Proposed Changes Comment Meetings
September Proposed Changes Comment Meetings
 
Final public meeting presentation
Final public meeting presentationFinal public meeting presentation
Final public meeting presentation
 
Transit BRT In LA County
Transit BRT In LA CountyTransit BRT In LA County
Transit BRT In LA County
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Ottawa fall construction season 2016
Ottawa fall construction season 2016Ottawa fall construction season 2016
Ottawa fall construction season 2016
 
Urban Design Quality. Church Fields, Boston Spa, a case study.
Urban Design Quality. Church Fields, Boston Spa, a case study.Urban Design Quality. Church Fields, Boston Spa, a case study.
Urban Design Quality. Church Fields, Boston Spa, a case study.
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 
Rethinking Urban Highways
Rethinking Urban HighwaysRethinking Urban Highways
Rethinking Urban Highways
 
Design of the Marmion Way Corridor
Design of the Marmion Way CorridorDesign of the Marmion Way Corridor
Design of the Marmion Way Corridor
 

More from E'ville Eye

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdf
E'ville Eye
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdf
E'ville Eye
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdf
E'ville Eye
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdf
E'ville Eye
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
E'ville Eye
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdf
E'ville Eye
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff report
E'ville Eye
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition
E'ville Eye
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packet
E'ville Eye
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0
E'ville Eye
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in Emeryville
E'ville Eye
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20
E'ville Eye
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
E'ville Eye
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
E'ville Eye
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement notice
E'ville Eye
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020
E'ville Eye
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
E'ville Eye
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance program
E'ville Eye
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measure
E'ville Eye
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
E'ville Eye
 

More from E'ville Eye (20)

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdf
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdf
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdf
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdf
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdf
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff report
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packet
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in Emeryville
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement notice
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance program
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measure
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
 

Recently uploaded

2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
teeaszt
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
ahcitycouncil
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
uu1psyf6
 

Recently uploaded (20)

2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
 

Emeryville 40th and San Pablo Avenue Bus Hub Conceptual Design

  • 2. Outline • Background • Draft Preferred Concept Design • Corridor-wide Improvements • Streetscape, Art, and Green Infrastructure • Improvements by Segment • Multimodal Operations Analysis • Preliminary Cost Estimate • Next Steps Outline 2
  • 3. Outline • General Plan and subsequent plans call for project • Options were reviewed in fall of 2018 • Council directed staff to prepare design for 40th Street from Adeline to IKEA entry • Two-way separated bikeway on north side of street • Bus-only lanes (one by converting westbound mixed-flow lane to bus-only lane west of San Pablo Avenue) • Elimination of parking and bus stops at Harlan Street • Bicycle-pedestrian intersection improvements • Bus stop improvements with passenger loading areas • Streetscaping with green infrastructure and art opportunities • Transit agencies and Caltrans reviewed draft design Background 3
  • 5. Outline • Multimodal Treatments • Two-way Separated (Class IV) Bikeway Corridor-wide Improvements Example of treatment at Shellmound/Christie intersection 5
  • 6. Outline • Multimodal Treatments • East- and West-bound Bus-only Lanes Corridor-wide Improvements Bus-Only Lanes in San Francisco Source: SFMTASource: NACTO Concept Diagram 6
  • 7. Outline • Multimodal Treatments • Multimodal Intersection Improvements Corridor-wide Improvements Diagram of Protected Intersection Source: globaldesigningcities.org 7
  • 8. Outline • Bus Stops along Bikeway Corridor-wide Improvements Source: AC Transit Multimodal Corridor GuidelinesExample of Treatment on Shellmound 8
  • 9. Outline • Bus Stops West of San Pablo Avenue – North Side Corridor-wide Improvements 9
  • 10. Outline • Bus Stops West of San Pablo Avenue – South Side Corridor-wide Improvements 10
  • 11. Outline • Green Infrastructure • Biofiltraton or Bioretention Planters • Permeable Asphalt Bikeway • Tree Wells • Rain Gardens Corridor-wide Improvements 11
  • 12. Outline • Streetscape Improvement at curb reconfigurations • Seating • Bus Shelter • Lighting Corridor-wide Improvements 12
  • 13. Outline • Streetscape Improvement at curb reconfigurations • Bike Parking • Public Art • Wayfinding Signage Corridor-wide Improvements Source: belson.com 13
  • 15. Outline • 40th Street Bus Hub between Adeline and San Pablo 40th Street Bus Hub 15
  • 16. Outline • Adeline Street Intersection • Protected corner • Signal changes • Visible crosswalks 40th Street Bus Hub 16
  • 17. Outline • 40th Street Bus Hub Area – streetscape 40th Street Bus Hub 17
  • 18. Outline • 40th Street Bus Hub Area – near Adeline Street 40th Street Bus Hub Section A: 40th Street bus stops at Adeline Street (looking west) 18
  • 19. Outline • 40th Street Bus Hub Area – Mid-Block 40th Street Bus Hub Section B: 40th Street bus stops between Adeline and San Pablo Avenue (looking west) 19
  • 20. Outline • 40th Street Bus Hub Area – near San Pablo Avenue 40th Street Bus Hub Section C: 40th Street at San Pablo Avenue (looking west) 20
  • 22. Outline • San Pablo Avenue to Emery Street San Pablo Avenue to West of Emery Street 22
  • 23. Outline • San Pablo Avenue to Emery Street San Pablo Avenue to West of Emery Street Section D: 40th Street between San Pablo Avenue and Emery Street (looking west) 23
  • 24. Outline • Bus Stops at Emery Street West of Emery Street to West of Holden Street Section E: 40th Street Bus Stops at Emery Street (looking west) 24
  • 25. • Watts Street to Holden Street West of Emery Street to West of Holden Street 25
  • 26. Outline • Watts Street to Holden Street Section F: 40th Street Typical mid-block Condition (looking west) West of Emery Street to West of Holden Street 26
  • 27. Outline • Watts Street to Holden Street Section G: 40th Street Typical Condition with Turn Lane at Intersections (looking west) West of Emery Street to West of Holden Street 27
  • 28. Outline • Holden Street to Hubbard Street West of Holden Street to West of Hubbard Street 28
  • 29. Outline • Holden Street to Hubbard Street West of Holden Street to West of Hubbard Street Section H: 40th Street at Eastbound Bus Stops at Horton Street (looking west) 29
  • 30. Outline • Hubbard Street to Halleck Street West of Hubbard Street to IKEA Entry 30
  • 31. Outline • Hubbard Street to IKEA Entry West of Hubbard Street to IKEA Entry 31
  • 32. Outline Section I: Shellmound Street Bridge (looking west) • Hubbard Street to IKEA Entry – Shellmound Street Bridge West of Hubbard Street to IKEA Entry 32
  • 33. Outline • Hubbard Street to IKEA Entry – IKEA Entry Section J: Shellmound Street at IKEA Entry (looking west) West of Hubbard Street to IKEA Entry 33
  • 35. Outline • Change in travel time between Yerba Buena Avenue east of Adeline Street and IKEA entrance End-to End Travel Time Change in End-to-End Travel Time with Project (minutes) Morning Eastbound Morning Westbound Evening Eastbound Evening Westbound Bus -0.2 -0.2 -1.5 -0.3 Car +0.5 +1.0 +0.3 +1.2 35
  • 36. Outline • Travel time between Yerba Buena Avenue east of Adeline Street and IKEA entrance End-to End Travel Time Buses Cars and Trucks Existing 7.1 minutes 3.8 minutes With Project 5.6 minutes 4.1 minutes Eastbound Travel Time during Evening Rush Hour 36
  • 37. Outline LOS C: • Stable flow • Comfortable • Efficiently close to capacity • Posted speed maintained • Common goal for highways Vehicular Level of Service (LOS) LOS D: • Approaching unstable flow • Less comfortable • Approaching but not at capacity • Speeds decrease slightly as volumes increase • Common goal for urban streets during peak hours 37
  • 38. OutlineVehicular Level of Service (LOS) Level of Service with Project • No intersection exceeds LOS D • LOS changes from C to D at • Adeline/40th – morning rush hour • Hollis/40th – evening rush hour • Emery/40th – evening rush hour 38
  • 39. OutlinePreliminary Cost Estimate Construction $12,500,000 Design, Engineering, Land, Art $ 3,000,000 ______________________________________ Total Project Cost $15,500,000 39
  • 40. OutlineNext Steps • Review • Planning Commission – May 23 • Bicycle/Pedestrian Advisory Committee – June 3 • Public Art Committee – June 13 • Transportation Committee – June 20 • City Council – July 9 • Implementation • Final Memorandum and Plans • Final Operations Analysis and Cost Estimate • Draft and Final Funding Strategy • Grant Applications 40