QUALITY SERVICES WITH VALUES & INTEGRITY

                                                    AN
                                                L




                                            P




                                                         DO
                                 TM
                                                                Quality

Co n s u l t i n g
                                                              Environment


                                                               Health &
                                                                Safety


                                                                 Food
                                                                Safety

                                                                Social
                                                              Compliance


                                                              Information
                                                                Security

                                                              Lab Quality
                                                              Assurance


PRODUCTS &                                                    CE Marking
SERVICES GUIDE
OUR BUSINESS IS TO ADVANCE INDIVIDUAL AND ORGANIZATIONAL PERFORMANCE
TM


                             A USA-based Management System Consulting and
 Co n s u l t i n g          Training Orgnization with worldwide operation in 140 countries




WHO WE ARE ?
A WORLD OF POSSIBILITY IN MANAGEMENT SYSTEMS
Diversey Consulting, a division of Diversey Inc., is the world leader and the most trusted USA-based
consultancy and training services providing conglomerate. The delivery of THE MOST PROFESSIONAL SERVICES
have established & strengthened the TRUST & CONFIDENCE of our clients, industry and authorities around the
Globe. Diversey is world leader in number of employed technical experts, consultants and trainers. We have
wealth of domestic and international experiance with orgnizations of all sizes and we bring all that practicial
experiance to our clients worldwide. Very few providers in the world can match our experience in delivery.
The regional head office for GCC, Middle East & Africa is located in Dubai with 20 offices in this region and
employing 100 plus technical resources to serve the regional clients. In the Kingdom of Saudi Arabia, Diversey
Consulting have five offices with all management system expertise at Riyadh, Jeddah, Makkah, Madina &
Dammam.


FROM LOCAL TO GLOBAL BUSINESS
Customers, consumers and shareholders are increasingly demanding responsible business practices. They
expect companies to comply with all applicable rules and regulations related to quality, food safety, environment
and occupational health and demonstrate their commitment in daily operations. In this regards, our proven
solutions are very clear.
Ì   To protect business
Ì   To protect the brands
Ì   To Protect future of the globe and future generations
Ì   To protect health associated risk at operational level
Ì   To Protect the interest of all the stake holder and interested parties




                 CONFORMITY ŸCOMPLIANCE                                                                             1
                 CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
TM


                                 Industry Expert, Veteran Consultants & Best Professionals
    Co n s u l t i n g           for Management System’s Consulting and Training Services


    Diversey Consulting
    Business Philosophy

    Outstanding Service Excellence
    Diversey Consulting Services takes extra care to ensure we fully
    understand your organizational and personnel needs before we
    propose a solution. Unlike traditional Training Organization's we do
    not sell services, which may not meet your requirements. We provide
    practical learning solutions, which work and value for you. On top of
    this, Diversey Staff provides outstanding pre and post-delivery
    support service.
    Full Service Provider
    It is Diversey Consulting Services policy to provide a full-service or one-
    stop shop solution to your organizational and personnel development.
    The variety of services and the competence that Diversey do have
    globally and in KSA does not exist with any other training and
    consulting organization.
    Global Reach with Local Convenience
    Unlike traditional Training Organizations who deliver their services in
    one country or local region or within a country, our consulting and
    training solutions are delivered in each geographic region, major cities
    around the globe.
    Flexibility
    Diversey consulting and training solutions are available in publicly and in-house and we offer Accredited and
    Non-Accredited solutions. Diversey Consulting and Training Services is one of a
    few Training Organizations with the capability to offer such flexibility.
    Outstanding Value for Money                                                           AN
                                                                                      L
    Most of Diversey Consulting solutions are accredited with leading
                                                                                  P




                                                                                                       DO




    brands such as IRCA, CIEH, RSPH and Highfield United Kingdom. It is
    Diversey Consulting Services policy to seek accreditation where it
    adds value to our clients. Diversey Consultants and Tutors bring a
    wealth of industry specific knowledge and expertise with them so
    you can be assured your valuable time is not wasted.
    Competitive Pricing:
    Diversey Consulting believes in providing industry standard and
    leading-edge learning solutions at down-to earth prices. In contrast
    with traditional Consulting and Training Organizations who charge a
    premium for their services, and/or include hidden and non-value costs in their
    fees, We have eliminated all non value-added costs from our services by managing and controlling all the
    costs in the value chain.




2                                        CONFORMITY ŸCOMPLIANCE
                                         CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
TM

                                     A USA-based Management System Consulting and
  Co n s u l t i n g                 Training Orgnization with worldwide operation in 140 countries



    Services Profile




    CONSULTANCY                                          TRAININGS                                   AUDIT AND
Establishing Complete                            Other than food, Diversey having
                                                                                                    INSPECTIONS
Management System for:                           Trainings expertise for:
                                                                                             Product Development as per
                                                 Basic awareness session for Quality,        SASO requirements
ISO 9001:2008 (Quality Management System)        environment, health & safety, Internal
                                                 auditing for Quality, Environment, Health   Compliance and Product Identification
ISO 13485:2003 (Quality Management System        & Safety Environmental Aspect               Product Shelf Life Studies
for Medical Device)                              Assessment Training
                                                                                             Process Risk Engineering
ISO 14001:2004 (Environmental
Management System)                               Training for Solid waste Management
                                                 Liquid waste Management                     Food Plant Layout and Kitchen Design and
                                                                                             Staff Hygiene
ISO 17025:2005 (Management system
for Lab accreditation)                           Environmental Impact Assessment (EIAs)
                                                                                             Legal and Regulatory compliance cleaning
OHSAS 18001:2007 (Occupational                   OH&S Risk Assessment Course                 & Sanitation
Health & Safety Management System)               Stress Management
                                                                                             Occupational Health & Safety
ISO 22000:2005 (Food Safety                      Fire Safety                                 Risk Assessment
Management System)
                                                 OH&S Incident investigation and Reporting
HACCP (Hazard Analysis of                                                                    Environmental Impact Assessment Studies
Critical control Point)                          Emergency Preparedness & Response
                                                 Training course for QMS guidelines for      Internal Auditing services
ISO 27000:2005 (Information security             Trainings
Management System)                                                                           GAP Analysis Services
                                                 One day training course for effective
                                                 customer's complaint handling               Supplier Auditing Services
ISO 28000 (Specification for Security
Management system for
supply chain Management)                           Food Safety Management Training
BS EN 16000 / ISO 50000 (Energy                  Level 01-Award in Food Safety Management
Management System)
                                                 Level 02-Award in Food Safety Management
 SA 8000:2007 (Social Accountability Standard)   Level 03-Award in Food Safety Management
                                                 Level 04-Award in Safety Management
 Ts16949 (Management system for
 Automobile industry)                            HACCP System Management Training
                                                 Level – 02 Award in HACCP
                                                 Level – 03 Award in HACCP




                                                     RSPH
                                                      ROYAL SOCIETY FOR PUBLIC HEALTH
                                                      VISION, VOICE AND PRACTICE
                                                                                                                                        3
Quality
 ISO 9001:2008                                                                                         Quality Management
 Boosting Quality to Differentiate Yourself                                                                 ISO9001
 from the Competition
 What is ISO 9001..?
 ISO 9001 is an international standard related to quality management, applicable to any organization from all types of
 business sectors & activities. It is based on eight quality management principles (all fundamental to good business practices):
 Ÿ             Customer focus
 Ÿ             Leadership                                                        Key Benefits
 Ÿ             Involvement of people                                             Proves your commitment to quality and customer
 Ÿ             Process approach                                                  satisfaction. Ensures your products and services
 Ÿ             System approach to management                                     effectively meet customer and applicable statutory
 Ÿ             Continual improvement                                             and regulatory requirements. Allows you to measure
 Ÿ             Factual decision-making                                           your progress towards continual improvement of
 Ÿ             Mutually beneficial supplier                                      business performance creating a benchmark Helps
               relationships                                                     improve your organizational performance.

                      CONSULTING & AUDITING SERVICES                         PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




                   Gap Analyses for ISO 9001:2008 QMS                         ISO 9001:2008 QMS One Day Awareness Session
                   ISO 9001:2008 Quality Management System Designing,         ISO 9001:2008 QMS Three Days Lead Practitioner and Lead
                   Documentation and Implementation Services                  Implementer Training Course
                   ISO 9001:2008 Internal Auditing                            ISO 9001:2008 QMS Three Days IRCA UK Registered Internal
                   Supplier Quality Assurance, Supplier Development and       Auditing Training Course
                   Supplier Performance Improvement                           ISO 9001:2008 QMS Five Days Auditor / Lead Auditor IRCA
                   Organization Quality Excellence Modeling and Quality       UK Registered Training Course
                   Road Mapping


 Environment
 ISO 14001:2004                                                                                          Environmental
 Environment Management System                                                                            ISO 14001
 What is ISO 14001..?
 ISO 14001:2004 is a part of a series of international standards applicable to any organization. Anywhere relating to
 environmental management. Based on Plan-Do-Check-Act cycle, ISO 14001: 2004 specifies most important requirements to
 identify, control and monitor environmental aspects of any organization and also how to manage & improve whole system.
 Key Benefits
 Customer, investor, public, community assurance by demonstrating commitment Improving cost control through conserving
 input materials and energy. Reducing incidents that result in liability, therefore reducing insurance costs and assisting the
 attainment of permits and authorizations for local trade.

                      CONSULTING & AUDITING SERVICES                         PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




                   Gap Analyses for ISO 14001:2004 EMS                        ISO 14001:2004 EMS One Day Awareness Session
                   ISO 14001:2004 Environmental Management System             ISO 14001:2004 EMS Three Days Lead Practitioner and Lead
                   Designing, Documentation and Implementation Services       Implementer Training Course
                   Environmental Internal Auditing                            ISO 14001:2004 EMS Three Days IRCA UK Registered Internal
                   Environmental Impact Assessment Studies (EIAS)             Auditing Training Course
                   Industrial Liquid waste and solid waste Management         ISO 14001:2004 EMS Five Days Auditor / Lead Auditor IRCA
                   Meteorology and Environmental Protection Agency (MEPA)     UK Registered Training Course
                   Compliance review
                   Environmental Legal Compliance Evaluation and Assurance



 4                                                    CONFORMITY ŸCOMPLIANCE
                                                      CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
Environment
Green Globe
The Premier Global Certification
for Sustainability
 What is Green Globe..?                                                                           Why Green Globe..?
 Green Globe Certification is the worldwide sustainability system                                 1.     Credibility
 based on internationally accepted criteria for sustainable                                       2.     Transparency
 operation and management of travel and tourism businesses.                                       3.     Lower Operational Costs
 Operating under a worldwide license, Green Globe Certification                                   4.     Better Business
 is based in California, USA and is represented in over 83                                        5.     Corporate Social Responsibility
 countries. Green Globe is the only certification brand to be an                                  6.     Better Environmental Performance
 affiliate member of the United Nations World Tourism                                             7.     Paperless Certification Process
 Organization (UNWTO), is partly owned by the World Travel and
                                                                                                  8.     Marketing Advantage
 Tourism Council (WTTC) and a member of the Caribbean
                                                                                                  9.     Higher Visibility in the Market
 Alliance for Sustainable Tourism (CAST) governing council.

                  CONSULTING & AUDITING SERVICES                                  PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




               Green Globe - Gap Analyses and Strategic Solutions                    Green Globe - One Day Awareness raining
               Green Globe - System Designing, Documentation                         Green Globe - Three Days Implementation Training
               and Implementation Services                                           Course
               Green Globe - Internal Auditing for Performance                       Green Globe - Three Days Internal Auditing Training
               Improvement                                                           Course



 Health & Safety
 OHSAS 18001                                                                                                     Health And Safety
 Occupational Health & Safety                                                                                     OHSAS 18001
 What is OHSAS 18001?
 OHSAS 18001 is an international standard giving requirements
 related to Health and Safety Management Systems. It enables
 an organization to have control over, and knowledge of, all
 relevant hazards resulting from normal operations and
 abnormal situations, and improve its performance.

                  CONSULTING & AUDITING SERVICES                                 PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




               Gap Analyses for OHSAS 18001:2007                                     OHSAS 18001:2007 One Day Awareness Session
               OHSAS 18001:2007 Environmental Management System                      OHSAS 18001:2007 Three Days Lead Practitioner and Lead
               Designing, Documentation and Implementation Services                  Implementer Training Course
               Health & Safety Internal Auditing                                     OHSAS 18001:2007 Three Days IRCA UK Registered Internal
               Health & Safety risk Assessment Studies                               Auditing Training Course
               Industrial Risk Analyses, Risk Management & risk engineering          OHSAS 18001:2007 Five Days Auditor / Lead Auditor IRCA
               Health and Safety – Population, Society and Community                 UK Registered Training Course
               Risk Analyses and Risk Management
               Operational risk management and risk mapping



                                                                      RSPH
                                                                       ROYAL SOCIETY FOR PUBLIC HEALTH
                                                                       VISION, VOICE AND PRACTICE
                                                                                                                                               5
Social Accountability                                                                                             SA 8000
 Corporate Social Responsibility                                                                                 ISO 26000
 What is SA 8000..?                                                                OUR SERVICES
 SA 8000 is the first auditable standard for social accountability. In                     CONSULTING & AUDITING SERVICES
 particular, it is compatible with ISO 9001, ISO 14001 and OHSAS1                      Gap Analyses for SA 8000 Social Accountability and
 8001 structure and based on conventions of the International Labour                   ISO 26000 Social Responsibility
 Organisation [ILO), the Universal Declaration of Human Rights and                     SA 8000 Social Accountability and ISO 26000 System
 the UN Convention on the Rights of the Child. The world wide                          Designing, Documentation and Implementation Services
                                                                                       SA 8000 Social Acc. & ISO 26000 Internal Auditing
 recognized SA8000 standard involves the development and auditing                      Corporate Social Responsibility Norms Designing and
 of management systems that promote socially acceptable working                        Implementation
 practices bringing benefits to the complete supply chain.                             Social Compliance Auditing
                                                                                       Code of Conduct Compliance Assessment and Evaluation
 What is ISO 26000..?
 Organizations around the world, and their stakeholders, are PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
 becoming increasingly aware of the need for and benefits of socially            SA 8000 Social Accountability and ISO 26000 One Day
 responsible behaviour. The objective of social responsibility is to             Awareness Session
                                                                                 SA 8000 Social Accountability and ISO 26000 Three Days
 contribute to sustainable development.
                                                                                 Lead Practitioner and Lead Implementer Training Course
 An organization's performance in relation to the society in which it            SA 8000 Social Accountability and ISO 26000 Three Days
 operates and to its impact on the environment has become a critical             Internal Auditing Training Course
 part of measuring its overall performance and its ability to continue
 operating effectively. This is, in part, a reflection of the growing recognition of the need to ensure healthy ecosystems, social
 equity and good organizational governance. In the long run, all organizations' activities depend on the health of the world's
 ecosystems. Organizations are subject to greater scrutiny by their various stakeholders.



 Information Security
 ISO 27001:2005                                                                                          Information Security

 Information Security Management System                                                                    ISO/IEC 27001
 ISO 27001:2005 is an international standard giving requirements related to Information
 Security Management System in order to enable an organization to assess its risk and
 implement appropriate controls to preserve confidentiality, integrity and availability of information assets. The fundamental
 aim is to protect the information of your organization getting into the wrong hands or losing it forever.
 What are the key benefits?
 Due to dependability of information and information systems, confidentiality, integrity and availability of information is
 essential to maintain competitive edge, cash-flow, profitability and commercial image. Compliance with legal, statutory,
 regulatory and contractual requirements. Improved corporate governance and assurance to stakeholders such as
 shareholders, clients, consumers and suppliers. Through a proper risk assessment, threats to assets are identified,
 vulnerability to and likelihood of occurrence is evaluated and potential impact is estimated, so your investment is allocated
 where it is necessary.
                  CONSULTING & AUDITING SERVICES                             PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




               Gap Analyses for ISO 27001:2005 Info. Security Mgt. System     ISO 27001:2005 Info. Security Management System
               ISO 27001:2005 Info. Security Mgt. System Designing,           One Day Awareness Session
               Documentation and Implementation Services                      ISO 27001:2005 Info. Security Management System
               ISO 27001:2005 Info. Security Mgt. System Internal Auditing    Three Days Lead Practitioner and Lead Implementer Training Course
               Information Security Risk Assessment Studies                   ISO 27001:2005 Info. Security Management System
               Information risk management and risk mapping                   Three Days IRCA UK Registered Internal Auditing Training Course
                                                                              ISO 27001:2005 Info. Security Management System
                                                                              Five Days Auditor/Lead Auditor IRCA UK Registered Training Course



 6                                                   CONFORMITY ŸCOMPLIANCE
                                                     CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
Energy Management
EN 16001 / ISO 50000                                                                    Energy Management

Energy Management Systems                                                                EN 16001/ISO 50000
What is EN 16001... ?
"Saving energy to reduce carbon dioxide emissions", is the message of current fight against global warming.
Energy savings are at the forefront of the actions to contribute to the sustainability of human activities.
Organizations have a major role to play by controlling their energy consumption and reducing their energy bill.
Reducing energy costs also plays a strategic role in that it leads to higher financial profitability and a competitive
advantage.
What are Energy Management Systems?
Energy Management Systems offer a systemic approach to monitor and reduce the energy consumption in all
kinds of organizations. EN 16001 is the European standard for Energy Management Systems. It is based on Plan-
Do-Check-Act cycle, with requirements for establishing an energy policy with concrete objectives, putting in place
actions to reduce and monitor energy use, verifying energy savings and planning improvements. It offers a
comprehensive set of guidelines to meet carbon emissions
reduction requirements. EN 16001 is based on regulatory                  OUR SERVICES
compliance and has the same structure as ISO 14001. It can be
easily integrated to existing Quality, Safety and/or Environment            Management system Development
Managements Systems.                                                        Gap Analysis and Internal Auditing



Food Safety
HACCP
Hazard Analysis Critical Control Point
                                                                                OUR SERVICES
What is HACCP?                                                          CONSULTING & AUDITING SERVICES
HACCP system is 12 Steps and 7 Principles based risk
                                                                     Gap Analyses and Strategic Food Safety Solutions.
based approach to food safety. These steps are:
                                                                     HACCP Based Food Safety System Designing,
1. Assemble HACCP Team
                                                                     Documentation and Implementation Services.
2. Describe Product                                                  HACCP Internal Auditing for Food Safety
3. Identify Intended Use                                             Performance Improvement.
4. Construct Flow Diagram                                            Food Safety Legal Compliance Audit.
5. On-site Confirmation of Flow Diagram                              Municipality, SASO and SFDA Compliance Audit
6. Conduct a Hazard Analysis                                         and Compliance Assurance
7. Determine CCPs
8. Establish Critical Limits for each CCP
                                                                   PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
9. Establish a Monitoring System for each CCP
10. Establish Corrective Actions                                     1 Day HACCP Awareness Level-01 Award Training
11. Establish Verification Procedures                                3 Days HACCP Implementation & Lead Practitioner
12. Establish Documentation and Record Keeping                       Training Course (Level-2 Awards in HACCP)
                                                                     Three Days HACCP - Food Safety Internal Auditing
       FAO/WHO Food Standards                                        Training Course
                                                                     Award in Effective Auditing and Inspection Skills
         CODEX alimentarius                                          Training Course



                                                                                                                    7
Food Safety
                                                                                           Food Safety
 ISO 22000:2005                                                                         Management Systems
                                                                                          ISO 22000:2005
  Food Safety Management System                                                             FSSC 22000
 Many standards have been developed within food safety: specific company                         International
 standards, legal regulations, as well as standards developed by retailers. Their                Organization for
                                                                                                 Standardization
 proliferation made their application difficult. At the same time, food safety
 principles have spread across the world. The safety of foodstuffs has become a
 major issue for all players in the food chain. A single standard with worldwide
 reach, and including the food safety principles, thus became necessary. This was
 the reason ISO developed and released ISO 22000:2005 Food Safety Management
 System in 2005. There are number of technical standards and guidelines in the
 series of ISO 22000 and published to facilitate the industry for effective food safety management system.
 ISO 22000:2005 is best standard to integrate other management system concepts like Quality, Environment and
 Occupational Health and Safety. The design of ISO 22000 is very much in lined with ISO 9001, ISO 14001 and
 OHSAHS 18001.

 FSSC 22000
 Food Safety Management System                                                      Food Safety System
                                                                                       Certification 22000
 The Foundation for Food Safety Certification was founded in 2004. The
 Foundation developed FSSC 22000, the ISO 22000 and BSI PAS 220 based
 certification scheme for certification of food manufacturers. This
 development is supported by the Confederation of the Food and Drink Industries of the European Union (CIAA).
 The scheme is recognized by the Global Food Safety Initiative (GFSI).
 FSSC 22000 contains a complete certification scheme for Food Safety Systems based ISO 22000: 2005, Publicly
 Available Specification for Prerequisite Programs on food safety for food manufacturing, BSI PAS 220: 2008. The
 scheme is using existing standards for certification (ISO 22000, PAS 220 and ISO 22003) and the certification will be
 accredited under the standard ISO guide 17021. Manufacturers that are already certified against ISO 22000 will
 only need an additional review against BSI PAS 220 to meet this certification scheme.
 The FSSC 22000 certification scheme has been given full recognition by the Global Food Safety Initiative Board of
 Directors. This follows an extensive benchmarking process using the requirements laid out in the GFSI Guidance
 Document Version 5, and an addendum which was issued in December 2009.

                 CONSULTING & AUDITING SERVICES                   PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
               Gap Analyses for ISO 22000:2005                     ISO 22000:2005 FSMS One Day Awareness Session
OUR SERVICES




               ISO 22000:2005 Food Safety System Designing,        ISO 22000:2005 FSMS Three Days Lead Practitioner
               Documentation and Implementation Services           and Lead Implementer Training Course
               ISO 22000:2005 Internal Auditing for Food Safety    ISO 22000:2005 FSMS Three Days IRCA UK Registered
               Performance Improvement                             Internal Auditing Training Course
               Food Safety Legal Compliance Audit                  ISO 22000:2005 FSMS Five Days Auditor / Lead
               Municipality, SASO and SFDA Compliance Audit        Auditor IRCA UK Registered Training Course
               and Compliance Assurance                            PAS 220:2005 PRP Two days Awareness
               PAS 220:2008 PRP Gap Assessment                     Training Course



 8                                            CONFORMITY ŸCOMPLIANCE
                                              CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
Food Safety
 British Retail Consortium                                                                                              Food Safety
                                                                                                                     Management Systems

 BRC GLOBAL STANDARDS                                                                                                   BRC / IFS
               THE WORLDWIDE STANDARDS OF CHOICE
 The British Retail Consortium is the lead trade association
 representing the whole range of retailers, from the large
 multiples and department stores in the United Kingdom. In
 1998 the British Retail Consortium (BRC), responding to
 industry needs, developed and introduced the BRC Food Technical Standard to be used to evaluate manufacturers
 of retailers own brand food products. It is designed to be used as a pillar to help retailers and brand owners with
 their 'due diligence' defence, should they be subject to a prosecution by the enforcement authorities. Under EU
 food Law, retailers and brand owners have a legal responsibility for their brands.

                   CONSULTING & AUDITING SERVICES                                 PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




                 Gap Analyses for BRC Food, Packaging, Consumer                       BRC Food, Packaging, Consumer Products and Storage
                 Products and Storage and Distribution                                and Distribution - One Day Awareness Session
                 BRC Food, Packaging, Consumer Products and                           BRC Food, Packaging, Consumer Products and Storage
                 Storage and Distribution System Designing,                           and Distribution - Three Days Documentation Training Course
                 Documentation and Implementation Services                            BRC Food, Packaging, Consumer Products and Storage
                 BRC Food, Packaging, Consumer Products and                           and Distribution - Three Days Internal Auditing Training Course
                 Storage and Distribution Internal Auditing

 IFS               International Food Standard
                                                                                                                                     international
                                                                                                                                     featured     ®
                                                                                                                                          standards
 In 2002, in order to create common food safety standard, German food retailers from the HDE                                                 IFS
 (Hauptverband des Deutschen Einzelhandels) have developed a common audit standard called
 International Food Standard or IFS. In 2003, French food retailers (and wholesalers) from the
 FCD have joined the IFS Working Group and have contributed to development of IFS version 4.
                                                                                                                                          Food

     IFS Standard                                                              Application Description
    IFS Food             IFS Food is a standard for auditing companies that process food or companies that pack loose food products. IFS Food can
                         only be used when a product is "processed or handled", or when there is a hazard for product contamination during the
                         primary packing.
    IFS HPC              IFS HPC is a standard for auditing companies that process household and personal care products, or companies that pack
                         loose household and personal care products.
    IFS Cash & Carry     IFS Cash & Carry / Wholesale is the standard which covers all handling activities of loose and packed products in Cash &
    / Wholesale          Carry markets or wholesale companies. .
    IFS Logistics        IFS Logistics is applicable to both food and non-food products and covers all logistics activities, such as loading and
                         unloading, transport, storage handling of packed products and further distribution.
    IFS Broker           IFS Broker is intended to be applied to all companies primarily involved in "trading activities“ and who select their own
                         suppliers and purchase or broker goods from these themselves or on behalf.

                   CONSULTING & AUDITING SERVICES                                                PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




                 Gap Analyses for IFS Food, HPC, Logistics,                                        IFS Food, HPC, Logistics, Broker, Cash & Carry -
                 Broker, Cash & Carry                                                              One Day Awareness Session
                 IFS Food, HPC, Logistics, Broker, Cash & Carry System                             IFS Food, HPC, Logistics, Broker, Cash & Carry -
                 Designing, Documentation and Implementation Services                              Three Days Documentation Training Course
                 IFS Food, HPC, Logistics, Broker, Cash & Carry                                    IFS Food, HPC, Logistics, Broker, Cash & Carry -
                 Internal Auditing                                                                 Three Days Internal Auditing Training Course



                                                               RSPH
                                                               ROYAL SOCIETY FOR PUBLIC HEALTH
                                                               VISION, VOICE AND PRACTICE
                                                                                                                                                   9
Food Safety
 SQF
 Safe Quality Food
 The SQF Institute (SQFI) is a division of the Food Marketing Institute (FMI), an
 association that conducts programs in public affairs, food safety, research,
 education and industry relations on behalf of its 1,500 member companies -
 food retailers and wholesalers - in the United States and around the world. The
                                                                                                   SQF               INSTITUTE

 SQF Institute was established by FMI in 2004 to administer the SQF Program
 and is located in Arlington, Virginia.
 The SQF (Safe Quality Food) Program is a leading, global food safety and quality
 certification program and management system designed to meet the needs of buyers
 and suppliers worldwide. The SQF Program consists of the SQF 1000 Code (for use by
 primary producers) and the SQF 2000 Code (used mainly by food manufacturers).

                 CONSULTING & AUDITING SERVICES                   PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




               Gap Analyses for SQF Codes 1000 and SQF             SQF Codes 1000 and SQF Codes 2000 -
               Codes 2000                                          One Day Awareness Session
               SQF Codes 1000 and 2000 - System Designing,         SQF Codes 1000 and SQF Codes 2000 -
               Documentation & Implementation Services             Three Days Documentation Training Course
               SQF Codes 1000 and SQF Codes 2000 Internal          SQF Codes 1000 and SQF Codes 2000 -
               Auditing                                            Three Days Internal Auditing Training Course


 GLOBALGAP                                                         GLOBALG.A.P.
 What is GLOBALGAP?                                                                                   GLOBALG.A.P.
                                                                                                INTERGRATED FARM ASSURANCE
 GlobalGAP is a European based trade organisation whose members consists of                                 (IFA)


 growers, product marketing organisations (PMO), growers' co-operatives, food
                                                                                                      GLOBALG.A.P.
 manufacturers and retailers. The GLOBALGAP standard is primarily designed to                  COMPOUND FEED MANUFACTURING
                                                                                                          (CFM)
 reassure consumers about how food is produced on the farm by minimising
 detrimental environmental impacts of farming operations, reducing the use of                         GLOBALG.A.P.
 chemical inputs and ensuring a responsible approach to worker health and                            ANIMAL TRANSPORT
                                                                                                            (AT)
 safety as well as animal welfare
 GlobalGAP has developed an auditable standard promoting Good Agricultural                            GLOBALG.A.P.
                                                                                                PLANT PROPAGATION MATERIAL
 Practices (GAP). The scope of GlobalGAP currently covers the production of                               (PPM)

 fruit, vegetables, combinable crops, green coffee, tea, flowers and ornamentals,
 livestock, feed, nursery stock and aquaculture. GlobalGAP has support from                           GLOBALG.A.P.
                                                                                             RISK ASSESSMENT ON SOCIAL PRACTICE
 major European retailers, PMO's and growers on a global basis.                                           (GRASP)




                 CONSULTING & AUDITING SERVICES                   PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




               Gap Analyses and Strategic Food Safety Solutions    Global GAP One Day Awareness Training Course
               for Global GAP                                      Global GAP Three Days Documentation and
               Global GAP Based Food Safety System Designing,      Implementation Course
               Documentation and Implementation Services           Global GAP – Three Days Internal Auditing
               Global GAP Internal Auditing                        Training Course



10                                            CONFORMITY ŸCOMPLIANCE
                                              CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
Feed Safety & Quality
    FAMI Commitment to FEED Legality,
    Proving your
                          Feed Additive & Pre-MIxture
                          Quality and Safety System

    Safety & Quality
  What is BS EN ISO 13485:2003
  The FAMI-QS code standard addresses feed safety, legality & quality based on
  the European animal feed Regulation. It covers both quality & feed safety
  management systems, traceability, product regulatory compliance… and European Feed Additives and PreMixtures Quality System
  many other areas.
                                                                                                                             IQS
  The European Union has developed many food regulations in order to protect the consumer's health. In the last
  few years, EU regulation has become even more complex, as many food safety crises have occurred due to animal
  feed. To ensure compliance with these laws and to improve feed safety and quality, the European Feed Additives
  Manufacturers Association has issued a code against which to be certified: FAMI-QS (Feed Additive and
  preMIxture System). Whether you are a trader or a manufacturer of feed additives or premixtures you need to
  ensure the quality, safety and legality of your products.

                  CONSULTING & AUDITING SERVICES                         PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
 OUR SERVICES




                FAMI – QS Gap Analyses and Strategic                       FAMI – QS One Day Awareness Training Course
                Feed Safety Solutions                                      FAMI – QS Three Days Documentation and
                FAMI – QS Based Feed Safety System Designing,              Implementation Course
                Documentation and Implementation Services                  FAMI – QS – Three Days Internal Auditing Training
                FAMI - QS Internal Auditing                                Course


HALAL Certification
Food, Food Ingredients and Non Food Additives
                                             As A Halal Consumer, You Should Be Familiar With
What is the meaning of                                        SIMPLE or SINGLE                        COMPLEX or COMPOUND
                                              Salt                    Sugar                Batters                   Breadings
“Halal”?                                      Flour
                                              Honey
                                                                      Water
                                                                      Vinegar
                                                                                           Colorings
                                                                                           Cheese Powder
                                                                                                                     Flavorings
                                                                                                                     Enriched Flour
Halal is an Arabic word meaning               Ascorbic Acid           Aspartame            Enrichment Mix            Seasonings
                                              Benzoate                Gelatin              Shortenings               Spices
lawful. It refers to things or actions        L-Cysteine              Onion Powder         Vitamin Mix
                                              Phosphate               Propionic Acid
permitted by Shariah law without
                                             As A Halal Consumer, You Should Know Hidden Ingredients In Common Foods
punishment imposed on the doer. It                            INGREDIENT                                         FOOD
is usually used to describe                   Liquor                                       Chocolate
                                              Gelatin                                      Ice Cream and Pharmaceuticals
something that a Muslim is                    Lard                                         Maple Syrup
                                              Pan Grease/Lard                              Bread/Baked Goods
permitted to engage in, e.g. eat,             Polysorbates                                 Dairy Products
                                              LPork Lipase                                 Cheese
drink or use.                                 Stearates                                    Chewing Gum
What is Halal                                As A Halal Consumer, You Should Be Aware Of Ingredients By Function
                                                              FUNCTION                                      INGREDIENT
Certification?                                Antioxidants
                                              Acidulates
                                                                                           BHA, BHT, Ascorbic Acid
                                                                                           Citric Acid, Carbonic Acid
Halal Certification is a recognition          Colorings                                    Blue, Carmine, Red, Yellow 5,6 etc.
                                              Emulsifiers                                  Lecithin, Mono Di-Glycerides
that the products are permissible             Flavorings                                   Artificial/Natural Flavors, Spices
                                              Flavor Enhancers                             Monosodium Glutamate (MSG)
under Islamic law. These products             Fortifiers                                   Thiamine, Vitamin A & D
are thus edible, drinkable or usable          Preservatives                                Benzoic Acid, Propionic Acid
                                              Stabilizers                                  Alginate, Gelatin, Phosphates
by Muslims.                                   Supplements                                  Amino Acids, Minerals, Vitamins
                                              Sweeteners                                   Aspartame, Saccharin, Sucralose




                                                                                                                                      11
Supply Chain Security
 ISO 28000                                                                            Supply Chain Security

 Security Management System for                                                          ISO 28000
 Supply Chain
 What is ISO 28000?
 ISO 28000 was developed in response to the transportation and logistics industries· need for a commonly
 applicable security management system specific to supply chain security. However, companies in many other
 industries are finding it useful to assess security risks, implement controls, and mitigate arrangements to manage
 potential security threats and impacts from the supply chain.
 What are the key Benefits?
 Enhanced security risk assessment, asset protection and inventory visibility and management Assured supply
 continuity for sustainable business development and reduction of delivery times Improved customer satisfaction
 and business cooperation along the supply chain Reduction of losses resulted from transport related theft Shorter
 customs clearance time! Green Lane Approvals) and reduced secondary inspections Compliance with other trade
 and supply chain security schemes, such as AEO and C-TPAT.
                                                                            OUR SERVICES
                                                                               Management system Development
                                                                               Gap Analysis and Internal Auditing



 Laboratory Quality
 ISO/IEC 17025:2005                                                                            Laboratory
 General Requirements for the Competence of
 Testing and Calibration Laboratories                                                       ISO/IEC 17025
 ISO/IEC 17025:2005 specifies the general requirements for the competence to carry out tests and/or calibrations,
 including sampling. It covers testing and calibration performed using standard methods, non-
 standard methods, and laboratory-developed methods. It is applicable to all organizations
 performing tests and/or calibrations. These include, for example, first-, second- and
 third-party laboratories, and laboratories where testing and/or calibration forms part
 of inspection and product certification.
 ISO/IEC 17025:2005 is for use by laboratories in developing their management system
 for quality, administrative and technical operations. Laboratory customers, regulatory
 authorities and accreditation bodies may also use it in confirming or recognizing the
 competence of laboratories.

                 CONSULTING & AUDITING SERVICES                PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




               ISO 17025 - Gap Analyses                         ISO 17025 - One Day Awareness Session
               ISO 17025 System Designing, Documentation &      ISO 17025 - Three Days Lead Practitioner & Lead
               Implementation Services                          Implementer Training Course
               ISO 17025 - Internal Auditing for Performance    ISO 17025 - Three Days Internal Auditing Training
               Improvement                                      Course
               ISO 17025 Legal Compliance Audit



12                                           CONFORMITY ŸCOMPLIANCE
                                             CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
Medical Devices Quality
 BS EN ISO 13485:2003                                                                                                     Medical Devices
                                                                                                                            ISO13485
 Medical devices - Quality management systems -                                                                             ISO14971/ISO 14969

 Requirements for regulatory purposes
 What is BS EN ISO 13485:2003
 This Standard is aimed at companies that design, develop, produce, install or service medical devices and specifies
 requirements for a quality management system where an organization needs to demonstrate its ability to provide
 medical devices and related services that consistently meet customer and regulatory requirements.
                     CONSULTING & AUDITING SERVICES                                  PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
OUR SERVICES




                  Gap Analyses for ISO 13485:2003 Medical Devices Quality                Medical Devices Risk One Day Awareness Session
                  Management System                                                      Medical Devices Risk Three Days Lead Practitioner and Lead
                  ISO 13485:2003 Medical Devices Quality Mgt. System                     Implementer Training Course
                  Designing, Documentation and Implementation Services                   Medical Devices Risk Three Days IRCA UK Registered Internal
                  ISO 13485:2003 Medical Devices Quality Mgt. System                     Auditing Training Course
                  Internal Auditing                                                      Medical Devices Risk Five Days Auditor / Lead Auditor
                  Medical Devices Risk Assessment Studies                                IRCA UK Registered Training Course
                  Medical Devices Usage Risk Identification and End
                  of the life risk mapping



 CE - Marking
 Your passport to the World's Largest Market
 By affixing the CE marking, the manufacturer, or its representative, or the importer assures that the item meets all
 the essential requirements of all applicable EU directives. Examples of European Directives requiring CE marking
 include pressure equipment, toy safety, products, machinery, low-voltage equipment, R&TTE, and
 Electromagnetic compatibility. There are about 22 Directives requiring CE marking. The manufacturer, whether
 established inside or outside the Community, is the person ultimately responsible for the conformity of the
 product with the provisions of the relevant Directive(s) and for the affixing of the CE marking.

 Process of CE Marking:                                                                                     OUR SERVICES
                                                                                                  CONSULTING & AUDITING SERVICES
        CE- MARKING : ROLE PLAYERS                                                              Gap Analyses for product certification for CE Mark
                                                                                                CE Mark Quality Mgt. System Designing,
                 EU Commission                 Issue Directive(s)
                                                                                                Documentation and Implementation Services
                                                                                                CE Mark Internal Auditing
               Competent Authority                                                              Product related EU Directive compliance
                                             Monitor Compliance                                 Product related EU Testing and Technical file
                 (eg MHRA in UK)
                                                                                                preparation and documentation
                                                                                                Full facilitation on product usage identification
                 Notified Bodies               Conduct Audit &                                  to product CE Mark
                (eg SGS, BSL DQS)              Issue Certificate
                                                                                            PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING
                                                                                                CE Mark - One Day Awareness Session
Manufacturer                Authorized                                                          CE Mark - Three Days Lead Practitioner
                                                 Place Product
                                                   on Market                                    and Lead Implementer Training Course
                 Representative                                                                 CE Mark - Internal Auditing Training Course



                                                              RSPH
                                                              ROYAL SOCIETY FOR PUBLIC HEALTH
                                                              VISION, VOICE AND PRACTICE
                                                                                                                                                   13
TM




        Co n s u l t i n g




        Training Services Profile

     FOOD HYGIENE TRAINING SERVICES
     Training Course                                                       Target Audience                      Course Duration
     Basic Food Hygiene (Level 01 Award in Food Safety)                     New Food Handlers                04 Teaching hours (Half Day)
     Basic Food Hygiene (Level 02 Award in Food Safety)                    Existing Food Handlers            06 Teaching hours One Day)
     Intermediate Food Hygiene (Level 03 Award in Food Safety)               Food Supervisors              18 Teaching Hours (Three Days)
     Advance Diploma in Food Safety Management (Level 04 Award)     Food Professional and Food Managers     30 Teaching Hours (Five Days)


     HACCP FOOD SAFETY TRAINING SERVICES
     Training Course                                                               Target Audience              Course Duration
     HACCP Awareness (Level 2 Awards in HACCP)                                          All Staff            06 Teaching hours (One Day)
     HACCP Implementation and Lead Practitioner (Level 2 Awards in HACCP)       HACCP Team Members         18 Teaching Hours (Three Days)
     HACCP - Food Safety Internal Auditing                                      HACCP Team Members          30 Teaching Hours (Five Days)
     Level 3 Award in Effective Auditing and Inspection Skills                      Food Professional       30 Teaching Hours (Five Days)


     MANAGEMENT SYSTEM TRAINING SERVICES
     Training Course                                                                Awareness Lead Practitioner Internal Auditing
     ISO 9001:2008 Quality Management System                                           One Day            Three Days             Three Days
     ISO 14001:2004 Environmental Management System                                    One Day            Three Days             Three Days
     OHSAS 18001:2007 Occupational Health and Safety Management System                 One Day            Three Days             Three Days
     ISO 22000:2005 Food Safety Management System                                      One Day            Three Days             Three Days
     HACCP Food Safety Management System                                               One Day            Three Days             Three Days
     BRC (Food & IoP)Food Safety Management System                                     One Day            Three Days             Three Days
     Global Gap – Agricultural Practices                                               One Day            Three Days             Three Days
     ISO 27001:2006 Information Security Management System                             One Day            Three Days             Three Days
     BS 16000 / ISO 50000 Energy Management System                                     One Day            Three Days             Three Days
     Halal Certification Schemes                                                       One Day            Three Days             Three Days
     SA 8000 Social Accountability                                                     One Day            Three Days             Three Days
     ISO 13485:2003 CE Mark and Medical Devices Certification System                   One Day            Three Days             Three Days
     Z 11.1 (Quality Management System for Schools and Educational Institutions)       One Day            Three Days             Three Days


     GENERAL MANAGEMENT TRAINING SERVICES
     Training Course                                                                                              Duration
     Environmental Impact Assessment (EIAs)                                                                            One Day
     Waste (Solid, Liquid and Gaseous) Management Practices                                                            One Day
     OH&S Risk Assessment Course                                                                                       One Day
     Stress Management                                                                                                 One Day
     Fire Safety System                                                                                                One Day
     Incident investigation and Reporting                                                                              One Day
     Emergency Preparedness & Response                                                                                 One Day
     ISO 10002 - Effective Customer's Complaint Handling                                                               One Day




14                                               CONFORMITY ŸCOMPLIANCE
                                                 CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
TM




Co n s u l t i n g




 Company Resources
                                                         Abdul Rashid
                                                         MSC Public Health
                                                         Food Safety, Environment and
                                                         Public Health Expert
                                                         Abdul.Rashid@diversey.com



                                                         Yaser Nazir
                     Mohammed Azam Khan                  MSC Total Quality Management
                     MSC Food Science &Technology        MSC Food Science &Technology
                     Food Safety, Hygiene Solution and   Quality, Environment, Food
                     Sanitation System Expert            Safety & Health Safety Expert
                     azam.khan@abcdiversey.com           Yaser.Nazir@Diversey.com




                     Mohsin Baig                         Johan D’ Souza
                                                         B. Sc. Hospitality, MBA
                     B.Sc. Chemical Engineering
                                                         Hospitality & Restaurant Quality
                     QHSE Expert
                                                         and Food Safety Expert
                     mohsin.baig@abcdiversey.com
                                                         johann.d'souza@diversey.com




                     Nina D’ Costa
                     BSC Microbiology & Biochemistry     Monika Manchanda
                     Food Safety and Quality             MSC Microbiology
                     Management System Expert            Lab Quality Assurance Expert
                     nina.da-costa@diversey.com




                     Fawwad Hussain                      Mohammad Abdo
                                                         Mohammad Abdo
                     MBA
                                                         BSC
                     Quality, Social Compliance and
                                                         Food Safety and Quality Expert
                     Corporate Governance Expert
                     fawwad.hussain@abcdiversey.com
                                                         mohamed.abdo@diversey.com



                     Ashraf Mahmoud
                     As'ad Al-khamaiseh                  Alaa Meabd
                     MSC Nutrition and Food Technology   BSC Food Industrial Management
                     Food Safety, Hygiene Solution and   Quality and Food Safety Expert
                     Sanitation System Expert            alaa.mebed@diversey.com
                     ashraf.mahmoud@abcdiversey.com




                                                                                            15
TM




                                           A USA-based Management System Consulting and
     Co n s u l t i n g                    Training Orgnization with worldwide operation in 140 countries



     Certification Road Map

     Management System Development,
     Implementation and Certification Roadmap

                          INPUT                                       OUTPUT
                          Client Inquiry                      Client and Diversey Relationship

                  Proposal Request Form                         Filled Proposal Request Form

                 Client Need Review and                            Technical Solution and
                 Submission of Proposal                              Financial Proposal

                 Agreement on Proposal                            Agreement and Contract
                    and Contracting

                Gap Audit or Assessment                        Gap Audit Report - Project Plan

                 Management System                         Management system Manual, policies,
             Designing and Implementation                procedures, Plans, instructions and records

                  Challenge Testing and                            Internal Review Report
              First Implementation Review

                    First Internal Audit                            Internal Audit Report

                    First Management                            Minutes of the Management
                     Review Meeting                                  Review Meeting

                Selection and Contracting                     Contract with Certification Body
                 with Certification Body

                   Stage Nr. 01 Audit –                           Stage Nr. 01 Audit Report
               Pre Assessment or Pre Audit

                    Stage Nr. 02 Audit –                   Stage 02 Audit or Final Audit Report -
                        Final Audit                       Recom. for Certification by Lead Auditor

                   System Handing Over                         Effective Management System

                    Biannual or Annual                            Surveillance Audit Report
                    Surveillance Audit

                    Re-Certification                                   Re-Certification



14                                    CONFORMITY ŸCOMPLIANCE
                                      CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
TM



                                                                                        Fore details, visit
Co n s u l t i n g                                                                      http://www.diversey.com


    Kingdom of Saudi Arabia
    Jeddah
    P.O. Box: 9272
    Tel: +966 2 6573994-5
    Fax: +966 2 6573497


    Riyadh                       Al-Khobar                    Makkah                     Madina
    P.O. Box: 85200              P.O. Box: 1159
    Tel: +966 1 2424919          Tel: +966 3 847 6986         Tel: +966 2 5588923        Tel: +966 4 8292335
    Fax: +966 1 2705211          Fax: +966 3 8476989          Fax: +966 2 5588042        Fax: +966 4 8292337




GCC Middle East & Africa Head Office

     Dubai    P.O. Box 61485
              Jebel Ali Free Zone              Tel: +971.4.8819470   Email: customerservice.uae@diversey.com
              Dubai, United Arab Emirates      Fax: +971.4.8819488   www.diversey.com


GCC Middle East & Africa Operations
    Lebanon   Arabian Group S.A.L.                         U.A.E     lntercare Ltd.
              P.O. Box 55162                                         P.O. Box 5628
              Beirut, Lebanon                                        Sharjah, United Arab Emirates
              Tel: +961.1.684839/40/41/42                            Tel: +971.6.5345500 Fax: +971.6.5349991
              Fax: +961.1.683871                                     Thani Murshid Establishment
              R.S. K. & Partners Co.                                 P.O. Box 49
     Jordan
              P.O. Box 940851                                        Abu Dhabi, United Arab Emirates
              Amman 11194, Jordan                                    Tel: +971.2.6732047 Fax: +971.2.6731498
              Tel: +962.6.5921 436                                   Mahmood Akbar Alireza W.L.L.
                                                          Bahrain
              Fax: +962.6.5921437                                    P.O. Box 20117
                                                                     Manama, Kingdom of Bahrain
     Egypt    Diversey Egypt                                         Tel: +973.17.458080/244168
              39 Beirut Street                                       Fax: +973.17.730778/234214
              Heliopolis, Cairo, Egypt                               Mutrah Shipping & Trading Agency L.L.C.
                                                           Oman
              Tel: +20 2 291 7491                                    P.O. Box 1984
              Fax: +20 2 418 3602                                    Ruwi 112, Sultanate of Oman
                                                                     Tel: +968.2.4477900 Fax: +968.2.4477991

              Mazen Khanati Est.                           Yamen     Yemen Sales Office
     Syria                                                           JohnsonDiversey
              Serrieh Trading & Distributing
              P.O. Box 33 712                                        (SumaChem General Trading Ltd.)
              Damascus, Syria                                        P.O. Box 16613
              Tel: +963.11.3334589 I 3341823                         Sana'a, Republic of Yemen
              Fax: +963.11.331 4674                                  Tel: +967.1.41 7196/419128 1419298
                                                                     Fax: +967.1.419296

Diversey consulting product guide

  • 1.
    QUALITY SERVICES WITHVALUES & INTEGRITY AN L P DO TM Quality Co n s u l t i n g Environment Health & Safety Food Safety Social Compliance Information Security Lab Quality Assurance PRODUCTS & CE Marking SERVICES GUIDE OUR BUSINESS IS TO ADVANCE INDIVIDUAL AND ORGANIZATIONAL PERFORMANCE
  • 2.
    TM A USA-based Management System Consulting and Co n s u l t i n g Training Orgnization with worldwide operation in 140 countries WHO WE ARE ? A WORLD OF POSSIBILITY IN MANAGEMENT SYSTEMS Diversey Consulting, a division of Diversey Inc., is the world leader and the most trusted USA-based consultancy and training services providing conglomerate. The delivery of THE MOST PROFESSIONAL SERVICES have established & strengthened the TRUST & CONFIDENCE of our clients, industry and authorities around the Globe. Diversey is world leader in number of employed technical experts, consultants and trainers. We have wealth of domestic and international experiance with orgnizations of all sizes and we bring all that practicial experiance to our clients worldwide. Very few providers in the world can match our experience in delivery. The regional head office for GCC, Middle East & Africa is located in Dubai with 20 offices in this region and employing 100 plus technical resources to serve the regional clients. In the Kingdom of Saudi Arabia, Diversey Consulting have five offices with all management system expertise at Riyadh, Jeddah, Makkah, Madina & Dammam. FROM LOCAL TO GLOBAL BUSINESS Customers, consumers and shareholders are increasingly demanding responsible business practices. They expect companies to comply with all applicable rules and regulations related to quality, food safety, environment and occupational health and demonstrate their commitment in daily operations. In this regards, our proven solutions are very clear. Ì To protect business Ì To protect the brands Ì To Protect future of the globe and future generations Ì To protect health associated risk at operational level Ì To Protect the interest of all the stake holder and interested parties CONFORMITY ŸCOMPLIANCE 1 CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 3.
    TM Industry Expert, Veteran Consultants & Best Professionals Co n s u l t i n g for Management System’s Consulting and Training Services Diversey Consulting Business Philosophy Outstanding Service Excellence Diversey Consulting Services takes extra care to ensure we fully understand your organizational and personnel needs before we propose a solution. Unlike traditional Training Organization's we do not sell services, which may not meet your requirements. We provide practical learning solutions, which work and value for you. On top of this, Diversey Staff provides outstanding pre and post-delivery support service. Full Service Provider It is Diversey Consulting Services policy to provide a full-service or one- stop shop solution to your organizational and personnel development. The variety of services and the competence that Diversey do have globally and in KSA does not exist with any other training and consulting organization. Global Reach with Local Convenience Unlike traditional Training Organizations who deliver their services in one country or local region or within a country, our consulting and training solutions are delivered in each geographic region, major cities around the globe. Flexibility Diversey consulting and training solutions are available in publicly and in-house and we offer Accredited and Non-Accredited solutions. Diversey Consulting and Training Services is one of a few Training Organizations with the capability to offer such flexibility. Outstanding Value for Money AN L Most of Diversey Consulting solutions are accredited with leading P DO brands such as IRCA, CIEH, RSPH and Highfield United Kingdom. It is Diversey Consulting Services policy to seek accreditation where it adds value to our clients. Diversey Consultants and Tutors bring a wealth of industry specific knowledge and expertise with them so you can be assured your valuable time is not wasted. Competitive Pricing: Diversey Consulting believes in providing industry standard and leading-edge learning solutions at down-to earth prices. In contrast with traditional Consulting and Training Organizations who charge a premium for their services, and/or include hidden and non-value costs in their fees, We have eliminated all non value-added costs from our services by managing and controlling all the costs in the value chain. 2 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 4.
    TM A USA-based Management System Consulting and Co n s u l t i n g Training Orgnization with worldwide operation in 140 countries Services Profile CONSULTANCY TRAININGS AUDIT AND Establishing Complete Other than food, Diversey having INSPECTIONS Management System for: Trainings expertise for: Product Development as per Basic awareness session for Quality, SASO requirements ISO 9001:2008 (Quality Management System) environment, health & safety, Internal auditing for Quality, Environment, Health Compliance and Product Identification ISO 13485:2003 (Quality Management System & Safety Environmental Aspect Product Shelf Life Studies for Medical Device) Assessment Training Process Risk Engineering ISO 14001:2004 (Environmental Management System) Training for Solid waste Management Liquid waste Management Food Plant Layout and Kitchen Design and Staff Hygiene ISO 17025:2005 (Management system for Lab accreditation) Environmental Impact Assessment (EIAs) Legal and Regulatory compliance cleaning OHSAS 18001:2007 (Occupational OH&S Risk Assessment Course & Sanitation Health & Safety Management System) Stress Management Occupational Health & Safety ISO 22000:2005 (Food Safety Fire Safety Risk Assessment Management System) OH&S Incident investigation and Reporting HACCP (Hazard Analysis of Environmental Impact Assessment Studies Critical control Point) Emergency Preparedness & Response Training course for QMS guidelines for Internal Auditing services ISO 27000:2005 (Information security Trainings Management System) GAP Analysis Services One day training course for effective customer's complaint handling Supplier Auditing Services ISO 28000 (Specification for Security Management system for supply chain Management) Food Safety Management Training BS EN 16000 / ISO 50000 (Energy Level 01-Award in Food Safety Management Management System) Level 02-Award in Food Safety Management SA 8000:2007 (Social Accountability Standard) Level 03-Award in Food Safety Management Level 04-Award in Safety Management Ts16949 (Management system for Automobile industry) HACCP System Management Training Level – 02 Award in HACCP Level – 03 Award in HACCP RSPH ROYAL SOCIETY FOR PUBLIC HEALTH VISION, VOICE AND PRACTICE 3
  • 5.
    Quality ISO 9001:2008 Quality Management Boosting Quality to Differentiate Yourself ISO9001 from the Competition What is ISO 9001..? ISO 9001 is an international standard related to quality management, applicable to any organization from all types of business sectors & activities. It is based on eight quality management principles (all fundamental to good business practices): Ÿ Customer focus Ÿ Leadership Key Benefits Ÿ Involvement of people Proves your commitment to quality and customer Ÿ Process approach satisfaction. Ensures your products and services Ÿ System approach to management effectively meet customer and applicable statutory Ÿ Continual improvement and regulatory requirements. Allows you to measure Ÿ Factual decision-making your progress towards continual improvement of Ÿ Mutually beneficial supplier business performance creating a benchmark Helps relationships improve your organizational performance. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for ISO 9001:2008 QMS ISO 9001:2008 QMS One Day Awareness Session ISO 9001:2008 Quality Management System Designing, ISO 9001:2008 QMS Three Days Lead Practitioner and Lead Documentation and Implementation Services Implementer Training Course ISO 9001:2008 Internal Auditing ISO 9001:2008 QMS Three Days IRCA UK Registered Internal Supplier Quality Assurance, Supplier Development and Auditing Training Course Supplier Performance Improvement ISO 9001:2008 QMS Five Days Auditor / Lead Auditor IRCA Organization Quality Excellence Modeling and Quality UK Registered Training Course Road Mapping Environment ISO 14001:2004 Environmental Environment Management System ISO 14001 What is ISO 14001..? ISO 14001:2004 is a part of a series of international standards applicable to any organization. Anywhere relating to environmental management. Based on Plan-Do-Check-Act cycle, ISO 14001: 2004 specifies most important requirements to identify, control and monitor environmental aspects of any organization and also how to manage & improve whole system. Key Benefits Customer, investor, public, community assurance by demonstrating commitment Improving cost control through conserving input materials and energy. Reducing incidents that result in liability, therefore reducing insurance costs and assisting the attainment of permits and authorizations for local trade. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for ISO 14001:2004 EMS ISO 14001:2004 EMS One Day Awareness Session ISO 14001:2004 Environmental Management System ISO 14001:2004 EMS Three Days Lead Practitioner and Lead Designing, Documentation and Implementation Services Implementer Training Course Environmental Internal Auditing ISO 14001:2004 EMS Three Days IRCA UK Registered Internal Environmental Impact Assessment Studies (EIAS) Auditing Training Course Industrial Liquid waste and solid waste Management ISO 14001:2004 EMS Five Days Auditor / Lead Auditor IRCA Meteorology and Environmental Protection Agency (MEPA) UK Registered Training Course Compliance review Environmental Legal Compliance Evaluation and Assurance 4 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 6.
    Environment Green Globe The PremierGlobal Certification for Sustainability What is Green Globe..? Why Green Globe..? Green Globe Certification is the worldwide sustainability system 1. Credibility based on internationally accepted criteria for sustainable 2. Transparency operation and management of travel and tourism businesses. 3. Lower Operational Costs Operating under a worldwide license, Green Globe Certification 4. Better Business is based in California, USA and is represented in over 83 5. Corporate Social Responsibility countries. Green Globe is the only certification brand to be an 6. Better Environmental Performance affiliate member of the United Nations World Tourism 7. Paperless Certification Process Organization (UNWTO), is partly owned by the World Travel and 8. Marketing Advantage Tourism Council (WTTC) and a member of the Caribbean 9. Higher Visibility in the Market Alliance for Sustainable Tourism (CAST) governing council. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Green Globe - Gap Analyses and Strategic Solutions Green Globe - One Day Awareness raining Green Globe - System Designing, Documentation Green Globe - Three Days Implementation Training and Implementation Services Course Green Globe - Internal Auditing for Performance Green Globe - Three Days Internal Auditing Training Improvement Course Health & Safety OHSAS 18001 Health And Safety Occupational Health & Safety OHSAS 18001 What is OHSAS 18001? OHSAS 18001 is an international standard giving requirements related to Health and Safety Management Systems. It enables an organization to have control over, and knowledge of, all relevant hazards resulting from normal operations and abnormal situations, and improve its performance. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for OHSAS 18001:2007 OHSAS 18001:2007 One Day Awareness Session OHSAS 18001:2007 Environmental Management System OHSAS 18001:2007 Three Days Lead Practitioner and Lead Designing, Documentation and Implementation Services Implementer Training Course Health & Safety Internal Auditing OHSAS 18001:2007 Three Days IRCA UK Registered Internal Health & Safety risk Assessment Studies Auditing Training Course Industrial Risk Analyses, Risk Management & risk engineering OHSAS 18001:2007 Five Days Auditor / Lead Auditor IRCA Health and Safety – Population, Society and Community UK Registered Training Course Risk Analyses and Risk Management Operational risk management and risk mapping RSPH ROYAL SOCIETY FOR PUBLIC HEALTH VISION, VOICE AND PRACTICE 5
  • 7.
    Social Accountability SA 8000 Corporate Social Responsibility ISO 26000 What is SA 8000..? OUR SERVICES SA 8000 is the first auditable standard for social accountability. In CONSULTING & AUDITING SERVICES particular, it is compatible with ISO 9001, ISO 14001 and OHSAS1 Gap Analyses for SA 8000 Social Accountability and 8001 structure and based on conventions of the International Labour ISO 26000 Social Responsibility Organisation [ILO), the Universal Declaration of Human Rights and SA 8000 Social Accountability and ISO 26000 System the UN Convention on the Rights of the Child. The world wide Designing, Documentation and Implementation Services SA 8000 Social Acc. & ISO 26000 Internal Auditing recognized SA8000 standard involves the development and auditing Corporate Social Responsibility Norms Designing and of management systems that promote socially acceptable working Implementation practices bringing benefits to the complete supply chain. Social Compliance Auditing Code of Conduct Compliance Assessment and Evaluation What is ISO 26000..? Organizations around the world, and their stakeholders, are PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING becoming increasingly aware of the need for and benefits of socially SA 8000 Social Accountability and ISO 26000 One Day responsible behaviour. The objective of social responsibility is to Awareness Session SA 8000 Social Accountability and ISO 26000 Three Days contribute to sustainable development. Lead Practitioner and Lead Implementer Training Course An organization's performance in relation to the society in which it SA 8000 Social Accountability and ISO 26000 Three Days operates and to its impact on the environment has become a critical Internal Auditing Training Course part of measuring its overall performance and its ability to continue operating effectively. This is, in part, a reflection of the growing recognition of the need to ensure healthy ecosystems, social equity and good organizational governance. In the long run, all organizations' activities depend on the health of the world's ecosystems. Organizations are subject to greater scrutiny by their various stakeholders. Information Security ISO 27001:2005 Information Security Information Security Management System ISO/IEC 27001 ISO 27001:2005 is an international standard giving requirements related to Information Security Management System in order to enable an organization to assess its risk and implement appropriate controls to preserve confidentiality, integrity and availability of information assets. The fundamental aim is to protect the information of your organization getting into the wrong hands or losing it forever. What are the key benefits? Due to dependability of information and information systems, confidentiality, integrity and availability of information is essential to maintain competitive edge, cash-flow, profitability and commercial image. Compliance with legal, statutory, regulatory and contractual requirements. Improved corporate governance and assurance to stakeholders such as shareholders, clients, consumers and suppliers. Through a proper risk assessment, threats to assets are identified, vulnerability to and likelihood of occurrence is evaluated and potential impact is estimated, so your investment is allocated where it is necessary. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for ISO 27001:2005 Info. Security Mgt. System ISO 27001:2005 Info. Security Management System ISO 27001:2005 Info. Security Mgt. System Designing, One Day Awareness Session Documentation and Implementation Services ISO 27001:2005 Info. Security Management System ISO 27001:2005 Info. Security Mgt. System Internal Auditing Three Days Lead Practitioner and Lead Implementer Training Course Information Security Risk Assessment Studies ISO 27001:2005 Info. Security Management System Information risk management and risk mapping Three Days IRCA UK Registered Internal Auditing Training Course ISO 27001:2005 Info. Security Management System Five Days Auditor/Lead Auditor IRCA UK Registered Training Course 6 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 8.
    Energy Management EN 16001/ ISO 50000 Energy Management Energy Management Systems EN 16001/ISO 50000 What is EN 16001... ? "Saving energy to reduce carbon dioxide emissions", is the message of current fight against global warming. Energy savings are at the forefront of the actions to contribute to the sustainability of human activities. Organizations have a major role to play by controlling their energy consumption and reducing their energy bill. Reducing energy costs also plays a strategic role in that it leads to higher financial profitability and a competitive advantage. What are Energy Management Systems? Energy Management Systems offer a systemic approach to monitor and reduce the energy consumption in all kinds of organizations. EN 16001 is the European standard for Energy Management Systems. It is based on Plan- Do-Check-Act cycle, with requirements for establishing an energy policy with concrete objectives, putting in place actions to reduce and monitor energy use, verifying energy savings and planning improvements. It offers a comprehensive set of guidelines to meet carbon emissions reduction requirements. EN 16001 is based on regulatory OUR SERVICES compliance and has the same structure as ISO 14001. It can be easily integrated to existing Quality, Safety and/or Environment Management system Development Managements Systems. Gap Analysis and Internal Auditing Food Safety HACCP Hazard Analysis Critical Control Point OUR SERVICES What is HACCP? CONSULTING & AUDITING SERVICES HACCP system is 12 Steps and 7 Principles based risk Gap Analyses and Strategic Food Safety Solutions. based approach to food safety. These steps are: HACCP Based Food Safety System Designing, 1. Assemble HACCP Team Documentation and Implementation Services. 2. Describe Product HACCP Internal Auditing for Food Safety 3. Identify Intended Use Performance Improvement. 4. Construct Flow Diagram Food Safety Legal Compliance Audit. 5. On-site Confirmation of Flow Diagram Municipality, SASO and SFDA Compliance Audit 6. Conduct a Hazard Analysis and Compliance Assurance 7. Determine CCPs 8. Establish Critical Limits for each CCP PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING 9. Establish a Monitoring System for each CCP 10. Establish Corrective Actions 1 Day HACCP Awareness Level-01 Award Training 11. Establish Verification Procedures 3 Days HACCP Implementation & Lead Practitioner 12. Establish Documentation and Record Keeping Training Course (Level-2 Awards in HACCP) Three Days HACCP - Food Safety Internal Auditing FAO/WHO Food Standards Training Course Award in Effective Auditing and Inspection Skills CODEX alimentarius Training Course 7
  • 9.
    Food Safety Food Safety ISO 22000:2005 Management Systems ISO 22000:2005 Food Safety Management System FSSC 22000 Many standards have been developed within food safety: specific company International standards, legal regulations, as well as standards developed by retailers. Their Organization for Standardization proliferation made their application difficult. At the same time, food safety principles have spread across the world. The safety of foodstuffs has become a major issue for all players in the food chain. A single standard with worldwide reach, and including the food safety principles, thus became necessary. This was the reason ISO developed and released ISO 22000:2005 Food Safety Management System in 2005. There are number of technical standards and guidelines in the series of ISO 22000 and published to facilitate the industry for effective food safety management system. ISO 22000:2005 is best standard to integrate other management system concepts like Quality, Environment and Occupational Health and Safety. The design of ISO 22000 is very much in lined with ISO 9001, ISO 14001 and OHSAHS 18001. FSSC 22000 Food Safety Management System Food Safety System Certification 22000 The Foundation for Food Safety Certification was founded in 2004. The Foundation developed FSSC 22000, the ISO 22000 and BSI PAS 220 based certification scheme for certification of food manufacturers. This development is supported by the Confederation of the Food and Drink Industries of the European Union (CIAA). The scheme is recognized by the Global Food Safety Initiative (GFSI). FSSC 22000 contains a complete certification scheme for Food Safety Systems based ISO 22000: 2005, Publicly Available Specification for Prerequisite Programs on food safety for food manufacturing, BSI PAS 220: 2008. The scheme is using existing standards for certification (ISO 22000, PAS 220 and ISO 22003) and the certification will be accredited under the standard ISO guide 17021. Manufacturers that are already certified against ISO 22000 will only need an additional review against BSI PAS 220 to meet this certification scheme. The FSSC 22000 certification scheme has been given full recognition by the Global Food Safety Initiative Board of Directors. This follows an extensive benchmarking process using the requirements laid out in the GFSI Guidance Document Version 5, and an addendum which was issued in December 2009. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING Gap Analyses for ISO 22000:2005 ISO 22000:2005 FSMS One Day Awareness Session OUR SERVICES ISO 22000:2005 Food Safety System Designing, ISO 22000:2005 FSMS Three Days Lead Practitioner Documentation and Implementation Services and Lead Implementer Training Course ISO 22000:2005 Internal Auditing for Food Safety ISO 22000:2005 FSMS Three Days IRCA UK Registered Performance Improvement Internal Auditing Training Course Food Safety Legal Compliance Audit ISO 22000:2005 FSMS Five Days Auditor / Lead Municipality, SASO and SFDA Compliance Audit Auditor IRCA UK Registered Training Course and Compliance Assurance PAS 220:2005 PRP Two days Awareness PAS 220:2008 PRP Gap Assessment Training Course 8 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 10.
    Food Safety BritishRetail Consortium Food Safety Management Systems BRC GLOBAL STANDARDS BRC / IFS THE WORLDWIDE STANDARDS OF CHOICE The British Retail Consortium is the lead trade association representing the whole range of retailers, from the large multiples and department stores in the United Kingdom. In 1998 the British Retail Consortium (BRC), responding to industry needs, developed and introduced the BRC Food Technical Standard to be used to evaluate manufacturers of retailers own brand food products. It is designed to be used as a pillar to help retailers and brand owners with their 'due diligence' defence, should they be subject to a prosecution by the enforcement authorities. Under EU food Law, retailers and brand owners have a legal responsibility for their brands. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for BRC Food, Packaging, Consumer BRC Food, Packaging, Consumer Products and Storage Products and Storage and Distribution and Distribution - One Day Awareness Session BRC Food, Packaging, Consumer Products and BRC Food, Packaging, Consumer Products and Storage Storage and Distribution System Designing, and Distribution - Three Days Documentation Training Course Documentation and Implementation Services BRC Food, Packaging, Consumer Products and Storage BRC Food, Packaging, Consumer Products and and Distribution - Three Days Internal Auditing Training Course Storage and Distribution Internal Auditing IFS International Food Standard international featured ® standards In 2002, in order to create common food safety standard, German food retailers from the HDE IFS (Hauptverband des Deutschen Einzelhandels) have developed a common audit standard called International Food Standard or IFS. In 2003, French food retailers (and wholesalers) from the FCD have joined the IFS Working Group and have contributed to development of IFS version 4. Food IFS Standard Application Description IFS Food IFS Food is a standard for auditing companies that process food or companies that pack loose food products. IFS Food can only be used when a product is "processed or handled", or when there is a hazard for product contamination during the primary packing. IFS HPC IFS HPC is a standard for auditing companies that process household and personal care products, or companies that pack loose household and personal care products. IFS Cash & Carry IFS Cash & Carry / Wholesale is the standard which covers all handling activities of loose and packed products in Cash & / Wholesale Carry markets or wholesale companies. . IFS Logistics IFS Logistics is applicable to both food and non-food products and covers all logistics activities, such as loading and unloading, transport, storage handling of packed products and further distribution. IFS Broker IFS Broker is intended to be applied to all companies primarily involved in "trading activities“ and who select their own suppliers and purchase or broker goods from these themselves or on behalf. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for IFS Food, HPC, Logistics, IFS Food, HPC, Logistics, Broker, Cash & Carry - Broker, Cash & Carry One Day Awareness Session IFS Food, HPC, Logistics, Broker, Cash & Carry System IFS Food, HPC, Logistics, Broker, Cash & Carry - Designing, Documentation and Implementation Services Three Days Documentation Training Course IFS Food, HPC, Logistics, Broker, Cash & Carry IFS Food, HPC, Logistics, Broker, Cash & Carry - Internal Auditing Three Days Internal Auditing Training Course RSPH ROYAL SOCIETY FOR PUBLIC HEALTH VISION, VOICE AND PRACTICE 9
  • 11.
    Food Safety SQF Safe Quality Food The SQF Institute (SQFI) is a division of the Food Marketing Institute (FMI), an association that conducts programs in public affairs, food safety, research, education and industry relations on behalf of its 1,500 member companies - food retailers and wholesalers - in the United States and around the world. The SQF INSTITUTE SQF Institute was established by FMI in 2004 to administer the SQF Program and is located in Arlington, Virginia. The SQF (Safe Quality Food) Program is a leading, global food safety and quality certification program and management system designed to meet the needs of buyers and suppliers worldwide. The SQF Program consists of the SQF 1000 Code (for use by primary producers) and the SQF 2000 Code (used mainly by food manufacturers). CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for SQF Codes 1000 and SQF SQF Codes 1000 and SQF Codes 2000 - Codes 2000 One Day Awareness Session SQF Codes 1000 and 2000 - System Designing, SQF Codes 1000 and SQF Codes 2000 - Documentation & Implementation Services Three Days Documentation Training Course SQF Codes 1000 and SQF Codes 2000 Internal SQF Codes 1000 and SQF Codes 2000 - Auditing Three Days Internal Auditing Training Course GLOBALGAP GLOBALG.A.P. What is GLOBALGAP? GLOBALG.A.P. INTERGRATED FARM ASSURANCE GlobalGAP is a European based trade organisation whose members consists of (IFA) growers, product marketing organisations (PMO), growers' co-operatives, food GLOBALG.A.P. manufacturers and retailers. The GLOBALGAP standard is primarily designed to COMPOUND FEED MANUFACTURING (CFM) reassure consumers about how food is produced on the farm by minimising detrimental environmental impacts of farming operations, reducing the use of GLOBALG.A.P. chemical inputs and ensuring a responsible approach to worker health and ANIMAL TRANSPORT (AT) safety as well as animal welfare GlobalGAP has developed an auditable standard promoting Good Agricultural GLOBALG.A.P. PLANT PROPAGATION MATERIAL Practices (GAP). The scope of GlobalGAP currently covers the production of (PPM) fruit, vegetables, combinable crops, green coffee, tea, flowers and ornamentals, livestock, feed, nursery stock and aquaculture. GlobalGAP has support from GLOBALG.A.P. RISK ASSESSMENT ON SOCIAL PRACTICE major European retailers, PMO's and growers on a global basis. (GRASP) CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses and Strategic Food Safety Solutions Global GAP One Day Awareness Training Course for Global GAP Global GAP Three Days Documentation and Global GAP Based Food Safety System Designing, Implementation Course Documentation and Implementation Services Global GAP – Three Days Internal Auditing Global GAP Internal Auditing Training Course 10 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 12.
    Feed Safety &Quality FAMI Commitment to FEED Legality, Proving your Feed Additive & Pre-MIxture Quality and Safety System Safety & Quality What is BS EN ISO 13485:2003 The FAMI-QS code standard addresses feed safety, legality & quality based on the European animal feed Regulation. It covers both quality & feed safety management systems, traceability, product regulatory compliance… and European Feed Additives and PreMixtures Quality System many other areas. IQS The European Union has developed many food regulations in order to protect the consumer's health. In the last few years, EU regulation has become even more complex, as many food safety crises have occurred due to animal feed. To ensure compliance with these laws and to improve feed safety and quality, the European Feed Additives Manufacturers Association has issued a code against which to be certified: FAMI-QS (Feed Additive and preMIxture System). Whether you are a trader or a manufacturer of feed additives or premixtures you need to ensure the quality, safety and legality of your products. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES FAMI – QS Gap Analyses and Strategic FAMI – QS One Day Awareness Training Course Feed Safety Solutions FAMI – QS Three Days Documentation and FAMI – QS Based Feed Safety System Designing, Implementation Course Documentation and Implementation Services FAMI – QS – Three Days Internal Auditing Training FAMI - QS Internal Auditing Course HALAL Certification Food, Food Ingredients and Non Food Additives As A Halal Consumer, You Should Be Familiar With What is the meaning of SIMPLE or SINGLE COMPLEX or COMPOUND Salt Sugar Batters Breadings “Halal”? Flour Honey Water Vinegar Colorings Cheese Powder Flavorings Enriched Flour Halal is an Arabic word meaning Ascorbic Acid Aspartame Enrichment Mix Seasonings Benzoate Gelatin Shortenings Spices lawful. It refers to things or actions L-Cysteine Onion Powder Vitamin Mix Phosphate Propionic Acid permitted by Shariah law without As A Halal Consumer, You Should Know Hidden Ingredients In Common Foods punishment imposed on the doer. It INGREDIENT FOOD is usually used to describe Liquor Chocolate Gelatin Ice Cream and Pharmaceuticals something that a Muslim is Lard Maple Syrup Pan Grease/Lard Bread/Baked Goods permitted to engage in, e.g. eat, Polysorbates Dairy Products LPork Lipase Cheese drink or use. Stearates Chewing Gum What is Halal As A Halal Consumer, You Should Be Aware Of Ingredients By Function FUNCTION INGREDIENT Certification? Antioxidants Acidulates BHA, BHT, Ascorbic Acid Citric Acid, Carbonic Acid Halal Certification is a recognition Colorings Blue, Carmine, Red, Yellow 5,6 etc. Emulsifiers Lecithin, Mono Di-Glycerides that the products are permissible Flavorings Artificial/Natural Flavors, Spices Flavor Enhancers Monosodium Glutamate (MSG) under Islamic law. These products Fortifiers Thiamine, Vitamin A & D are thus edible, drinkable or usable Preservatives Benzoic Acid, Propionic Acid Stabilizers Alginate, Gelatin, Phosphates by Muslims. Supplements Amino Acids, Minerals, Vitamins Sweeteners Aspartame, Saccharin, Sucralose 11
  • 13.
    Supply Chain Security ISO 28000 Supply Chain Security Security Management System for ISO 28000 Supply Chain What is ISO 28000? ISO 28000 was developed in response to the transportation and logistics industries· need for a commonly applicable security management system specific to supply chain security. However, companies in many other industries are finding it useful to assess security risks, implement controls, and mitigate arrangements to manage potential security threats and impacts from the supply chain. What are the key Benefits? Enhanced security risk assessment, asset protection and inventory visibility and management Assured supply continuity for sustainable business development and reduction of delivery times Improved customer satisfaction and business cooperation along the supply chain Reduction of losses resulted from transport related theft Shorter customs clearance time! Green Lane Approvals) and reduced secondary inspections Compliance with other trade and supply chain security schemes, such as AEO and C-TPAT. OUR SERVICES Management system Development Gap Analysis and Internal Auditing Laboratory Quality ISO/IEC 17025:2005 Laboratory General Requirements for the Competence of Testing and Calibration Laboratories ISO/IEC 17025 ISO/IEC 17025:2005 specifies the general requirements for the competence to carry out tests and/or calibrations, including sampling. It covers testing and calibration performed using standard methods, non- standard methods, and laboratory-developed methods. It is applicable to all organizations performing tests and/or calibrations. These include, for example, first-, second- and third-party laboratories, and laboratories where testing and/or calibration forms part of inspection and product certification. ISO/IEC 17025:2005 is for use by laboratories in developing their management system for quality, administrative and technical operations. Laboratory customers, regulatory authorities and accreditation bodies may also use it in confirming or recognizing the competence of laboratories. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES ISO 17025 - Gap Analyses ISO 17025 - One Day Awareness Session ISO 17025 System Designing, Documentation & ISO 17025 - Three Days Lead Practitioner & Lead Implementation Services Implementer Training Course ISO 17025 - Internal Auditing for Performance ISO 17025 - Three Days Internal Auditing Training Improvement Course ISO 17025 Legal Compliance Audit 12 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 14.
    Medical Devices Quality BS EN ISO 13485:2003 Medical Devices ISO13485 Medical devices - Quality management systems - ISO14971/ISO 14969 Requirements for regulatory purposes What is BS EN ISO 13485:2003 This Standard is aimed at companies that design, develop, produce, install or service medical devices and specifies requirements for a quality management system where an organization needs to demonstrate its ability to provide medical devices and related services that consistently meet customer and regulatory requirements. CONSULTING & AUDITING SERVICES PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING OUR SERVICES Gap Analyses for ISO 13485:2003 Medical Devices Quality Medical Devices Risk One Day Awareness Session Management System Medical Devices Risk Three Days Lead Practitioner and Lead ISO 13485:2003 Medical Devices Quality Mgt. System Implementer Training Course Designing, Documentation and Implementation Services Medical Devices Risk Three Days IRCA UK Registered Internal ISO 13485:2003 Medical Devices Quality Mgt. System Auditing Training Course Internal Auditing Medical Devices Risk Five Days Auditor / Lead Auditor Medical Devices Risk Assessment Studies IRCA UK Registered Training Course Medical Devices Usage Risk Identification and End of the life risk mapping CE - Marking Your passport to the World's Largest Market By affixing the CE marking, the manufacturer, or its representative, or the importer assures that the item meets all the essential requirements of all applicable EU directives. Examples of European Directives requiring CE marking include pressure equipment, toy safety, products, machinery, low-voltage equipment, R&TTE, and Electromagnetic compatibility. There are about 22 Directives requiring CE marking. The manufacturer, whether established inside or outside the Community, is the person ultimately responsible for the conformity of the product with the provisions of the relevant Directive(s) and for the affixing of the CE marking. Process of CE Marking: OUR SERVICES CONSULTING & AUDITING SERVICES CE- MARKING : ROLE PLAYERS Gap Analyses for product certification for CE Mark CE Mark Quality Mgt. System Designing, EU Commission Issue Directive(s) Documentation and Implementation Services CE Mark Internal Auditing Competent Authority Product related EU Directive compliance Monitor Compliance Product related EU Testing and Technical file (eg MHRA in UK) preparation and documentation Full facilitation on product usage identification Notified Bodies Conduct Audit & to product CE Mark (eg SGS, BSL DQS) Issue Certificate PUBLIC TRAINING & TAILORED IN-COMPANY TRAINING CE Mark - One Day Awareness Session Manufacturer Authorized CE Mark - Three Days Lead Practitioner Place Product on Market and Lead Implementer Training Course Representative CE Mark - Internal Auditing Training Course RSPH ROYAL SOCIETY FOR PUBLIC HEALTH VISION, VOICE AND PRACTICE 13
  • 15.
    TM Co n s u l t i n g Training Services Profile FOOD HYGIENE TRAINING SERVICES Training Course Target Audience Course Duration Basic Food Hygiene (Level 01 Award in Food Safety) New Food Handlers 04 Teaching hours (Half Day) Basic Food Hygiene (Level 02 Award in Food Safety) Existing Food Handlers 06 Teaching hours One Day) Intermediate Food Hygiene (Level 03 Award in Food Safety) Food Supervisors 18 Teaching Hours (Three Days) Advance Diploma in Food Safety Management (Level 04 Award) Food Professional and Food Managers 30 Teaching Hours (Five Days) HACCP FOOD SAFETY TRAINING SERVICES Training Course Target Audience Course Duration HACCP Awareness (Level 2 Awards in HACCP) All Staff 06 Teaching hours (One Day) HACCP Implementation and Lead Practitioner (Level 2 Awards in HACCP) HACCP Team Members 18 Teaching Hours (Three Days) HACCP - Food Safety Internal Auditing HACCP Team Members 30 Teaching Hours (Five Days) Level 3 Award in Effective Auditing and Inspection Skills Food Professional 30 Teaching Hours (Five Days) MANAGEMENT SYSTEM TRAINING SERVICES Training Course Awareness Lead Practitioner Internal Auditing ISO 9001:2008 Quality Management System One Day Three Days Three Days ISO 14001:2004 Environmental Management System One Day Three Days Three Days OHSAS 18001:2007 Occupational Health and Safety Management System One Day Three Days Three Days ISO 22000:2005 Food Safety Management System One Day Three Days Three Days HACCP Food Safety Management System One Day Three Days Three Days BRC (Food & IoP)Food Safety Management System One Day Three Days Three Days Global Gap – Agricultural Practices One Day Three Days Three Days ISO 27001:2006 Information Security Management System One Day Three Days Three Days BS 16000 / ISO 50000 Energy Management System One Day Three Days Three Days Halal Certification Schemes One Day Three Days Three Days SA 8000 Social Accountability One Day Three Days Three Days ISO 13485:2003 CE Mark and Medical Devices Certification System One Day Three Days Three Days Z 11.1 (Quality Management System for Schools and Educational Institutions) One Day Three Days Three Days GENERAL MANAGEMENT TRAINING SERVICES Training Course Duration Environmental Impact Assessment (EIAs) One Day Waste (Solid, Liquid and Gaseous) Management Practices One Day OH&S Risk Assessment Course One Day Stress Management One Day Fire Safety System One Day Incident investigation and Reporting One Day Emergency Preparedness & Response One Day ISO 10002 - Effective Customer's Complaint Handling One Day 14 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 16.
    TM Co n su l t i n g Company Resources Abdul Rashid MSC Public Health Food Safety, Environment and Public Health Expert Abdul.Rashid@diversey.com Yaser Nazir Mohammed Azam Khan MSC Total Quality Management MSC Food Science &Technology MSC Food Science &Technology Food Safety, Hygiene Solution and Quality, Environment, Food Sanitation System Expert Safety & Health Safety Expert azam.khan@abcdiversey.com Yaser.Nazir@Diversey.com Mohsin Baig Johan D’ Souza B. Sc. Hospitality, MBA B.Sc. Chemical Engineering Hospitality & Restaurant Quality QHSE Expert and Food Safety Expert mohsin.baig@abcdiversey.com johann.d'souza@diversey.com Nina D’ Costa BSC Microbiology & Biochemistry Monika Manchanda Food Safety and Quality MSC Microbiology Management System Expert Lab Quality Assurance Expert nina.da-costa@diversey.com Fawwad Hussain Mohammad Abdo Mohammad Abdo MBA BSC Quality, Social Compliance and Food Safety and Quality Expert Corporate Governance Expert fawwad.hussain@abcdiversey.com mohamed.abdo@diversey.com Ashraf Mahmoud As'ad Al-khamaiseh Alaa Meabd MSC Nutrition and Food Technology BSC Food Industrial Management Food Safety, Hygiene Solution and Quality and Food Safety Expert Sanitation System Expert alaa.mebed@diversey.com ashraf.mahmoud@abcdiversey.com 15
  • 17.
    TM A USA-based Management System Consulting and Co n s u l t i n g Training Orgnization with worldwide operation in 140 countries Certification Road Map Management System Development, Implementation and Certification Roadmap INPUT OUTPUT Client Inquiry Client and Diversey Relationship Proposal Request Form Filled Proposal Request Form Client Need Review and Technical Solution and Submission of Proposal Financial Proposal Agreement on Proposal Agreement and Contract and Contracting Gap Audit or Assessment Gap Audit Report - Project Plan Management System Management system Manual, policies, Designing and Implementation procedures, Plans, instructions and records Challenge Testing and Internal Review Report First Implementation Review First Internal Audit Internal Audit Report First Management Minutes of the Management Review Meeting Review Meeting Selection and Contracting Contract with Certification Body with Certification Body Stage Nr. 01 Audit – Stage Nr. 01 Audit Report Pre Assessment or Pre Audit Stage Nr. 02 Audit – Stage 02 Audit or Final Audit Report - Final Audit Recom. for Certification by Lead Auditor System Handing Over Effective Management System Biannual or Annual Surveillance Audit Report Surveillance Audit Re-Certification Re-Certification 14 CONFORMITY ŸCOMPLIANCE CONSULTING ŸTRAINING ŸAUDITING ŸINSPECTION
  • 18.
    TM Fore details, visit Co n s u l t i n g http://www.diversey.com Kingdom of Saudi Arabia Jeddah P.O. Box: 9272 Tel: +966 2 6573994-5 Fax: +966 2 6573497 Riyadh Al-Khobar Makkah Madina P.O. Box: 85200 P.O. Box: 1159 Tel: +966 1 2424919 Tel: +966 3 847 6986 Tel: +966 2 5588923 Tel: +966 4 8292335 Fax: +966 1 2705211 Fax: +966 3 8476989 Fax: +966 2 5588042 Fax: +966 4 8292337 GCC Middle East & Africa Head Office Dubai P.O. Box 61485 Jebel Ali Free Zone Tel: +971.4.8819470 Email: customerservice.uae@diversey.com Dubai, United Arab Emirates Fax: +971.4.8819488 www.diversey.com GCC Middle East & Africa Operations Lebanon Arabian Group S.A.L. U.A.E lntercare Ltd. P.O. Box 55162 P.O. Box 5628 Beirut, Lebanon Sharjah, United Arab Emirates Tel: +961.1.684839/40/41/42 Tel: +971.6.5345500 Fax: +971.6.5349991 Fax: +961.1.683871 Thani Murshid Establishment R.S. K. & Partners Co. P.O. Box 49 Jordan P.O. Box 940851 Abu Dhabi, United Arab Emirates Amman 11194, Jordan Tel: +971.2.6732047 Fax: +971.2.6731498 Tel: +962.6.5921 436 Mahmood Akbar Alireza W.L.L. Bahrain Fax: +962.6.5921437 P.O. Box 20117 Manama, Kingdom of Bahrain Egypt Diversey Egypt Tel: +973.17.458080/244168 39 Beirut Street Fax: +973.17.730778/234214 Heliopolis, Cairo, Egypt Mutrah Shipping & Trading Agency L.L.C. Oman Tel: +20 2 291 7491 P.O. Box 1984 Fax: +20 2 418 3602 Ruwi 112, Sultanate of Oman Tel: +968.2.4477900 Fax: +968.2.4477991 Mazen Khanati Est. Yamen Yemen Sales Office Syria JohnsonDiversey Serrieh Trading & Distributing P.O. Box 33 712 (SumaChem General Trading Ltd.) Damascus, Syria P.O. Box 16613 Tel: +963.11.3334589 I 3341823 Sana'a, Republic of Yemen Fax: +963.11.331 4674 Tel: +967.1.41 7196/419128 1419298 Fax: +967.1.419296