1) The document provides an overview of the internship and training that the author completed at Durgapur Steel Plant.
2) It includes a brief profile of Durgapur Steel Plant, describing its facilities and production of various steel products.
3) The process flow chart and descriptions of major units are given, outlining the production process from raw materials to finished steel products.
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANTBasant Kumar Sahu
I learn and enjoy the project in Bhilai steel plant. It is very important part of Blast Furnace of a steel industry. Mudgun and mudgun column repaired in MARS2 repairing workshop in Bhilai Steel Plant.
A 45 days observational training program that gave exposure to the industrial environment and included visit to various plants like RHMP, Coke Oven, Steel Making Units, Blast Furnace which was a learning experience pertaining to the functioning of all the mentioned units.
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANTBasant Kumar Sahu
I learn and enjoy the project in Bhilai steel plant. It is very important part of Blast Furnace of a steel industry. Mudgun and mudgun column repaired in MARS2 repairing workshop in Bhilai Steel Plant.
A 45 days observational training program that gave exposure to the industrial environment and included visit to various plants like RHMP, Coke Oven, Steel Making Units, Blast Furnace which was a learning experience pertaining to the functioning of all the mentioned units.
This ppt is define a general overview of Bokaro Steel Plant, how to make a steel in the industry & all procedure is given in the ppt and also CBRS department is include where the automobile parts of machine is overhauling.
This is a practical training of seminar report. In this seminar report all the procedure is include which is use in the industry to how to make a steel and CBRS Department is also include where the engine parts is repair.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.Anirudh Singhar
For all those 5 sem students finding problem in making PPT, maybe due to lack of covinience or whatsoever.
THough I havent covered every shop or branch but its enough as per req
Presentation on bokaro steel plant, a SAIL subsidiary unit situated in bokaro steel city, jharkhand. I complied it at the end of my training there in my 2nd year.
Summer training report on NTPC Badarpur ,DELHI
This Report includes the following department
1. Turbine Maintenance Department
2. Boiler Maintenance Department
3. Plant Auxiliary Maintenance
4. Coal Handling Department
Industrial Training Project Report on B.S.PPiyush Verma
B.S.P a unit of steel Authority of India Ltd. Inagurated at 1959 by the President of India Dr. Rajendra Prasad with a production capacity of 1.0 million ton.
B.S.P is Indian sole procedure for rails and heavy steel plates and major producer of structural.
The plant is the sole suppliers of the country’s longest rail tracks of 260 meters. With annual production capacity of 3.153MT
This ppt is define a general overview of Bokaro Steel Plant, how to make a steel in the industry & all procedure is given in the ppt and also CBRS department is include where the automobile parts of machine is overhauling.
This is a practical training of seminar report. In this seminar report all the procedure is include which is use in the industry to how to make a steel and CBRS Department is also include where the engine parts is repair.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.Anirudh Singhar
For all those 5 sem students finding problem in making PPT, maybe due to lack of covinience or whatsoever.
THough I havent covered every shop or branch but its enough as per req
Presentation on bokaro steel plant, a SAIL subsidiary unit situated in bokaro steel city, jharkhand. I complied it at the end of my training there in my 2nd year.
Summer training report on NTPC Badarpur ,DELHI
This Report includes the following department
1. Turbine Maintenance Department
2. Boiler Maintenance Department
3. Plant Auxiliary Maintenance
4. Coal Handling Department
Industrial Training Project Report on B.S.PPiyush Verma
B.S.P a unit of steel Authority of India Ltd. Inagurated at 1959 by the President of India Dr. Rajendra Prasad with a production capacity of 1.0 million ton.
B.S.P is Indian sole procedure for rails and heavy steel plates and major producer of structural.
The plant is the sole suppliers of the country’s longest rail tracks of 260 meters. With annual production capacity of 3.153MT
Rukmani Engineering Works, Coimbatore based concern are engaged in Manufacturing of Stainless Steel Castings for Pulp & Paper Industry, Sugar Industry, Food Industry, Chemical Plants, Process Industry, Oil & Petrochemical Industry, Cement Industry, Mining Industry
Stone Crushing, Earth Excavating, Automotive & Locomotive Industry, Aerospace Industry, Tyre & Rubber Stations, Thermal Power Stations, Valve Industry
Pump Industry, Plant & Machinery as per customer satisfaction
Project report on Automated Strapping Machine (BRM)_Bhilai Steel Plant.pdfAnurag Yadav
This project was prepared by me when I was doing my major training in "Bhilai Steel Plant" during my 6th semester of B.tech mechanical engineering.
Our training duration :- 13 July to 9 August, 2022.
In this project I have covered overview of "Bar and rod mill" and also the working of "Automated strapping machine".
Online aptitude test management system project report.pdfKamal Acharya
The purpose of on-line aptitude test system is to take online test in an efficient manner and no time wasting for checking the paper. The main objective of on-line aptitude test system is to efficiently evaluate the candidate thoroughly through a fully automated system that not only saves lot of time but also gives fast results. For students they give papers according to their convenience and time and there is no need of using extra thing like paper, pen etc. This can be used in educational institutions as well as in corporate world. Can be used anywhere any time as it is a web based application (user Location doesn’t matter). No restriction that examiner has to be present when the candidate takes the test.
Every time when lecturers/professors need to conduct examinations they have to sit down think about the questions and then create a whole new set of questions for each and every exam. In some cases the professor may want to give an open book online exam that is the student can take the exam any time anywhere, but the student might have to answer the questions in a limited time period. The professor may want to change the sequence of questions for every student. The problem that a student has is whenever a date for the exam is declared the student has to take it and there is no way he can take it at some other time. This project will create an interface for the examiner to create and store questions in a repository. It will also create an interface for the student to take examinations at his convenience and the questions and/or exams may be timed. Thereby creating an application which can be used by examiners and examinee’s simultaneously.
Examination System is very useful for Teachers/Professors. As in the teaching profession, you are responsible for writing question papers. In the conventional method, you write the question paper on paper, keep question papers separate from answers and all this information you have to keep in a locker to avoid unauthorized access. Using the Examination System you can create a question paper and everything will be written to a single exam file in encrypted format. You can set the General and Administrator password to avoid unauthorized access to your question paper. Every time you start the examination, the program shuffles all the questions and selects them randomly from the database, which reduces the chances of memorizing the questions.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
DSP VT REPORT
1. INDUSTRIAL INTERNSHIP TRAINING At DURGAPUR
STEEL PLANT, SAIL (Industrial Area, Durgapur, 713203)
A report submitted to NIT Durgapur
in partial fulfillment of the requirement for the degree of
Bachelor of Technology
In
Electrical Engineering
By
Name: DIPNARAYAN SAHA
Roll No:19EE8017
Department of Electrical Engineering
National Institute of Technology Durgapur
URL : https://nitdgp.ac.in
Durgapur-713209 , India
July 26, 2022
2. DURGAPUR STEEL PLANT LETTER HEAD
………………………………………………………………………………………………………………………….....................................
Date: 01/07/2022
3. NATIONAL INSTITUTE OF TECHNOLOGY, DURGAPUR
Acknowledgement
I am grateful to the career development centre of National Institute of
Technology Durgapur and Prof. Sankar Narayan Mahato, H.O.D. of
Electrical Engineering department for giving us the permission to
undergo this industrial training.
And also I would like to thank DSP, SAIL for giving me this
esteemed privilege to acquire knowledge about the industrial
methodology of work.
I will really cherish this experience of industrial training
throughout my life and hope that this will count a lot more in my future
career.
Name of the student: DIPNARAYAN SAHA
Roll No: 19EE8017
6. Durgapur Steel Plant (DSP) set up in late fifties is a leading producer of long products
and is the pioneer in manufacturing and supply of forged Railway Wheels & Axles in the
country. DSP started production with an initial crude steel capacity of 1 MPTA (million
ton per annum) in 1959, which has been progressively increased to 1.8 MTPA during
the modernization in nineties and further to 2.2 MTPA during recently completed
Modernization & Expansion Plan (MEP).
Broad facilities:
DSP produces liquid steel through conventional BF-BOF route, which is cast into billets,
blooms &rounds in its Billet Casters (2 Nos), Bloom Caster and Bloom cum Round Caster
(BRC). The finishing mills comprise of Merchant Mill to produces special quality EQR TMT
bars (20 &25 mm), Section Mill for medium structural sections and a state of art Medium
Structural Mill (MSM) to produce next generation parallel beams, channels and equal
angles.
Unique feature of this plant is its Wheel & Axle Plant for making forged wheels and axles
catering to Indian Railways. The product portfolio has evolved over the years with ever-
changing requirements of railways and includes a variety of loco and coach wheels. DSP
has successfully developed LHB wheels and LHB axles for Indian Railways.
7. Finished Steel
TMT Bars 20 mm, 25 mm in straight lengths of 12m
Medium
Structural
Equal Angle 90-200 mm, Medium Beam 100-300 mm ,Narrow parallel Beam (NPB) 100-300
mm, Wide Parallel Beam (WPB) 100-160 mm, Medium Channel 100-300 mm
Channels 200x75 mm, 150x75mm
Joists 200X100mm
Wheels
Coaching Wheels : BG,EMU, Metro, LHB (Developed), Loco Wheels: MG, BG, S-profile,
WAG9,WAP5, WDG 4(Developed)
Axles BG, BOX N (Developed), LHB (Developed)
Semi-finished Steel
Cast Billets 125 mm sq.
Cast Blooms 210x160, 230x160, 300x150, 350x150 , 350x240 mm
Cast round 340 m.m. dia.
By-products
Coal Chemicals Tar &Benzol products, Ammonium Sulphate
BF Granulated Slag Molten & Granulated Slag
12. Major Units of Durgapur Steel Plant
• Raw Material Handling Plant
• Coke Oven and Coal Chemicals
• Sinter Plant
• Blast Furnaces
• Steel Melting Shop
• Merchant Mill
• Medium Structural Mill
• Section Mill
• Wheel and Axle Mill
• Engineering Shops
• Research and control Laboratory
➢ Raw Materials Handling Plant
Raw Material Handling Plant is one of
the most important of a integrated steel
plant. The major input for steel making
comes from mines to this section.
Raw Material Handling plant is meant
for transporting materials from Raw
Material yard /Base Mix yard to various
process units of the plant.
The Raw Materials Handling Plant
prepares blend mix for Sinter Plant and
also supplies raw material lumps to Blast
Furnaces and Steel Melting Shop. It has
3 nos. tipplers and 3 nos. blender-cum-
reclaimers.
13. ➢ Coke Ovens & Coal Chemicals
DSP is equipped with 5 nos. of Coke Oven batteries, out of which 4 batteries are in
operation and 1 battery is under cold repair. Each battery is of 4.45 Meter height and
comprises of 78 nos. of ovens. The Coke Ovens convert coking coal into coke, which is an
input for Blast Furnaces.
The Coke Ovens and Coal Chemicals
zone is divided into four basic sections
namely coal preparation plant, coal
carbonization plant, coke handling plant
and coal chemicals. The Blast Furnace
grade coke produced in Coke Ovens is
directly used in Blast Furnaces while
the undersized coke is used for sinter
making. The volatile matters, which
emanate during the process of coke
making subsequently produce a variety
of by-products like naphthalene oil,
heavy creosote oil, light oil, crude tar
partially distilled, ‘Raja’ brand fertilizer,
nitration grade benzene, nitration grade toluene, industrial grade toluene, light solvent
naphtha etc. The Coke Oven gas is generally used in combination with the Blast Furnace
gas and BOF gas as fuel and is carried through pipelines to different areas of the plant. The
adjoining Alloy Steels Plant under SAIL also gets this fuel gas from DSP.
➢ Sinter Plant
The Sinter Plant coverts blend mix into sinter, an
agglomerated input for Blast Furnaces. In order to
enhance the productivity of the blast furnaces, a
high percentage of sinter charge is a prerequisite.
Sinter is an agglomeration of iron ore fines, coke and
limestone in the form of cakes. DSP has three sinter
machines: 2 nos. with hearth area of 142.7M2 each
and 1 no. with hearth area of 198M2. Annual
capacity of Sinter Plant is 3.30 MT.
➢ Blast Furnaces
The Blast Furnaces produce liquid hot
metal, which is an input for Steel Melting
Shop. DSP has 3 Blast Furnaces of useful
volume of 1400 Mᶟ (BF No.2), 1400 Mᶟ (BF
No.3), 1800 Mᶟ (BF No.4) and working
volumes (W.V.) of 1207 Mᶟ, 1204 Mᶟ & 1539
Mᶟ respectively. The respective BF
productivitiesare 1.71, 1.82 & 1.69
T/Mᶟ(W.V.)/day. Annual hot metal
production capacity is 2.40 MT.The BF Slag
14. (granulated) is sold to the cement manufacturing companies.
➢ Steel Melting Shop
The Steel Melting Shop converts hot metal into
liquid steel, which is primarily processed through
Continuous Casting Plant (CCP). The Steel
Melting Shop (SMS) has 3 nos. 110/130 T Basic
Oxygen Furnaces (Converters), 1 no. of 110/130T
Vacuum Arc Degassing (VAD) unit and 3 nos. of
110/130T Ladle Furnaces for nominal heat size
of 120 T. The CCP is equipped with 2 Billet
Casters, 1 Bloom Caster and 1 Bloom-Cum-
Round Caster (BRC).In addition, SMS has
facilities forbottom pouring ingot casting for
vacuum-degassed loco wheel heats for Wheel &
Axle Plant of DSP and special steels for Alloy
Steels Plant (ASP).
➢ Merchant Mill
The Merchant Mill produces Earthquake Resistant (EQR)
Thermo Mechanically Treated (TMT) bars of different sizes,
which are used for construction and infrastructure
development. Its installed capacity wasoriginally 280,000
TPA. With phasing out of 16 mm TMT bar and maximising
production of 20 mm & 25 mm TMT bars, the mill capacity
is augmented to 360,000 TPA.
➢ Medium Structural Mill
DSP is equipped with new Medium Structural Mill (MSM) of 1.0
Million Tonne capacity. The new generation medium structural
produced in the mill are targeted for use in construction and
infrastructure development sectors, like parallel beams,
channels and equal angles.
15. ➢ Wheel & Axle Plant
The Wheel & Axle Plant produces forged and
machined wheels and axles for Indian Railways.
This includes wheels for Locomotives, BG
Coaches and EMU Coaches. DSP has
manufactured wheels for LHB coaches & Metro
Coaches as well. DSP produces BG Axles as per
Railway requirement. DSP Has also successfully
developed BOX N as well as LHB axles.
➢ Section Mill
The Section Mill rolls out light and medium structural like
joists, channels and angles, which is also used for
construction and infrastructure development.
➢ Engineering Shops
Durgapur Steel Plant has a number of captive engineering shops for repairs and supply of
spare parts. The Central Engineering Maintenance has a Machine Shop, Structural Shop,
Fitting and Assembly Shops. The Foundry produces Ingot moulds and bottom plates for the
Steel Melting Shop. There are also Auxiliary Repair Shops such as Electrical, Wagon and
Loco Repair Shops.
Electrical Repair shop
16. ➢ Research and Control Laboratory
The Research & Control Laboratory is well equipped for carrying out sophisticated
chemical, metallurgical and other tests both for better process control and improved quality
of products.
➢ Power Management Dept.
In Power Management dept. load
sharing of different mills, units of whole
steel plant is manged.
33 KV Substation
17. NATIONAL INSTITUTE OF TECHNOLOGY, DURGAPUR
DECLARATION
I affirm that the Industrial Internship Training report titled “INDUSTRIAL INTERNSHIP
TRAINING At DURGAPUR STEEL PLANT, SAIL “ being submitted in partial fulfillment of the
requirements for the award of the Degree of BACHELOR OF TECHNOLOGY IN
ELECTRICAL ENGINEERING is the original work carried out by me. It has not formed the
part of any other project work submitted for award of anydegree or diploma, either in this
or any other Institution.
……………………………………….…….………………………………………
Signature
Name of the student: DIPNARAYAN SAHA
Roll No: 19EE8017