ANNUAL CONFERENCE 

Implementing cutting‐edge technologies 
to develop products to improve daily life, 
making it simpler, safer and more 
comfortable. 
                                    Roberto Siagri
Cannes , May 26, 2011


            EIRMA
          Cannes 2011
Finding a pattern: it's easy... afterwards!




        EIRMA
      Cannes 2011            2
Meta-Trends in Technological Acceleration

   Moore's Law                        Miniaturization                   ‘65
      Transistors increase 2 times over 18 months

   Metcalfe's Law                     Interconnection             ‘93
      Value of a network increases with the square of the
        number of connections

   Gilder's Law                       Quantization          ’00
      Bandwidth increases 3 times faster than computer power




                              IDEAS are the new “ultimate” raw material
                  EIRMA
                Cannes 2011                          3
Exponential vs Linear view

history of technology
shows that
technological change                  KNEE
                                      where
                                    exponential
is exponential,                       growth
                                     becomes
                                     noticeable
contrary to the
common-sense
intuitive-linear view


            EIRMA
          Cannes 2011           4
EUROTECH   in 3 statements and 9 words

    Start                Think
    Small
                       Big
      Global
         Be
Less is More
        EIRMA
      Cannes 2011
                         5
The beginning

•1992: Eurotech     S.r.l.   is born




  A Personal Computer
      on the palm
      of your hand




        EIRMA
      Cannes 2011
The Ubiquitous Computers                               (*)




                           “The most profound
                           technologies are those that
                           disappear. They weave
                           themselves into the fabric of
                           everyday life until they are
                           indistinguishable from it.”
           Mark Weiser                        "The Computer for the 21st Century",
Chief Technologist, Xerox PARC    Scientific American, Vol. 265 No.9, pp. 66-75, ‘91




 (*) UbiComp is coined at PARC in the ‘90s
“All progressions are from
    material to abstract…”




“The principle of doing              R. Buckminster Fuller
                                             1895 - 1983
ever more with ever less
weight, time and energy
per each given level of
functional performance”
        EIRMA
      Cannes 2011
                  8
                                      Nine Chains to the Moon:
                           An Adventure Story of Thought (1938).
Technological “Cephalization” of the Earth


“…a network (a world network) of
economic and psychic affiliations is being
woven at ever increasing speed
which envelops and constantly penetrates
more deeply within each of us.
                                                   Pierre Teilhard de Chardin
                                                                 (1881-1955)
With every day that passes it becomes a
little more impossible for us to act or think
otherwise than collectively."
                                  Le Phénomène Humain, 1955



           EIRMA                                    adapted from John Smart 
         Cannes 2011                                         Accelereting.org
STEM compression :
              the Engine of Innovation



Space
Time                 Information
Energy
Matter

                  Computation
      EIRMA
    Cannes 2011
COMPANY VISION MISSION
      ROI PERVASIVE COMPUTERS CLOUD INTERNET   OF THINGS
                  MARKETS
            CATALOGS                  TCO      DAAS
             PRODUCT OFFER             NANOPC     HPC

                               ESF TECHNOLOGY
            INNOVATION MIDDLEWARE
            STRATEGY GLOBAL VALUE EDC VPX

         COMPLEXITY EXTREME DATA BOARDS EMBBEDDED
        COMPANY GROWTH VALUE STACK HW SW FW
              SYSTEMS   SOLUTIONS COMPETITIVENESS

          EUROTECH                    PC/104   CPCI   VME
               PLATFORM SAAS      AURORA EDGE
        END-TO-END   SENSORS   BUSINESS INTEGRATION
               R2U IMAGINE-BUILD-SUCCEED NETWORK


11
Group Global Footprint

                                       EUROPE                      ASIA
    USA                                 HC = 142               HC = 163
   HC = 150                           19.7% of Rev           30.8% of Rev
 46.9% of Rev




                                                       RoW
                                                     2.6% of Rev

                (as at 31 Dec 2010)
                                                                            12
The Vision
       Computers will be smaller and smaller,
         and more and more interconnected.
    They will weave themselves into the fabric of
 everyday life until they are indistinguishable from it,
                        improving
    our abilities, our senses and our perceptions.




                                                           13
The Mission
                     With attention to the customer,
                          Eurotech presents
 sophisticated computer and communications technologies
                 to deliver a competitive advantage.

By relying on our expertise in modular hardware, software and services,
        our customers are free to focus on their core competencies
  for successful realization of their leading-edge business applications.




                                                                            14
COMPANY         VISION MISSION ROI
  PERVASIVE COMPUTERS   CLOUD   INTERNET OF THINGS
        CATALOGSMARKETS TCO DAAS
        PRODUCT OFFER NANOPC HPC
  INNOVATION MIDDLEWARE ESF COMPRESSION


STRATEGY                          GLOBAL VALUE    EDC VPX

COMPLEXITY EXTREME DATA                     BOARDS EMBBEDDED
    COMPANY GROWTH              VALUE STACK HW SW FW
                SOLUTIONS COMPETITIVENESS
           SYSTEMS

             EUROTECH PC/104 CPCI VME
           PLATFORM SAAS        AURORA EDGE
   END-TO-END    SENSORS   BUSINESS INTEGRATION
           R2U IMAGINE-BUILD-SUCCEED NETWORK

                                                               15
Reducing TCO:
SW vs. HW
                                                               TCO
                                                               SW
                                                          -$
                                                                PC-TCO

                                                                PC-SW
Cost




                                                                x86

                                                                HW

                                                      Time
  Wirth’s law: “Software gets slower faster than hardware gets faster”

                                                                         16
Minimize Size in the loosely coupled
                                               NanoPC
   16Mhz-1MB
                           ’92:
                            A Personal Computer
                           on the palm
                           of your hand


                            800Mhz-512MB
         ’07: A Netbook
            Computer
        on half the palm
          of your hand

                                  NOW: 1,6Ghz – 2GB RAM
                                                          17
Minimize Size in the tightly coupled
     Aurora HPC
   40TFLOP in 3,3 m3




                        LESS IS MORE as driving principle
                             Less Energy, Less Space
                       better TCO and better Performances
                                                            18
Pervasive Computers & Massive Data Collection

                                                "By the year 2015, you can
                                                          expect
                                                    15 billion devices”

                                                Justin Rattner - CTO - Intel




                                                    Dealing with the
                                                     complexity of
                                                     Extreme Data



                                                                               19
Communication Overcomes Computing

The framework is changing now.
The Internet is redefining software.
The Internet is redefining the role of
computing and communication ………
I still don’t understand the framework.
I don’t think any of us really do.                        Andy Grove
                                                      former INTEL CEO

But some aspects of it are pretty clear.
It’s proven not to be computing based
but communication based.       from : “Decisions Don’t Wait”,
                                         Harvard Management Update. 2003
            EIRMA
          Cannes 2011
THE PLANETARY COMPUTATIONAL EXOSKELETON

Computers are becoming pervasive and ubiquitous
Ubiquitous high bandwidth connection to the Internet at all times

Massive computation available on demand through the CLOUD

Tiny Computers embedded in

    – the environment,
    – our clothing,
    – our body




Augmented real reality
             EIRMA
           Cannes 2011                        21
Complexity of
collecting data y
is growing     l
                 l
                      i a
            n t
        n e
  Ex po
     EIRMA
   Cannes 2011   22
Addressing Software Complexity
and a new way to create Distributed Systems
                                                                  Cloud based apps
                                                                  Multitenant
                                                                  Mesh-up
                                                                  Scalable
                                  PC –Programming
                                  Easy
                                  A lot of available programs
                                  Backward compatible
 Productivity




                Assembly
                Limited reuse
                of written code




                                            Complexity and Size

                                                                                     23
POWER IS THERE, AND YOU
 DON’T NEED TO CARE

EDISON 1.0:
Electric Power Distribution




EDISON 2.0:
Computation Power Distribution


          EIRMA
        Cannes 2011
Transforming Bits of Data at
      the Edge of the Network into
              Actionable Information in the Users’ Hands

                        Everyware™ Device Cloud




                                                       Cloud based
                        Device Firmware /                                    Business Application
   Sensors &   Device                              Device Data Management
                           Application                                            Integration
   Hardware                                              and Delivery

                                      Eurotech
                                     End-To-End
                                      Solution

                        Devices running the Everyware™ Device Cloud Client
                                                                                                    25
Encapsulating complexity:
          HW, Systems, R2U, Daas, PaaS




Company
 Space




                                         26
COMPANY       VISION MISSION                 ROI
 PERVASIVE COMPUTERS   CLOUD    INTERNET OF THINGS
       CATALOGSMARKETS TCO DAAS
       PRODUCT OFFER NANOPC HPC
 INNOVATION MIDDLEWARE ESF COMPRESSION
    STRATEGY GLOBAL VALUE EDC VPX
COMPLEXITY EXTREME DATA BOARDS
   COMPANY GROWTH                VALUE STACK   HW SW   FW
                   SYSTEMS     SOLUTIONS

    COMPETITIVENESS
    EUROTECH           PC/104   CPCI   VME EMBBEDDED
          PLATFORM SAAS         AURORA EDGE
  END-TO-END    SENSORS   BUSINESS INTEGRATION
          R2U IMAGINE-BUILD-SUCCEED NETWORK
                                                            27
Invention vs. Innovation

         Invention: 
         New  idea, design, model of a new  device.
      An idea is something that it is not yet inside the 
    economic system and  it  may never enter it.



Innovation: 
All the development process of a new product,
that bring the product inside the economic system.

                                                 According to Schumpeter

          EIRMA
        Cannes 2011
Sustainable Growth vs. Saturation

                                                                S curves get old
                                     New Evolution,
                                     New Development phase
Performance




                      Return reduction                  New technology


                  Evolution
                  Development phase
                                                                Take-off
                Existing
                technology
                                              Research,
                                              Invention phase

                                                                     Time
              Each new TECHNOLOGICAL substrate is more efficient than the previous one
                         EIRMA
                       Cannes 2011                              29
Punctuated Equilibrium (in Biology, Technology, Economics, Politics…)


 Pareto’s Law : “The 80/20 Rule”
                                    ~ 20% Punctuation   (Disruption)
                                    ~ 80% Equilibrium    (Evolution)

              Stabile environment
  evolution




                                                                       Vilfredo F. D. Pareto
                                                                            1848 ‐ 1923




                                       Rapid changing
                                       environment


                                           time
                     EIRMA
                   Cannes 2011                          30
Are we really willing to innovate?




Innovation fails, because organizations
unwittingly strip the disruptive potential
from new ideas before they ever see the
light of day              C.M. Christensen, M. E. Raynor

            EIRMA
          Cannes 2011                31
The organization model: standard vision


                               Markets / Customers


                                           Mercati di Oggi
                                                    It goes like
                          Mktg                    “CIVILIZATION
                         Operative
                        Operativo
                            Mktg                  & BARBARITY” ! Sales
 Research                                                           Sales
                                                                     Sales
 centres /
Universities                                         It doesn't
                                                       work...
                         Research &   Industri-                     Catalog/
                                                       Production
                        Development   alization                     Products




            EIRMA
          Cannes 2011                 32
The 3 How To:


• 1 : bring the right technological innovation inside
the company (at a moderate cost…)

• 2: shift the innovation from research to market. In
other words, how to pass from ideas and prototypes
to turnover and large sales volumes

• 3: avoid destroying the company, that is, how to
balance change and stability



         EIRMA
       Cannes 2011
The organization model: pushed by continous innovation
                                          Markets

             Tomorrow’s Customers                       Today’s Customers


                   Strategic
                   Planning
                                            INCREMENTAL INNOVATION              Sales &
                                                   Market pull                   Mktg
Foresight 
 Studies




               DISRUPTIVE INNOVATION
                    Technology push



                    Research           Development   Engineering   Production   Product
                                                                                Portfolio




              Universities and Research Centres

                        EIRMA
                      Cannes 2011
INNOVATION, MARKETS & BUSINESS MODELS

                                                 DEVELOPMENT
Products’ Performance




                            STRATEGIC
                            PLANNING
                                             RESEARCH



Inspired to Christensen’s innovation model
                                                               Time
                                 EIRMA
                               Cannes 2011
The Paradigm shift in Knowledge



from the
Know-How
                     to the
                       Know-Who
                        and the
                            Know-Where

         EIRMA
       Cannes 2011
Business Process Pillars using an 80/20 ROT
–Fabless production model  stay flexible
–Innovation within the standards  stay open


 TECH PUSH: 20%                        Prod IN
 Univ                                                            Direct
                  CONCEPTS

                                                                 SALES




                                                 PRODUCTS
                             Dev IN
                             >80%
 Labs                                   Prod
                                        OUT                      Reps /
                                        >80%                     Agents

                             Dev
                             OUT
                                                            Distributors
                             MARKET PULL: 80%               37
               EIRMA
             Cannes 2011
Technology evolution and
                     Insource-Outsource relation
     VISIBILITY                             Gartner Hype Cycle

               EDGE Technologies                             STABLE Technologies
                                                                                                   External
 External
                                                                                                 Development
 Research
                                                                                                     20%
   80%
                                                                                                   Internal
  Internal
                                                                                                 Development
 Research
                                                                                                     80%
    20%




             Technology      Peak of Inflated      Trough of         Slope of      Plateau of     MATURITY
               Trigger        Expectations      Disillusionment   Enlightenment   Productivity




                 EIRMA
               Cannes 2011
The many faces of innovation




                                   process
                                 innovation
            technology
             innovation



                              business model
                                innovation     DaaS
                                                  PaaS
                                                    IaaS
          product & service
             innovation

                                                           39
A new approach in strategic management
   Strategy based on dynamic equilibrium driven by innovation:
                           - High adaptability capacity
                    - Management of many business models
                            -Incremental Innovation
                                -Disruptive Innovation
                                -Knowledge network

                                Dynamic Balancing
                                    Strategy
                                                          Disruptive
                                         1                Innovation
                                                          (10%-20%)
                       2
Incremental
 Innovation
 (80%-90%)
                                     Poised
                                  Organization
                           (wide range of dexterities)
        EIRMA
      Cannes 2011          40
Be ready to catch the wind of change



     be distinct …      or extinct
                              Tom Peters




 change is the process by which the future
             invades our lives
                                           Alvin Toffler

      EIRMA
    Cannes 2011
Thank you for your attention




        "On résiste à l'invasion des armées;
      on ne résiste pas à l'invasion des idées.“
                                        Victor Hugo, Paris 1877
                                                              42

Eirna 2011 Nice

  • 1.
  • 2.
  • 3.
    Meta-Trends in TechnologicalAcceleration  Moore's Law Miniaturization ‘65  Transistors increase 2 times over 18 months  Metcalfe's Law Interconnection ‘93  Value of a network increases with the square of the number of connections  Gilder's Law Quantization ’00  Bandwidth increases 3 times faster than computer power IDEAS are the new “ultimate” raw material EIRMA Cannes 2011 3
  • 4.
    Exponential vs Linearview history of technology shows that technological change KNEE where exponential is exponential, growth becomes noticeable contrary to the common-sense intuitive-linear view EIRMA Cannes 2011 4
  • 5.
    EUROTECH   in 3 statements and 9 words Start Think Small Big Global Be Less is More EIRMA Cannes 2011 5
  • 6.
    The beginning •1992: Eurotech S.r.l. is born A Personal Computer on the palm of your hand EIRMA Cannes 2011
  • 7.
    The Ubiquitous Computers (*) “The most profound technologies are those that disappear. They weave themselves into the fabric of everyday life until they are indistinguishable from it.” Mark Weiser "The Computer for the 21st Century", Chief Technologist, Xerox PARC Scientific American, Vol. 265 No.9, pp. 66-75, ‘91 (*) UbiComp is coined at PARC in the ‘90s
  • 8.
    “All progressions arefrom material to abstract…” “The principle of doing R. Buckminster Fuller 1895 - 1983 ever more with ever less weight, time and energy per each given level of functional performance” EIRMA Cannes 2011 8 Nine Chains to the Moon: An Adventure Story of Thought (1938).
  • 9.
    Technological “Cephalization” ofthe Earth “…a network (a world network) of economic and psychic affiliations is being woven at ever increasing speed which envelops and constantly penetrates more deeply within each of us. Pierre Teilhard de Chardin (1881-1955) With every day that passes it becomes a little more impossible for us to act or think otherwise than collectively." Le Phénomène Humain, 1955 EIRMA adapted from John Smart  Cannes 2011 Accelereting.org
  • 10.
    STEM compression : the Engine of Innovation Space Time Information Energy Matter Computation EIRMA Cannes 2011
  • 11.
    COMPANY VISION MISSION ROI PERVASIVE COMPUTERS CLOUD INTERNET OF THINGS MARKETS CATALOGS TCO DAAS PRODUCT OFFER NANOPC HPC ESF TECHNOLOGY INNOVATION MIDDLEWARE STRATEGY GLOBAL VALUE EDC VPX COMPLEXITY EXTREME DATA BOARDS EMBBEDDED COMPANY GROWTH VALUE STACK HW SW FW SYSTEMS SOLUTIONS COMPETITIVENESS EUROTECH PC/104 CPCI VME PLATFORM SAAS AURORA EDGE END-TO-END SENSORS BUSINESS INTEGRATION R2U IMAGINE-BUILD-SUCCEED NETWORK 11
  • 12.
    Group Global Footprint EUROPE ASIA USA HC = 142 HC = 163 HC = 150 19.7% of Rev 30.8% of Rev 46.9% of Rev RoW 2.6% of Rev (as at 31 Dec 2010) 12
  • 13.
    The Vision Computers will be smaller and smaller, and more and more interconnected. They will weave themselves into the fabric of everyday life until they are indistinguishable from it, improving our abilities, our senses and our perceptions. 13
  • 14.
    The Mission With attention to the customer, Eurotech presents sophisticated computer and communications technologies to deliver a competitive advantage. By relying on our expertise in modular hardware, software and services, our customers are free to focus on their core competencies for successful realization of their leading-edge business applications. 14
  • 15.
    COMPANY VISION MISSION ROI PERVASIVE COMPUTERS CLOUD INTERNET OF THINGS CATALOGSMARKETS TCO DAAS PRODUCT OFFER NANOPC HPC INNOVATION MIDDLEWARE ESF COMPRESSION STRATEGY GLOBAL VALUE EDC VPX COMPLEXITY EXTREME DATA BOARDS EMBBEDDED COMPANY GROWTH VALUE STACK HW SW FW SOLUTIONS COMPETITIVENESS SYSTEMS EUROTECH PC/104 CPCI VME PLATFORM SAAS AURORA EDGE END-TO-END SENSORS BUSINESS INTEGRATION R2U IMAGINE-BUILD-SUCCEED NETWORK 15
  • 16.
    Reducing TCO: SW vs.HW TCO SW -$ PC-TCO PC-SW Cost x86 HW Time Wirth’s law: “Software gets slower faster than hardware gets faster” 16
  • 17.
    Minimize Size inthe loosely coupled NanoPC 16Mhz-1MB ’92: A Personal Computer on the palm of your hand 800Mhz-512MB ’07: A Netbook Computer on half the palm of your hand NOW: 1,6Ghz – 2GB RAM 17
  • 18.
    Minimize Size inthe tightly coupled Aurora HPC 40TFLOP in 3,3 m3 LESS IS MORE as driving principle Less Energy, Less Space better TCO and better Performances 18
  • 19.
    Pervasive Computers &Massive Data Collection "By the year 2015, you can expect 15 billion devices” Justin Rattner - CTO - Intel Dealing with the complexity of Extreme Data 19
  • 20.
    Communication Overcomes Computing Theframework is changing now. The Internet is redefining software. The Internet is redefining the role of computing and communication ……… I still don’t understand the framework. I don’t think any of us really do. Andy Grove former INTEL CEO But some aspects of it are pretty clear. It’s proven not to be computing based but communication based. from : “Decisions Don’t Wait”, Harvard Management Update. 2003 EIRMA Cannes 2011
  • 21.
    THE PLANETARY COMPUTATIONALEXOSKELETON Computers are becoming pervasive and ubiquitous Ubiquitous high bandwidth connection to the Internet at all times Massive computation available on demand through the CLOUD Tiny Computers embedded in – the environment, – our clothing, – our body Augmented real reality EIRMA Cannes 2011 21
  • 22.
    Complexity of collecting datay is growing l l i a n t n e Ex po EIRMA Cannes 2011 22
  • 23.
    Addressing Software Complexity anda new way to create Distributed Systems Cloud based apps Multitenant Mesh-up Scalable PC –Programming Easy A lot of available programs Backward compatible Productivity Assembly Limited reuse of written code Complexity and Size 23
  • 24.
    POWER IS THERE,AND YOU DON’T NEED TO CARE EDISON 1.0: Electric Power Distribution EDISON 2.0: Computation Power Distribution EIRMA Cannes 2011
  • 25.
    Transforming Bits ofData at the Edge of the Network into Actionable Information in the Users’ Hands Everyware™ Device Cloud Cloud based Device Firmware / Business Application Sensors & Device Device Data Management Application Integration Hardware and Delivery Eurotech End-To-End Solution Devices running the Everyware™ Device Cloud Client 25
  • 26.
    Encapsulating complexity: HW, Systems, R2U, Daas, PaaS Company Space 26
  • 27.
    COMPANY VISION MISSION ROI PERVASIVE COMPUTERS CLOUD INTERNET OF THINGS CATALOGSMARKETS TCO DAAS PRODUCT OFFER NANOPC HPC INNOVATION MIDDLEWARE ESF COMPRESSION STRATEGY GLOBAL VALUE EDC VPX COMPLEXITY EXTREME DATA BOARDS COMPANY GROWTH VALUE STACK HW SW FW SYSTEMS SOLUTIONS COMPETITIVENESS EUROTECH PC/104 CPCI VME EMBBEDDED PLATFORM SAAS AURORA EDGE END-TO-END SENSORS BUSINESS INTEGRATION R2U IMAGINE-BUILD-SUCCEED NETWORK 27
  • 28.
    Invention vs. Innovation Invention:  New  idea, design, model of a new  device. An idea is something that it is not yet inside the  economic system and  it  may never enter it. Innovation:  All the development process of a new product, that bring the product inside the economic system. According to Schumpeter EIRMA Cannes 2011
  • 29.
    Sustainable Growth vs.Saturation S curves get old New Evolution, New Development phase Performance Return reduction New technology Evolution Development phase Take-off Existing technology Research, Invention phase Time Each new TECHNOLOGICAL substrate is more efficient than the previous one EIRMA Cannes 2011 29
  • 30.
    Punctuated Equilibrium (inBiology, Technology, Economics, Politics…) Pareto’s Law : “The 80/20 Rule” ~ 20% Punctuation (Disruption) ~ 80% Equilibrium (Evolution) Stabile environment evolution Vilfredo F. D. Pareto 1848 ‐ 1923 Rapid changing environment time EIRMA Cannes 2011 30
  • 31.
    Are we reallywilling to innovate? Innovation fails, because organizations unwittingly strip the disruptive potential from new ideas before they ever see the light of day C.M. Christensen, M. E. Raynor EIRMA Cannes 2011 31
  • 32.
    The organization model:standard vision Markets / Customers Mercati di Oggi It goes like Mktg “CIVILIZATION Operative Operativo Mktg & BARBARITY” ! Sales Research Sales Sales centres / Universities It doesn't work... Research & Industri- Catalog/ Production Development alization Products EIRMA Cannes 2011 32
  • 33.
    The 3 HowTo: • 1 : bring the right technological innovation inside the company (at a moderate cost…) • 2: shift the innovation from research to market. In other words, how to pass from ideas and prototypes to turnover and large sales volumes • 3: avoid destroying the company, that is, how to balance change and stability EIRMA Cannes 2011
  • 34.
    The organization model:pushed by continous innovation Markets Tomorrow’s Customers Today’s Customers Strategic Planning INCREMENTAL INNOVATION Sales & Market pull Mktg Foresight  Studies DISRUPTIVE INNOVATION Technology push Research Development Engineering Production Product Portfolio Universities and Research Centres EIRMA Cannes 2011
  • 35.
    INNOVATION, MARKETS &BUSINESS MODELS DEVELOPMENT Products’ Performance STRATEGIC PLANNING RESEARCH Inspired to Christensen’s innovation model Time EIRMA Cannes 2011
  • 36.
    The Paradigm shiftin Knowledge from the Know-How to the Know-Who and the Know-Where EIRMA Cannes 2011
  • 37.
    Business Process Pillarsusing an 80/20 ROT –Fabless production model  stay flexible –Innovation within the standards  stay open TECH PUSH: 20% Prod IN Univ Direct CONCEPTS SALES PRODUCTS Dev IN >80% Labs Prod OUT Reps / >80% Agents Dev OUT Distributors MARKET PULL: 80% 37 EIRMA Cannes 2011
  • 38.
    Technology evolution and Insource-Outsource relation VISIBILITY Gartner Hype Cycle EDGE Technologies STABLE Technologies External External Development Research 20% 80% Internal Internal Development Research 80% 20% Technology Peak of Inflated Trough of Slope of Plateau of MATURITY Trigger Expectations Disillusionment Enlightenment Productivity EIRMA Cannes 2011
  • 39.
    The many facesof innovation process innovation technology innovation business model innovation DaaS PaaS IaaS product & service innovation 39
  • 40.
    A new approachin strategic management Strategy based on dynamic equilibrium driven by innovation: - High adaptability capacity - Management of many business models -Incremental Innovation -Disruptive Innovation -Knowledge network Dynamic Balancing Strategy Disruptive 1 Innovation (10%-20%) 2 Incremental Innovation (80%-90%) Poised Organization (wide range of dexterities) EIRMA Cannes 2011 40
  • 41.
    Be ready to catch the wind of change be distinct … or extinct Tom Peters change is the process by which the future invades our lives Alvin Toffler EIRMA Cannes 2011
  • 42.
    Thank you foryour attention "On résiste à l'invasion des armées; on ne résiste pas à l'invasion des idées.“ Victor Hugo, Paris 1877 42