Driving Innovative IT Metrics
Focusing on the CONDITIONS for Success
© 2013 Joe Hessmiller
1
2
© 2013 Joe Hessmiller
Schedule Check
You Are
Here
Joe Hessmiller
• Over 30 years in IT; analyst, programmer, technical
training manager, project manager, user interface
designer, project management consultant, consulting
sales and marketing manager.
• Worked with dozens of IT managers from Fortune 50
corporations and large government agencies.
• Current focus on software project risk management,
specifically, identifying, monitoring and use of project
risk “early warning signs”.
3
© 2013 Joe Hessmiller
1. To establish the need for monitoring the
metrics that really matter.
2. To identify the types of metrics that really
matter.
3. Show how a familiar framework can be
adapted for metrics identification (and
communication).
4. Give you enough to use back at your office to
improve your metrics program.
4
© 2013 Joe Hessmiller
Objectives of Session
Agenda
1. The Innovative Metrics Opportunity
2. Why Do These Opportunities Still Exist?
3. What Metrics Should We Monitor?
4. Working With Conditions Data
5. Developing Innovative Metrics for Your
Organization
5
© 2013 Joe Hessmiller
Part One
The Innovative Metrics
Opportunity
(in Project Management)
6
© 2013 Joe Hessmiller
7
• Despite Everything
We’ve Tried, Project
Success Rates Little
Changed in 30 Years
– McKinsey (17% threaten)
– IBM (40% met 10X range)
– KPMG (70% orgs)
– Standish CHAOS Report
Source: http://calleam.com/WTPF/?page_id=1445
The Innovative Metrics
Opportunity
8
• There Is Plenty of Opportunity for
Improving Project Success Rates
Source:
http://versionone.com/assets/img/files/ChaosMa
nifesto2013.pdf
Source:
http://versionone.com/assets/img/files/ChaosMa
nifesto2013.pdf
The Innovative Metrics
Opportunity
9
• Strategic Opportunity to Increase
Market Competitiveness
Organizations with a mature PMO outperform those
with an immature PMO by:
28% for on-time project delivery;
24% for on-budget delivery; and
20% for meeting original goals and business
intent of projects. Source: www.metier.com,
According to PMI
The Innovative Metrics
Opportunity
10
Source: Paul D. Nielsen, “About Us: From Director and CEO Paul D.
Nielsen,” Carnegie Mellon Software Engineering Institute,
http://www.sei.cmu.edu/about/message/
• Operational Opportunity to Address
Causes of Largest Project Cost
Component
According to the Carnegie Mellon Software Engineering
Institute, “Data indicate that 60-80% of the cost of software
development is in rework.”
The Innovative Metrics
Opportunity
Part Two
Why Do These “Opportunities”
Still Exist?
11
© 2013 Joe Hessmiller
12
• The “99% Complete”
Syndrome
– Everything is Fine…Everything is
Fine…
– Oh, Oh, SURPRISE! We’re in Trouble!
• The real challenge to
successful software project
management is:
– having the information
– that is very DIFFICULT to collect,
analyze and act on
– in time to make a difference.
What
You
Know
What
You
Don’t
Know…
but
Need
To
Know
Why Do These Opportunities
Still Exist?
13
• It’s DIFFICULT to Have Project Managers
Who Can Predict the Future
Source:
http://versionone.com/assets
/img/files/ChaosManifesto20
13.pdf
Why Do These Opportunities
Still Exist?
14
• It’s DIFFICULT to find project managers
who can keep everyone on the same
accurate, relevant and timely page.
Source:
http://versionone.com/assets
/img/files/ChaosManifesto20
13.pdf
Why Do These Opportunities
Still Exist?
15
• It’s DIFFICULT to Trust the Service
Providers You Rely On When You Can’t
Verify Their Behavior/Performance
Source:
http://versionone.com/assets
/img/files/ChaosManifesto20
13.pdf
Why Do These Opportunities
Still Exist?
SO…What Does an Innovative
Project Manager Need to Do?
16
• Address these DIFFICULT Project
Management Challenges
• By Having the Data That’s Really
Needed to Be Successful
Part Three
What Metrics Should We
Monitor?
17
© 2013 Joe Hessmiller
What Metrics Should We
Monitor?
• Tracking Progress
–Backward Looking
• Managing Risk
–Forward Looking
18
© 2013 Joe Hessmiller
Tracking Progress
Looking Backward
• Volume
• Quality
• Cost
19
© 2013 Joe Hessmiller
What did we do?
• Alignment of IT Investments to Business Strategy
• Cumulative Business Value of IT Investment
• IT Spend Ratio – New Versus Maintenance
• Critical Business Services
– Customer Satisfaction
– Service Level Performance
• Operational Health
– Outages
– Security Incidents
– Project Success Rate
– Average Defect Rate
Source: Craig Symons, Forrester Research, 4-4-08
20
© 2013 Joe Hessmiller
Tracking Progress
Looking Backward – Enterprise Level
21
© 2013 Joe Hessmiller
http://www.slideshare.net/anandsubramaniam/project-metrics-measures
Tracking Progress
Looking Backward – Project Level
22
© 2013 Joe Hessmiller
Managing Risk
Looking Forward – Experts Agree on EWS
What should we do?
Managing Risk
Looking Forward – Kappelman Research
• Kappelman
Research
– Derived List of
• Six People Factors
• Six Process Factors
• For In-process
Audits
23
24
© 2013 Joe Hessmiller
Managing Risk
Looking Forward – Dominant Dozen
• Project
Management
Institute
– 10 Knowledge Areas
– Things You Should
Know
– Things You Should
Do
• For Gate Audits
25
Managing Risk
Looking Forward – Practitioners Too
• In Addition to Traditional
–Key Performance Status
• What To Collect
–Key Performance Conditions
• Intra-process Conditions
• Inter-process Conditions
–Key Process/Practice Compliance
26
© 2013 Joe Hessmiller
Summary: What Metrics Should
We Monitor?
• How Collect
–Intuition
–MBWA
–Survey Software
–Purpose Designed
Software
27
© 2013 Joe Hessmiller
What Metrics Should We
Monitor?
• Pattern Recognition
– Correlations Between Outcomes and
Precedent Conditions
• Feedback Loops
– Correlations Drive KPI Algorithms
Need to Collect the Data for the Insights
28
© 2013 Joe Hessmiller
The Future: PMBD
Project Management Big Data
Part Four
Working with Conditions Data
(The Four Missing Metrics)
29
© 2013 Joe Hessmiller
Three Important CONDITIONS to Monitor
• Expectations Management
• Sponsor Involvement
• Process Compliance
To Minimize Project Risk Factor
• Rework Probability
At 40% of total project costs, Rework is the leading cause of
projects running over budget and beyond schedule.
30
© 2013 Joe Hessmiller
Managing Risk
ESPR “The Missing Metrics”
The Four Missing Metrics
• SMART – Are expectations clear?
• SMPL – Is sponsor engaged?
• PAL - Are processes being
followed?
• PRPL – Are causes of
Rework being avoided?
31
© 2013 Joe Hessmiller
SMART
Level
Tracks the clarity of
assignments. The higher
the SMART Level, the
higher the level of
understanding of what is
expected. Therefore,
less Rework and less
management intervention
required.
The SMART Level
0.0
20.0
40.0
60.0
80.0
100.0
120.0
SMART Index
Upper Control Limit
Lower Control Limit
The SMART Level
32
© 2013 Joe Hessmiller
SMART
Level
Metric derived from
participant feedback on the
perceived Specificity,
Measurability, Achievability,
Relevancy and Timeframes
for their
assignments/deliverables.
SMART Index
Week
SMART
Index
Upper
Control
Limit
Lower
Control
Limit
Specific Measurable Achievable Relevant
Time-
Based
8/10/2010 76.3 100 75 75 50 80 100 95
8/17/2010 76.3 100 75 75 50 80 100 90
8/24/2010 75.0 100 75 75 50 80 95 95
8/31/2010 82.5 100 75 80 70 85 95 95
9/7/2010 83.8 100 75 80 70 85 100 95
9/14/2010 82.5 100 75 90 70 85 85 90
9/21/2010 87.5 100 75 90 90 80 90 90
9/28/2010 92.5 100 75 100 90 80 100 90
10/5/2010 88.8 100 75 100 90 75 90 95
10/12/2010 86.3 100 75 90 90 75 90 95
10/19/2010 87.5 100 75 90 90 75 95 85
10/26/2010 88.8 100 75 90 90 80 95 85
11/2/2010 92.5 100 75 95 95 80 100 90
11/9/2010 92.5 100 75 95 90 85 100 95
11/16/2010 93.8 100 75 100 90 85 100 95
11/23/2010 93.8 100 75 100 100 85 90 100
11/30/2010 93.8 100 75 100 100 80 95 95
12/7/2010 88.8 100 75 90 90 85 90 90
12/14/2010 92.5 100 75 90 90 90 100 95
12/21/2010 95.0 100 75 95 95 95 95 95
12/28/2010 92.5 100 75 90 80 100 100 100
Components of the SMART
Level
The SMART Level
33
© 2013 Joe Hessmiller
SMART
Level
Looks like this project was
back under control once the
Relevance of the
assignments were made
clear to the staff.
40.0
50.0
60.0
70.0
80.0
90.0
100.0
110.0
SMART Index
Upper Control Limit
Lower Control Limit
Specific
Measurable
Achievable
Relevant
Time-Based
The SMART Level
SMART Level Influencers
34
© 2013 Joe Hessmiller
SMPL
Line
Tracks the
participation level of
the senior
management and/or
sponsor.
The SMPL Line
Senior Management Participation Level
Attention
Needed
0.0
20.0
40.0
60.0
80.0
100.0
120.0
SMPL
Upper Control Limit
Lower Control Limit
35
© 2013 Joe Hessmiller
SMPL
Line
In this example, the
level of participation in
meetings, surveys,
and other activities is
compared to the
planned participation
by senior
management
Senior Management Participation Level
Components of the SMPL Line
36
© 2013 Joe Hessmiller
SMPL
Line
In this example, the
components of the
SMPL are shown
separately to identify
individual areas
needing improvement.
Senior Management Participation Level
0.0
20.0
40.0
60.0
80.0
100.0
120.0
SMPL
Upper Control Limit
Lower Control Limit
Status Meeting
Attendenace Rate
APO Response Rate
Decisions
Made/Delegated Rate
SMPL Line Influences
37
© 2013 Joe Hessmiller
PAL
Measures likely level of
process adherence
based on conditions that
would tend to lead to
‘short cuts’ on process..
Process Adherence Likelihood
38
© 2013 Joe Hessmiller
PAL
This table shows how
problems with EVA
lead to likely
abandonment of
process until project
gets back on track.
May be OK, must be
identified to be
managed.
Process Adherence Likelihood
Components of PAL Line
39
© 2013 Joe Hessmiller
PAL
This illustrates the various
components of PAL.
PAL Line Influences
40
© 2013 Joe Hessmiller
Project Rework Probability Level
PRPL
Line
Tracks the ‘probability’
of Rework based on
changes in the
conditions that are
known to cause
Rework.
0.0
5.0
10.0
15.0
20.0
25.0
PRPL
Upper Control Limit
Lower Control Limit
Attention
Needed
The PRPL Line
41
© 2013 Joe Hessmiller
PRPL
Line
SME Involvement,
Team Confidence
Level, Technical
Capability and
Requirements
Stability are
components of PRPL
Line.
Project Rework Probability Level (PRPL)
Week PRPL
Upper
Control
Limit
Lower
Control
Limit
SME
Involvement
Technical
Capability
Requirements
Stability
Confidence
Level
8/10/2010 5.0 20 0 100 100 80 100
8/17/2010 10.0 20 0 80 100 80 100
8/24/2010 12.5 20 0 80 100 80 90
8/31/2010 22.5 20 0 70 90 70 80
9/7/2010 17.5 20 0 80 90 70 90
9/14/2010 16.3 20 0 80 90 75 90
9/21/2010 11.3 20 0 80 90 85 100
9/28/2010 23.8 20 0 80 60 85 80
10/5/2010 23.8 20 0 80 60 85 80
10/12/2010 23.8 20 0 80 60 85 80
10/19/2010 18.8 20 0 65 90 85 85
10/26/2010 21.3 20 0 70 90 70 85
11/2/2010 16.3 20 0 80 90 70 95
11/9/2010 16.3 20 0 80 90 70 95
11/16/2010 16.3 20 0 80 80 80 95
11/23/2010 16.3 20 0 80 80 80 95
11/30/2010 17.5 20 0 80 80 80 90
12/7/2010 12.5 20 0 80 90 80 100
12/14/2010 8.8 20 0 85 90 90 100
12/21/2010 5.0 20 0 90 100 90 100
12/28/2010 0.0 20 0 100 100 100 100
Project Rework Probability Level
Components of PRPL Line
42
© 2013 Joe Hessmiller
PRPL
Line
SME Involvement,
Team Confidence
Level, Technical
Capability and
Requirements
Stability influence
rework probability.
Project Rework Probability Level
0.0
20.0
40.0
60.0
80.0
100.0
120.0
PRPL
Upper Control Limit
Lower Control Limit
SME Involvement
Confidence Level
Technical Capability
Requirements Stability
PRPL Line Influences
43
© 2013 Joe Hessmiller
Part Five
Developing Innovative Metrics
for Your Organization
44
© 2013 Joe Hessmiller
Five “C”s of Effective Metrics
• Connected to important goals (G-Q-M)
• Complete so that all the factors important to
achieving the goal are included
• Current so that they reflect current goals
• Communicated so that they drive behavior
• Calibrated so that values are comparable
across organizations and over time.
Source: Bob Lewis, InfoWorld, 12-28-11
45
© 2013 Joe Hessmiller
A Gauge for Every Condition
Automotive Engineers Long Ago Defined
the Critical Measures for Safe, Effective
Engine Operation.
46
© 2013 Joe Hessmiller
The Basic Automobile
Dashboard
Automotive Gauge
Odometer
Clock
Fuel Level
Speedometer
Tachometer
Oil Pressure
Oil Temperature
Water Pressure
Water Temperature
Voltmeter
47
© 2013 Joe Hessmiller
What Questions Are We
Asking?
Automotive Gauge Asks the Question
Odometer
How far have we gone?
Clock How much time has it taken?
Fuel Level How far can we go?
Speedometer How fast are we going now?
Tachometer How intensely is engine working?
Oil Pressure Do we have enough ‘lubrication’ to keep parts
working well together?
Oil Temperature How smooth are interactions?
Water Pressure Do we have enough coolant to keep the engine
producing?
Water Temperature How effective is the coolant in keeping the
engine cool?
Voltmeter Is enough energy being applied to the other
important systems?
48
© 2013 Joe Hessmiller
The Basic Measures
Automotive Gauge Asks the Question To Measure
Odometer How far? Deliverables Delivered
Clock How long? Duration
Fuel Level How much further? Input Units Available
Speedometer How fast? Deliverables per Unit of Time
Tachometer How intensely? Effort Intensity
Oil Pressure Do we have enough lubrication to
smooth interactions?
Supply of Lubricant to Smooth Interaction
Between Components
Oil Temperature How smooth are interactions? Ability of Lubricant to smooth Interaction
Between Components
Water Pressure Do we have enough coolant to keep the
engine producing?
Supply of Coolant to dissipate excess
engine heat
Water Temperature How effective is the coolant in keeping
the engine cool?
Ability of Coolant to dissipate engine heat
Voltmeter Is enough energy being applied to the
other important systems?
Ability to Support other Control and
Comfort Systems
49
© 2013 Joe Hessmiller
Comparative Metrics
To Measure
Automotive
Metric IT Metric
Deliverables Delivered Miles Service Level Achieved, Function Point Delivered
Duration Hour Hour
Input Units Available Gallons Resource Hour
Deliverables per Unit of Time Miles Per Hour Earned Value Per Clock Hour
Effort Intensity RPM Hours Worked Per Week/Available Hours
Supply of Lubricant to Smooth
Interaction Between Components
PSI Stakeholder Interaction Satisfaction
Ability of Lubricant to Smooth Interaction
Between Components
Degrees Number of Open Issues from Stakeholder Interactions
Supply of Coolant to dissipate excess
engine heat
PSI Duration to Close Issues/Number of Issues
Ability of Coolant to dissipate engine
heat
Degrees Number of Escalated Issues
Ability to Support other Control and
Comfort Systems
Volts On Time Process Deliverables (Status, Reporting, Training)
50
© 2013 Joe Hessmiller
The More Complex the Project
Environment…
51
© 2013 Joe Hessmiller
• To establish the need for monitoring the metrics
that really matter.
• To identify the types of metrics that really
matter.
• Show how familiar framework can be adapted
for metrics identification (and communication).
• Give you enough to use back at your office to
improve your metrics program.
52
© 2013 Joe Hessmiller
Objective of Session

More Related Content

What's hot

Introduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP WorkgroupIntroduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP Workgroup
Tùng Trần Thanh
 
OCM Overview
OCM OverviewOCM Overview
OCM Overview
Fred Asher, Ph.D.
 
Hr Management
Hr ManagementHr Management
Hr Management
asim78
 
Strategies for successful engineering management
Strategies for successful engineering managementStrategies for successful engineering management
Strategies for successful engineering management
Carla Fair-Wright
 
Measuring Business Readiness & Adoption
Measuring Business Readiness & AdoptionMeasuring Business Readiness & Adoption
Measuring Business Readiness & Adoption
Flevy.com Best Practices
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governance
Glen Alleman
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
102 Project Manager's Function
102 Project Manager's Function102 Project Manager's Function
102 Project Manager's Function
Dr Fereidoun Dejahang
 
Key role of business analysis in project success
Key role of business analysis in project successKey role of business analysis in project success
Key role of business analysis in project successAbid Khan
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service Transition
Axios Systems
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
GlobalSkillup
 
Business Transformation Readiness Assessment- The BTEP Way
Business Transformation Readiness Assessment- The BTEP WayBusiness Transformation Readiness Assessment- The BTEP Way
Business Transformation Readiness Assessment- The BTEP Way
Chandrashekhar More
 
IT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance MeasurementIT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance Measurement
Glen Alleman
 
Project Portfolio Selection Model - Voice narrated
Project Portfolio Selection Model - Voice narratedProject Portfolio Selection Model - Voice narrated
Project Portfolio Selection Model - Voice narrated
Russ McDowell, PMP, OPM3, PRINCE2, MoP
 
Strategic program management
Strategic program managementStrategic program management
Strategic program managementEdwin Provencal
 
Implementing Project Portfolio Management
Implementing Project Portfolio ManagementImplementing Project Portfolio Management
Implementing Project Portfolio Management
dlipper
 
Agile Methodologies & Key Principles
Agile Methodologies & Key Principles Agile Methodologies & Key Principles
Agile Methodologies & Key Principles
Orchestrate Mortgage and Title Solutions, LLC
 
500 - Management of Project Benefits
500 - Management of Project Benefits500 - Management of Project Benefits
500 - Management of Project Benefits
PMI-Montréal
 

What's hot (20)

Introduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP WorkgroupIntroduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP Workgroup
 
OCM Overview
OCM OverviewOCM Overview
OCM Overview
 
Hr Management
Hr ManagementHr Management
Hr Management
 
Strategies for successful engineering management
Strategies for successful engineering managementStrategies for successful engineering management
Strategies for successful engineering management
 
Measuring Business Readiness & Adoption
Measuring Business Readiness & AdoptionMeasuring Business Readiness & Adoption
Measuring Business Readiness & Adoption
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governance
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
102 Project Manager's Function
102 Project Manager's Function102 Project Manager's Function
102 Project Manager's Function
 
09 project human resources management pmbok 5th
09 project human resources management pmbok 5th09 project human resources management pmbok 5th
09 project human resources management pmbok 5th
 
Key role of business analysis in project success
Key role of business analysis in project successKey role of business analysis in project success
Key role of business analysis in project success
 
Greencastle readiness assessment webinar 14 aug13
Greencastle readiness assessment webinar 14 aug13Greencastle readiness assessment webinar 14 aug13
Greencastle readiness assessment webinar 14 aug13
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service Transition
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
 
Business Transformation Readiness Assessment- The BTEP Way
Business Transformation Readiness Assessment- The BTEP WayBusiness Transformation Readiness Assessment- The BTEP Way
Business Transformation Readiness Assessment- The BTEP Way
 
IT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance MeasurementIT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance Measurement
 
Project Portfolio Selection Model - Voice narrated
Project Portfolio Selection Model - Voice narratedProject Portfolio Selection Model - Voice narrated
Project Portfolio Selection Model - Voice narrated
 
Strategic program management
Strategic program managementStrategic program management
Strategic program management
 
Implementing Project Portfolio Management
Implementing Project Portfolio ManagementImplementing Project Portfolio Management
Implementing Project Portfolio Management
 
Agile Methodologies & Key Principles
Agile Methodologies & Key Principles Agile Methodologies & Key Principles
Agile Methodologies & Key Principles
 
500 - Management of Project Benefits
500 - Management of Project Benefits500 - Management of Project Benefits
500 - Management of Project Benefits
 

Viewers also liked

Automation of Information (Cyber) Security
Automation of Information (Cyber) SecurityAutomation of Information (Cyber) Security
Automation of Information (Cyber) Security
Computer Aid, Inc
 
Automated Decision Making Comes to Age
Automated Decision Making Comes to AgeAutomated Decision Making Comes to Age
Automated Decision Making Comes to Age
Computer Aid, Inc
 
Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...
Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...
Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...Computer Aid, Inc
 
Automated Decision making with Predictive Applications – Big Data Hamburg
Automated Decision making with Predictive Applications – Big Data HamburgAutomated Decision making with Predictive Applications – Big Data Hamburg
Automated Decision making with Predictive Applications – Big Data Hamburg
Lars Trieloff
 
Artificial Intelligence for Automated Decision Support Project
Artificial Intelligence for Automated Decision Support ProjectArtificial Intelligence for Automated Decision Support Project
Artificial Intelligence for Automated Decision Support Project
Valerii Klymchuk
 
Problem solving& Decision Making
Problem solving& Decision MakingProblem solving& Decision Making

Viewers also liked (6)

Automation of Information (Cyber) Security
Automation of Information (Cyber) SecurityAutomation of Information (Cyber) Security
Automation of Information (Cyber) Security
 
Automated Decision Making Comes to Age
Automated Decision Making Comes to AgeAutomated Decision Making Comes to Age
Automated Decision Making Comes to Age
 
Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...
Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...
Leadership is Simple, Followership is a Challenge - Lehigh University Guest L...
 
Automated Decision making with Predictive Applications – Big Data Hamburg
Automated Decision making with Predictive Applications – Big Data HamburgAutomated Decision making with Predictive Applications – Big Data Hamburg
Automated Decision making with Predictive Applications – Big Data Hamburg
 
Artificial Intelligence for Automated Decision Support Project
Artificial Intelligence for Automated Decision Support ProjectArtificial Intelligence for Automated Decision Support Project
Artificial Intelligence for Automated Decision Support Project
 
Problem solving& Decision Making
Problem solving& Decision MakingProblem solving& Decision Making
Problem solving& Decision Making
 

Similar to Driving Innovative IT Metrics (Project Management Institute Presentation)

Driving Innovative IT Metrics (Project Management Institute Presentation)
Driving Innovative IT Metrics (Project Management Institute Presentation)Driving Innovative IT Metrics (Project Management Institute Presentation)
Driving Innovative IT Metrics (Project Management Institute Presentation)
Joe Hessmiller
 
Ba process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTDBa process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTD
Debarata Basu
 
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
Pink Elephant
 
The 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalThe 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 final
Troy DuMoulin
 
Project Brief template.pptx
Project Brief template.pptxProject Brief template.pptx
Project Brief template.pptx
ZsuzsaLuka
 
Maximize your Lean ROI
Maximize your Lean ROIMaximize your Lean ROI
Maximize your Lean ROI
SIMUL8 Corporation
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and Examples
Axiom EPM
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best PracticesJeff McClay
 
IT Business Value
IT Business ValueIT Business Value
IT Business Value
Victor Font
 
Betsol | Machine Learning for IT Project Estimates
Betsol | Machine Learning for IT Project Estimates  Betsol | Machine Learning for IT Project Estimates
Betsol | Machine Learning for IT Project Estimates
BETSOL
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
Jason Uyder
 
Core Skills for Change Agents
Core Skills for Change AgentsCore Skills for Change Agents
Core Skills for Change Agents
Caltech
 
Learning Six Sigma
Learning Six SigmaLearning Six Sigma
Learning Six Sigma
Methusael Cebrian
 
Tools guide
Tools guideTools guide
Tools guide
Salman Khan
 
Governance Risk and Compliance for SAP
Governance Risk and Compliance for SAPGovernance Risk and Compliance for SAP
Governance Risk and Compliance for SAP
PECB
 
Building a business case & selecting an ehs mis platform
Building a business case & selecting an ehs mis platformBuilding a business case & selecting an ehs mis platform
Building a business case & selecting an ehs mis platform
ProcessMAP Corporation
 
six-sigma2040.ppt
six-sigma2040.pptsix-sigma2040.ppt
six-sigma2040.ppt
OnurUyar6
 
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
Biswadeep Ghosh Hazra
 
Taking Splunk to the Next Level - New to Splunk
Taking Splunk to the Next Level - New to SplunkTaking Splunk to the Next Level - New to Splunk
Taking Splunk to the Next Level - New to Splunk
Splunk
 
SPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePointSPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePoint
Naomi Moneypenny
 

Similar to Driving Innovative IT Metrics (Project Management Institute Presentation) (20)

Driving Innovative IT Metrics (Project Management Institute Presentation)
Driving Innovative IT Metrics (Project Management Institute Presentation)Driving Innovative IT Metrics (Project Management Institute Presentation)
Driving Innovative IT Metrics (Project Management Institute Presentation)
 
Ba process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTDBa process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTD
 
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
 
The 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalThe 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 final
 
Project Brief template.pptx
Project Brief template.pptxProject Brief template.pptx
Project Brief template.pptx
 
Maximize your Lean ROI
Maximize your Lean ROIMaximize your Lean ROI
Maximize your Lean ROI
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and Examples
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
 
IT Business Value
IT Business ValueIT Business Value
IT Business Value
 
Betsol | Machine Learning for IT Project Estimates
Betsol | Machine Learning for IT Project Estimates  Betsol | Machine Learning for IT Project Estimates
Betsol | Machine Learning for IT Project Estimates
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
 
Core Skills for Change Agents
Core Skills for Change AgentsCore Skills for Change Agents
Core Skills for Change Agents
 
Learning Six Sigma
Learning Six SigmaLearning Six Sigma
Learning Six Sigma
 
Tools guide
Tools guideTools guide
Tools guide
 
Governance Risk and Compliance for SAP
Governance Risk and Compliance for SAPGovernance Risk and Compliance for SAP
Governance Risk and Compliance for SAP
 
Building a business case & selecting an ehs mis platform
Building a business case & selecting an ehs mis platformBuilding a business case & selecting an ehs mis platform
Building a business case & selecting an ehs mis platform
 
six-sigma2040.ppt
six-sigma2040.pptsix-sigma2040.ppt
six-sigma2040.ppt
 
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
 
Taking Splunk to the Next Level - New to Splunk
Taking Splunk to the Next Level - New to SplunkTaking Splunk to the Next Level - New to Splunk
Taking Splunk to the Next Level - New to Splunk
 
SPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePointSPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePoint
 

More from Computer Aid, Inc

A Few Interesting Observations From 2014 PMI Pulse
A Few Interesting Observations From 2014 PMI PulseA Few Interesting Observations From 2014 PMI Pulse
A Few Interesting Observations From 2014 PMI Pulse
Computer Aid, Inc
 
Management by Walking Around
Management by Walking AroundManagement by Walking Around
Management by Walking Around
Computer Aid, Inc
 
Knowledge Management - By Joe Hessmiller
Knowledge Management - By Joe HessmillerKnowledge Management - By Joe Hessmiller
Knowledge Management - By Joe HessmillerComputer Aid, Inc
 
Why Do CIO's Get Fired? By Joe Hessmiller
Why Do CIO's Get Fired? By Joe HessmillerWhy Do CIO's Get Fired? By Joe Hessmiller
Why Do CIO's Get Fired? By Joe HessmillerComputer Aid, Inc
 
APO State Government Business Brief
APO State Government Business BriefAPO State Government Business Brief
APO State Government Business BriefComputer Aid, Inc
 
White paper-management-by-walking-around
White paper-management-by-walking-aroundWhite paper-management-by-walking-around
White paper-management-by-walking-aroundComputer Aid, Inc
 
Leadership, Presented at Lehigh University
Leadership, Presented at Lehigh UniversityLeadership, Presented at Lehigh University
Leadership, Presented at Lehigh UniversityComputer Aid, Inc
 
Managing in the 21st Century
Managing in the 21st CenturyManaging in the 21st Century
Managing in the 21st CenturyComputer Aid, Inc
 
State of Georgia
State of GeorgiaState of Georgia
State of Georgia
Computer Aid, Inc
 
Managing in the 21st Century
Managing in the 21st CenturyManaging in the 21st Century
Managing in the 21st CenturyComputer Aid, Inc
 
APO IT Buzz Overview and Screenshots
APO IT Buzz Overview and ScreenshotsAPO IT Buzz Overview and Screenshots
APO IT Buzz Overview and ScreenshotsComputer Aid, Inc
 
Interview with Risk Management Practitioner: Robert Charette
Interview with Risk Management Practitioner: Robert CharetteInterview with Risk Management Practitioner: Robert Charette
Interview with Risk Management Practitioner: Robert CharetteComputer Aid, Inc
 
IT buzz overview
IT buzz overview IT buzz overview
IT buzz overview
Computer Aid, Inc
 
Improving Application Development Effectiveness
Improving Application Development Effectiveness Improving Application Development Effectiveness
Improving Application Development Effectiveness Computer Aid, Inc
 
CAI APO Overview
CAI APO OverviewCAI APO Overview
CAI APO Overview
Computer Aid, Inc
 

More from Computer Aid, Inc (20)

A Few Interesting Observations From 2014 PMI Pulse
A Few Interesting Observations From 2014 PMI PulseA Few Interesting Observations From 2014 PMI Pulse
A Few Interesting Observations From 2014 PMI Pulse
 
Management by Walking Around
Management by Walking AroundManagement by Walking Around
Management by Walking Around
 
Knowledge Management - By Joe Hessmiller
Knowledge Management - By Joe HessmillerKnowledge Management - By Joe Hessmiller
Knowledge Management - By Joe Hessmiller
 
Why Do CIO's Get Fired? By Joe Hessmiller
Why Do CIO's Get Fired? By Joe HessmillerWhy Do CIO's Get Fired? By Joe Hessmiller
Why Do CIO's Get Fired? By Joe Hessmiller
 
APO State Government Business Brief
APO State Government Business BriefAPO State Government Business Brief
APO State Government Business Brief
 
White paper-management-by-walking-around
White paper-management-by-walking-aroundWhite paper-management-by-walking-around
White paper-management-by-walking-around
 
Leadership, Presented at Lehigh University
Leadership, Presented at Lehigh UniversityLeadership, Presented at Lehigh University
Leadership, Presented at Lehigh University
 
APO ITBuzz Overview
APO ITBuzz OverviewAPO ITBuzz Overview
APO ITBuzz Overview
 
Introduction to CAI
Introduction to CAIIntroduction to CAI
Introduction to CAI
 
Managing in the 21st Century
Managing in the 21st CenturyManaging in the 21st Century
Managing in the 21st Century
 
State of Georgia
State of GeorgiaState of Georgia
State of Georgia
 
Managing in the 21st Century
Managing in the 21st CenturyManaging in the 21st Century
Managing in the 21st Century
 
APO IT Buzz Overview and Screenshots
APO IT Buzz Overview and ScreenshotsAPO IT Buzz Overview and Screenshots
APO IT Buzz Overview and Screenshots
 
AmeriHealth Case Study
AmeriHealth Case StudyAmeriHealth Case Study
AmeriHealth Case Study
 
APO Presentation
APO PresentationAPO Presentation
APO Presentation
 
Interview with Risk Management Practitioner: Robert Charette
Interview with Risk Management Practitioner: Robert CharetteInterview with Risk Management Practitioner: Robert Charette
Interview with Risk Management Practitioner: Robert Charette
 
APO 2.0
APO 2.0APO 2.0
APO 2.0
 
IT buzz overview
IT buzz overview IT buzz overview
IT buzz overview
 
Improving Application Development Effectiveness
Improving Application Development Effectiveness Improving Application Development Effectiveness
Improving Application Development Effectiveness
 
CAI APO Overview
CAI APO OverviewCAI APO Overview
CAI APO Overview
 

Recently uploaded

Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.ILBeyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Natan Silnitsky
 
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus
 
A Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdfA Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdf
kalichargn70th171
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with Platformless
WSO2
 
GlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote sessionGlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote session
Globus
 
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
XfilesPro
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
AMB-Review
 
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Hivelance Technology
 
Software Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdfSoftware Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdf
MayankTawar1
 
De mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FMEDe mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FME
Jelle | Nordend
 
top nidhi software solution freedownload
top nidhi software solution freedownloadtop nidhi software solution freedownload
top nidhi software solution freedownload
vrstrong314
 
Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024
Sharepoint Designs
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdf
Cyanic lab
 
Strategies for Successful Data Migration Tools.pptx
Strategies for Successful Data Migration Tools.pptxStrategies for Successful Data Migration Tools.pptx
Strategies for Successful Data Migration Tools.pptx
varshanayak241
 
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns
 
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume MontevideoVitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke
 
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
XfilesPro
 
Using IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New ZealandUsing IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New Zealand
IES VE
 
Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...
Globus
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
Globus
 

Recently uploaded (20)

Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.ILBeyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
 
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024
 
A Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdfA Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdf
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with Platformless
 
GlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote sessionGlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote session
 
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
How Does XfilesPro Ensure Security While Sharing Documents in Salesforce?
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
 
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
 
Software Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdfSoftware Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdf
 
De mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FMEDe mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FME
 
top nidhi software solution freedownload
top nidhi software solution freedownloadtop nidhi software solution freedownload
top nidhi software solution freedownload
 
Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdf
 
Strategies for Successful Data Migration Tools.pptx
Strategies for Successful Data Migration Tools.pptxStrategies for Successful Data Migration Tools.pptx
Strategies for Successful Data Migration Tools.pptx
 
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology Solutions
 
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume MontevideoVitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume Montevideo
 
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
 
Using IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New ZealandUsing IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New Zealand
 
Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
 

Driving Innovative IT Metrics (Project Management Institute Presentation)

  • 1. Driving Innovative IT Metrics Focusing on the CONDITIONS for Success © 2013 Joe Hessmiller 1
  • 2. 2 © 2013 Joe Hessmiller Schedule Check You Are Here
  • 3. Joe Hessmiller • Over 30 years in IT; analyst, programmer, technical training manager, project manager, user interface designer, project management consultant, consulting sales and marketing manager. • Worked with dozens of IT managers from Fortune 50 corporations and large government agencies. • Current focus on software project risk management, specifically, identifying, monitoring and use of project risk “early warning signs”. 3 © 2013 Joe Hessmiller
  • 4. 1. To establish the need for monitoring the metrics that really matter. 2. To identify the types of metrics that really matter. 3. Show how a familiar framework can be adapted for metrics identification (and communication). 4. Give you enough to use back at your office to improve your metrics program. 4 © 2013 Joe Hessmiller Objectives of Session
  • 5. Agenda 1. The Innovative Metrics Opportunity 2. Why Do These Opportunities Still Exist? 3. What Metrics Should We Monitor? 4. Working With Conditions Data 5. Developing Innovative Metrics for Your Organization 5 © 2013 Joe Hessmiller
  • 6. Part One The Innovative Metrics Opportunity (in Project Management) 6 © 2013 Joe Hessmiller
  • 7. 7 • Despite Everything We’ve Tried, Project Success Rates Little Changed in 30 Years – McKinsey (17% threaten) – IBM (40% met 10X range) – KPMG (70% orgs) – Standish CHAOS Report Source: http://calleam.com/WTPF/?page_id=1445 The Innovative Metrics Opportunity
  • 8. 8 • There Is Plenty of Opportunity for Improving Project Success Rates Source: http://versionone.com/assets/img/files/ChaosMa nifesto2013.pdf Source: http://versionone.com/assets/img/files/ChaosMa nifesto2013.pdf The Innovative Metrics Opportunity
  • 9. 9 • Strategic Opportunity to Increase Market Competitiveness Organizations with a mature PMO outperform those with an immature PMO by: 28% for on-time project delivery; 24% for on-budget delivery; and 20% for meeting original goals and business intent of projects. Source: www.metier.com, According to PMI The Innovative Metrics Opportunity
  • 10. 10 Source: Paul D. Nielsen, “About Us: From Director and CEO Paul D. Nielsen,” Carnegie Mellon Software Engineering Institute, http://www.sei.cmu.edu/about/message/ • Operational Opportunity to Address Causes of Largest Project Cost Component According to the Carnegie Mellon Software Engineering Institute, “Data indicate that 60-80% of the cost of software development is in rework.” The Innovative Metrics Opportunity
  • 11. Part Two Why Do These “Opportunities” Still Exist? 11 © 2013 Joe Hessmiller
  • 12. 12 • The “99% Complete” Syndrome – Everything is Fine…Everything is Fine… – Oh, Oh, SURPRISE! We’re in Trouble! • The real challenge to successful software project management is: – having the information – that is very DIFFICULT to collect, analyze and act on – in time to make a difference. What You Know What You Don’t Know… but Need To Know Why Do These Opportunities Still Exist?
  • 13. 13 • It’s DIFFICULT to Have Project Managers Who Can Predict the Future Source: http://versionone.com/assets /img/files/ChaosManifesto20 13.pdf Why Do These Opportunities Still Exist?
  • 14. 14 • It’s DIFFICULT to find project managers who can keep everyone on the same accurate, relevant and timely page. Source: http://versionone.com/assets /img/files/ChaosManifesto20 13.pdf Why Do These Opportunities Still Exist?
  • 15. 15 • It’s DIFFICULT to Trust the Service Providers You Rely On When You Can’t Verify Their Behavior/Performance Source: http://versionone.com/assets /img/files/ChaosManifesto20 13.pdf Why Do These Opportunities Still Exist?
  • 16. SO…What Does an Innovative Project Manager Need to Do? 16 • Address these DIFFICULT Project Management Challenges • By Having the Data That’s Really Needed to Be Successful
  • 17. Part Three What Metrics Should We Monitor? 17 © 2013 Joe Hessmiller
  • 18. What Metrics Should We Monitor? • Tracking Progress –Backward Looking • Managing Risk –Forward Looking 18 © 2013 Joe Hessmiller
  • 19. Tracking Progress Looking Backward • Volume • Quality • Cost 19 © 2013 Joe Hessmiller What did we do?
  • 20. • Alignment of IT Investments to Business Strategy • Cumulative Business Value of IT Investment • IT Spend Ratio – New Versus Maintenance • Critical Business Services – Customer Satisfaction – Service Level Performance • Operational Health – Outages – Security Incidents – Project Success Rate – Average Defect Rate Source: Craig Symons, Forrester Research, 4-4-08 20 © 2013 Joe Hessmiller Tracking Progress Looking Backward – Enterprise Level
  • 21. 21 © 2013 Joe Hessmiller http://www.slideshare.net/anandsubramaniam/project-metrics-measures Tracking Progress Looking Backward – Project Level
  • 22. 22 © 2013 Joe Hessmiller Managing Risk Looking Forward – Experts Agree on EWS What should we do?
  • 23. Managing Risk Looking Forward – Kappelman Research • Kappelman Research – Derived List of • Six People Factors • Six Process Factors • For In-process Audits 23
  • 24. 24 © 2013 Joe Hessmiller Managing Risk Looking Forward – Dominant Dozen
  • 25. • Project Management Institute – 10 Knowledge Areas – Things You Should Know – Things You Should Do • For Gate Audits 25 Managing Risk Looking Forward – Practitioners Too
  • 26. • In Addition to Traditional –Key Performance Status • What To Collect –Key Performance Conditions • Intra-process Conditions • Inter-process Conditions –Key Process/Practice Compliance 26 © 2013 Joe Hessmiller Summary: What Metrics Should We Monitor?
  • 27. • How Collect –Intuition –MBWA –Survey Software –Purpose Designed Software 27 © 2013 Joe Hessmiller What Metrics Should We Monitor?
  • 28. • Pattern Recognition – Correlations Between Outcomes and Precedent Conditions • Feedback Loops – Correlations Drive KPI Algorithms Need to Collect the Data for the Insights 28 © 2013 Joe Hessmiller The Future: PMBD Project Management Big Data
  • 29. Part Four Working with Conditions Data (The Four Missing Metrics) 29 © 2013 Joe Hessmiller
  • 30. Three Important CONDITIONS to Monitor • Expectations Management • Sponsor Involvement • Process Compliance To Minimize Project Risk Factor • Rework Probability At 40% of total project costs, Rework is the leading cause of projects running over budget and beyond schedule. 30 © 2013 Joe Hessmiller Managing Risk ESPR “The Missing Metrics”
  • 31. The Four Missing Metrics • SMART – Are expectations clear? • SMPL – Is sponsor engaged? • PAL - Are processes being followed? • PRPL – Are causes of Rework being avoided? 31 © 2013 Joe Hessmiller
  • 32. SMART Level Tracks the clarity of assignments. The higher the SMART Level, the higher the level of understanding of what is expected. Therefore, less Rework and less management intervention required. The SMART Level 0.0 20.0 40.0 60.0 80.0 100.0 120.0 SMART Index Upper Control Limit Lower Control Limit The SMART Level 32 © 2013 Joe Hessmiller
  • 33. SMART Level Metric derived from participant feedback on the perceived Specificity, Measurability, Achievability, Relevancy and Timeframes for their assignments/deliverables. SMART Index Week SMART Index Upper Control Limit Lower Control Limit Specific Measurable Achievable Relevant Time- Based 8/10/2010 76.3 100 75 75 50 80 100 95 8/17/2010 76.3 100 75 75 50 80 100 90 8/24/2010 75.0 100 75 75 50 80 95 95 8/31/2010 82.5 100 75 80 70 85 95 95 9/7/2010 83.8 100 75 80 70 85 100 95 9/14/2010 82.5 100 75 90 70 85 85 90 9/21/2010 87.5 100 75 90 90 80 90 90 9/28/2010 92.5 100 75 100 90 80 100 90 10/5/2010 88.8 100 75 100 90 75 90 95 10/12/2010 86.3 100 75 90 90 75 90 95 10/19/2010 87.5 100 75 90 90 75 95 85 10/26/2010 88.8 100 75 90 90 80 95 85 11/2/2010 92.5 100 75 95 95 80 100 90 11/9/2010 92.5 100 75 95 90 85 100 95 11/16/2010 93.8 100 75 100 90 85 100 95 11/23/2010 93.8 100 75 100 100 85 90 100 11/30/2010 93.8 100 75 100 100 80 95 95 12/7/2010 88.8 100 75 90 90 85 90 90 12/14/2010 92.5 100 75 90 90 90 100 95 12/21/2010 95.0 100 75 95 95 95 95 95 12/28/2010 92.5 100 75 90 80 100 100 100 Components of the SMART Level The SMART Level 33 © 2013 Joe Hessmiller
  • 34. SMART Level Looks like this project was back under control once the Relevance of the assignments were made clear to the staff. 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 SMART Index Upper Control Limit Lower Control Limit Specific Measurable Achievable Relevant Time-Based The SMART Level SMART Level Influencers 34 © 2013 Joe Hessmiller
  • 35. SMPL Line Tracks the participation level of the senior management and/or sponsor. The SMPL Line Senior Management Participation Level Attention Needed 0.0 20.0 40.0 60.0 80.0 100.0 120.0 SMPL Upper Control Limit Lower Control Limit 35 © 2013 Joe Hessmiller
  • 36. SMPL Line In this example, the level of participation in meetings, surveys, and other activities is compared to the planned participation by senior management Senior Management Participation Level Components of the SMPL Line 36 © 2013 Joe Hessmiller
  • 37. SMPL Line In this example, the components of the SMPL are shown separately to identify individual areas needing improvement. Senior Management Participation Level 0.0 20.0 40.0 60.0 80.0 100.0 120.0 SMPL Upper Control Limit Lower Control Limit Status Meeting Attendenace Rate APO Response Rate Decisions Made/Delegated Rate SMPL Line Influences 37 © 2013 Joe Hessmiller
  • 38. PAL Measures likely level of process adherence based on conditions that would tend to lead to ‘short cuts’ on process.. Process Adherence Likelihood 38 © 2013 Joe Hessmiller
  • 39. PAL This table shows how problems with EVA lead to likely abandonment of process until project gets back on track. May be OK, must be identified to be managed. Process Adherence Likelihood Components of PAL Line 39 © 2013 Joe Hessmiller
  • 40. PAL This illustrates the various components of PAL. PAL Line Influences 40 © 2013 Joe Hessmiller
  • 41. Project Rework Probability Level PRPL Line Tracks the ‘probability’ of Rework based on changes in the conditions that are known to cause Rework. 0.0 5.0 10.0 15.0 20.0 25.0 PRPL Upper Control Limit Lower Control Limit Attention Needed The PRPL Line 41 © 2013 Joe Hessmiller
  • 42. PRPL Line SME Involvement, Team Confidence Level, Technical Capability and Requirements Stability are components of PRPL Line. Project Rework Probability Level (PRPL) Week PRPL Upper Control Limit Lower Control Limit SME Involvement Technical Capability Requirements Stability Confidence Level 8/10/2010 5.0 20 0 100 100 80 100 8/17/2010 10.0 20 0 80 100 80 100 8/24/2010 12.5 20 0 80 100 80 90 8/31/2010 22.5 20 0 70 90 70 80 9/7/2010 17.5 20 0 80 90 70 90 9/14/2010 16.3 20 0 80 90 75 90 9/21/2010 11.3 20 0 80 90 85 100 9/28/2010 23.8 20 0 80 60 85 80 10/5/2010 23.8 20 0 80 60 85 80 10/12/2010 23.8 20 0 80 60 85 80 10/19/2010 18.8 20 0 65 90 85 85 10/26/2010 21.3 20 0 70 90 70 85 11/2/2010 16.3 20 0 80 90 70 95 11/9/2010 16.3 20 0 80 90 70 95 11/16/2010 16.3 20 0 80 80 80 95 11/23/2010 16.3 20 0 80 80 80 95 11/30/2010 17.5 20 0 80 80 80 90 12/7/2010 12.5 20 0 80 90 80 100 12/14/2010 8.8 20 0 85 90 90 100 12/21/2010 5.0 20 0 90 100 90 100 12/28/2010 0.0 20 0 100 100 100 100 Project Rework Probability Level Components of PRPL Line 42 © 2013 Joe Hessmiller
  • 43. PRPL Line SME Involvement, Team Confidence Level, Technical Capability and Requirements Stability influence rework probability. Project Rework Probability Level 0.0 20.0 40.0 60.0 80.0 100.0 120.0 PRPL Upper Control Limit Lower Control Limit SME Involvement Confidence Level Technical Capability Requirements Stability PRPL Line Influences 43 © 2013 Joe Hessmiller
  • 44. Part Five Developing Innovative Metrics for Your Organization 44 © 2013 Joe Hessmiller
  • 45. Five “C”s of Effective Metrics • Connected to important goals (G-Q-M) • Complete so that all the factors important to achieving the goal are included • Current so that they reflect current goals • Communicated so that they drive behavior • Calibrated so that values are comparable across organizations and over time. Source: Bob Lewis, InfoWorld, 12-28-11 45 © 2013 Joe Hessmiller
  • 46. A Gauge for Every Condition Automotive Engineers Long Ago Defined the Critical Measures for Safe, Effective Engine Operation. 46 © 2013 Joe Hessmiller
  • 47. The Basic Automobile Dashboard Automotive Gauge Odometer Clock Fuel Level Speedometer Tachometer Oil Pressure Oil Temperature Water Pressure Water Temperature Voltmeter 47 © 2013 Joe Hessmiller
  • 48. What Questions Are We Asking? Automotive Gauge Asks the Question Odometer How far have we gone? Clock How much time has it taken? Fuel Level How far can we go? Speedometer How fast are we going now? Tachometer How intensely is engine working? Oil Pressure Do we have enough ‘lubrication’ to keep parts working well together? Oil Temperature How smooth are interactions? Water Pressure Do we have enough coolant to keep the engine producing? Water Temperature How effective is the coolant in keeping the engine cool? Voltmeter Is enough energy being applied to the other important systems? 48 © 2013 Joe Hessmiller
  • 49. The Basic Measures Automotive Gauge Asks the Question To Measure Odometer How far? Deliverables Delivered Clock How long? Duration Fuel Level How much further? Input Units Available Speedometer How fast? Deliverables per Unit of Time Tachometer How intensely? Effort Intensity Oil Pressure Do we have enough lubrication to smooth interactions? Supply of Lubricant to Smooth Interaction Between Components Oil Temperature How smooth are interactions? Ability of Lubricant to smooth Interaction Between Components Water Pressure Do we have enough coolant to keep the engine producing? Supply of Coolant to dissipate excess engine heat Water Temperature How effective is the coolant in keeping the engine cool? Ability of Coolant to dissipate engine heat Voltmeter Is enough energy being applied to the other important systems? Ability to Support other Control and Comfort Systems 49 © 2013 Joe Hessmiller
  • 50. Comparative Metrics To Measure Automotive Metric IT Metric Deliverables Delivered Miles Service Level Achieved, Function Point Delivered Duration Hour Hour Input Units Available Gallons Resource Hour Deliverables per Unit of Time Miles Per Hour Earned Value Per Clock Hour Effort Intensity RPM Hours Worked Per Week/Available Hours Supply of Lubricant to Smooth Interaction Between Components PSI Stakeholder Interaction Satisfaction Ability of Lubricant to Smooth Interaction Between Components Degrees Number of Open Issues from Stakeholder Interactions Supply of Coolant to dissipate excess engine heat PSI Duration to Close Issues/Number of Issues Ability of Coolant to dissipate engine heat Degrees Number of Escalated Issues Ability to Support other Control and Comfort Systems Volts On Time Process Deliverables (Status, Reporting, Training) 50 © 2013 Joe Hessmiller
  • 51. The More Complex the Project Environment… 51 © 2013 Joe Hessmiller
  • 52. • To establish the need for monitoring the metrics that really matter. • To identify the types of metrics that really matter. • Show how familiar framework can be adapted for metrics identification (and communication). • Give you enough to use back at your office to improve your metrics program. 52 © 2013 Joe Hessmiller Objective of Session

Editor's Notes

  1. Source : McKinsey & Company in conjunction with the University of Oxford Type of survey : Study on large scale IT Projects Date : 2012 A study of 5,400 large scale IT projects (projects with initial budgets greater than $15M) finds that the well known problems with IT Project Management are persisting. Among the key findings quoted from the report: 17 percent of large IT projects go so badly that they can threaten the very existence of the company On average, large IT projects run 45 percent over budget and 7 percent over time, while delivering 56 percent less value than predicted Source material - Delivering large-scale IT projects on time, on budget, and on value Source : IBM Type of survey : Survey of 1,500 change management executives Date : Oct 2008 IBM survey in the success / failure rates of “change” projects finds; Only 40% of projects met schedule, budget and quality goals Best organizations are 10 times more successful than worst organizations Biggest barriers to success listed as people factors: Changing mindsets and attitudes – 58%. Corporate culture – 49%.  Lack of senior management support – 32%. Underestimation of complexity listed as a factor in 35% of projects For source data read – Making change work Source : KPMG (New Zealand) Type of survey : Survey of 100 businesses across a broad cross section of industries Date : Dec 2010 KPMG survey of Project Management practices in New Zealand finds some truly startling results; Survey shows an incredible 70% of organizations have suffered at least one project failure in the prior 12 months! 50% of respondents also indicated that their project failed to consistently achieve what they set out to achieve! Reference article - Most Business Experience Project Failure Source material – KPMG Project Management Survey 2010
  2. Even if we say that the 39% successful project doers don’t need us, and the 18% failures were doomed from the start…that still leaves 43% who are “challenged”. If just that is the market…it’s a huge market. http://versionone.com/assets/img/files/ChaosManifesto2013.pdf
  3. Let’s not dwell on the negative (failure). Let’s focus on the positive…becoming more competitive. Dramatic Opportunity: Those organizations that HAVE developed mature project management offices have become more significantly more consistently reliable. Giving their organizations the ability to out-compete their rivals. http://www.pmsolutions.com/audio/State_of_the_PMO_2012_Research_Report.pdf
  4. Then there is the huge cost savings potential from doing things right the first time because enough time was taken to do it right…or to cancel the project that isn’t possible at this time or worth it knowing the challenges. http://public.dhe.ibm.com/common/ssi/ecm/en/ras14021usen/RAS14021USEN.PDF