Background of the project
Scope - capturing the water from rain & treat the gray water from wash room and
reuse them for toilet flushing in RCW changing room premises
Ruhuna cement works plant is situated in low country wet zone. Average annual
rainfall in wet zone is 2000-2500mm. RCW site average annual rainfall is
2570mm
As new trend to sustainable development and green technologies this will help to
move our organization good picture as eco friendly industry.
rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 2
Significance of the Project
In current situation water requirement is fulfilled by the National water supply
and drainage board.
Average water requirement is about 3000 m3 per month from the NWSDB.
more than 450m3 is used for the changing room domestic water usage.
Objective of this project is to reduce the water supply from the NWSDB by
rainwater harvesting and gray water treatment system. This is a long term cost
effective sustainable design.
rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 3
Capacity
Average annual rainfall in the site
Total catchment area
Catchment coefficient
Average rainwater that can be captured per day
2570mm
365m2
0.9
2313 L
Average Daily water requirement for the
changing rooms
Water requirement for showers and sinks 70%
Water requirement for toilet flushing 30%
15 000 L
10 500L
4 500L
Daily Wastewater treatment capacity 4000L
Total daily water saving percentage 42%
Annual water saving
Annual water requirement
2305 m3
5475
rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 4
Diagram of the RWHS design
rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 5
Gray water treatment system
rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 6
Cost analysis- RWHS
rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 7
Purpose amou
nt
LKR
Gutters Already available
Screen 3 5 000
First flush floating ball device 3 6 000
1000L storage tank 3 Reusable IBC tank/already available tanks
Pump 1 50 000
Pressure accumulator 1 40 000
plumbing 60 000
Cartridge filter 10 µm 1 8 000
Base for above ground level tank(1000L) 1 3 000
Miscellaneous 30 000
Fixed cost 202 000
Operating cost Per
Year
50 000
8rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015
Purpose amount LKR
Storage tank
5 (5000L)
Reusable IBC tank 5
Digging ( for 2 IBC tank) 50 000
Plumbing 30 000
Pump (underground to changing room first floor ) 1 25 000
Accumulator 1 20 000
sand filter 1 75 000
Chlorine treatment (chlorine dosing pump) 2 120 000
Miscellaneous 50 000
Fixed cost 370 000
Operating cost
For chlorine
treatment
4 000
Gray water treatment plant
9rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015
• Total fixed cost = 572 000
• Annual operating cost = 54 000
• Annual water saving = 2305 m3
• Annual water saving percentage = 42 %
• Annual cost saving = 207 450LKR
• Payback period = 2 years and 8 months
Cost benefit analysis
10rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015
Project implementation time frame
# Activity
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
W
1
W
2
W
3
W
4
W
1
W
2
W
3
W
4
W
1
W
2
W
3
W
4
W
1
W
2
W
3
W
4
W
1
W
2
W
3
W
4
W
1
W
2
W
3
W
4
1
Identifying suitable area for
project
2
Prepare project proposal and
get approval
3
Further Improvement of the
design according to
discussion panel
4
Get quotation (by
procurement division )
5 Build and construction
6
Water testing and
commissioning
•
Thank you…
For the sustainable performance according to our 2030
plan
rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 11

More Related Content

What's hot

Wastewater Capital Improvement Program
Wastewater Capital Improvement ProgramWastewater Capital Improvement Program
Wastewater Capital Improvement Program
City of College Station
 
Packaged and FRP Sewage Treatment Plant
Packaged and FRP Sewage Treatment PlantPackaged and FRP Sewage Treatment Plant
Packaged and FRP Sewage Treatment Plant
Sushil Ghorawat
 
DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master Plan
CityofKilleen
 
Wastewater Master Plan Update
Wastewater Master Plan UpdateWastewater Master Plan Update
Wastewater Master Plan Update
City of College Station
 
Water Conservation at the Port of San Diego
Water Conservation at the Port of San DiegoWater Conservation at the Port of San Diego
Water Conservation at the Port of San Diego
San Diego County Water Authority
 
International Water Summit 2016
International Water Summit 2016International Water Summit 2016
International Water Summit 2016
Dori Álvarez Romero
 
Drip irrigation and service provision of irrigation water: New ways to step i...
Drip irrigation and service provision of irrigation water: New ways to step i...Drip irrigation and service provision of irrigation water: New ways to step i...
Drip irrigation and service provision of irrigation water: New ways to step i...
africa-rising
 
Alan Cook - Bristol Water
Alan Cook - Bristol Water  Alan Cook - Bristol Water
Alan Cook - Bristol Water
Go Green
 
Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013
India Water Portal
 
James Castro
James CastroJames Castro
James Castro
CCCASTAFF
 
IRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of Gutters
IRJET Journal
 
Farm Business Update 2014: Lavenham, Essex and Suffolk Water
Farm Business Update 2014: Lavenham, Essex and Suffolk WaterFarm Business Update 2014: Lavenham, Essex and Suffolk Water
Farm Business Update 2014: Lavenham, Essex and Suffolk Water
CLA - East
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina
 
WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015
The Texas Network, LLC
 
Fy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and UtilitiesFy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and Utilities
ahcitycouncil
 

What's hot (18)

Wastewater Capital Improvement Program
Wastewater Capital Improvement ProgramWastewater Capital Improvement Program
Wastewater Capital Improvement Program
 
Packaged and FRP Sewage Treatment Plant
Packaged and FRP Sewage Treatment PlantPackaged and FRP Sewage Treatment Plant
Packaged and FRP Sewage Treatment Plant
 
DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master Plan
 
Ph d presentation npc final
Ph d presentation npc finalPh d presentation npc final
Ph d presentation npc final
 
Wastewater Master Plan Update
Wastewater Master Plan UpdateWastewater Master Plan Update
Wastewater Master Plan Update
 
Water Conservation at the Port of San Diego
Water Conservation at the Port of San DiegoWater Conservation at the Port of San Diego
Water Conservation at the Port of San Diego
 
MobileUnit
MobileUnitMobileUnit
MobileUnit
 
International Water Summit 2016
International Water Summit 2016International Water Summit 2016
International Water Summit 2016
 
1.3 pbcwud update
1.3 pbcwud update1.3 pbcwud update
1.3 pbcwud update
 
Drip irrigation and service provision of irrigation water: New ways to step i...
Drip irrigation and service provision of irrigation water: New ways to step i...Drip irrigation and service provision of irrigation water: New ways to step i...
Drip irrigation and service provision of irrigation water: New ways to step i...
 
Alan Cook - Bristol Water
Alan Cook - Bristol Water  Alan Cook - Bristol Water
Alan Cook - Bristol Water
 
Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013
 
James Castro
James CastroJames Castro
James Castro
 
IRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of Gutters
 
Farm Business Update 2014: Lavenham, Essex and Suffolk Water
Farm Business Update 2014: Lavenham, Essex and Suffolk WaterFarm Business Update 2014: Lavenham, Essex and Suffolk Water
Farm Business Update 2014: Lavenham, Essex and Suffolk Water
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
 
WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015
 
Fy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and UtilitiesFy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and Utilities
 

Similar to Efficient water usage improvement

Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
IRJET Journal
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
IRJET Journal
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalManuel Hidalgo
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalManuel Hidalgo
 
Next Gen Filton Airfield, UK
Next Gen Filton Airfield, UKNext Gen Filton Airfield, UK
Next Gen Filton Airfield, UK
NextGen Water Solutions
 
CMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdfCMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdf
AthrvaKumkar
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET Journal
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatment
A.T.E. Private Limited
 
Rainwater Harvesting in an Urban Context : Training of Urban Local Bodies
Rainwater Harvesting in an Urban Context : Training of Urban Local BodiesRainwater Harvesting in an Urban Context : Training of Urban Local Bodies
Rainwater Harvesting in an Urban Context : Training of Urban Local Bodies
biomeshubha
 
IWRM Evaluation Result_Singapore
IWRM Evaluation Result_SingaporeIWRM Evaluation Result_Singapore
IWRM Evaluation Result_Singapore
GWP SOUTHEAST ASIA
 
Rainwater harvesting at APD
Rainwater harvesting at APDRainwater harvesting at APD
Rainwater harvesting at APD
biometrust
 
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
IRJET Journal
 
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
Melvin Eldin
 
Kenworth Trucks saving water case study
Kenworth Trucks saving water case studyKenworth Trucks saving water case study
Kenworth Trucks saving water case study
NEXTDC
 
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...
vivatechijri
 
Environmental presentation from malthouse engineering
Environmental presentation from malthouse engineeringEnvironmental presentation from malthouse engineering
Environmental presentation from malthouse engineering
Malthouse Engineering Ltd.
 
Biomerwh in kristalvilla
Biomerwh in kristalvillaBiomerwh in kristalvilla
Biomerwh in kristalvillabiomeshubha
 
Presentation fyp
Presentation fypPresentation fyp
Presentation fyp
MuhammadRehanAnjum
 
Ppt dated 7th recycle &Reuse
Ppt dated 7th recycle &ReusePpt dated 7th recycle &Reuse
Ppt dated 7th recycle &Reuse
Amit Mishra
 
01. nalco tsl sustainability expo
01. nalco   tsl sustainability expo01. nalco   tsl sustainability expo
01. nalco tsl sustainability expo
EEGRAB
 

Similar to Efficient water usage improvement (20)

Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Next Gen Filton Airfield, UK
Next Gen Filton Airfield, UKNext Gen Filton Airfield, UK
Next Gen Filton Airfield, UK
 
CMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdfCMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdf
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatment
 
Rainwater Harvesting in an Urban Context : Training of Urban Local Bodies
Rainwater Harvesting in an Urban Context : Training of Urban Local BodiesRainwater Harvesting in an Urban Context : Training of Urban Local Bodies
Rainwater Harvesting in an Urban Context : Training of Urban Local Bodies
 
IWRM Evaluation Result_Singapore
IWRM Evaluation Result_SingaporeIWRM Evaluation Result_Singapore
IWRM Evaluation Result_Singapore
 
Rainwater harvesting at APD
Rainwater harvesting at APDRainwater harvesting at APD
Rainwater harvesting at APD
 
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
 
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
 
Kenworth Trucks saving water case study
Kenworth Trucks saving water case studyKenworth Trucks saving water case study
Kenworth Trucks saving water case study
 
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...
 
Environmental presentation from malthouse engineering
Environmental presentation from malthouse engineeringEnvironmental presentation from malthouse engineering
Environmental presentation from malthouse engineering
 
Biomerwh in kristalvilla
Biomerwh in kristalvillaBiomerwh in kristalvilla
Biomerwh in kristalvilla
 
Presentation fyp
Presentation fypPresentation fyp
Presentation fyp
 
Ppt dated 7th recycle &Reuse
Ppt dated 7th recycle &ReusePpt dated 7th recycle &Reuse
Ppt dated 7th recycle &Reuse
 
01. nalco tsl sustainability expo
01. nalco   tsl sustainability expo01. nalco   tsl sustainability expo
01. nalco tsl sustainability expo
 

Recently uploaded

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 

Efficient water usage improvement

  • 1. Strength. Performance. Passion. Efficient Water Usage Improvement(RCW) Theekshani Jayaweera NJS (Trainee - Environment)
  • 2. Background of the project Scope - capturing the water from rain & treat the gray water from wash room and reuse them for toilet flushing in RCW changing room premises Ruhuna cement works plant is situated in low country wet zone. Average annual rainfall in wet zone is 2000-2500mm. RCW site average annual rainfall is 2570mm As new trend to sustainable development and green technologies this will help to move our organization good picture as eco friendly industry. rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 2
  • 3. Significance of the Project In current situation water requirement is fulfilled by the National water supply and drainage board. Average water requirement is about 3000 m3 per month from the NWSDB. more than 450m3 is used for the changing room domestic water usage. Objective of this project is to reduce the water supply from the NWSDB by rainwater harvesting and gray water treatment system. This is a long term cost effective sustainable design. rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 3
  • 4. Capacity Average annual rainfall in the site Total catchment area Catchment coefficient Average rainwater that can be captured per day 2570mm 365m2 0.9 2313 L Average Daily water requirement for the changing rooms Water requirement for showers and sinks 70% Water requirement for toilet flushing 30% 15 000 L 10 500L 4 500L Daily Wastewater treatment capacity 4000L Total daily water saving percentage 42% Annual water saving Annual water requirement 2305 m3 5475 rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 4
  • 5. Diagram of the RWHS design rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 5
  • 6. Gray water treatment system rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 6
  • 7. Cost analysis- RWHS rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 7 Purpose amou nt LKR Gutters Already available Screen 3 5 000 First flush floating ball device 3 6 000 1000L storage tank 3 Reusable IBC tank/already available tanks Pump 1 50 000 Pressure accumulator 1 40 000 plumbing 60 000 Cartridge filter 10 µm 1 8 000 Base for above ground level tank(1000L) 1 3 000 Miscellaneous 30 000 Fixed cost 202 000 Operating cost Per Year 50 000
  • 8. 8rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 Purpose amount LKR Storage tank 5 (5000L) Reusable IBC tank 5 Digging ( for 2 IBC tank) 50 000 Plumbing 30 000 Pump (underground to changing room first floor ) 1 25 000 Accumulator 1 20 000 sand filter 1 75 000 Chlorine treatment (chlorine dosing pump) 2 120 000 Miscellaneous 50 000 Fixed cost 370 000 Operating cost For chlorine treatment 4 000 Gray water treatment plant
  • 9. 9rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 • Total fixed cost = 572 000 • Annual operating cost = 54 000 • Annual water saving = 2305 m3 • Annual water saving percentage = 42 % • Annual cost saving = 207 450LKR • Payback period = 2 years and 8 months Cost benefit analysis
  • 10. 10rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 Project implementation time frame # Activity Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 W 1 W 2 W 3 W 4 W 1 W 2 W 3 W 4 W 1 W 2 W 3 W 4 W 1 W 2 W 3 W 4 W 1 W 2 W 3 W 4 W 1 W 2 W 3 W 4 1 Identifying suitable area for project 2 Prepare project proposal and get approval 3 Further Improvement of the design according to discussion panel 4 Get quotation (by procurement division ) 5 Build and construction 6 Water testing and commissioning
  • 11. • Thank you… For the sustainable performance according to our 2030 plan rainwater harvesting and efficient water usage(RCW), 2016-05-17 © 2015 11