A report from The Economist Intelligence Unit
Mapping the cloud maturity curve
The fundamental five
What businesses must have in place to extract maximum value from the cloud
Sponsored by
© The Economist Intelligence Unit Limited 20141
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
About this research 2
The fundamental five:
What businesses must have in place to extract maximum value from the cloud
3
Fundamental 1
Ask the big question: Is your business strategy cloud ready?
4
Fundamental 2
Put a ring on it. Make the IT relationship real
6
Fundamental 3
Prepare for the rule of the digital natives
7
Fundamental 4
Practical makes perfect
8
Fundamental 5
Don’t risk the reward: Get good advice
9
Reality checks and balances 10
Contents
1
2
3
4
5
© The Economist Intelligence Unit Limited 20142
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
The fundamental five: What businesses must have
in place to extract maximum value from the cloud
identifies and explores the core foundational
elements of a mature cloud strategy. It is the central
piece in the first phase of a research programme,
Mapping the cloud maturity curve, sponsored by
IBM. The second phase will examine the degree to
which companies have put this foundation in place
and where they lie on the cloud maturity curve.
As the basis of this research, The Economist
Intelligence Unit solicited the views of eight leading
experts, based on their real-world experience.
We also reviewed relevant existing literature. The
findings and views expressed in this report do
not necessarily reflect the views of the sponsor.
We would like to thank all of the executives who
participated, whether on record or anonymously,
for their valuable insights. The author was Stuart
Lauchlan. Riva Richmond edited the report and Mike
Kenny was responsible for the layout. We would like
to thank all of the people who participated, whether
on record or anonymously, for their valuable
insights.
Contributors:
Ian Davidson, president of Pitney Bowes Europe
Kuan Hon, research consultant at the Cloud
Computing Project, University of London
Antoine de Kerviler, chief information officer of
Eurostar
David Jack, chief information officer at Hyperion
Insurance Group
Barry Jennings, senior associate at Bird & Bird
Richard Sykes, chairman of the Cloud Industry
Forum and former global group chief
information officer at ICI
Rebecca Wetteman, vice-president at Nucleus
Research
Leslie Willcocks, professor of technology, work and
globalisation and governor of the Information
Systems and Innovation Group, London School
of Economics
About this
research
© The Economist Intelligence Unit Limited 20143
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
Many companies have embraced the cloud—
technology services delivered over a network
connection—to save money, boost speed and
productivity and seize new business opportunities.
But fewer have committed to the underlying
strategic machinery needed to achieve optimal
business benefits from the cloud and ignite
outsized success.
Well-oiled machinery is becoming a requirement
at a time when business is being transformed by
cloud, mobile, social and other technologies. To
compete and win in this fast-paced digital
marketplace, companies must align their business
strategies, organisational structures and cloud
approach.
To understand the nature of this machinery and
whether it is in good working order inside
companies today, The Economist Intelligence Unit
(EIU) has undertaken a one-year research
programme sponsored by IBM. For the first phase,
the EIU sourced the collective views of eight
leading experts, including chief information
officers, industry analysts, academics and legal
experts, to identify the core foundational elements
of a mature cloud strategy, based on their real-
world experience. This report kicks off this initial
stage of our programme.
In the next phase, we will survey executives
globally and interview leading practitioners to
examine the degree to which companies have put
this foundation in place, the nature of the
obstacles they face and how far they have
journeyed down the road to cloud maturity.
The five fundamentals, in our view, are: cloud-
aligned business strategies, organisational
structures, corporate cultures, technology
infrastructures and governance best practices.
While companies can reap some benefits from the
cloud without having all five of these in place, the
corporate engine will not then fire at optimum
capacity, thus full benefits will not be realised.
In short, cloud computing has become a
business-critical issue, and organisations must
take a systematic approach if they are to get the
business benefits they have been told—and sold—
to expect.
The fundamental five:
What businesses must have in place to
extract maximum value from the cloud
Cloud computing
has become a
business-critical
issue, and
organisations
must take a
methodical
approach if they
are to get the
business benefits
they have been
told—and sold—to
expect.
© The Economist Intelligence Unit Limited 20144
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
a
x
A critical starting point for any cloud strategy is to
understand the business imperative driving
investment. What are the business objectives an
organisation hopes to achieve? How do these fit
within the overall corporate strategy? And how will
cloud computing help a firm meet those objectives
and deliver on that strategy?
Often, the main business imperative will be
cost-reduction and the cost-efficiencies promised
by the cloud delivery model, which reduces the
need for capital expenditures on IT infrastructure
and resources because companies can, instead, buy
technology as a service. Increasingly, however,
companies are focusing on the greater agility and
speed of delivery that cloud systems offer and how
these systems can fuel the hot pursuit of new
revenue opportunities.
The primary motivation for cloud adoption has
evolved over time, notes Barry Jennings, senior
associate at Bird & Bird, an international law firm,
who advises companies and governments on
outsourcing and cloud implementations and
formerly served as industry co-lead for the UK
government on its G-Cloud national cloud
programme. “In 2010, it was basically a money-
driven thing, partly driven by the economic crisis,
partly driven by the fact that [chief information
officer] budgets had been cut by huge amounts,”
he said at the Westminster eForum Next Steps for
Cloud Computing conference in London in
September 2014.
But today, executives have more flexibility to
pursue core business objectives with “vigour”, he
said. And they are looking to the cloud to produce
growth.
Freedom fast forward: Pitney Bowes commits
to the cloud
Organisations often use cloud computing to break
free of the shackles of ageing, legacy IT systems
and to better position themselves to sell and
compete on digital platforms.
Such is the case at Pitney Bowes, a global
corporate mail-equipment and technology provider
based in Stamford, Connecticut. Ian Davidson,
president of Pitney Bowes Europe, says the
division’s investment in cloud-based applications
for salesforce automation, customer relationship
management (CRM) and field-service management
was primarily a business decision triggered by its IT
function’s inability to provide meaningful
comparative operational data.
“We were faced with a decision really: Do we invest
in our on-premise solution, with lots of cost in the
back office redesigning those systems? Or do we
leverage the investment we’d already made in [the
cloud] and have our sales and service organisations
on a common platform across Europe?”
Pitney Bowes chose the cloud route because it
could help optimise existing business practices and
open up new revenue opportunities. “By having
sales and service on the same platform, we had
greater visibility to our clients and what
technology they had deployed, so we have much
better life-cycle and sales-cycle management
across the organisation,” Mr Davidson explains.
Fundamental 1
Ask the big question: Is your business
strategy cloud ready?1
ALIGNED
STRATEGY
Know what’s
possible, what’s
imperative and
how you will
measure success.
© The Economist Intelligence Unit Limited 20145
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
Of course, cost benefits are still a factor.
“Anyone who says that they are not focused on cost
is not telling the truth. That’s still very much an
issue. But cloud is also about speed and agility and
the ability to get stuff to market,” he says.
Strategic sanity check: What is your business
imperative?
Speed of execution and enhanced customer
experience were the main business imperatives for
Eurostar. The London-based rail operator’s
call-centre staff had been wasting precious time
toggling between and among a plethora of
computer programs while talking with customers.
But recently Eurostar streamlined those systems
and now “they can concentrate more on the
customer than the computer”, says Antoine de
Kerviler, Eurostar’s chief information officer (CIO).
It is important to focus on specific goals and
avoid chasing too many, says David Jack, CIO at the
London-based Hyperion Insurance Group.
“Be honest. Is the discussion around cloud
because you want to save money or because you want
a better service or because you want to deliver
service better?” he asks. “The executive board will
want all three: better, cheaper, faster. Be clear about
which one you focus on. What we’ve done is map [our
goals] across five years. Are we focusing on delivery,
quality or price of service? In each year, what is going
to be the most important to the business?”
Last things first: Know your success metrics
Whatever the business goal driving cloud adoption,
it is vital to know what metrics will be used to
measure the success or failure of the investment.
These will most likely be quantitative in the first
instance, says Rebecca Wetteman, a vice-president
and analyst at Nucleus Research, a Boston-based
research firm that focuses on technology return on
investment (ROI).
Nucleus case studies indicate that the cloud can
deliver 1.7 times the return produced by IT
systems that are run in-house within an
organisation’s own data centre, the more
traditional set-up known as “on-premise” IT. “Part
of that is down to a lower initial cost, but if you
look out over time, it’s also down to the capacity
to add, expand and upgrade without the cost of
disruption of a traditional technology project,” Ms
Wetteman explains.
With a traditional project, “the day after it went
live, it would be out of date. There would be new
fixes, new patches, new updates. So as an IT
manager, I’d be chasing the value curve all the
time,” she says. “With cloud, you stay on that
value curve. You don’t need to do a cost trade-off.
You get more value over time for applications, not
less.”
In addition to quantitative returns that increase
with time, many companies realise important,
long-lasting qualitative returns. For instance,
Eurostar’s customer-satisfaction ratings improved
after it streamlined its contact centre. Such
qualitative metrics vary from organisation to
organisation and industry to industry and ought to
be identified and measured.
The bottom-line message is straightforward:
Know your destination, know why you’re making
this journey, and know how you’re going to
recognise when you have arrived.
❛❛
Is the discussion
around cloud
because you want
to save money or
because you want
a better service or
because you want
to deliver service
better?
❜❜
Antoine De Kerviler,
Eurostar’s chief information
officer
© The Economist Intelligence Unit Limited 20146
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
For too long, employees have complained that the
IT department is an inhibitor to progress. They
blame it for failing to provide systems to support
fast-changing business objectives in a timely
manner, thus putting the organisation at a
competitive disadvantage.
One side effect has been an organisational
schism in the form of “rogue” or “shadow” IT, a
phenomenon in which employees looking for better
ways to do their jobs introduce technologies into
the company without permission or consideration
for the organisation’s wider technology plan. If a
new salesforce automation application can be
downloaded by anyone with the swipe of a credit
card, why wait for the centrally mandated upgrade
from IT in six months’ time?
While understandable and apt to produce
short-term gains, this attitude can lead to
fragmented IT strategies with serious long-term
implications for corporate governance, compliance
and basic security.
Think us, not them
Organisational harmony is the wiser solution, and
the onus is on CIOs to create it by retooling how IT
works with the rest of the business. “The
relationship between business and IT has
changed,” says Mr Davidson of Pitney Bowes. “It is
more of a partnership, less of us and them and
more of ‘what can we give you?’” Both parties now
must focus squarely on how cloud technologies
support business imperatives.
Organisational constructs like working groups
and committees can ease IT and business
cooperation. Richard Sykes, chairman of the
nonprofit Cloud Industry Forum, advises companies
to start with “two or three of your brightest
commercial people who are very articulate about
how you compete in the marketplace [and] then
identify two or three of your best IT operational
people. Then you have to get those two groups into
a very market-focused discussion.”
At Eurostar, such structures are in place. “We
put together a priority list, which we co-manage
with other departments at C-level,” explains Mr de
Kerviler. “The chief commercial officer and I sit
together in cost-of-sales committees. We discuss
the priorities, the infrastructure, the architecture,”
he says. The two then explain the business issues
to the technical staff and the technical issues to
the businesspeople.
Cross-company buy-in to cloud initiatives is
critical to success, but a clear owner of the strategy
is also necessary. That person is most likely to be
the CIO.
At one time, some CIOs feared that cloud
computing would reduce their influence, but that
concern subsided as it became clear that the cloud
did not obviate the need for internal IT expertise
and involvement. “The IT department has a big role
to play in getting organisations over cloud
challenges,” says Leslie Willcocks, professor of
technology work and globalisation at the London
School of Economics and Political Science (LSE).
Companies need the strategic approach that
only centralised IT can provide, but shadow IT may
now be an entrenched cultural phenomenon that
organisations will have to tackle as well.
Fundamental 2
Put a ring on it. Make the IT
relationship real2
ORGANISATIONAL
HARMONY
Redefine
teamwork. Always
bring IT and
business
executives closer
together to
ensure cloud
technologies
support business
strategy.
© The Economist Intelligence Unit Limited 20147
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
Millennials are rising as a force inside companies,
as are a larger group of people who thrive on
connection and digital content. These digital
“natives” and “immigrants” will demand very
different sorts of technologies in their working
lives than most current employees. Many have
never known a world without Facebook or Twitter
or Google, and their expectations are high for
technologies that are powerful, simple and social.
This massive global cultural shift will shake
many organisations, especially if they rely on older
business systems and have employees with
pre-Internet cultural expectations. “In the [old]
corporate world, there was a feeling that you were
tied up, that you were bound by what had been
deployed by your company,” says Bird & Bird’s Mr
Jennings. People were accustomed to having
better technology at work than they had at home
and less apt to question it.
But all that has flipped now, he says: Today’s
employees expect and demand flexibility and
office technology that is as good as what they have
at home.
Bridge all digital divides
To optimise their return from cloud systems, many
organisations will need to adjust their cultures so
that the established workforce and the emerging
one work seamlessly together. They will have to
step up to the demands of digital enthusiasts by
providing technologies that empower them. And
they will need to bring along the rest of their
colleagues by using top-down leadership-by-
example as well as support and training.
Time may ease the cultural issues as the
“as-a-service” generation comes to dominate the
workplace and their mindset becomes the cultural
norm. For now, however, companies will need to
reshape their organisational culture proactively.
Fundamental 3
Prepare for the rule of the digital
natives3
DIGITAL CULTURE
Prepare for the
rule of the digital
natives. Help
employees of all
ages and
backgrounds
embrace the
“as-a-service”
culture.
© The Economist Intelligence Unit Limited 20148
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
d
Once a sound business imperative has been
identified, organisational unity has been achieved
and the company culture embraces cloud
technology, companies should revisit and perhaps
redesign their underlying technology
infrastructure.
This effort is often presented as requiring a
“religious” choice between private clouds, where
an organisation has a dedicated compute resource
of its own, and public clouds, where the compute
resource is shared with others. The arguments in
favour of each have been well rehearsed over the
years: Private cloud is more costly but more secure,
while public cloud offers greater cost arbitrage, but
requires mixing your data in with those of other
organisations.
In reality, the choice is seldom as simple as
private vs public, except perhaps for start-ups and
particularly bold enterprises. Pitney Bowes, for
example, is clearly a strong cloud advocate, but its
current enterprise-resource-planning (ERP)
programme is on-premise, not in the cloud. “I can’t
see us being 100% cloud,” says Mr Davidson.
Even those who aspire to be cloud-only will not
get there immediately, argues the LSE’s Mr
Willcocks. This is where the concept of the hybrid
cloud comes in—a combination of private and
public clouds deployed where appropriate and to
coexist with existing on-premise IT investment. So
an enterprise like Pitney Bowes can keep its
existing ERP system in-house, but then layer cloud
CRM on top of that, thus enabling the company to
protect existing investments while also gaining the
benefits of more flexible, up-to-date cloud
applications.
Mix and match
This sort of combination is increasingly common,
says Nucleus Research’s Ms Wetteman, and one
that will inform technology selections long into the
future. “Most organisations that have been around
for more than five years are going to have some
on-premises systems for some time to come, and
it’s probably most cost-effective to keep them
where they are,” she argues. “It’s IT’s role and
responsibility, as a result, to understand cloud
integration.”
For Cloud Industry Forum’s Mr Sykes, the critical
issue is to understand your organisation’s
particular needs and capabilities and build
technology choices around them. Then you can
focus on the suppliers and technologies that suit
you and your market sector, he says.
The key message here is: Do not be dogmatic
about your technology selections, but be sensitive
to your current and future business requirements
and capabilities. “Very few businesses have the
opportunity to move everything to the cloud. Other
than that it looks beautiful and modern, I’m not
convinced it’s the optimum approach,” says Mr
Jack of Hyperion Insurance. “The real genius is
what you keep behind.”
Fundamental 4
Practical makes perfect4
DYNAMIC
INFRASTRUCTURE
Be practical. Find
ways that cloud
technologies fit
with your
organisation’s
unique needs and
capabilities.
© The Economist Intelligence Unit Limited 20149
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
The final element of a mature approach to the
cloud is good governance. Companies must
carefully consider their approaches to the cloud
and data to ensure that they have the right
technology in place to support corporate needs and
that they will not run afoul of laws and regulations.
The cloud revolution has raised a fresh set of
security, privacy, compliance and risk-management
questions. Such is the relative immaturity of the
cloud industry that, in many cases, good
governance is typically the responsibility of
corporate buyers, not cloud providers.
While companies can often assess a provider’s
security credentials, other areas are less clear-cut.
Most notably, data-protection law—much of which
was written before the Internet era, let alone the
cloud-computing age—is often confusing and open
to interpretation.
“The law always lags behind technology. Law
can regulate technology, but technology can be
used to enforce or to break laws,” says Kuan Hon,
research consultant at the Cloud Computing Project
at the University of London. “Some of the
requirements of law, as interpreted by regulators,
are pretty incompatible with cloud computing.”
For instance, in Europe, data-protection
regulators are concerned about personal data
being stored outside European Economic Area
borders. As such US cloud-services providers face
having to set up in-region data centres at
considerable cost, which they will pass on to their
customers, thus undermining cost-arbitrage
benefits.
“There is no set meaning of data sovereignty,”
says Ms Hon. “Generally, what people are talking
about here is data localisation or data residency. If
the physical location of data is so important to you,
then you need to think about all the locations
involved, not just the location of storage. Where is
the location of processing? Where does the
compute happen? Where are the back-up
locations?”
What this exposes is the need for expert advice
on governance, security and contracts. Cloud
contracts are highly standardised, with even the
largest of enterprises struggling for concessions
from providers. “A lot of organisations just don’t
consult lawyers,” Ms Hon says.
Fundamental 5
Don’t risk the reward: Get good advice5
GOOD
GOVERNANCE
Don’t risk the
reward. Ensure
that security,
privacy and legal
compliance are
addressed—up
front.
© The Economist Intelligence Unit Limited 201410
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
Reality checks and balances
Evangelical cloud-computing advocates once made
great play of the idea that companies and even
individual employees could swipe a credit card and
get started with a cloud service straight away.
While this carefree way of starting out with cloud
services attracted attention in the early days of
mainstream adoption and seeded the workplace
with enthusiastic users, it is not a good philosophy
today—and, in retrospect, it never was.
While easy start-up is a virtue, the most
successful corporate adopters approach cloud
technologies with the same seriousness they apply
to more traditional IT delivery mechanisms. As can
be seen with enterprise deployments by the likes of
Eurostar and Pitney Bowes, this typically involves
top-level support from the business and IT as well
as expertise and due diligence in procurement,
contract management, governance and security.
In short, if cloud computing is now business-
critical, then companies must treat their evolving
cloud strategy as critical, too.
They need a clear understanding of how and why
they are deploying cloud technologies and what
role they play in delivering on wider corporate
goals. They need organisational structures and
corporate cultures that optimise ROI and deliver
results. And they need a pragmatic approach to the
selection and deployment of technologies that
ensures those choices support good governance.
Companies that put these gears in place and get
them turning will gain a high-performance
business.
The most
successful
corporate
adopters
approach cloud
technologies with
the same
seriousness they
apply to more
traditional IT
delivery
mechanisms.
© The Economist Intelligence Unit Limited 201411
Mapping the cloud maturity curve
The fundamental five: What businesses must have in place to extract maximum value from the cloud
Whilst every effort has been taken to verify the accuracy of this
information, neither The Economist Intelligence Unit Ltd. nor the
sponsor of this report can accept any responsibility or liability
for reliance by any person on this white paper or any of the
information, opinions or conclusions set out in the white paper.
London
20 Cabot Square
London
E14 4QW
United Kingdom
Tel: (44.20) 7576 8000
Fax: (44.20) 7576 8476
E-mail: london@eiu.com
New York
750 Third Avenue
5th Floor
New York, NY 10017
United States
Tel: (1.212) 554 0600
Fax: (1.212) 586 0248
E-mail: newyork@eiu.com
Hong Kong
6001, Central Plaza
18 Harbour Road
Wanchai
Hong Kong
Tel: (852) 2585 3888
Fax: (852) 2802 7638
E-mail: hongkong@eiu.com
Geneva
Boulevard des
Tranchées 16
1206 Geneva
Switzerland
Tel: (41) 22 566 2470
Fax: (41) 22 346 93 47
E-mail: geneva@eiu.com

The fundamental five

  • 1.
    A report fromThe Economist Intelligence Unit Mapping the cloud maturity curve The fundamental five What businesses must have in place to extract maximum value from the cloud Sponsored by
  • 2.
    © The EconomistIntelligence Unit Limited 20141 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud About this research 2 The fundamental five: What businesses must have in place to extract maximum value from the cloud 3 Fundamental 1 Ask the big question: Is your business strategy cloud ready? 4 Fundamental 2 Put a ring on it. Make the IT relationship real 6 Fundamental 3 Prepare for the rule of the digital natives 7 Fundamental 4 Practical makes perfect 8 Fundamental 5 Don’t risk the reward: Get good advice 9 Reality checks and balances 10 Contents 1 2 3 4 5
  • 3.
    © The EconomistIntelligence Unit Limited 20142 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud The fundamental five: What businesses must have in place to extract maximum value from the cloud identifies and explores the core foundational elements of a mature cloud strategy. It is the central piece in the first phase of a research programme, Mapping the cloud maturity curve, sponsored by IBM. The second phase will examine the degree to which companies have put this foundation in place and where they lie on the cloud maturity curve. As the basis of this research, The Economist Intelligence Unit solicited the views of eight leading experts, based on their real-world experience. We also reviewed relevant existing literature. The findings and views expressed in this report do not necessarily reflect the views of the sponsor. We would like to thank all of the executives who participated, whether on record or anonymously, for their valuable insights. The author was Stuart Lauchlan. Riva Richmond edited the report and Mike Kenny was responsible for the layout. We would like to thank all of the people who participated, whether on record or anonymously, for their valuable insights. Contributors: Ian Davidson, president of Pitney Bowes Europe Kuan Hon, research consultant at the Cloud Computing Project, University of London Antoine de Kerviler, chief information officer of Eurostar David Jack, chief information officer at Hyperion Insurance Group Barry Jennings, senior associate at Bird & Bird Richard Sykes, chairman of the Cloud Industry Forum and former global group chief information officer at ICI Rebecca Wetteman, vice-president at Nucleus Research Leslie Willcocks, professor of technology, work and globalisation and governor of the Information Systems and Innovation Group, London School of Economics About this research
  • 4.
    © The EconomistIntelligence Unit Limited 20143 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud Many companies have embraced the cloud— technology services delivered over a network connection—to save money, boost speed and productivity and seize new business opportunities. But fewer have committed to the underlying strategic machinery needed to achieve optimal business benefits from the cloud and ignite outsized success. Well-oiled machinery is becoming a requirement at a time when business is being transformed by cloud, mobile, social and other technologies. To compete and win in this fast-paced digital marketplace, companies must align their business strategies, organisational structures and cloud approach. To understand the nature of this machinery and whether it is in good working order inside companies today, The Economist Intelligence Unit (EIU) has undertaken a one-year research programme sponsored by IBM. For the first phase, the EIU sourced the collective views of eight leading experts, including chief information officers, industry analysts, academics and legal experts, to identify the core foundational elements of a mature cloud strategy, based on their real- world experience. This report kicks off this initial stage of our programme. In the next phase, we will survey executives globally and interview leading practitioners to examine the degree to which companies have put this foundation in place, the nature of the obstacles they face and how far they have journeyed down the road to cloud maturity. The five fundamentals, in our view, are: cloud- aligned business strategies, organisational structures, corporate cultures, technology infrastructures and governance best practices. While companies can reap some benefits from the cloud without having all five of these in place, the corporate engine will not then fire at optimum capacity, thus full benefits will not be realised. In short, cloud computing has become a business-critical issue, and organisations must take a systematic approach if they are to get the business benefits they have been told—and sold— to expect. The fundamental five: What businesses must have in place to extract maximum value from the cloud Cloud computing has become a business-critical issue, and organisations must take a methodical approach if they are to get the business benefits they have been told—and sold—to expect.
  • 5.
    © The EconomistIntelligence Unit Limited 20144 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud a x A critical starting point for any cloud strategy is to understand the business imperative driving investment. What are the business objectives an organisation hopes to achieve? How do these fit within the overall corporate strategy? And how will cloud computing help a firm meet those objectives and deliver on that strategy? Often, the main business imperative will be cost-reduction and the cost-efficiencies promised by the cloud delivery model, which reduces the need for capital expenditures on IT infrastructure and resources because companies can, instead, buy technology as a service. Increasingly, however, companies are focusing on the greater agility and speed of delivery that cloud systems offer and how these systems can fuel the hot pursuit of new revenue opportunities. The primary motivation for cloud adoption has evolved over time, notes Barry Jennings, senior associate at Bird & Bird, an international law firm, who advises companies and governments on outsourcing and cloud implementations and formerly served as industry co-lead for the UK government on its G-Cloud national cloud programme. “In 2010, it was basically a money- driven thing, partly driven by the economic crisis, partly driven by the fact that [chief information officer] budgets had been cut by huge amounts,” he said at the Westminster eForum Next Steps for Cloud Computing conference in London in September 2014. But today, executives have more flexibility to pursue core business objectives with “vigour”, he said. And they are looking to the cloud to produce growth. Freedom fast forward: Pitney Bowes commits to the cloud Organisations often use cloud computing to break free of the shackles of ageing, legacy IT systems and to better position themselves to sell and compete on digital platforms. Such is the case at Pitney Bowes, a global corporate mail-equipment and technology provider based in Stamford, Connecticut. Ian Davidson, president of Pitney Bowes Europe, says the division’s investment in cloud-based applications for salesforce automation, customer relationship management (CRM) and field-service management was primarily a business decision triggered by its IT function’s inability to provide meaningful comparative operational data. “We were faced with a decision really: Do we invest in our on-premise solution, with lots of cost in the back office redesigning those systems? Or do we leverage the investment we’d already made in [the cloud] and have our sales and service organisations on a common platform across Europe?” Pitney Bowes chose the cloud route because it could help optimise existing business practices and open up new revenue opportunities. “By having sales and service on the same platform, we had greater visibility to our clients and what technology they had deployed, so we have much better life-cycle and sales-cycle management across the organisation,” Mr Davidson explains. Fundamental 1 Ask the big question: Is your business strategy cloud ready?1 ALIGNED STRATEGY Know what’s possible, what’s imperative and how you will measure success.
  • 6.
    © The EconomistIntelligence Unit Limited 20145 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud Of course, cost benefits are still a factor. “Anyone who says that they are not focused on cost is not telling the truth. That’s still very much an issue. But cloud is also about speed and agility and the ability to get stuff to market,” he says. Strategic sanity check: What is your business imperative? Speed of execution and enhanced customer experience were the main business imperatives for Eurostar. The London-based rail operator’s call-centre staff had been wasting precious time toggling between and among a plethora of computer programs while talking with customers. But recently Eurostar streamlined those systems and now “they can concentrate more on the customer than the computer”, says Antoine de Kerviler, Eurostar’s chief information officer (CIO). It is important to focus on specific goals and avoid chasing too many, says David Jack, CIO at the London-based Hyperion Insurance Group. “Be honest. Is the discussion around cloud because you want to save money or because you want a better service or because you want to deliver service better?” he asks. “The executive board will want all three: better, cheaper, faster. Be clear about which one you focus on. What we’ve done is map [our goals] across five years. Are we focusing on delivery, quality or price of service? In each year, what is going to be the most important to the business?” Last things first: Know your success metrics Whatever the business goal driving cloud adoption, it is vital to know what metrics will be used to measure the success or failure of the investment. These will most likely be quantitative in the first instance, says Rebecca Wetteman, a vice-president and analyst at Nucleus Research, a Boston-based research firm that focuses on technology return on investment (ROI). Nucleus case studies indicate that the cloud can deliver 1.7 times the return produced by IT systems that are run in-house within an organisation’s own data centre, the more traditional set-up known as “on-premise” IT. “Part of that is down to a lower initial cost, but if you look out over time, it’s also down to the capacity to add, expand and upgrade without the cost of disruption of a traditional technology project,” Ms Wetteman explains. With a traditional project, “the day after it went live, it would be out of date. There would be new fixes, new patches, new updates. So as an IT manager, I’d be chasing the value curve all the time,” she says. “With cloud, you stay on that value curve. You don’t need to do a cost trade-off. You get more value over time for applications, not less.” In addition to quantitative returns that increase with time, many companies realise important, long-lasting qualitative returns. For instance, Eurostar’s customer-satisfaction ratings improved after it streamlined its contact centre. Such qualitative metrics vary from organisation to organisation and industry to industry and ought to be identified and measured. The bottom-line message is straightforward: Know your destination, know why you’re making this journey, and know how you’re going to recognise when you have arrived. ❛❛ Is the discussion around cloud because you want to save money or because you want a better service or because you want to deliver service better? ❜❜ Antoine De Kerviler, Eurostar’s chief information officer
  • 7.
    © The EconomistIntelligence Unit Limited 20146 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud For too long, employees have complained that the IT department is an inhibitor to progress. They blame it for failing to provide systems to support fast-changing business objectives in a timely manner, thus putting the organisation at a competitive disadvantage. One side effect has been an organisational schism in the form of “rogue” or “shadow” IT, a phenomenon in which employees looking for better ways to do their jobs introduce technologies into the company without permission or consideration for the organisation’s wider technology plan. If a new salesforce automation application can be downloaded by anyone with the swipe of a credit card, why wait for the centrally mandated upgrade from IT in six months’ time? While understandable and apt to produce short-term gains, this attitude can lead to fragmented IT strategies with serious long-term implications for corporate governance, compliance and basic security. Think us, not them Organisational harmony is the wiser solution, and the onus is on CIOs to create it by retooling how IT works with the rest of the business. “The relationship between business and IT has changed,” says Mr Davidson of Pitney Bowes. “It is more of a partnership, less of us and them and more of ‘what can we give you?’” Both parties now must focus squarely on how cloud technologies support business imperatives. Organisational constructs like working groups and committees can ease IT and business cooperation. Richard Sykes, chairman of the nonprofit Cloud Industry Forum, advises companies to start with “two or three of your brightest commercial people who are very articulate about how you compete in the marketplace [and] then identify two or three of your best IT operational people. Then you have to get those two groups into a very market-focused discussion.” At Eurostar, such structures are in place. “We put together a priority list, which we co-manage with other departments at C-level,” explains Mr de Kerviler. “The chief commercial officer and I sit together in cost-of-sales committees. We discuss the priorities, the infrastructure, the architecture,” he says. The two then explain the business issues to the technical staff and the technical issues to the businesspeople. Cross-company buy-in to cloud initiatives is critical to success, but a clear owner of the strategy is also necessary. That person is most likely to be the CIO. At one time, some CIOs feared that cloud computing would reduce their influence, but that concern subsided as it became clear that the cloud did not obviate the need for internal IT expertise and involvement. “The IT department has a big role to play in getting organisations over cloud challenges,” says Leslie Willcocks, professor of technology work and globalisation at the London School of Economics and Political Science (LSE). Companies need the strategic approach that only centralised IT can provide, but shadow IT may now be an entrenched cultural phenomenon that organisations will have to tackle as well. Fundamental 2 Put a ring on it. Make the IT relationship real2 ORGANISATIONAL HARMONY Redefine teamwork. Always bring IT and business executives closer together to ensure cloud technologies support business strategy.
  • 8.
    © The EconomistIntelligence Unit Limited 20147 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud Millennials are rising as a force inside companies, as are a larger group of people who thrive on connection and digital content. These digital “natives” and “immigrants” will demand very different sorts of technologies in their working lives than most current employees. Many have never known a world without Facebook or Twitter or Google, and their expectations are high for technologies that are powerful, simple and social. This massive global cultural shift will shake many organisations, especially if they rely on older business systems and have employees with pre-Internet cultural expectations. “In the [old] corporate world, there was a feeling that you were tied up, that you were bound by what had been deployed by your company,” says Bird & Bird’s Mr Jennings. People were accustomed to having better technology at work than they had at home and less apt to question it. But all that has flipped now, he says: Today’s employees expect and demand flexibility and office technology that is as good as what they have at home. Bridge all digital divides To optimise their return from cloud systems, many organisations will need to adjust their cultures so that the established workforce and the emerging one work seamlessly together. They will have to step up to the demands of digital enthusiasts by providing technologies that empower them. And they will need to bring along the rest of their colleagues by using top-down leadership-by- example as well as support and training. Time may ease the cultural issues as the “as-a-service” generation comes to dominate the workplace and their mindset becomes the cultural norm. For now, however, companies will need to reshape their organisational culture proactively. Fundamental 3 Prepare for the rule of the digital natives3 DIGITAL CULTURE Prepare for the rule of the digital natives. Help employees of all ages and backgrounds embrace the “as-a-service” culture.
  • 9.
    © The EconomistIntelligence Unit Limited 20148 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud d Once a sound business imperative has been identified, organisational unity has been achieved and the company culture embraces cloud technology, companies should revisit and perhaps redesign their underlying technology infrastructure. This effort is often presented as requiring a “religious” choice between private clouds, where an organisation has a dedicated compute resource of its own, and public clouds, where the compute resource is shared with others. The arguments in favour of each have been well rehearsed over the years: Private cloud is more costly but more secure, while public cloud offers greater cost arbitrage, but requires mixing your data in with those of other organisations. In reality, the choice is seldom as simple as private vs public, except perhaps for start-ups and particularly bold enterprises. Pitney Bowes, for example, is clearly a strong cloud advocate, but its current enterprise-resource-planning (ERP) programme is on-premise, not in the cloud. “I can’t see us being 100% cloud,” says Mr Davidson. Even those who aspire to be cloud-only will not get there immediately, argues the LSE’s Mr Willcocks. This is where the concept of the hybrid cloud comes in—a combination of private and public clouds deployed where appropriate and to coexist with existing on-premise IT investment. So an enterprise like Pitney Bowes can keep its existing ERP system in-house, but then layer cloud CRM on top of that, thus enabling the company to protect existing investments while also gaining the benefits of more flexible, up-to-date cloud applications. Mix and match This sort of combination is increasingly common, says Nucleus Research’s Ms Wetteman, and one that will inform technology selections long into the future. “Most organisations that have been around for more than five years are going to have some on-premises systems for some time to come, and it’s probably most cost-effective to keep them where they are,” she argues. “It’s IT’s role and responsibility, as a result, to understand cloud integration.” For Cloud Industry Forum’s Mr Sykes, the critical issue is to understand your organisation’s particular needs and capabilities and build technology choices around them. Then you can focus on the suppliers and technologies that suit you and your market sector, he says. The key message here is: Do not be dogmatic about your technology selections, but be sensitive to your current and future business requirements and capabilities. “Very few businesses have the opportunity to move everything to the cloud. Other than that it looks beautiful and modern, I’m not convinced it’s the optimum approach,” says Mr Jack of Hyperion Insurance. “The real genius is what you keep behind.” Fundamental 4 Practical makes perfect4 DYNAMIC INFRASTRUCTURE Be practical. Find ways that cloud technologies fit with your organisation’s unique needs and capabilities.
  • 10.
    © The EconomistIntelligence Unit Limited 20149 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud The final element of a mature approach to the cloud is good governance. Companies must carefully consider their approaches to the cloud and data to ensure that they have the right technology in place to support corporate needs and that they will not run afoul of laws and regulations. The cloud revolution has raised a fresh set of security, privacy, compliance and risk-management questions. Such is the relative immaturity of the cloud industry that, in many cases, good governance is typically the responsibility of corporate buyers, not cloud providers. While companies can often assess a provider’s security credentials, other areas are less clear-cut. Most notably, data-protection law—much of which was written before the Internet era, let alone the cloud-computing age—is often confusing and open to interpretation. “The law always lags behind technology. Law can regulate technology, but technology can be used to enforce or to break laws,” says Kuan Hon, research consultant at the Cloud Computing Project at the University of London. “Some of the requirements of law, as interpreted by regulators, are pretty incompatible with cloud computing.” For instance, in Europe, data-protection regulators are concerned about personal data being stored outside European Economic Area borders. As such US cloud-services providers face having to set up in-region data centres at considerable cost, which they will pass on to their customers, thus undermining cost-arbitrage benefits. “There is no set meaning of data sovereignty,” says Ms Hon. “Generally, what people are talking about here is data localisation or data residency. If the physical location of data is so important to you, then you need to think about all the locations involved, not just the location of storage. Where is the location of processing? Where does the compute happen? Where are the back-up locations?” What this exposes is the need for expert advice on governance, security and contracts. Cloud contracts are highly standardised, with even the largest of enterprises struggling for concessions from providers. “A lot of organisations just don’t consult lawyers,” Ms Hon says. Fundamental 5 Don’t risk the reward: Get good advice5 GOOD GOVERNANCE Don’t risk the reward. Ensure that security, privacy and legal compliance are addressed—up front.
  • 11.
    © The EconomistIntelligence Unit Limited 201410 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud Reality checks and balances Evangelical cloud-computing advocates once made great play of the idea that companies and even individual employees could swipe a credit card and get started with a cloud service straight away. While this carefree way of starting out with cloud services attracted attention in the early days of mainstream adoption and seeded the workplace with enthusiastic users, it is not a good philosophy today—and, in retrospect, it never was. While easy start-up is a virtue, the most successful corporate adopters approach cloud technologies with the same seriousness they apply to more traditional IT delivery mechanisms. As can be seen with enterprise deployments by the likes of Eurostar and Pitney Bowes, this typically involves top-level support from the business and IT as well as expertise and due diligence in procurement, contract management, governance and security. In short, if cloud computing is now business- critical, then companies must treat their evolving cloud strategy as critical, too. They need a clear understanding of how and why they are deploying cloud technologies and what role they play in delivering on wider corporate goals. They need organisational structures and corporate cultures that optimise ROI and deliver results. And they need a pragmatic approach to the selection and deployment of technologies that ensures those choices support good governance. Companies that put these gears in place and get them turning will gain a high-performance business. The most successful corporate adopters approach cloud technologies with the same seriousness they apply to more traditional IT delivery mechanisms.
  • 12.
    © The EconomistIntelligence Unit Limited 201411 Mapping the cloud maturity curve The fundamental five: What businesses must have in place to extract maximum value from the cloud Whilst every effort has been taken to verify the accuracy of this information, neither The Economist Intelligence Unit Ltd. nor the sponsor of this report can accept any responsibility or liability for reliance by any person on this white paper or any of the information, opinions or conclusions set out in the white paper.
  • 13.
    London 20 Cabot Square London E144QW United Kingdom Tel: (44.20) 7576 8000 Fax: (44.20) 7576 8476 E-mail: london@eiu.com New York 750 Third Avenue 5th Floor New York, NY 10017 United States Tel: (1.212) 554 0600 Fax: (1.212) 586 0248 E-mail: newyork@eiu.com Hong Kong 6001, Central Plaza 18 Harbour Road Wanchai Hong Kong Tel: (852) 2585 3888 Fax: (852) 2802 7638 E-mail: hongkong@eiu.com Geneva Boulevard des Tranchées 16 1206 Geneva Switzerland Tel: (41) 22 566 2470 Fax: (41) 22 346 93 47 E-mail: geneva@eiu.com