BID FORM CONTRACT
Our Project # 030715-15
Date 03/08/15
PROPOSAL FOR: Lynnwood Hall Library Lighting Retrofit
TO: Edmonds Community College
20000 68TH Ave. W
Snohomish Hall Room # 255
Lynnwood, WA 98036
Attn: Scott Haddock
Sir:
The undersigned, doing business under the name of THE ELECTRIC SMITH CO.
Having, examined the Request for Bid, including all Documents referenced therein, and
Addenda thereto, prepared by Edmonds Community College, and having familiarized
myself/ourselves with the project. The project site and any conditions which affect the
construction of the proposed project, including the availability of labor and materials, hereby
agrees/agree to execute a contract to furnish all labor, material and equipment and any other
miscellaneous items and services necessary to provide the proposed scope of work in accordance
with the Contract Documents.
A. Base Bid Price:
Our firm price is in the Lump Sum amount of Five Hundred Thousand Dollars and NO
Cents, ($500,000.00). Said bid price will be represented by a detailed itemization,
referred to as Schedule W. This Lump Sum amount includes all, Federal, State and local
taxes, including but not limited to, sales, use and excise taxes that may be, imposed on
materials or services provided under this proposal.
B. General Agreements:
1.) In submitting this Bid, the Undersigned agrees/agree and understands/understand that
this Bid is a firm offer continuing for sixty, (60) days from the date and time of Bid. By
submission of this, bid the Undersigned agrees/agree to execute a construction contract
for the work in the form provided with the Request for Bid.
2.) By submission of this Bid, the Undersigned agrees/agree and commits/commit to
performing the work with sufficient trained personnel to complete all work within the
scheduled time, frame. It is also understood that schedules, as issued, are subject to
change and the Undersigned agrees/agree to keep informed of said changes and abide
accordingly, notwithstanding strikes, work stoppages or labor disputes of any kind. The
Undersigned shall be liable to both the Owner and the General Contractor for all costs,
expenses and/or liabilities incurred by the Owner and/or General Contractor resulting
from delays on the job or for any other liability due to the Undersigned's failure to
perform as required by this paragraph. For purposes of this subcontract work stoppages
and/or labor disputes shall not be, under any circumstances, or for any reason, construed
as being beyond the Subcontractor's control.
3. The Undersigned has/have visited and examined the location of the proposed work and
is/are thoroughly familiar with the drawings, Specifications and related Contract
Documents.
4. The Undersigned understands/understand that Edmonds Community College reserves
the right to reject all Bids and has no obligation to enter into a Contract for the work. In
addition, it is, understood that all Bids become the property of Edmonds Community
College and there is no obligation to publish the results of any bids.
5. The Undersigned understands/understand that Edmonds Community College will not
be responsible for any errors of commission or omission incurred by the Undersigned in
the preparation of this Bid. The Undersigned further understands/understand that no
modification or withdrawal of this Bid will be, permitted after the Bid opening has
commenced.
C. Changes, Modifications and/or Revisions:
1. Changes, modifications and/or revisions that may occur in the work shall have
appropriate adjustments made in the Contract price, and the Undersigned agrees/agree
that the charges for extra work shall be determined in one of the following ways
Edmonds Community College:
a. By estimate and mutual acceptance of a Lump Sum, properly itemized or;
b. By cost plus a percentage fee.
2. If, such work is, to be added, or deducted by written change order from Edmonds
Community College and, such work is not covered by unit prices or Alternate Bids
quoted in this proposal. The cost of such changes shall be determined prior to the time the
work is ordered, and, at Edmonds Community College’s option, the Contract will be,
adjusted accordingly on the following basis:
a. Additional Work Performed by Subcontractors:
(1) Charges are to be the Subcontractor's estimated price for the work, agreed to
by the Owner, plus ten percent (10%) for overhead and profit.
b. Additional Work Performed by the Undersigned's Forces:
(1) Charges shall be, computed at the estimated cost for labor and material
entering into the work plus ten percent (10%) for overhead and five percent (5%)
for profit.
c. Work Omitted:
(1) Credit will be, allowed in, the amount of the actual savings in cost computed
on the same basis as for added work but without application of the above costs
covering the Undersigned's job supervision, general job expenses and the
percentage for overhead and profit.
d. Changes Resulting in Work Being Added or Omitted:
(1) Costs covering the Undersigned's job supervision (if applicable), general job
expense and the percentage for overhead and profit shall be applied to the new
difference only between the cost of work added and deducted if the net result is an
ADD.
e. Additional Costs for Supervision:
(1) There will be no, adds for supervision costs if the extra work is performed
concurrently with work already contracted. Should extra work extend or,
performed after contracted work has been, completed, supervision costs may then
be added for the time from when contracted work was completed to when the
extra work was completed.
(2) Supervision costs will only be, paid for once during any period of
construction. At no time will the Subcontractor include these costs in Lump Sum
or Time and Material, change order requests unless they are, permitted above, or,
in case of Time and Material work in which the Superintendent actually performs
the work and this is, verified by, the Contractor's Project Superintendent.
f. Premium Time Costs:
(1) When a Subcontractor has been, directed to perform contracted work on an
overtime basis, said Subcontractor, shall submit only the premium time cost for
labor, documented by signed time tickets, plus ten percent (10%) allowable mark-
up for overhead. Additional, mark-up for profit on already contracted work will
not be, permitted.
g. Job Progress:
(1) The Undersigned agrees/agree not to delay job progress of any work pending
final determination of value for the revised scope, provided the Undersigned
receives/receive written authorization to proceed from Edmonds Community
College.
D. Contract Bond/Evidence of Insurance:
The Undersigned agrees/agree to execute and abide by the form of the Contract provided to the
Undersigned with this Bid Form, and to furnish, at the time of execution of the Contract,
guaranty bonds and evidences of insurance as specified in the General Conditions.
E. Addenda:
Receipt of Addendum/Addenda # 030715-15ad is/are hereby acknowledged.
F. Return of Plans and Specifications:
If not the successful bidder, I/we agree to return the Plans and Specifications, Addenda and all
other Contract Documents heretofore furnished to me/us as soon as the Contract is, awarded to
the successful bidder, including any additional copies.
G. Contractor's License: The Undersigned is, licensed to perform the proposed scope of work
described herein and holds Washington State Electrical Contractor License # ELESMIM954LD,
Classification General, with a license limit of none.
H. Contractor's Washington UBI # 166-004-752
I. Contractor's Bonding Agent: North American Specialty Ins. Co., Bond Account # 3283772,
Bond Amount $5,000.00
J. Contractor’s Insurer: Nationwide Ins. Co., Policy # EC2435733, Policy Amount
$1,000,000.00
Respectfully submitted this 8th day of March 2015
Bidder's Legal Name: Thomas R. Smith
(Signature) _________________________
(Title) Owner
Bidder's Legal Address: 21801 44th Ave West
Mountlake Terrace, WA 98043
Telephone Number: 425-640-1026
Type of Organization: Corporation

More Related Content

What's hot

Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10
Farah Sham
 
Terms and conditions, Premier Equestrian Builders
Terms and conditions, Premier Equestrian BuildersTerms and conditions, Premier Equestrian Builders
Terms and conditions, Premier Equestrian Builders
Steven Scansaroli
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
VISHNU VIJAYAN
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
Dr K M SONI
 
Construction Contract Issues in Nebraska
Construction Contract Issues in NebraskaConstruction Contract Issues in Nebraska
Construction Contract Issues in Nebraska
Woods & Aitken LLP
 
Lecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-byLecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-by
seenyeeyong
 
Site possession
Site possessionSite possession
Site possession
Amir Ibrahim
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Divyanshu Dayal
 
Building contract introduction
Building contract  introductionBuilding contract  introduction
Building contract introduction
Hafizul Mukhlis
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
Vj NiroSh
 
Construction law cl3 (completed)
Construction law cl3 (completed)Construction law cl3 (completed)
Construction law cl3 (completed)
Emilia Chian Chee Yong
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
Dr K M SONI
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACT
Avinash Kumar Gupta
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
Dr K M SONI
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
Trace96
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Divyanshu Dayal
 

What's hot (20)

Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10
 
Terms and conditions, Premier Equestrian Builders
Terms and conditions, Premier Equestrian BuildersTerms and conditions, Premier Equestrian Builders
Terms and conditions, Premier Equestrian Builders
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
 
Construction Contract Issues in Nebraska
Construction Contract Issues in NebraskaConstruction Contract Issues in Nebraska
Construction Contract Issues in Nebraska
 
Lecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-byLecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-by
 
Site possession
Site possessionSite possession
Site possession
 
Pp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyangPp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyang
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
 
Building contract introduction
Building contract  introductionBuilding contract  introduction
Building contract introduction
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
 
Construction law cl3 (completed)
Construction law cl3 (completed)Construction law cl3 (completed)
Construction law cl3 (completed)
 
Document samples
Document samplesDocument samples
Document samples
 
Defects liability
Defects liabilityDefects liability
Defects liability
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACT
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
 

Viewers also liked

Solar Power Plants Photovoltaic vs Thermal
Solar Power Plants Photovoltaic vs ThermalSolar Power Plants Photovoltaic vs Thermal
Solar Power Plants Photovoltaic vs ThermalThomas Smith
 
CONCERTE JUMP FORM BUILDING CONSTRUCTION
CONCERTE JUMP FORM BUILDING CONSTRUCTION CONCERTE JUMP FORM BUILDING CONSTRUCTION
CONCERTE JUMP FORM BUILDING CONSTRUCTION Thomas Smith
 
Alliance experts brochure: 5 steps how to make your exports profitable
Alliance experts brochure: 5 steps how to make your exports profitableAlliance experts brochure: 5 steps how to make your exports profitable
Alliance experts brochure: 5 steps how to make your exports profitable
Alliance experts
 
Honneursgraad Almeri
Honneursgraad AlmeriHonneursgraad Almeri
Honneursgraad AlmeriAlmeri Pelser
 
TravelFocuspresentation2014
TravelFocuspresentation2014TravelFocuspresentation2014
TravelFocuspresentation2014Pat Kamm
 
CURRICULUM VITAE.LKC
CURRICULUM VITAE.LKCCURRICULUM VITAE.LKC
CURRICULUM VITAE.LKClalit chavan
 

Viewers also liked (6)

Solar Power Plants Photovoltaic vs Thermal
Solar Power Plants Photovoltaic vs ThermalSolar Power Plants Photovoltaic vs Thermal
Solar Power Plants Photovoltaic vs Thermal
 
CONCERTE JUMP FORM BUILDING CONSTRUCTION
CONCERTE JUMP FORM BUILDING CONSTRUCTION CONCERTE JUMP FORM BUILDING CONSTRUCTION
CONCERTE JUMP FORM BUILDING CONSTRUCTION
 
Alliance experts brochure: 5 steps how to make your exports profitable
Alliance experts brochure: 5 steps how to make your exports profitableAlliance experts brochure: 5 steps how to make your exports profitable
Alliance experts brochure: 5 steps how to make your exports profitable
 
Honneursgraad Almeri
Honneursgraad AlmeriHonneursgraad Almeri
Honneursgraad Almeri
 
TravelFocuspresentation2014
TravelFocuspresentation2014TravelFocuspresentation2014
TravelFocuspresentation2014
 
CURRICULUM VITAE.LKC
CURRICULUM VITAE.LKCCURRICULUM VITAE.LKC
CURRICULUM VITAE.LKC
 

Similar to Edmonds Community College

ZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docxZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docx
FairFASST
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
ChelDems
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
Saqib Imran
 
Chapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptxChapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptx
sulevrunda
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
Nikhil Kumar
 
Tender
TenderTender
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
Archistudent Portal
 
Construction practices
Construction practicesConstruction practices
Construction practices
Arun Kurali
 
Unit-1_Contracts
Unit-1_ContractsUnit-1_Contracts
Unit-1_Contracts
Akash Bharti
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
jagadish108
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
srinivas2036
 
Contracts & tenders
Contracts & tendersContracts & tenders
Contracts & tenders
Swamy Vanapalli
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
arpantripathi2
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
Sakshi Kirar
 
Construction contract
Construction contractConstruction contract
Construction contract
Delhi Technological University
 
Construction contract
Construction contractConstruction contract
Construction contract
Delhi Technological University
 
Progress billing definition
Progress billing definitionProgress billing definition
Progress billing definition
Akosichelle
 
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendmentsKey terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Kegler Brown Hill + Ritter
 

Similar to Edmonds Community College (20)

ZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docxZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docx
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Chapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptxChapter-2 Construction Contract. Subject code:3160614ptx
Chapter-2 Construction Contract. Subject code:3160614ptx
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Tender
TenderTender
Tender
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Construction practices
Construction practicesConstruction practices
Construction practices
 
Unit-1_Contracts
Unit-1_ContractsUnit-1_Contracts
Unit-1_Contracts
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Contracts & tenders
Contracts & tendersContracts & tenders
Contracts & tenders
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Progress billing definition
Progress billing definitionProgress billing definition
Progress billing definition
 
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendmentsKey terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
 

Edmonds Community College

  • 1. Edmonds Community College 20000 68TH Ave. W Lynnwood, WA 98036 425-640-1459 BID FORM CONTRACT Our Project # 030715-15 Date 03/08/15 PROPOSAL FOR: Lynnwood Hall Library Lighting Retrofit TO: Edmonds Community College 20000 68TH Ave. W Snohomish Hall Room # 255 Lynnwood, WA 98036 Attn: Scott Haddock Sir: The undersigned, doing business under the name of THE ELECTRIC SMITH CO. Having, examined the Request for Bid, including all Documents referenced therein, and Addenda thereto, prepared by Edmonds Community College, and having familiarized myself/ourselves with the project. The project site and any conditions which affect the construction of the proposed project, including the availability of labor and materials, hereby agrees/agree to execute a contract to furnish all labor, material and equipment and any other miscellaneous items and services necessary to provide the proposed scope of work in accordance with the Contract Documents. A. Base Bid Price: Our firm price is in the Lump Sum amount of Five Hundred Thousand Dollars and NO Cents, ($500,000.00). Said bid price will be represented by a detailed itemization, referred to as Schedule W. This Lump Sum amount includes all, Federal, State and local taxes, including but not limited to, sales, use and excise taxes that may be, imposed on materials or services provided under this proposal. B. General Agreements: 1.) In submitting this Bid, the Undersigned agrees/agree and understands/understand that this Bid is a firm offer continuing for sixty, (60) days from the date and time of Bid. By submission of this, bid the Undersigned agrees/agree to execute a construction contract for the work in the form provided with the Request for Bid. 2.) By submission of this Bid, the Undersigned agrees/agree and commits/commit to performing the work with sufficient trained personnel to complete all work within the scheduled time, frame. It is also understood that schedules, as issued, are subject to change and the Undersigned agrees/agree to keep informed of said changes and abide accordingly, notwithstanding strikes, work stoppages or labor disputes of any kind. The Undersigned shall be liable to both the Owner and the General Contractor for all costs,
  • 2. expenses and/or liabilities incurred by the Owner and/or General Contractor resulting from delays on the job or for any other liability due to the Undersigned's failure to perform as required by this paragraph. For purposes of this subcontract work stoppages and/or labor disputes shall not be, under any circumstances, or for any reason, construed as being beyond the Subcontractor's control. 3. The Undersigned has/have visited and examined the location of the proposed work and is/are thoroughly familiar with the drawings, Specifications and related Contract Documents. 4. The Undersigned understands/understand that Edmonds Community College reserves the right to reject all Bids and has no obligation to enter into a Contract for the work. In addition, it is, understood that all Bids become the property of Edmonds Community College and there is no obligation to publish the results of any bids. 5. The Undersigned understands/understand that Edmonds Community College will not be responsible for any errors of commission or omission incurred by the Undersigned in the preparation of this Bid. The Undersigned further understands/understand that no modification or withdrawal of this Bid will be, permitted after the Bid opening has commenced. C. Changes, Modifications and/or Revisions: 1. Changes, modifications and/or revisions that may occur in the work shall have appropriate adjustments made in the Contract price, and the Undersigned agrees/agree that the charges for extra work shall be determined in one of the following ways Edmonds Community College: a. By estimate and mutual acceptance of a Lump Sum, properly itemized or; b. By cost plus a percentage fee. 2. If, such work is, to be added, or deducted by written change order from Edmonds Community College and, such work is not covered by unit prices or Alternate Bids quoted in this proposal. The cost of such changes shall be determined prior to the time the work is ordered, and, at Edmonds Community College’s option, the Contract will be, adjusted accordingly on the following basis: a. Additional Work Performed by Subcontractors: (1) Charges are to be the Subcontractor's estimated price for the work, agreed to by the Owner, plus ten percent (10%) for overhead and profit. b. Additional Work Performed by the Undersigned's Forces: (1) Charges shall be, computed at the estimated cost for labor and material entering into the work plus ten percent (10%) for overhead and five percent (5%) for profit.
  • 3. c. Work Omitted: (1) Credit will be, allowed in, the amount of the actual savings in cost computed on the same basis as for added work but without application of the above costs covering the Undersigned's job supervision, general job expenses and the percentage for overhead and profit. d. Changes Resulting in Work Being Added or Omitted: (1) Costs covering the Undersigned's job supervision (if applicable), general job expense and the percentage for overhead and profit shall be applied to the new difference only between the cost of work added and deducted if the net result is an ADD. e. Additional Costs for Supervision: (1) There will be no, adds for supervision costs if the extra work is performed concurrently with work already contracted. Should extra work extend or, performed after contracted work has been, completed, supervision costs may then be added for the time from when contracted work was completed to when the extra work was completed. (2) Supervision costs will only be, paid for once during any period of construction. At no time will the Subcontractor include these costs in Lump Sum or Time and Material, change order requests unless they are, permitted above, or, in case of Time and Material work in which the Superintendent actually performs the work and this is, verified by, the Contractor's Project Superintendent. f. Premium Time Costs: (1) When a Subcontractor has been, directed to perform contracted work on an overtime basis, said Subcontractor, shall submit only the premium time cost for labor, documented by signed time tickets, plus ten percent (10%) allowable mark- up for overhead. Additional, mark-up for profit on already contracted work will not be, permitted. g. Job Progress: (1) The Undersigned agrees/agree not to delay job progress of any work pending final determination of value for the revised scope, provided the Undersigned receives/receive written authorization to proceed from Edmonds Community College. D. Contract Bond/Evidence of Insurance: The Undersigned agrees/agree to execute and abide by the form of the Contract provided to the Undersigned with this Bid Form, and to furnish, at the time of execution of the Contract, guaranty bonds and evidences of insurance as specified in the General Conditions.
  • 4. E. Addenda: Receipt of Addendum/Addenda # 030715-15ad is/are hereby acknowledged. F. Return of Plans and Specifications: If not the successful bidder, I/we agree to return the Plans and Specifications, Addenda and all other Contract Documents heretofore furnished to me/us as soon as the Contract is, awarded to the successful bidder, including any additional copies. G. Contractor's License: The Undersigned is, licensed to perform the proposed scope of work described herein and holds Washington State Electrical Contractor License # ELESMIM954LD, Classification General, with a license limit of none. H. Contractor's Washington UBI # 166-004-752 I. Contractor's Bonding Agent: North American Specialty Ins. Co., Bond Account # 3283772, Bond Amount $5,000.00 J. Contractor’s Insurer: Nationwide Ins. Co., Policy # EC2435733, Policy Amount $1,000,000.00 Respectfully submitted this 8th day of March 2015 Bidder's Legal Name: Thomas R. Smith (Signature) _________________________ (Title) Owner Bidder's Legal Address: 21801 44th Ave West Mountlake Terrace, WA 98043 Telephone Number: 425-640-1026 Type of Organization: Corporation