Questions                                                                     Answer
Change Strategy (insert name of point person)
1 Do a hygiene check! Do you have adequate sponsorship? Are roles and
   decision makers clearly defined?
2 Complete a thorough stakeholder analysis. What is the role of each
   stakeholder group in the change? From which stakeholder groups do
   you need to get buy-in and at what stage?

3   Does the change compete or conflict with other changes or work
    priorities?
4   How does your program support foundation-wide priorities and/or the
    scorecard? Is there an opportunity for leveraging the relationship of
    this initiative to other work in your change strategy?

5   What is your plan for leading people through the change curve? Think
    through exactly what will change and what's the distance from the
    current state to the desired? Then consider what is each group's
    "stake" in the change? And how do you get their support?

6   How will you evaluate whether the stakeholder groups are on board
    with the change?
7   How will you gather feedback and measure adoption of the change?

8  What role does the business or end user have in defining the solution
   and assessing the impact of the change?
9 How will you manage resistance to the change?
Communications (insert name of point person)
1 What key messages need to be communicated? Should not total more
   than 5-7. Is it a new program or business process, or change(s) to a
   current program?
2 What are the key components of the program or change? Should
   include a discussion about timing as well.
3 Who is your primary audience for this communication: employees,
   managers, assistants, etc.? Are there other audiences that need to be
   aware of this communication? When thinking about your audiences, be
   sure to think about it from their perspective and answer the questions:
   What’s in it for them? Why should they care? How does it affect them?

4    What are you trying to accomplish as a result of communicating? What
    action is being asked of your audience(s)? Change in behavior?
    Process? No action, just FYI?
5   What other activities, programs, or functions might be impacted by this
    initiative/communication? Is there an opportunity to leverage other
    communication activities? Might your communications conflict with
    the timing of other communications?

6   What vehicles are most appropriate for your communication: email,
    The Commons, info sessions, Town Square dialogue, conference calls,
    team/intranet sites, staff meetings, or a combination of these?
    Consider the need for ongoing communication.

7   If you need a specific stakeholder group to communicate information
    about the change to their teams, then you must be prescriptive about
    what you are asking them to do. You will also need to provide specific
    communication materials and distribution dates to them.

8   What potential obstacles need to be overcome to ensure the success
    of your communication?
9   How will you know that your communication is successful? What
    metrics will you use (survey(s), focus groups, etc.)?


                                                                                         Page 1 of 2
Business Readiness Planning Checklist
Questions                                                                        Answer
Training (insert name of point person)
1 Who is your primary audience for training?
2 How many people will be need to be trained? If there is role specific
    training be clear about the different levels of training.
3 Will training be required or optional? What logistical considerations
    will be needed to support this decision?
4 What specific training needs have you identified (objectives for
    training)?
5 What is your project timeline? When will training be required of
    specific groups.
6 What are your perceived training constraints?
7 What specific training strategies would you like to see implemented
    (elearning, instructor-led, job aids, etc.)?
8 Who will develop and deliver the training?
Support (insert name of point person)
1 Who will support the change upon launch? What is the resource plan
    for providing this support?
2 What is your plan to train the support team on the change?
3 How long with the support team be in place?
4 How will you evaluate whether the support team is needed for longer
    than initially planned?
5 What is your back-up plan if support is needed for longer than initially
    planned?
Documentation (insert name of point person)
  1 What types of documents and support materials will be needed and by
    whom? What will admins and support desk staff need?

2   What types of job aids will users need?
3   Will users need detailed reference materials, such as a user guide? Will
    they need supplementary materials, such as quick-reference guides,
    getting started guides, FAQs, etc.?
4   If out-of-the-box content is available, will you use it as-is, or leverage
    the content in some other form?
5   Who will create the documentation? Have you built editing and review
    time into your schedule? Who will update and sustain the
    documentation?
6   How will you distribute documents? Where will they be hosted online?




                                                                                           Page 2 of 2

More Related Content

What's hot

Change Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation SlidesChange Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation SlidesSlideTeam
 
Change and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesChange and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesAurelien Domont, MBA
 
Change Management Strategy
Change Management StrategyChange Management Strategy
Change Management Strategykudospower
 
Change Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation SlidesChange Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation SlidesSlideTeam
 
Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides SlideTeam
 
Enterprise Agile Transformation Strategies
Enterprise Agile Transformation StrategiesEnterprise Agile Transformation Strategies
Enterprise Agile Transformation StrategiesMike Cottmeyer
 
Change Management Framework PowerPoint Presentation Slides
Change Management Framework PowerPoint Presentation Slides Change Management Framework PowerPoint Presentation Slides
Change Management Framework PowerPoint Presentation Slides SlideTeam
 
Agile Transformation Explained
Agile Transformation ExplainedAgile Transformation Explained
Agile Transformation ExplainedLeadingAgile
 
An Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureAn Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureCraig Martin
 
Agile transformation Explained: Agile 2017 Session
Agile transformation Explained: Agile 2017 SessionAgile transformation Explained: Agile 2017 Session
Agile transformation Explained: Agile 2017 SessionLeadingAgile
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsRob Betcher
 
Portfolio Management in an Agile World - Rick Austin
Portfolio Management in an Agile World - Rick AustinPortfolio Management in an Agile World - Rick Austin
Portfolio Management in an Agile World - Rick AustinLeadingAgile
 
Change Management Training
Change Management TrainingChange Management Training
Change Management TrainingJulia Smith
 
Agile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily ReleasesAgile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily ReleasesLeadingAgile
 

What's hot (20)

Change Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation SlidesChange Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation Slides
 
Change and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesChange and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and Templates
 
Change Management Strategy
Change Management StrategyChange Management Strategy
Change Management Strategy
 
Change Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation SlidesChange Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation Slides
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 
Workday Change Management
Workday Change ManagementWorkday Change Management
Workday Change Management
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides
 
Enterprise Agile Transformation Strategies
Enterprise Agile Transformation StrategiesEnterprise Agile Transformation Strategies
Enterprise Agile Transformation Strategies
 
PMO & CMMI
PMO & CMMIPMO & CMMI
PMO & CMMI
 
Change Management Framework PowerPoint Presentation Slides
Change Management Framework PowerPoint Presentation Slides Change Management Framework PowerPoint Presentation Slides
Change Management Framework PowerPoint Presentation Slides
 
Agile Transformation Explained
Agile Transformation ExplainedAgile Transformation Explained
Agile Transformation Explained
 
An Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureAn Introduction into the design of business using business architecture
An Introduction into the design of business using business architecture
 
Agile Transformation Journey on Large Scale Projects
Agile Transformation Journey on Large Scale ProjectsAgile Transformation Journey on Large Scale Projects
Agile Transformation Journey on Large Scale Projects
 
Agile transformation Explained: Agile 2017 Session
Agile transformation Explained: Agile 2017 SessionAgile transformation Explained: Agile 2017 Session
Agile transformation Explained: Agile 2017 Session
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and Meetings
 
Portfolio Management in an Agile World - Rick Austin
Portfolio Management in an Agile World - Rick AustinPortfolio Management in an Agile World - Rick Austin
Portfolio Management in an Agile World - Rick Austin
 
Change Management Training
Change Management TrainingChange Management Training
Change Management Training
 
Agile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily ReleasesAgile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily Releases
 
Service Delivery Management (Lucia Eversley)
Service Delivery Management (Lucia Eversley)Service Delivery Management (Lucia Eversley)
Service Delivery Management (Lucia Eversley)
 

Viewers also liked

Customisable Agile readiness assessment
Customisable Agile readiness assessmentCustomisable Agile readiness assessment
Customisable Agile readiness assessmentExo Futures
 
Web2.0. Business Readiness Self Assessment
Web2.0. Business Readiness Self AssessmentWeb2.0. Business Readiness Self Assessment
Web2.0. Business Readiness Self AssessmentAlexander Osterwalder
 
Change Readiness Questionaire
Change Readiness QuestionaireChange Readiness Questionaire
Change Readiness Questionairedmdk12
 
Organization transformation ppt
Organization transformation pptOrganization transformation ppt
Organization transformation pptpinkuuu
 
Change implementation and business readiness
Change implementation and business readinessChange implementation and business readiness
Change implementation and business readinessJaipal Naidu
 
Business transformation workshop feb 2014
Business transformation workshop feb 2014Business transformation workshop feb 2014
Business transformation workshop feb 2014Iayn Clark
 
Change management questionnaires
Change management questionnairesChange management questionnaires
Change management questionnairessebastien gerard
 
Business Transformation Process
Business Transformation ProcessBusiness Transformation Process
Business Transformation ProcessTamer Gouda
 
Business Transformation and Innovation
Business Transformation and InnovationBusiness Transformation and Innovation
Business Transformation and InnovationCapitaSymonds
 
Business Transformation Quick Guide
Business Transformation Quick GuideBusiness Transformation Quick Guide
Business Transformation Quick GuideMaven
 
Case Study - Business Transformation
Case Study - Business TransformationCase Study - Business Transformation
Case Study - Business TransformationPeopleWiz Consulting
 
Transformation Planning Workshop Template
Transformation Planning Workshop TemplateTransformation Planning Workshop Template
Transformation Planning Workshop Templateronaslideshare
 
Prosci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKARProsci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKARProsci ANZ
 
Prosci Change Measurement Framework and Scorecard - Draft
Prosci Change Measurement Framework and Scorecard - DraftProsci Change Measurement Framework and Scorecard - Draft
Prosci Change Measurement Framework and Scorecard - DraftTim Creasey
 
A Model for Process Transformation
A Model for Process TransformationA Model for Process Transformation
A Model for Process TransformationNathaniel Palmer
 
Change Management - Leading Organizational Change
Change Management - Leading Organizational ChangeChange Management - Leading Organizational Change
Change Management - Leading Organizational Changejohnnyg14
 

Viewers also liked (18)

Customisable Agile readiness assessment
Customisable Agile readiness assessmentCustomisable Agile readiness assessment
Customisable Agile readiness assessment
 
Change Management Checklist
Change Management ChecklistChange Management Checklist
Change Management Checklist
 
Web2.0. Business Readiness Self Assessment
Web2.0. Business Readiness Self AssessmentWeb2.0. Business Readiness Self Assessment
Web2.0. Business Readiness Self Assessment
 
Change Readiness Questionaire
Change Readiness QuestionaireChange Readiness Questionaire
Change Readiness Questionaire
 
Organization transformation ppt
Organization transformation pptOrganization transformation ppt
Organization transformation ppt
 
Change implementation and business readiness
Change implementation and business readinessChange implementation and business readiness
Change implementation and business readiness
 
Business transformation workshop feb 2014
Business transformation workshop feb 2014Business transformation workshop feb 2014
Business transformation workshop feb 2014
 
Change management questionnaires
Change management questionnairesChange management questionnaires
Change management questionnaires
 
Business Transformation Process
Business Transformation ProcessBusiness Transformation Process
Business Transformation Process
 
Business Transformation and Innovation
Business Transformation and InnovationBusiness Transformation and Innovation
Business Transformation and Innovation
 
Business Transformation Quick Guide
Business Transformation Quick GuideBusiness Transformation Quick Guide
Business Transformation Quick Guide
 
Case Study - Business Transformation
Case Study - Business TransformationCase Study - Business Transformation
Case Study - Business Transformation
 
Transformation Planning Workshop Template
Transformation Planning Workshop TemplateTransformation Planning Workshop Template
Transformation Planning Workshop Template
 
Prosci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKARProsci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKAR
 
Prosci Change Measurement Framework and Scorecard - Draft
Prosci Change Measurement Framework and Scorecard - DraftProsci Change Measurement Framework and Scorecard - Draft
Prosci Change Measurement Framework and Scorecard - Draft
 
Greencastle readiness assessment webinar 14 aug13
Greencastle readiness assessment webinar 14 aug13Greencastle readiness assessment webinar 14 aug13
Greencastle readiness assessment webinar 14 aug13
 
A Model for Process Transformation
A Model for Process TransformationA Model for Process Transformation
A Model for Process Transformation
 
Change Management - Leading Organizational Change
Change Management - Leading Organizational ChangeChange Management - Leading Organizational Change
Change Management - Leading Organizational Change
 

Similar to Business Readiness Planning Checklist

Communication planning due diligence roadmap
Communication planning   due diligence roadmapCommunication planning   due diligence roadmap
Communication planning due diligence roadmapThinktwice Communications
 
Leadership and management of social organisations clara
Leadership and management of social organisations claraLeadership and management of social organisations clara
Leadership and management of social organisations claraClara Cruz Santos
 
Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...
Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...
Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...Findley Davies, Inc.
 
Active Problem Solving
Active Problem SolvingActive Problem Solving
Active Problem SolvingMichael Brown
 
MeTA MSP workshop: The Generic Multi Stakeholder Process Model
MeTA MSP workshop: The Generic Multi Stakeholder Process ModelMeTA MSP workshop: The Generic Multi Stakeholder Process Model
MeTA MSP workshop: The Generic Multi Stakeholder Process ModelMeTApresents
 
© 2013 Laureate Education, Inc. 1 NURS 6441 Indivi.docx
© 2013 Laureate Education, Inc.   1 NURS 6441 Indivi.docx© 2013 Laureate Education, Inc.   1 NURS 6441 Indivi.docx
© 2013 Laureate Education, Inc. 1 NURS 6441 Indivi.docxharrisonhoward80223
 
Communication Infrastructure Strategy Essay Discussion Paper.docx
Communication Infrastructure Strategy Essay Discussion Paper.docxCommunication Infrastructure Strategy Essay Discussion Paper.docx
Communication Infrastructure Strategy Essay Discussion Paper.docx4934bk
 
Change Management.pptx
Change Management.pptxChange Management.pptx
Change Management.pptxSweetSupandit
 
EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...
EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...
EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...Poudel Dinesh
 
Change Management.pptx
Change Management.pptxChange Management.pptx
Change Management.pptxMohsen Hefni
 
Social learning strategy checklist
Social learning strategy checklistSocial learning strategy checklist
Social learning strategy checklistTaleo Research
 
How Strategic Human Resource Communications Influence Hiring Practice
How Strategic Human Resource Communications Influence Hiring PracticeHow Strategic Human Resource Communications Influence Hiring Practice
How Strategic Human Resource Communications Influence Hiring PracticeCyndyTT
 
Transformation module 2 detailing behaviour 4 feb 16
Transformation module 2 detailing behaviour 4 feb 16Transformation module 2 detailing behaviour 4 feb 16
Transformation module 2 detailing behaviour 4 feb 16Ghazali Md. Noor
 
Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...Ann Pilkington
 
Running head IMPROVEMENT OPPORTUNITY .docx
Running head IMPROVEMENT OPPORTUNITY                             .docxRunning head IMPROVEMENT OPPORTUNITY                             .docx
Running head IMPROVEMENT OPPORTUNITY .docxwlynn1
 
Devry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final examDevry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final examMelissaHarrington321
 
Type/MBTI and Strategic Planning
Type/MBTI and Strategic PlanningType/MBTI and Strategic Planning
Type/MBTI and Strategic PlanningJennifer Tucker
 

Similar to Business Readiness Planning Checklist (20)

Communication planning due diligence roadmap
Communication planning   due diligence roadmapCommunication planning   due diligence roadmap
Communication planning due diligence roadmap
 
Leadership and management of social organisations clara
Leadership and management of social organisations claraLeadership and management of social organisations clara
Leadership and management of social organisations clara
 
Wessex AHSN organisational change roadmap
Wessex AHSN organisational change roadmapWessex AHSN organisational change roadmap
Wessex AHSN organisational change roadmap
 
Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...
Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...
Ohio HR Conference - Navigating Change: A Proven Model for Influencing Employ...
 
Complete class 1
Complete class 1Complete class 1
Complete class 1
 
Active Problem Solving
Active Problem SolvingActive Problem Solving
Active Problem Solving
 
MeTA MSP workshop: The Generic Multi Stakeholder Process Model
MeTA MSP workshop: The Generic Multi Stakeholder Process ModelMeTA MSP workshop: The Generic Multi Stakeholder Process Model
MeTA MSP workshop: The Generic Multi Stakeholder Process Model
 
© 2013 Laureate Education, Inc. 1 NURS 6441 Indivi.docx
© 2013 Laureate Education, Inc.   1 NURS 6441 Indivi.docx© 2013 Laureate Education, Inc.   1 NURS 6441 Indivi.docx
© 2013 Laureate Education, Inc. 1 NURS 6441 Indivi.docx
 
Communication Infrastructure Strategy Essay Discussion Paper.docx
Communication Infrastructure Strategy Essay Discussion Paper.docxCommunication Infrastructure Strategy Essay Discussion Paper.docx
Communication Infrastructure Strategy Essay Discussion Paper.docx
 
Change Management.pptx
Change Management.pptxChange Management.pptx
Change Management.pptx
 
EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...
EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...
EcO9Op-aTUGDvTqfms1BCg_22992a0fc216492c830c65c38b2610f1_Change-Management-Fra...
 
Change Management.pptx
Change Management.pptxChange Management.pptx
Change Management.pptx
 
Common factors for managing successful change leeds jan 2016
Common factors for managing successful change   leeds jan 2016 Common factors for managing successful change   leeds jan 2016
Common factors for managing successful change leeds jan 2016
 
Social learning strategy checklist
Social learning strategy checklistSocial learning strategy checklist
Social learning strategy checklist
 
How Strategic Human Resource Communications Influence Hiring Practice
How Strategic Human Resource Communications Influence Hiring PracticeHow Strategic Human Resource Communications Influence Hiring Practice
How Strategic Human Resource Communications Influence Hiring Practice
 
Transformation module 2 detailing behaviour 4 feb 16
Transformation module 2 detailing behaviour 4 feb 16Transformation module 2 detailing behaviour 4 feb 16
Transformation module 2 detailing behaviour 4 feb 16
 
Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...
 
Running head IMPROVEMENT OPPORTUNITY .docx
Running head IMPROVEMENT OPPORTUNITY                             .docxRunning head IMPROVEMENT OPPORTUNITY                             .docx
Running head IMPROVEMENT OPPORTUNITY .docx
 
Devry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final examDevry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final exam
 
Type/MBTI and Strategic Planning
Type/MBTI and Strategic PlanningType/MBTI and Strategic Planning
Type/MBTI and Strategic Planning
 

More from Darren Nerland

Building a learning ecosystem
Building a learning ecosystemBuilding a learning ecosystem
Building a learning ecosystemDarren Nerland
 
Design thinking is not rocket science!
Design thinking is not rocket science! Design thinking is not rocket science!
Design thinking is not rocket science! Darren Nerland
 
Learner Persona Template
Learner Persona TemplateLearner Persona Template
Learner Persona TemplateDarren Nerland
 
How to Run a Learning Hackathon
How to Run a Learning HackathonHow to Run a Learning Hackathon
How to Run a Learning HackathonDarren Nerland
 
Persona template for learners and demographics
Persona template for learners and demographicsPersona template for learners and demographics
Persona template for learners and demographicsDarren Nerland
 
Learn-a-palooza - Preparing for the Future of Learning
Learn-a-palooza - Preparing for the Future of LearningLearn-a-palooza - Preparing for the Future of Learning
Learn-a-palooza - Preparing for the Future of LearningDarren Nerland
 
What do learning platforms look like in the future
What do learning platforms look like in the futureWhat do learning platforms look like in the future
What do learning platforms look like in the futureDarren Nerland
 
Social media tool matrix starter
Social media tool matrix starterSocial media tool matrix starter
Social media tool matrix starterDarren Nerland
 
Preparing for the Future of Learning
Preparing for the Future of LearningPreparing for the Future of Learning
Preparing for the Future of LearningDarren Nerland
 
4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ...
 4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ... 4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ...
4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ...Darren Nerland
 
Social and informal Learning
Social and informal Learning Social and informal Learning
Social and informal Learning Darren Nerland
 
Learning in the Cloud - Training Magazine Conference 2015
Learning in the Cloud - Training Magazine Conference 2015Learning in the Cloud - Training Magazine Conference 2015
Learning in the Cloud - Training Magazine Conference 2015Darren Nerland
 
ISD / ADDIE Design Document Template
ISD / ADDIE Design Document TemplateISD / ADDIE Design Document Template
ISD / ADDIE Design Document TemplateDarren Nerland
 
Learning Objectives and Topics Outline form
Learning Objectives and Topics Outline formLearning Objectives and Topics Outline form
Learning Objectives and Topics Outline formDarren Nerland
 
Using Social Media in Learning and Communications
Using Social Media in Learning and CommunicationsUsing Social Media in Learning and Communications
Using Social Media in Learning and CommunicationsDarren Nerland
 

More from Darren Nerland (19)

Building a learning ecosystem
Building a learning ecosystemBuilding a learning ecosystem
Building a learning ecosystem
 
Design thinking is not rocket science!
Design thinking is not rocket science! Design thinking is not rocket science!
Design thinking is not rocket science!
 
Learner Persona Template
Learner Persona TemplateLearner Persona Template
Learner Persona Template
 
Learning Ecosystems
Learning EcosystemsLearning Ecosystems
Learning Ecosystems
 
How to Run a Learning Hackathon
How to Run a Learning HackathonHow to Run a Learning Hackathon
How to Run a Learning Hackathon
 
Dot for your thoughts
Dot for your thoughtsDot for your thoughts
Dot for your thoughts
 
Persona template for learners and demographics
Persona template for learners and demographicsPersona template for learners and demographics
Persona template for learners and demographics
 
Learn-a-palooza - Preparing for the Future of Learning
Learn-a-palooza - Preparing for the Future of LearningLearn-a-palooza - Preparing for the Future of Learning
Learn-a-palooza - Preparing for the Future of Learning
 
What do learning platforms look like in the future
What do learning platforms look like in the futureWhat do learning platforms look like in the future
What do learning platforms look like in the future
 
Social media tool matrix starter
Social media tool matrix starterSocial media tool matrix starter
Social media tool matrix starter
 
Preparing for the Future of Learning
Preparing for the Future of LearningPreparing for the Future of Learning
Preparing for the Future of Learning
 
4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ...
 4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ... 4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ...
4 Learning Trends - Micro Learning, MOOCs, Learning Paths, Content Creation ...
 
Social and informal Learning
Social and informal Learning Social and informal Learning
Social and informal Learning
 
Learning in the Cloud - Training Magazine Conference 2015
Learning in the Cloud - Training Magazine Conference 2015Learning in the Cloud - Training Magazine Conference 2015
Learning in the Cloud - Training Magazine Conference 2015
 
Learning in the cloud
Learning in the cloudLearning in the cloud
Learning in the cloud
 
ISD / ADDIE Design Document Template
ISD / ADDIE Design Document TemplateISD / ADDIE Design Document Template
ISD / ADDIE Design Document Template
 
Learning Objectives and Topics Outline form
Learning Objectives and Topics Outline formLearning Objectives and Topics Outline form
Learning Objectives and Topics Outline form
 
Performance support
Performance supportPerformance support
Performance support
 
Using Social Media in Learning and Communications
Using Social Media in Learning and CommunicationsUsing Social Media in Learning and Communications
Using Social Media in Learning and Communications
 

Business Readiness Planning Checklist

  • 1. Business Readiness Planning Checklist Questions Answer Change Strategy (insert name of point person) 1 Do a hygiene check! Do you have adequate sponsorship? Are roles and decision makers clearly defined? 2 Complete a thorough stakeholder analysis. What is the role of each stakeholder group in the change? From which stakeholder groups do you need to get buy-in and at what stage? 3 Does the change compete or conflict with other changes or work priorities? 4 How does your program support foundation-wide priorities and/or the scorecard? Is there an opportunity for leveraging the relationship of this initiative to other work in your change strategy? 5 What is your plan for leading people through the change curve? Think through exactly what will change and what's the distance from the current state to the desired? Then consider what is each group's "stake" in the change? And how do you get their support? 6 How will you evaluate whether the stakeholder groups are on board with the change? 7 How will you gather feedback and measure adoption of the change? 8 What role does the business or end user have in defining the solution and assessing the impact of the change? 9 How will you manage resistance to the change? Communications (insert name of point person) 1 What key messages need to be communicated? Should not total more than 5-7. Is it a new program or business process, or change(s) to a current program? 2 What are the key components of the program or change? Should include a discussion about timing as well. 3 Who is your primary audience for this communication: employees, managers, assistants, etc.? Are there other audiences that need to be aware of this communication? When thinking about your audiences, be sure to think about it from their perspective and answer the questions: What’s in it for them? Why should they care? How does it affect them? 4 What are you trying to accomplish as a result of communicating? What action is being asked of your audience(s)? Change in behavior? Process? No action, just FYI? 5 What other activities, programs, or functions might be impacted by this initiative/communication? Is there an opportunity to leverage other communication activities? Might your communications conflict with the timing of other communications? 6 What vehicles are most appropriate for your communication: email, The Commons, info sessions, Town Square dialogue, conference calls, team/intranet sites, staff meetings, or a combination of these? Consider the need for ongoing communication. 7 If you need a specific stakeholder group to communicate information about the change to their teams, then you must be prescriptive about what you are asking them to do. You will also need to provide specific communication materials and distribution dates to them. 8 What potential obstacles need to be overcome to ensure the success of your communication? 9 How will you know that your communication is successful? What metrics will you use (survey(s), focus groups, etc.)? Page 1 of 2
  • 2. Business Readiness Planning Checklist Questions Answer Training (insert name of point person) 1 Who is your primary audience for training? 2 How many people will be need to be trained? If there is role specific training be clear about the different levels of training. 3 Will training be required or optional? What logistical considerations will be needed to support this decision? 4 What specific training needs have you identified (objectives for training)? 5 What is your project timeline? When will training be required of specific groups. 6 What are your perceived training constraints? 7 What specific training strategies would you like to see implemented (elearning, instructor-led, job aids, etc.)? 8 Who will develop and deliver the training? Support (insert name of point person) 1 Who will support the change upon launch? What is the resource plan for providing this support? 2 What is your plan to train the support team on the change? 3 How long with the support team be in place? 4 How will you evaluate whether the support team is needed for longer than initially planned? 5 What is your back-up plan if support is needed for longer than initially planned? Documentation (insert name of point person) 1 What types of documents and support materials will be needed and by whom? What will admins and support desk staff need? 2 What types of job aids will users need? 3 Will users need detailed reference materials, such as a user guide? Will they need supplementary materials, such as quick-reference guides, getting started guides, FAQs, etc.? 4 If out-of-the-box content is available, will you use it as-is, or leverage the content in some other form? 5 Who will create the documentation? Have you built editing and review time into your schedule? Who will update and sustain the documentation? 6 How will you distribute documents? Where will they be hosted online? Page 2 of 2