Moving Beyond
Recorded
Lectures

Clive Young
Sylvia Moes
(REC:all project)
REC:all

          • how lectures are currently
            being captured and used
          • new learning designs for
            flexible and off-campus
            delivery
          • technical, pedagogical and
            legal issues
          • case studies and scenarios
          • practical guidelines to help
            teachers
weblecture       enriched lecture




slidecast
                 social tagging




studio based         screencast
knowledge clip
enriched     webinar
lecture
with tasks




  tutorial   virtual
             classroom
Case study of REC:all
      Rome in the film, film in Rome
– Teacher planned a study trip to Rome with 20 students, coming out of different
  universities, in the field of history of film.
– Two weeks effectively for this trip in Rome.
– Because of the small time frame, it’s needed to make a good choice between
  information which can be given face-to-face and via different types of lecture
  capture.
– Learning/tasks for students:
    • Knowlegde of 3 theories:
         •   Insiders/outsiders
         •   Cinema and architecture
         •   The film in history
    • In the first week they have to watch films which are recorded in Rome, related to these
      theories.
    • In the second week students have to do research on the locations in Rome where these
      movies have been shot. You give the task to students to find angles of camera’s on film
      locations in Rome.
    • Students have to work out their findings of research, location based (with geographical
      information), in a presentation at the end of the course.
– Which kind of lecture captures scenario’s did we choose?
Some ideas...you may have others!
•   weblecture
•   enriched lecture
•   slidecast
•   screencast/tabletcast/pencast
•   social tagging
•   studio-based knowledge
•   enriched lecture with tasks
•   webinar
•   tutorial/instruction
•   virtual classroom
Week 1         Week 2



                 Geoplaza to see the growth and
                 changes in and of Rome




            Instruction clips for skills to work with
            Geoplaza and how to upload content in
            Google Maps
         Google maps to upload their
         own pictures/videos
Remembering/Understanding                                                  Applying/Analyzing                                                     Evaluating/Creating

                                                                       FLIPPING THE CLASSROOM
                                                                                                                                                     Live lecture capture
            Lecture capture                                                      Lecture capture
          from start- to end (classic)                                             (classic/chapters)                                               or video conferencing
                                                                                                                                                      High level of interaction

Self produced          (partly) Re-used                                                                                                                 Self produced
                                                                      Weblecture
                                e.g. iTunes U                                                         Quizes
   Weblecture                   YouTube edu
                                                                      Slidecasts           +           Tasks                                                Webinar
                                                                        e.g. iTunes U
                                                                       YouTube edu               Discussions
                             e.g. Academic Earth
    Slidecasts                                                          e.g. Academic                Tagging                                                 Virtual
                              Videolectures.net
                                                                             Earth                                                                         classroom




                                                                                                                Enriched with tasks, quizes, etc.
                                                                      Videolectures.net
                                                                                                      Polling
                                                   Enriched

             Editted/cutting


                                                                                                                                                      Student generated
          Knowledge clips                                                        Instruction clips
                                                                                                                                                      (knowlegde) clips
                                                   with objects




Self produced          (partly) Re-used                                   Tutorial                         Google maps see the growth ownchanges in
                                                                                                            Geoplaza to to upload their and
                                                                  Instruction clips
                                                                       Studio-based          +       to work of Rome
                                                                                                            and
                                                                                          for skills Taskspictures/videos       (Flip)camera
                 producing                                                                        Practise
                                                                  with Geoplaza and how to
                                                                       e.g. Screencast-o-     Assessment                         Screencast
   Screencast                                                     upload content in Google Maps
                                                                         matic and
                                                                         MIT OCW
                               e.g. iTunes U                                                                                                                 Fieldwork
  (Flip)camera                 YouTube edu

                                                                                                                                                           Studio-based
                         e.g. Academic Earth
  Studio-based            Videolectures.net
What next?



Join: http://www.rec-all.info/

Follow: http://www.scoop.it/t/rec-all

Contact: c.p.l.young@ucl.ac.uk
Contact: s.moes@vu.nl

Diverse 2012: Workshop: Moving beyond recorded lectures

  • 1.
  • 2.
    REC:all • how lectures are currently being captured and used • new learning designs for flexible and off-campus delivery • technical, pedagogical and legal issues • case studies and scenarios • practical guidelines to help teachers
  • 4.
    weblecture enriched lecture slidecast social tagging studio based screencast knowledge clip
  • 5.
    enriched webinar lecture with tasks tutorial virtual classroom
  • 6.
    Case study ofREC:all Rome in the film, film in Rome – Teacher planned a study trip to Rome with 20 students, coming out of different universities, in the field of history of film. – Two weeks effectively for this trip in Rome. – Because of the small time frame, it’s needed to make a good choice between information which can be given face-to-face and via different types of lecture capture. – Learning/tasks for students: • Knowlegde of 3 theories: • Insiders/outsiders • Cinema and architecture • The film in history • In the first week they have to watch films which are recorded in Rome, related to these theories. • In the second week students have to do research on the locations in Rome where these movies have been shot. You give the task to students to find angles of camera’s on film locations in Rome. • Students have to work out their findings of research, location based (with geographical information), in a presentation at the end of the course. – Which kind of lecture captures scenario’s did we choose?
  • 7.
    Some ideas...you mayhave others! • weblecture • enriched lecture • slidecast • screencast/tabletcast/pencast • social tagging • studio-based knowledge • enriched lecture with tasks • webinar • tutorial/instruction • virtual classroom
  • 8.
    Week 1 Week 2 Geoplaza to see the growth and changes in and of Rome Instruction clips for skills to work with Geoplaza and how to upload content in Google Maps Google maps to upload their own pictures/videos
  • 9.
    Remembering/Understanding Applying/Analyzing Evaluating/Creating FLIPPING THE CLASSROOM Live lecture capture Lecture capture Lecture capture from start- to end (classic) (classic/chapters) or video conferencing High level of interaction Self produced (partly) Re-used Self produced Weblecture e.g. iTunes U Quizes Weblecture YouTube edu Slidecasts + Tasks Webinar e.g. iTunes U YouTube edu Discussions e.g. Academic Earth Slidecasts e.g. Academic Tagging Virtual Videolectures.net Earth classroom Enriched with tasks, quizes, etc. Videolectures.net Polling Enriched Editted/cutting Student generated Knowledge clips Instruction clips (knowlegde) clips with objects Self produced (partly) Re-used Tutorial Google maps see the growth ownchanges in Geoplaza to to upload their and Instruction clips Studio-based + to work of Rome and for skills Taskspictures/videos (Flip)camera producing Practise with Geoplaza and how to e.g. Screencast-o- Assessment Screencast Screencast upload content in Google Maps matic and MIT OCW e.g. iTunes U Fieldwork (Flip)camera YouTube edu Studio-based e.g. Academic Earth Studio-based Videolectures.net
  • 10.
    What next? Join: http://www.rec-all.info/ Follow:http://www.scoop.it/t/rec-all Contact: c.p.l.young@ucl.ac.uk Contact: s.moes@vu.nl