SlideShare a Scribd company logo
GBC E-Bike
A Green Alternative to Urban Commuting
Research and Innovation
Pradeep Kalsi May 15, 2009
Edward Wong
• Tool & Die Graduate & Engineering Design Student (design & fabrication specialist)
Andy Lau
• Tool & Die student (research & design specialist)
Michael Joyette
• Electro-Mechanical Graduate (research & electrical specialist)
Clayton Wozney
• Tool & Die and Mechanical Engineering Design Graduate (scheduler, & motivation specialist)
Professor Leo Salemi
• Electrical Advisor and Great Guy!
Professor Ted Lewis
Electrical Advisor and Good Friend!
Professor Pradeep Kalsi
• Mastermind and Project Lead
Team Members
To create an urban Electric Bicycle that has increased
power and range, to fit the urban lifestyle.
Introduction
Signature Vehicle
To develop a vehicle whereby GBC students, faculty and staff from the
Electro-Mechanical & Mechanical Engineering cluster can collaborate on a
common project to develop inter-disciplinary skills and strengthen
relationships
Racing Competitions
To provide GBC students an opportunity to enhance this vehicle on a yearly
basis for racing competitions between like minded institutions
Relationships
To develop relationships between GBC, Industry Partners and The Municipality
Of Toronto as participants and sponsors for Electric Bike Racing Competitions
Objectives
Building An Electric Bicycle For
Efficiency
For riding safely throughout the Toronto downtown core (ensuring visibility
and ease of mobility)
Long Distance Travel
Go a farther distance to and from a specific location without draining the
batteries (re-plenishing the batteries as you ride)
Power Requirements
Extra power for initial take off , climbing steep inclines, and maintaining a
safe speed without impeding traffic to make it a stress free ride
Research Objectives
Dual Battery Packs
• Can the electric bicycle be fitted with two battery packs working in tandem to provide
enough energy to travel great distances without discharging?
Controller Capacity
• Can the main controller effectively manage to control and process information to drive the
two hub motors?
Re-Generation
• Can the braking action of the bike be directed to re-generate a depleted battery pack?
Storage Rack
• Can a carrier be designed to house two lithium ion battery packs and pradeep’s sitar
without hindering maneuverability?
Main Questions for Research
1.Collaboration
• Group brain- storming among stakeholders; students, faculty and staff in meeting objectives,
outcomes, time-lines and duties
2. Design Stage
• Design of hard components; namely rear carrier housing, lighting housing, controller, ignition
housing, wiring and schematics of electrical hook ups to throttle, controller, hub motors,
lighting system
3. Development Stage
• Equipment and materials (type of batteries, capacity of electrical motors and controller) to be
used and purchased as well as functionality considerations and specifications of the bike after
completion
4. Manufacturing Stage
• D – Building Labs to be used and availability, logistics, machinery and equipment required
(manual and cnc machinery), Cad-Cam labs, time-lines, Faculty assistance and supervision
5. Testing Stage
• Testing the vehicle for handling, safety, performance, functionality and specifications
6. Electrical Wiring
• Leo’s Infrastructure Testing Lab
Methodology
Rear Carrier
– Build and design a rear carrier to house two lithium ion battery packs for longer travel
time
Controller
– Configure one controller with a throttle to activate (or de-activate) the front and rear
hub motors when necessary
Re-Generation
– Have one battery pack that was replete of energy being re-charged when braking or
slowing down
Braking System
– Fit the braking system to activate brake lights
– Configure the batteries to the braking system for power re-generation
Turning Signals
– Fit a switch to activate turning signals
Improvements
1.Rear Carrier
• Developed and attached a rear carrier to house two lithium batteries
2. Electrical System
• A Controller is hooked up to a throttle to power a rear hub motor
• A front switched attached to the braking system actives rear brake lights
3. Brake Light Housing
• Developed and hooked up a system with brake lights
Work in Progress
• Electrical hook-up between two hub motors is still in the development stage
as schematics for the controller are being investigated
• The battery packs are ready to be mounted in a manufactured rear carrier
• The turn signals require a housing and a switch is required for activation at
the hand controls
Result Thus Far
Result Thus Far
Research Projects Take Time
- juggling a teaching schedule and managing a research team can be challenging
Learning New Things
– Takes time and patience (electrical)
After Market Components
– Components obtained from an unknown distributor can be difficult to troubleshoot and specifications can be difficult to
obtain (namely specs. & schematics for the controller)
Dedicated & Motivated Team
– Developing a dedicated team to take responsibilities can be a big concern on such projects
– Delegating responsibilities can be difficult at times
Communication & Involvement
– It is okay to ask for help from faculty, staff and industry partners
Cooperation & Participation
– It is sometimes difficult accessing other labs
– It can be difficult to get faculty, staff and students to participation in projects such as this
Expectations
– Sometimes too many or too high expectations can delay the outcomes
– Sometimes being over ambitious can hinder progress and may not be contagious
– Punjab was not invented in one day
Simplicity
– Try to make things simple
The Sitar
– Leave it at home
Lessons Learned
Electrical System
– Developing the electrical system to be hooked up to the two hub motors so that they can be
activated together or independently when required
– Developing an activation switch for turn signals
– Developing a method for re-generating a depleted battery
Mechanical System
– Developing a housing for the controller, ignition switch and turn signals
Testing
– Testing the bike to determine specifications of distance on one charge, manoeuverability, speed,
mobility
Racing Potential
– Develop the bike to enter into competitions
– Testing the market for interest in developing e-bike racing competitions
Future Research
Acknowledgements
And
Questions
Michael Joyette
Edward Wong
Andy Lau
Clayton Wozney
Leo Salemi
Taesu Yim
Mark Dagenais
Ted Lewis
Laura Sauer
Green Rider: Neil and Julian
Robert Luke
Meadow Larkins
Dawn Davidson
Baaba Lewis
Nancy Sherman
Jeff Litwin
Erin Agnew
My Wife, Jasmine
GBC

More Related Content

Similar to E-Bike Presentation R1.ppt

Smart cycle proposal
Smart cycle proposalSmart cycle proposal
Smart cycle proposal
abhishekthakur309
 
Sagar chavan controls resume
Sagar chavan controls resumeSagar chavan controls resume
Sagar chavan controls resume
Sagar Chavan
 
MITCHELL DUNDON RESUME
MITCHELL DUNDON RESUMEMITCHELL DUNDON RESUME
MITCHELL DUNDON RESUME
Mitchell Dundon
 
Irtikaz Profile - 20160111
Irtikaz Profile - 20160111Irtikaz Profile - 20160111
Irtikaz Profile - 20160111
imranadeel
 
Regenerative braking system
Regenerative braking system Regenerative braking system
Regenerative braking system
Abhishek Patel
 
Dharmendra (1) (1)
Dharmendra (1) (1)Dharmendra (1) (1)
Dharmendra (1) (1)
Dharmendra Kumar
 
Resume Engineer DB
Resume Engineer DBResume Engineer DB
Resume Engineer DB
ramkishore195
 
University of Kentucky Solar Car Team Fluke Connect Student Contest Presentation
University of Kentucky Solar Car Team Fluke Connect Student Contest PresentationUniversity of Kentucky Solar Car Team Fluke Connect Student Contest Presentation
University of Kentucky Solar Car Team Fluke Connect Student Contest Presentation
flukecontests
 
Akshit Singh, BSIE, Purdue University
Akshit Singh, BSIE, Purdue UniversityAkshit Singh, BSIE, Purdue University
Akshit Singh, BSIE, Purdue University
Akshit Singh
 
WestSmartEV, James Campbell
WestSmartEV, James CampbellWestSmartEV, James Campbell
WestSmartEV, James Campbell
Forth
 
Adaptation of IOP of DLLE as a tool for persuing higher studies
Adaptation of IOP of DLLE as a tool for persuing higher studies Adaptation of IOP of DLLE as a tool for persuing higher studies
Adaptation of IOP of DLLE as a tool for persuing higher studies
Maya Bhat
 
Bhawna Narang
Bhawna NarangBhawna Narang
Bhawna Narang
Bhawna Narang
 
Joydip jana resume
Joydip jana resumeJoydip jana resume
Joydip jana resume
Joydip Jana
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
Saikat Bose
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
Saikat Bose
 
internship.pptx
internship.pptxinternship.pptx
internship.pptx
RithwikRanjan
 
presentation_v0.ppt
presentation_v0.pptpresentation_v0.ppt
presentation_v0.ppt
VickyCool15
 
Ranjeet resume Industrial
Ranjeet resume IndustrialRanjeet resume Industrial
Ranjeet resume Industrial
Ranjeet Buranwal
 
Resume-AREFIN A. TAUHID
Resume-AREFIN A. TAUHIDResume-AREFIN A. TAUHID
Resume-AREFIN A. TAUHID
Arefin Tauhid
 
Preparing an electric chair to work with solar energy.pptx
Preparing an electric chair to work with solar energy.pptxPreparing an electric chair to work with solar energy.pptx
Preparing an electric chair to work with solar energy.pptx
AhmedShoeeb
 

Similar to E-Bike Presentation R1.ppt (20)

Smart cycle proposal
Smart cycle proposalSmart cycle proposal
Smart cycle proposal
 
Sagar chavan controls resume
Sagar chavan controls resumeSagar chavan controls resume
Sagar chavan controls resume
 
MITCHELL DUNDON RESUME
MITCHELL DUNDON RESUMEMITCHELL DUNDON RESUME
MITCHELL DUNDON RESUME
 
Irtikaz Profile - 20160111
Irtikaz Profile - 20160111Irtikaz Profile - 20160111
Irtikaz Profile - 20160111
 
Regenerative braking system
Regenerative braking system Regenerative braking system
Regenerative braking system
 
Dharmendra (1) (1)
Dharmendra (1) (1)Dharmendra (1) (1)
Dharmendra (1) (1)
 
Resume Engineer DB
Resume Engineer DBResume Engineer DB
Resume Engineer DB
 
University of Kentucky Solar Car Team Fluke Connect Student Contest Presentation
University of Kentucky Solar Car Team Fluke Connect Student Contest PresentationUniversity of Kentucky Solar Car Team Fluke Connect Student Contest Presentation
University of Kentucky Solar Car Team Fluke Connect Student Contest Presentation
 
Akshit Singh, BSIE, Purdue University
Akshit Singh, BSIE, Purdue UniversityAkshit Singh, BSIE, Purdue University
Akshit Singh, BSIE, Purdue University
 
WestSmartEV, James Campbell
WestSmartEV, James CampbellWestSmartEV, James Campbell
WestSmartEV, James Campbell
 
Adaptation of IOP of DLLE as a tool for persuing higher studies
Adaptation of IOP of DLLE as a tool for persuing higher studies Adaptation of IOP of DLLE as a tool for persuing higher studies
Adaptation of IOP of DLLE as a tool for persuing higher studies
 
Bhawna Narang
Bhawna NarangBhawna Narang
Bhawna Narang
 
Joydip jana resume
Joydip jana resumeJoydip jana resume
Joydip jana resume
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
internship.pptx
internship.pptxinternship.pptx
internship.pptx
 
presentation_v0.ppt
presentation_v0.pptpresentation_v0.ppt
presentation_v0.ppt
 
Ranjeet resume Industrial
Ranjeet resume IndustrialRanjeet resume Industrial
Ranjeet resume Industrial
 
Resume-AREFIN A. TAUHID
Resume-AREFIN A. TAUHIDResume-AREFIN A. TAUHID
Resume-AREFIN A. TAUHID
 
Preparing an electric chair to work with solar energy.pptx
Preparing an electric chair to work with solar energy.pptxPreparing an electric chair to work with solar energy.pptx
Preparing an electric chair to work with solar energy.pptx
 

Recently uploaded

Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
Blue Star Brothers
 
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinCharging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Forth
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
78tq3hi2
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
78tq3hi2
 
EN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptxEN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptx
aichamardi99
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
Forth
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
afkxen
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
g1inbfro
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
ggany
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
afkxen
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
Forth
 
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinCharging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Forth
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
jennifermiller8137
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
MarynaYurchenko2
 
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program  by Kevin MillerCharging Fueling & Infrastructure (CFI) Program  by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Forth
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
u2cz10zq
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Forth
 
Dahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetiaDahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetia
Esentia Systems
 

Recently uploaded (19)

Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
 
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinCharging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
 
EN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptxEN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptx
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
 
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinCharging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
 
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program  by Kevin MillerCharging Fueling & Infrastructure (CFI) Program  by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
 
Dahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetiaDahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetia
 

E-Bike Presentation R1.ppt

  • 1. GBC E-Bike A Green Alternative to Urban Commuting Research and Innovation Pradeep Kalsi May 15, 2009
  • 2. Edward Wong • Tool & Die Graduate & Engineering Design Student (design & fabrication specialist) Andy Lau • Tool & Die student (research & design specialist) Michael Joyette • Electro-Mechanical Graduate (research & electrical specialist) Clayton Wozney • Tool & Die and Mechanical Engineering Design Graduate (scheduler, & motivation specialist) Professor Leo Salemi • Electrical Advisor and Great Guy! Professor Ted Lewis Electrical Advisor and Good Friend! Professor Pradeep Kalsi • Mastermind and Project Lead Team Members
  • 3. To create an urban Electric Bicycle that has increased power and range, to fit the urban lifestyle. Introduction
  • 4. Signature Vehicle To develop a vehicle whereby GBC students, faculty and staff from the Electro-Mechanical & Mechanical Engineering cluster can collaborate on a common project to develop inter-disciplinary skills and strengthen relationships Racing Competitions To provide GBC students an opportunity to enhance this vehicle on a yearly basis for racing competitions between like minded institutions Relationships To develop relationships between GBC, Industry Partners and The Municipality Of Toronto as participants and sponsors for Electric Bike Racing Competitions Objectives
  • 5. Building An Electric Bicycle For Efficiency For riding safely throughout the Toronto downtown core (ensuring visibility and ease of mobility) Long Distance Travel Go a farther distance to and from a specific location without draining the batteries (re-plenishing the batteries as you ride) Power Requirements Extra power for initial take off , climbing steep inclines, and maintaining a safe speed without impeding traffic to make it a stress free ride Research Objectives
  • 6. Dual Battery Packs • Can the electric bicycle be fitted with two battery packs working in tandem to provide enough energy to travel great distances without discharging? Controller Capacity • Can the main controller effectively manage to control and process information to drive the two hub motors? Re-Generation • Can the braking action of the bike be directed to re-generate a depleted battery pack? Storage Rack • Can a carrier be designed to house two lithium ion battery packs and pradeep’s sitar without hindering maneuverability? Main Questions for Research
  • 7. 1.Collaboration • Group brain- storming among stakeholders; students, faculty and staff in meeting objectives, outcomes, time-lines and duties 2. Design Stage • Design of hard components; namely rear carrier housing, lighting housing, controller, ignition housing, wiring and schematics of electrical hook ups to throttle, controller, hub motors, lighting system 3. Development Stage • Equipment and materials (type of batteries, capacity of electrical motors and controller) to be used and purchased as well as functionality considerations and specifications of the bike after completion 4. Manufacturing Stage • D – Building Labs to be used and availability, logistics, machinery and equipment required (manual and cnc machinery), Cad-Cam labs, time-lines, Faculty assistance and supervision 5. Testing Stage • Testing the vehicle for handling, safety, performance, functionality and specifications 6. Electrical Wiring • Leo’s Infrastructure Testing Lab Methodology
  • 8. Rear Carrier – Build and design a rear carrier to house two lithium ion battery packs for longer travel time Controller – Configure one controller with a throttle to activate (or de-activate) the front and rear hub motors when necessary Re-Generation – Have one battery pack that was replete of energy being re-charged when braking or slowing down Braking System – Fit the braking system to activate brake lights – Configure the batteries to the braking system for power re-generation Turning Signals – Fit a switch to activate turning signals Improvements
  • 9. 1.Rear Carrier • Developed and attached a rear carrier to house two lithium batteries 2. Electrical System • A Controller is hooked up to a throttle to power a rear hub motor • A front switched attached to the braking system actives rear brake lights 3. Brake Light Housing • Developed and hooked up a system with brake lights Work in Progress • Electrical hook-up between two hub motors is still in the development stage as schematics for the controller are being investigated • The battery packs are ready to be mounted in a manufactured rear carrier • The turn signals require a housing and a switch is required for activation at the hand controls Result Thus Far
  • 11. Research Projects Take Time - juggling a teaching schedule and managing a research team can be challenging Learning New Things – Takes time and patience (electrical) After Market Components – Components obtained from an unknown distributor can be difficult to troubleshoot and specifications can be difficult to obtain (namely specs. & schematics for the controller) Dedicated & Motivated Team – Developing a dedicated team to take responsibilities can be a big concern on such projects – Delegating responsibilities can be difficult at times Communication & Involvement – It is okay to ask for help from faculty, staff and industry partners Cooperation & Participation – It is sometimes difficult accessing other labs – It can be difficult to get faculty, staff and students to participation in projects such as this Expectations – Sometimes too many or too high expectations can delay the outcomes – Sometimes being over ambitious can hinder progress and may not be contagious – Punjab was not invented in one day Simplicity – Try to make things simple The Sitar – Leave it at home Lessons Learned
  • 12. Electrical System – Developing the electrical system to be hooked up to the two hub motors so that they can be activated together or independently when required – Developing an activation switch for turn signals – Developing a method for re-generating a depleted battery Mechanical System – Developing a housing for the controller, ignition switch and turn signals Testing – Testing the bike to determine specifications of distance on one charge, manoeuverability, speed, mobility Racing Potential – Develop the bike to enter into competitions – Testing the market for interest in developing e-bike racing competitions Future Research
  • 13. Acknowledgements And Questions Michael Joyette Edward Wong Andy Lau Clayton Wozney Leo Salemi Taesu Yim Mark Dagenais Ted Lewis Laura Sauer Green Rider: Neil and Julian Robert Luke Meadow Larkins Dawn Davidson Baaba Lewis Nancy Sherman Jeff Litwin Erin Agnew My Wife, Jasmine GBC