Wind Energy Development in Ethiopia Status quo, the Wind Energy PPP and Experiences from Aysha Wind Farm Development NEFAS New Energy For African Societies Ethio-German Konnect presentation Addis Ababa, November 09, 2011
Agenda ,[object Object],[object Object],[object Object]
Ethiopia will need to add ~ 33 GW electricity over the next 20 years to enable economic growth prospects GDP projection (2009-2030, in bln. PPP$) ,[object Object],[object Object],Electricity demand (2009-2030, in GWh) Cumulative investment for power generation (2009-2030, in mil. US$) 1) Actual supply from EEPCo ( EEPCo:  Ethiopian Electric Power Corporation, national energy supplying agency)  in 2009, which was 43% below demand;  2) Based on an average capacity factor of 33.4%, derived from EEPCo planning;  3) Based on an average capacity factor of 47.0%;  Source: EEPCo Strategic Plan Summary (December 2009); IMF World Economic Outlook Database (April 2010); MOFED according to Fortune: “Gov’t: Economy to take off” (August 8, 2010); Ernst&Young Ethiopia: “Investing in Ethiopia” (September 2009); GTZ-ecbp: Human Capital and Economic Growth Evaluation Study of Ethiopia 2009-2030 (April 2009), based on Lisbon Council methodology and statistics from Central Statistics Agency (2008); IEA World Energy Outlook (2009); Own calculations ,[object Object],[object Object],[object Object],[object Object],GDP and electricity projection for Ethiopia (2009-2030)  ~65 bln. US$ 79.0 178.6 560.4 CAGR 10.0 % p.a. 2009 2018 2030 34,035 MW 3,728 28,859 140,131 1,500 MW 8,336 MW 1) 2009 2018 2030 3) 2)  ~33 GW 2018 2030 2009 68,070 16,672 3,000
Over the next 10 years, potential supply gaps could open up from uncertain hydro projects [GWh] Gibe IV 1,472 MW Gibe III 1,870 MW Electricity supply vs. domestic demand (2009- 2018, in GWh, in mil. US$) ,[object Object],[object Object],[object Object],Supply assumptions ~ 50% of supply increase depends on only two projects in Gibe which have experienced delays in the past Supply planning Delayed supply scenario 2) Demand projection Opportunity costs: 8,823 mil. US$ 1) Opportunity costs: 236 mil. US$ 1) ,[object Object],[object Object],[object Object]
Wind energy could play an important role to master this challenge and set the example for energy projects with a private institutional set-up Cumulative capacity costs, effects of financing levers 1) (2009-2030, in mil. US$) Characteristics of wind energy in Ethiopia 65,071 53,354 35,824 25,077 [mil. US$] 1) Capacity costs based on EEPCo planning for the period 2009 – 2018 and capacity needed to supply projected demand in following years; cost per MW for the period 2019 – 2030 of 2 mil. US$  Source: EEPCo Strategic Plan Summary (December 2009); IEA World Energy Outlook (2009); NEFAS calculations 1. Complementary to hydro power 2. Pipeline to fill supply gaps and serve energy demand growth already exists 3. Potential to achieve long term growth prospects 4. Local value addition possible to finance immense capacity costs 5. Can trigger Ethiopian metal sector and offer high export potential
Promising wind sites have been identified … ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Development target: ~ 1,000 MW until 2014,  ~ 5,000 MW until 2030 Identified wind farm sites - mean annual wind power density (at 50 m in m/s) Source: EEPCo ;  NEFAS Mesobo Ashegoda Aysha Debre Birhan Adama Asela Mega Speed (m/s) Density  (W/m 2 ) 1.0 -3.5 3.5 -5.6 5.6 -6.4 6.4 -7.0 7.0 -7.5 7.5 -8.0 8.0 -8.8 1 -50 50 - 200 200 - 300 300 - 400 400 - 500 500 - 600 600 - 800 >8.8 >800
…  but the wind sector currently is in an early development stage Status quo of Ethiopian wind sector (in MW) Ashegoda Adama I Aysha Adama I Ashegoda Debre Birhan Aysha Adama I Ashegoda Asela Adama II Messebo Debre Birhan Aysha Adama I Ashegoda Others Asela Adama II Messebo Debre Birhan Aysha Adama I Ashegoda 5,000 -3,780 1,220 -350 870 -400 470 -300 170 ,[object Object],[object Object],[object Object],[object Object],Source: EEPCo ;  NEFAS CONSTRUCTION STUDY PRE-STUDY IDENTIFIED TOTAL MW
Agenda ,[object Object],[object Object],[object Object]
Success depends on overcoming inter-depending hurdles along the value chain and financing local activities Success factors in the Ethiopian environment Source: NEFAS 1. Collaboration of key players along the value chain 2. Acquisition of funds to finance local activities 3. Combination of suitable technical solutions with financial sources
Interest in Ethiopian wind is high – common resistance predominantly found in the market Inter-depending hurdles in Ethiopia (Exemplifications) “ There is not enough MW installed yet” “ No local project development capacity” “ No local S&M, Operations capacity” “ No FIT, longevity for tariffs, low level of tariffs” “ Limited possibility for private sector involvement” … . Source: NEFAS experiences 1. Collaboration of key players along the value chain
Collaboration of key players along the value chain is needed to get things started Operations Construction Manufacturing Service and Maintenance Supply chain management Operations Construction Manufacturing Service and Maintenance Supply chain management Project development Capacity building on ministerial, institutional and private sector level Policy dialogue on Prime Minister, Ministerial, Regulatory Level Gaps along the value chain to be addressed Source: NEFAS 1. Collaboration of key players along the value chain
The PPP avails the financial means to develop local capacity, finalize the feasibility studies and educate local HR  MINISTERIAL LEVEL ,[object Object],[object Object],[object Object],[object Object],INSTITUTIONAL LEVEL ,[object Object],[object Object],[object Object],[object Object],PRIVATE SECTOR LEVEL ,[object Object],[object Object],[object Object],[object Object],Total Budget for 3 Years: ~ 1.7 mil. EUR Capacity development levels of the PPP Source: NEFAS 2. Acquisition of funds to finance local activities
The PPP supports our local activities and helps us to build local capacity for the emerging industry 1 Oct. 2010 Date Key Activity Private Goal Public Goal Aug. 2010 June. 2011 Nov. 2011 Oct 2011 Apr. 2011 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Example 2: local capacity building Source: NEFAS ,[object Object],Implementing Pre- evaluations Commencing the program Progress made Establishing a joint design team Preliminary capacity assessment Continued assessment Continuous development of the process and further identification of local partners Time Line 2. Acquisition of funds to finance local activities
Agenda ,[object Object],[object Object],[object Object]
Location for the wind farm with promising site characteristics – 120 MW MoU and studies showing feasibility Reliable, high average wind speeds during the year Sandy gravel with strong load carrying capacity Location close to grid and heavy duty all-weather road Very flat terrain with some wind-bent vegetation Source: Aysha feasibility studies 120 MW MoU Site characteristics SITE  CHARACTERISTICS
Aysha 30 – 120 MW wind farm in Somali Regional State ,[object Object],[object Object],[object Object],[object Object],[object Object],Source: NEFAS The wind farm and description of the status quo
Resulting from the institutional set-up, the financing structure is the key component in the cycle from capacity increase to economic growth Capacity increase/ economic growth cycle Source: NEFAS Tech transfer Debt burden Economic growth Electricity demand FDI Local manufacturing and value added Financing Institutional set-up Capacity increase Determines price per MW, FDI and potential for technology transfer
NEFAS – New Energy for African Societies Project Office Zola Road, near Mozambique Embassy Addis Ababa Ethiopia Mobile: + 251 920 312 036 Email:  [email_address] Webpage: www.ethiopianwind.com NEFAS

More Related Content

What's hot

Power Sector Development in Myanmar
Power Sector Development in MyanmarPower Sector Development in Myanmar
Power Sector Development in Myanmar
MYO AUNG Myanmar
 
Recovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorRecovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sector
Alexander Decker
 
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Dr. Hachimenum Amadi
 
The roadmap for power sector reform update
The roadmap for power sector reform updateThe roadmap for power sector reform update
The roadmap for power sector reform update
Nigeria Alternative Energy Expo
 
7 andreas tuerk better_zagreb_09_12 10h03
7 andreas tuerk  better_zagreb_09_12 10h037 andreas tuerk  better_zagreb_09_12 10h03
7 andreas tuerk better_zagreb_09_12 10h03
UNDPhr
 
Myanmar Country Presentation at ACEF 2014
Myanmar Country Presentation at ACEF 2014Myanmar Country Presentation at ACEF 2014
Myanmar Country Presentation at ACEF 2014
Energy for All | Asian Development Bank
 
Policy Paper (advanced draft) with Recommendations to Government on Renewable...
Policy Paper (advanced draft) with Recommendations to Government on Renewable...Policy Paper (advanced draft) with Recommendations to Government on Renewable...
Policy Paper (advanced draft) with Recommendations to Government on Renewable...
Dr. Joshua Zake
 
Bitec 2013 , IPEEC
Bitec 2013 , IPEECBitec 2013 , IPEEC
Bitec 2013 , IPEEC
nooone
 
Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
Dr. Oliver Massmann
 
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
electricitygovernance
 
Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...
Gilberto De Martino Jannuzzi
 
Aceee 2006
Aceee 2006Aceee 2006
Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019
Danang Yogisworo
 
NAEE 2013 Renewable Energy Progamme of Nigeria Presentation
NAEE  2013 Renewable Energy Progamme of Nigeria Presentation NAEE  2013 Renewable Energy Progamme of Nigeria Presentation
NAEE 2013 Renewable Energy Progamme of Nigeria Presentation
Nigeria Alternative Energy Expo
 
FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...
FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...
FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...
Associação Nacional de Jovens Empresários
 
FARCROSS project Innovative solutions for increased regional cross-border coo...
FARCROSS project Innovative solutions for increased regional cross-border coo...FARCROSS project Innovative solutions for increased regional cross-border coo...
FARCROSS project Innovative solutions for increased regional cross-border coo...
Leonardo ENERGY
 
The integration of the energy sector in South Africa
The integration of the energy sector in South AfricaThe integration of the energy sector in South Africa
The integration of the energy sector in South Africa
Saidh KESSACI
 
OECD-GIZ-Conference-Presentations-JICA
OECD-GIZ-Conference-Presentations-JICAOECD-GIZ-Conference-Presentations-JICA
OECD-GIZ-Conference-Presentations-JICA
OECD Environment
 
NAEE 2013 GIZ presentation
NAEE 2013 GIZ presentation NAEE 2013 GIZ presentation
NAEE 2013 GIZ presentation
Nigeria Alternative Energy Expo
 
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Smart Villages
 

What's hot (20)

Power Sector Development in Myanmar
Power Sector Development in MyanmarPower Sector Development in Myanmar
Power Sector Development in Myanmar
 
Recovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorRecovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sector
 
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
Assessment of Energy Losses and Cost Implications in the Nigerian Distributio...
 
The roadmap for power sector reform update
The roadmap for power sector reform updateThe roadmap for power sector reform update
The roadmap for power sector reform update
 
7 andreas tuerk better_zagreb_09_12 10h03
7 andreas tuerk  better_zagreb_09_12 10h037 andreas tuerk  better_zagreb_09_12 10h03
7 andreas tuerk better_zagreb_09_12 10h03
 
Myanmar Country Presentation at ACEF 2014
Myanmar Country Presentation at ACEF 2014Myanmar Country Presentation at ACEF 2014
Myanmar Country Presentation at ACEF 2014
 
Policy Paper (advanced draft) with Recommendations to Government on Renewable...
Policy Paper (advanced draft) with Recommendations to Government on Renewable...Policy Paper (advanced draft) with Recommendations to Government on Renewable...
Policy Paper (advanced draft) with Recommendations to Government on Renewable...
 
Bitec 2013 , IPEEC
Bitec 2013 , IPEECBitec 2013 , IPEEC
Bitec 2013 , IPEEC
 
Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
 
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
 
Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...
 
Aceee 2006
Aceee 2006Aceee 2006
Aceee 2006
 
Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019
 
NAEE 2013 Renewable Energy Progamme of Nigeria Presentation
NAEE  2013 Renewable Energy Progamme of Nigeria Presentation NAEE  2013 Renewable Energy Progamme of Nigeria Presentation
NAEE 2013 Renewable Energy Progamme of Nigeria Presentation
 
FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...
FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...
FORUM PORTUGAL ENERGY POWER: Renewable Energy in Europe – until and beyond 20...
 
FARCROSS project Innovative solutions for increased regional cross-border coo...
FARCROSS project Innovative solutions for increased regional cross-border coo...FARCROSS project Innovative solutions for increased regional cross-border coo...
FARCROSS project Innovative solutions for increased regional cross-border coo...
 
The integration of the energy sector in South Africa
The integration of the energy sector in South AfricaThe integration of the energy sector in South Africa
The integration of the energy sector in South Africa
 
OECD-GIZ-Conference-Presentations-JICA
OECD-GIZ-Conference-Presentations-JICAOECD-GIZ-Conference-Presentations-JICA
OECD-GIZ-Conference-Presentations-JICA
 
NAEE 2013 GIZ presentation
NAEE 2013 GIZ presentation NAEE 2013 GIZ presentation
NAEE 2013 GIZ presentation
 
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
 

Viewers also liked

Growth and Structural Transformation in Ethiopia
Growth and Structural Transformation in EthiopiaGrowth and Structural Transformation in Ethiopia
Growth and Structural Transformation in Ethiopia
essp2
 
Implications of Agricultural Productivity Growth for Structural Change and ...
Implications of Agricultural Productivity Growth for Structural Change and ...Implications of Agricultural Productivity Growth for Structural Change and ...
Implications of Agricultural Productivity Growth for Structural Change and ...
essp2
 
Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...
Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...
Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...
essp2
 
Insights into the genetic diversity and structure of indigenous ovi-caprine p...
Insights into the genetic diversity and structure of indigenous ovi-caprine p...Insights into the genetic diversity and structure of indigenous ovi-caprine p...
Insights into the genetic diversity and structure of indigenous ovi-caprine p...
ILRI
 
Ethiopia
EthiopiaEthiopia
Ethiopia
Afadz101
 
Ethiopian political party Kinijit manifesto-english
Ethiopian political party Kinijit manifesto-englishEthiopian political party Kinijit manifesto-english
Ethiopian political party Kinijit manifesto-english
Ethio-Afric News en Views Media!!
 

Viewers also liked (6)

Growth and Structural Transformation in Ethiopia
Growth and Structural Transformation in EthiopiaGrowth and Structural Transformation in Ethiopia
Growth and Structural Transformation in Ethiopia
 
Implications of Agricultural Productivity Growth for Structural Change and ...
Implications of Agricultural Productivity Growth for Structural Change and ...Implications of Agricultural Productivity Growth for Structural Change and ...
Implications of Agricultural Productivity Growth for Structural Change and ...
 
Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...
Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...
Ethiopia's Growth and Transformation Plan: A CGE Analysis of Alternative Fina...
 
Insights into the genetic diversity and structure of indigenous ovi-caprine p...
Insights into the genetic diversity and structure of indigenous ovi-caprine p...Insights into the genetic diversity and structure of indigenous ovi-caprine p...
Insights into the genetic diversity and structure of indigenous ovi-caprine p...
 
Ethiopia
EthiopiaEthiopia
Ethiopia
 
Ethiopian political party Kinijit manifesto-english
Ethiopian political party Kinijit manifesto-englishEthiopian political party Kinijit manifesto-english
Ethiopian political party Kinijit manifesto-english
 

Similar to EGK 2011: Energy 01 LAFTO TURBINE

Capacity Building on Modeling the Ethiopian Energy System: Final Workshop
Capacity Building on Modeling the Ethiopian Energy System: Final WorkshopCapacity Building on Modeling the Ethiopian Energy System: Final Workshop
Capacity Building on Modeling the Ethiopian Energy System: Final Workshop
International Food Policy Research Institute (IFPRI)
 
AFD Energy Portfolio in Indonesia.pdf
AFD Energy Portfolio in Indonesia.pdfAFD Energy Portfolio in Indonesia.pdf
AFD Energy Portfolio in Indonesia.pdf
OECD Environment
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in morocco
RCREEE
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investing
Phat Nguyen
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...
OECD Environment
 
Re technologies cost_analysis-wind_power
Re technologies cost_analysis-wind_powerRe technologies cost_analysis-wind_power
Re technologies cost_analysis-wind_power
Dr Lendy Spires
 
IHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper OduorIHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper Oduor
International Hydropower Association
 
IHA Congress 2011 - Jasper Oduor global worshop
IHA Congress 2011 - Jasper Oduor global worshopIHA Congress 2011 - Jasper Oduor global worshop
IHA Congress 2011 - Jasper Oduor global worshop
International Hydropower Association
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mouhcine Benmeziane
 
14 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 201314 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 2013
UNDPhr
 
Infraestructura 2030
Infraestructura 2030Infraestructura 2030
L010437380
L010437380L010437380
L010437380
IOSR Journals
 
World Energy Council Scenarios Project: An International Perspective
World Energy Council Scenarios Project: An International PerspectiveWorld Energy Council Scenarios Project: An International Perspective
World Energy Council Scenarios Project: An International Perspective
NERI_NZ
 
ENTRO-Executive-Summary-final
ENTRO-Executive-Summary-finalENTRO-Executive-Summary-final
ENTRO-Executive-Summary-final
Philippe Lebreton
 
Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students
ZAINI ABDUL WAHAB
 
PIDA Brief Energy
PIDA Brief EnergyPIDA Brief Energy
PIDA Brief Energy
Dr Lendy Spires
 
Tajikistan
TajikistanTajikistan
Tajikistan
UNDP Eurasia
 
Infrastructure to 2030 opportunities and challenges
Infrastructure to 2030 opportunities and challengesInfrastructure to 2030 opportunities and challenges
Infrastructure to 2030 opportunities and challenges
Centro de la OCDE en México para América Latina
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for Malaysians
ZAINI ABDUL WAHAB
 
Apec bali 2013
Apec bali 2013Apec bali 2013
Apec bali 2013
nooone
 

Similar to EGK 2011: Energy 01 LAFTO TURBINE (20)

Capacity Building on Modeling the Ethiopian Energy System: Final Workshop
Capacity Building on Modeling the Ethiopian Energy System: Final WorkshopCapacity Building on Modeling the Ethiopian Energy System: Final Workshop
Capacity Building on Modeling the Ethiopian Energy System: Final Workshop
 
AFD Energy Portfolio in Indonesia.pdf
AFD Energy Portfolio in Indonesia.pdfAFD Energy Portfolio in Indonesia.pdf
AFD Energy Portfolio in Indonesia.pdf
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in morocco
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investing
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...
 
Re technologies cost_analysis-wind_power
Re technologies cost_analysis-wind_powerRe technologies cost_analysis-wind_power
Re technologies cost_analysis-wind_power
 
IHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper OduorIHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper Oduor
 
IHA Congress 2011 - Jasper Oduor global worshop
IHA Congress 2011 - Jasper Oduor global worshopIHA Congress 2011 - Jasper Oduor global worshop
IHA Congress 2011 - Jasper Oduor global worshop
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy Sector
 
14 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 201314 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 2013
 
Infraestructura 2030
Infraestructura 2030Infraestructura 2030
Infraestructura 2030
 
L010437380
L010437380L010437380
L010437380
 
World Energy Council Scenarios Project: An International Perspective
World Energy Council Scenarios Project: An International PerspectiveWorld Energy Council Scenarios Project: An International Perspective
World Energy Council Scenarios Project: An International Perspective
 
ENTRO-Executive-Summary-final
ENTRO-Executive-Summary-finalENTRO-Executive-Summary-final
ENTRO-Executive-Summary-final
 
Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students
 
PIDA Brief Energy
PIDA Brief EnergyPIDA Brief Energy
PIDA Brief Energy
 
Tajikistan
TajikistanTajikistan
Tajikistan
 
Infrastructure to 2030 opportunities and challenges
Infrastructure to 2030 opportunities and challengesInfrastructure to 2030 opportunities and challenges
Infrastructure to 2030 opportunities and challenges
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for Malaysians
 
Apec bali 2013
Apec bali 2013Apec bali 2013
Apec bali 2013
 

More from icebauhaus

egk14 - Input: WS Tools for Knowledge Application
egk14 - Input: WS Tools for Knowledge Applicationegk14 - Input: WS Tools for Knowledge Application
egk14 - Input: WS Tools for Knowledge Application
icebauhaus
 
Tools of knowledge application workshop decription
Tools of knowledge application   workshop decriptionTools of knowledge application   workshop decription
Tools of knowledge application workshop decription
icebauhaus
 
egk13 - African Business Women connected - Nigist Haile, ABW
egk13 - African Business Women connected  - Nigist Haile, ABWegk13 - African Business Women connected  - Nigist Haile, ABW
egk13 - African Business Women connected - Nigist Haile, ABW
icebauhaus
 
egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...
egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...
egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...
icebauhaus
 
egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...
egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...
egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...
icebauhaus
 
egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...
egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...
egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...
icebauhaus
 
egk13 - Intra Africa Trade - Abebe Abebayehu
egk13 - Intra Africa Trade - Abebe Abebayehuegk13 - Intra Africa Trade - Abebe Abebayehu
egk13 - Intra Africa Trade - Abebe Abebayehu
icebauhaus
 
egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...
egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...
egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...
icebauhaus
 
egk13 - Brain Circulation Schemes - Erick Tambo
egk13 - Brain Circulation Schemes - Erick Tamboegk13 - Brain Circulation Schemes - Erick Tambo
egk13 - Brain Circulation Schemes - Erick Tambo
icebauhaus
 
egk13 - PACCI - Victoria Endeshaw
egk13 - PACCI - Victoria Endeshaw egk13 - PACCI - Victoria Endeshaw
egk13 - PACCI - Victoria Endeshaw
icebauhaus
 
egk13 - 2 innovation & migration - Ahmed-Bastawy
egk13 - 2 innovation & migration - Ahmed-Bastawyegk13 - 2 innovation & migration - Ahmed-Bastawy
egk13 - 2 innovation & migration - Ahmed-Bastawy
icebauhaus
 
egk13 - Pan African University - Karola Hahn
egk13 - Pan African University - Karola Hahnegk13 - Pan African University - Karola Hahn
egk13 - Pan African University - Karola Hahn
icebauhaus
 
Egk 2012 sarah yussuf & florian manderscheid, iceaddis
Egk 2012   sarah yussuf & florian manderscheid, iceaddisEgk 2012   sarah yussuf & florian manderscheid, iceaddis
Egk 2012 sarah yussuf & florian manderscheid, iceaddis
icebauhaus
 
Egk 2012 stephanie deubler, giz
 Egk 2012   stephanie deubler, giz Egk 2012   stephanie deubler, giz
Egk 2012 stephanie deubler, giz
icebauhaus
 
Egk 2012 mewael kiros, assefa
 Egk 2012   mewael kiros, assefa Egk 2012   mewael kiros, assefa
Egk 2012 mewael kiros, assefa
icebauhaus
 
Egk 2012 jörn schultz, icebauhaus
 Egk 2012   jörn schultz, icebauhaus Egk 2012   jörn schultz, icebauhaus
Egk 2012 jörn schultz, icebauhausicebauhaus
 
Egk 2012 eskinder mamo, daesav
 Egk 2012   eskinder mamo, daesav Egk 2012   eskinder mamo, daesav
Egk 2012 eskinder mamo, daesav
icebauhaus
 
Egk 2012 esayas gebremedhin, i wish
 Egk 2012   esayas gebremedhin, i wish Egk 2012   esayas gebremedhin, i wish
Egk 2012 esayas gebremedhin, i wish
icebauhaus
 
Egk 2012 boris buechler, slm
 Egk 2012   boris buechler, slm Egk 2012   boris buechler, slm
Egk 2012 boris buechler, slm
icebauhaus
 
Egk 2012 amanuel abrha, ikta
 Egk 2012   amanuel abrha, ikta Egk 2012   amanuel abrha, ikta
Egk 2012 amanuel abrha, ikta
icebauhaus
 

More from icebauhaus (20)

egk14 - Input: WS Tools for Knowledge Application
egk14 - Input: WS Tools for Knowledge Applicationegk14 - Input: WS Tools for Knowledge Application
egk14 - Input: WS Tools for Knowledge Application
 
Tools of knowledge application workshop decription
Tools of knowledge application   workshop decriptionTools of knowledge application   workshop decription
Tools of knowledge application workshop decription
 
egk13 - African Business Women connected - Nigist Haile, ABW
egk13 - African Business Women connected  - Nigist Haile, ABWegk13 - African Business Women connected  - Nigist Haile, ABW
egk13 - African Business Women connected - Nigist Haile, ABW
 
egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...
egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...
egk - #OS SOUTH SUDAN Open Systems Strategies for Peace, Innovation and Devel...
 
egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...
egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...
egk13 - Hubs as anchor points for innovation in Africa - Claude Migisha, KLab...
 
egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...
egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...
egk13 - dibsr.com: Connecting Offline Merchants to Online Consumers - Tewodro...
 
egk13 - Intra Africa Trade - Abebe Abebayehu
egk13 - Intra Africa Trade - Abebe Abebayehuegk13 - Intra Africa Trade - Abebe Abebayehu
egk13 - Intra Africa Trade - Abebe Abebayehu
 
egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...
egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...
egk13 - Harnessing Innovation for Wider Educational Integration - Oforiwa Mac...
 
egk13 - Brain Circulation Schemes - Erick Tambo
egk13 - Brain Circulation Schemes - Erick Tamboegk13 - Brain Circulation Schemes - Erick Tambo
egk13 - Brain Circulation Schemes - Erick Tambo
 
egk13 - PACCI - Victoria Endeshaw
egk13 - PACCI - Victoria Endeshaw egk13 - PACCI - Victoria Endeshaw
egk13 - PACCI - Victoria Endeshaw
 
egk13 - 2 innovation & migration - Ahmed-Bastawy
egk13 - 2 innovation & migration - Ahmed-Bastawyegk13 - 2 innovation & migration - Ahmed-Bastawy
egk13 - 2 innovation & migration - Ahmed-Bastawy
 
egk13 - Pan African University - Karola Hahn
egk13 - Pan African University - Karola Hahnegk13 - Pan African University - Karola Hahn
egk13 - Pan African University - Karola Hahn
 
Egk 2012 sarah yussuf & florian manderscheid, iceaddis
Egk 2012   sarah yussuf & florian manderscheid, iceaddisEgk 2012   sarah yussuf & florian manderscheid, iceaddis
Egk 2012 sarah yussuf & florian manderscheid, iceaddis
 
Egk 2012 stephanie deubler, giz
 Egk 2012   stephanie deubler, giz Egk 2012   stephanie deubler, giz
Egk 2012 stephanie deubler, giz
 
Egk 2012 mewael kiros, assefa
 Egk 2012   mewael kiros, assefa Egk 2012   mewael kiros, assefa
Egk 2012 mewael kiros, assefa
 
Egk 2012 jörn schultz, icebauhaus
 Egk 2012   jörn schultz, icebauhaus Egk 2012   jörn schultz, icebauhaus
Egk 2012 jörn schultz, icebauhaus
 
Egk 2012 eskinder mamo, daesav
 Egk 2012   eskinder mamo, daesav Egk 2012   eskinder mamo, daesav
Egk 2012 eskinder mamo, daesav
 
Egk 2012 esayas gebremedhin, i wish
 Egk 2012   esayas gebremedhin, i wish Egk 2012   esayas gebremedhin, i wish
Egk 2012 esayas gebremedhin, i wish
 
Egk 2012 boris buechler, slm
 Egk 2012   boris buechler, slm Egk 2012   boris buechler, slm
Egk 2012 boris buechler, slm
 
Egk 2012 amanuel abrha, ikta
 Egk 2012   amanuel abrha, ikta Egk 2012   amanuel abrha, ikta
Egk 2012 amanuel abrha, ikta
 

Recently uploaded

Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |
AstuteBusiness
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
Zilliz
 
Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024
Jason Packer
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
Hiroshi SHIBATA
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
Javier Junquera
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
Chart Kalyan
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
DanBrown980551
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
Tatiana Kojar
 
A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024
Intelisync
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
HarisZaheer8
 
Trusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process MiningTrusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process Mining
LucaBarbaro3
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
Miro Wengner
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
ssuserfac0301
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
ScyllaDB
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
dbms calicut university B. sc Cs 4th sem.pdf
dbms  calicut university B. sc Cs 4th sem.pdfdbms  calicut university B. sc Cs 4th sem.pdf
dbms calicut university B. sc Cs 4th sem.pdf
Shinana2
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
Zilliz
 
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
alexjohnson7307
 

Recently uploaded (20)

Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
 
Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
 
A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
 
Trusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process MiningTrusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process Mining
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
dbms calicut university B. sc Cs 4th sem.pdf
dbms  calicut university B. sc Cs 4th sem.pdfdbms  calicut university B. sc Cs 4th sem.pdf
dbms calicut university B. sc Cs 4th sem.pdf
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
 
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
 

EGK 2011: Energy 01 LAFTO TURBINE

  • 1. Wind Energy Development in Ethiopia Status quo, the Wind Energy PPP and Experiences from Aysha Wind Farm Development NEFAS New Energy For African Societies Ethio-German Konnect presentation Addis Ababa, November 09, 2011
  • 2.
  • 3.
  • 4.
  • 5. Wind energy could play an important role to master this challenge and set the example for energy projects with a private institutional set-up Cumulative capacity costs, effects of financing levers 1) (2009-2030, in mil. US$) Characteristics of wind energy in Ethiopia 65,071 53,354 35,824 25,077 [mil. US$] 1) Capacity costs based on EEPCo planning for the period 2009 – 2018 and capacity needed to supply projected demand in following years; cost per MW for the period 2019 – 2030 of 2 mil. US$ Source: EEPCo Strategic Plan Summary (December 2009); IEA World Energy Outlook (2009); NEFAS calculations 1. Complementary to hydro power 2. Pipeline to fill supply gaps and serve energy demand growth already exists 3. Potential to achieve long term growth prospects 4. Local value addition possible to finance immense capacity costs 5. Can trigger Ethiopian metal sector and offer high export potential
  • 6.
  • 7.
  • 8.
  • 9. Success depends on overcoming inter-depending hurdles along the value chain and financing local activities Success factors in the Ethiopian environment Source: NEFAS 1. Collaboration of key players along the value chain 2. Acquisition of funds to finance local activities 3. Combination of suitable technical solutions with financial sources
  • 10. Interest in Ethiopian wind is high – common resistance predominantly found in the market Inter-depending hurdles in Ethiopia (Exemplifications) “ There is not enough MW installed yet” “ No local project development capacity” “ No local S&M, Operations capacity” “ No FIT, longevity for tariffs, low level of tariffs” “ Limited possibility for private sector involvement” … . Source: NEFAS experiences 1. Collaboration of key players along the value chain
  • 11. Collaboration of key players along the value chain is needed to get things started Operations Construction Manufacturing Service and Maintenance Supply chain management Operations Construction Manufacturing Service and Maintenance Supply chain management Project development Capacity building on ministerial, institutional and private sector level Policy dialogue on Prime Minister, Ministerial, Regulatory Level Gaps along the value chain to be addressed Source: NEFAS 1. Collaboration of key players along the value chain
  • 12.
  • 13.
  • 14.
  • 15. Location for the wind farm with promising site characteristics – 120 MW MoU and studies showing feasibility Reliable, high average wind speeds during the year Sandy gravel with strong load carrying capacity Location close to grid and heavy duty all-weather road Very flat terrain with some wind-bent vegetation Source: Aysha feasibility studies 120 MW MoU Site characteristics SITE CHARACTERISTICS
  • 16.
  • 17. Resulting from the institutional set-up, the financing structure is the key component in the cycle from capacity increase to economic growth Capacity increase/ economic growth cycle Source: NEFAS Tech transfer Debt burden Economic growth Electricity demand FDI Local manufacturing and value added Financing Institutional set-up Capacity increase Determines price per MW, FDI and potential for technology transfer
  • 18. NEFAS – New Energy for African Societies Project Office Zola Road, near Mozambique Embassy Addis Ababa Ethiopia Mobile: + 251 920 312 036 Email: [email_address] Webpage: www.ethiopianwind.com NEFAS

Editor's Notes

  1. Dietmar Ostermann was named our new CEO in December 2001. He is only the 5 th person to hold this position. He is young – 40 – and has brought a new generation of leadership to the company As well as a new energy and sense of purpose And a new strategic direction, with focus on collaboration and alliances
  2. Dietmar Ostermann was named our new CEO in December 2001. He is only the 5 th person to hold this position. He is young – 40 – and has brought a new generation of leadership to the company As well as a new energy and sense of purpose And a new strategic direction, with focus on collaboration and alliances