This document provides an overview of agile project management concepts including:
- Key characteristics of agile like iterative development and embracing change
- Common agile practices like sprints, product backlogs, and user stories
- How teams use velocity, story points and release planning to estimate work
- The roles of iteration planning, daily standups and burndown charts in agile
Are you thinking of implementing Microsoft® Project Server? Have you invested in Microsoft® Project Server, but are not getting the required results? This webinar will explain the critical success factors of implementation and optimization of Microsoft® Project Server 2010/13.
Organizations rely on cloud computing as a cost-effective and efficient method to harness and access data using the Internet and improve their productivity and performance. With a cloud computing credential as part of your skill set, you will be able to contribute to this IT service and stand apart from your peers.
TUV SUD’s Certified Cloud Computing Elementary Professional (TCCEP) is one of the most industry-recognized cloud computing certifications globally.
To know more about Cloud Computing Elementary Professional Certification trainings worldwide,
please contact us at -
Email :support@invensislearning.com
Phone - US +1-910-726-3695,
Website : https://www.invensislearning.com
Are you thinking of implementing Microsoft® Project Server? Have you invested in Microsoft® Project Server, but are not getting the required results? This webinar will explain the critical success factors of implementation and optimization of Microsoft® Project Server 2010/13.
Organizations rely on cloud computing as a cost-effective and efficient method to harness and access data using the Internet and improve their productivity and performance. With a cloud computing credential as part of your skill set, you will be able to contribute to this IT service and stand apart from your peers.
TUV SUD’s Certified Cloud Computing Elementary Professional (TCCEP) is one of the most industry-recognized cloud computing certifications globally.
To know more about Cloud Computing Elementary Professional Certification trainings worldwide,
please contact us at -
Email :support@invensislearning.com
Phone - US +1-910-726-3695,
Website : https://www.invensislearning.com
Summary of Accelerate - 2019 State of Devops report by Google Cloud's DORARagavendra Prasath
Â
A detailed 82 pages report is abridged to 5 pages report. Access DORA report here - https://services.google.com/fh/files/misc/state-of-devops-2019.pdf
Inspiration and Courtesy to the authors.
Implementing Cloud-Based DevOps for Distributed Agile ProjectsTechWell
Â
Cloud-based development, delivery, and deployment environments are the future of IT operations. Thomas Stiehm shares the hard-learned lessons of setting up and running cloud-based solutions that implement DevOps for geographically distributed agile projects. Thomas describes how to best leverage the cloud to enable your teams to use it effectively. Learn why cloud software delivery is different from traditional software delivery environments, and how to optimize your platform and team to get the most out of the cloud. Geographically-distributed software delivery teams are now the norm for large projects, and the cloud is a perfect enabler to level the playing field for your distributed teams and to give them all the same ability to achieve high productivity. Since the road to the cloud isn’t always paved, learn many of the trade-offs that must be made to implement cloud-based delivery and discover the situations that will derail a move to cloud-based development.
“Technical debt” refers to any quality issues within the implementation of an IT solution that hampers your ability to work with or evolve that solution. Technical debt is often thought of as a source code problem, but it also occurs in your user interface design, in your data sources, in your network architecture, and in many other places. This presentation explores disciplined agile strategies to avoid technical debt in the first place, to remove existing technical debt, and how to fund the removal of technical debt. Industry data regarding technical debt will be shared.
Effective Application Portfolio Management using ArchiMateCorso
Â
Learn how innovative organizations can manage and optimize the application portfolio, releasing time and costs for more strategic and valuable programs.
Take a high-level look into:
• Understanding the cost of your IT estate
• Analyzing the impact of change to an application in your portfolio
• Visualizing application and technology roadmaps for future decision making
• Identify overlaps and gaps in IT capabilities
Analysis is so important to agile teams they do it every day. Every. Single. Day. In some respects agile teams perform analysis in a very different manner than traditional teams, and in some respects in a very similar manner. Agile analysis is collaborative and evolutionary in nature. Disciplined agile analysis takes it up a notch to address the complexity factors agile teams face at scale.
In this presentation we discuss how disciplined agile teams address analysis activities throughout the lifecycle. The transition to agile requires a mindset, skill set, and very often role change for people who are currently business analysts. On the majority of agile teams the role of business analyst has disappeared, but in some situations at scale the role is of vital importance – this isn’t your father’s software team any more. Lessons learned from several organizations making the transition to agile will be shared.
Key learning points:
• Discover how disciplined agile teams approach analysis, and modeling in general
• Learn agile analysis and modeling strategies
• Discover how business analysts can transition to an agile environment
Video can be found here: https://www.youtube.com/watch?v=-8tR-UbUpvI
Enterprise architecture (EA) can potentially promote a common business vision within your organization, provide guidance to improve both business and IT decision making, and improve IT efficiencies. Unfortunately many EA teams struggle to provide these benefits, often because they are perceived as ivory tower or being too difficult to work with.
The adoption of disciplined agile and lean strategies that are based on collaboration, enablement, and streamlining the flow of work are the keys to EA success. Disciplined strategies that produce light-weight, yet still sufficient, artifacts are the key to your success. This presentation explores both the success factors and failure factors surrounding EA, pragmatic strategies for a lean/agile approach to EA, and how EA is supported and enhanced by the Disciplined Agile framework. This isn’t your grandfather’s EA strategy.
So, what exactly do we manage? Projects, business? Functional Teams, Product Teams? And especially what aspects do we manage? Let's look at some of the challenges we have to deal with.
What exactly do we need to take care of?
Here are some examples: Projects, Product Health, Improvement. We still have some gaps in awareness and management of some fundamental issues. We can use the DA toolkit to fill in the gaps in unmanaged issues.
DevOps is an exciting new management framework that combines software development and IT operations. It aims to shorten the systems development life cycle and provide continuous delivery with high software quality. DevOps is rapidly popularity across the IT industry due to the ease with which it can be used in combination with Agile software development.
Original Source: https://www.knowledgetrain.co.uk/it/devops/what-is-devops
At our recent agile breakfast event in London, two of our trainers discussed how organisations are improving outcomes with agile techniques. This presentation explores how agile techniques can complement your existing project management methodologies, and how agile principles can be applied to process improvement, accelerating outcomes, improving sustainability and helping you to deliver real value for your organisation.
APM members were guests of Lockheed Martin for this interactive presentation which outlined Lockheed Martin’s experience in implementing Enterprise Agile across the corporation. This presentation focuses on management practices and lessons learned.
Workshop delivered by Craig Smith and Julian Smith at DTA Digital Summit 2020 on 17 November 2020.
Today 'agile' is no longer just a buzzword. From building spacecraft to manufacturing, some of the most complex and largest organisations in the world are using agile ways of working to deliver better outcomes, respond to change, improve quality, foster more productive and happier teams, and reduce risk.
This hands-on and interactive session is aimed at helping public sector organisations build capability to support agile ways of working, from policy development through to service design and delivery.
Summary of Accelerate - 2019 State of Devops report by Google Cloud's DORARagavendra Prasath
Â
A detailed 82 pages report is abridged to 5 pages report. Access DORA report here - https://services.google.com/fh/files/misc/state-of-devops-2019.pdf
Inspiration and Courtesy to the authors.
Implementing Cloud-Based DevOps for Distributed Agile ProjectsTechWell
Â
Cloud-based development, delivery, and deployment environments are the future of IT operations. Thomas Stiehm shares the hard-learned lessons of setting up and running cloud-based solutions that implement DevOps for geographically distributed agile projects. Thomas describes how to best leverage the cloud to enable your teams to use it effectively. Learn why cloud software delivery is different from traditional software delivery environments, and how to optimize your platform and team to get the most out of the cloud. Geographically-distributed software delivery teams are now the norm for large projects, and the cloud is a perfect enabler to level the playing field for your distributed teams and to give them all the same ability to achieve high productivity. Since the road to the cloud isn’t always paved, learn many of the trade-offs that must be made to implement cloud-based delivery and discover the situations that will derail a move to cloud-based development.
“Technical debt” refers to any quality issues within the implementation of an IT solution that hampers your ability to work with or evolve that solution. Technical debt is often thought of as a source code problem, but it also occurs in your user interface design, in your data sources, in your network architecture, and in many other places. This presentation explores disciplined agile strategies to avoid technical debt in the first place, to remove existing technical debt, and how to fund the removal of technical debt. Industry data regarding technical debt will be shared.
Effective Application Portfolio Management using ArchiMateCorso
Â
Learn how innovative organizations can manage and optimize the application portfolio, releasing time and costs for more strategic and valuable programs.
Take a high-level look into:
• Understanding the cost of your IT estate
• Analyzing the impact of change to an application in your portfolio
• Visualizing application and technology roadmaps for future decision making
• Identify overlaps and gaps in IT capabilities
Analysis is so important to agile teams they do it every day. Every. Single. Day. In some respects agile teams perform analysis in a very different manner than traditional teams, and in some respects in a very similar manner. Agile analysis is collaborative and evolutionary in nature. Disciplined agile analysis takes it up a notch to address the complexity factors agile teams face at scale.
In this presentation we discuss how disciplined agile teams address analysis activities throughout the lifecycle. The transition to agile requires a mindset, skill set, and very often role change for people who are currently business analysts. On the majority of agile teams the role of business analyst has disappeared, but in some situations at scale the role is of vital importance – this isn’t your father’s software team any more. Lessons learned from several organizations making the transition to agile will be shared.
Key learning points:
• Discover how disciplined agile teams approach analysis, and modeling in general
• Learn agile analysis and modeling strategies
• Discover how business analysts can transition to an agile environment
Video can be found here: https://www.youtube.com/watch?v=-8tR-UbUpvI
Enterprise architecture (EA) can potentially promote a common business vision within your organization, provide guidance to improve both business and IT decision making, and improve IT efficiencies. Unfortunately many EA teams struggle to provide these benefits, often because they are perceived as ivory tower or being too difficult to work with.
The adoption of disciplined agile and lean strategies that are based on collaboration, enablement, and streamlining the flow of work are the keys to EA success. Disciplined strategies that produce light-weight, yet still sufficient, artifacts are the key to your success. This presentation explores both the success factors and failure factors surrounding EA, pragmatic strategies for a lean/agile approach to EA, and how EA is supported and enhanced by the Disciplined Agile framework. This isn’t your grandfather’s EA strategy.
So, what exactly do we manage? Projects, business? Functional Teams, Product Teams? And especially what aspects do we manage? Let's look at some of the challenges we have to deal with.
What exactly do we need to take care of?
Here are some examples: Projects, Product Health, Improvement. We still have some gaps in awareness and management of some fundamental issues. We can use the DA toolkit to fill in the gaps in unmanaged issues.
DevOps is an exciting new management framework that combines software development and IT operations. It aims to shorten the systems development life cycle and provide continuous delivery with high software quality. DevOps is rapidly popularity across the IT industry due to the ease with which it can be used in combination with Agile software development.
Original Source: https://www.knowledgetrain.co.uk/it/devops/what-is-devops
At our recent agile breakfast event in London, two of our trainers discussed how organisations are improving outcomes with agile techniques. This presentation explores how agile techniques can complement your existing project management methodologies, and how agile principles can be applied to process improvement, accelerating outcomes, improving sustainability and helping you to deliver real value for your organisation.
APM members were guests of Lockheed Martin for this interactive presentation which outlined Lockheed Martin’s experience in implementing Enterprise Agile across the corporation. This presentation focuses on management practices and lessons learned.
Workshop delivered by Craig Smith and Julian Smith at DTA Digital Summit 2020 on 17 November 2020.
Today 'agile' is no longer just a buzzword. From building spacecraft to manufacturing, some of the most complex and largest organisations in the world are using agile ways of working to deliver better outcomes, respond to change, improve quality, foster more productive and happier teams, and reduce risk.
This hands-on and interactive session is aimed at helping public sector organisations build capability to support agile ways of working, from policy development through to service design and delivery.
Rich Mironov's keynote for one-day agile workshop. Intro to agile development and agile organizations, tools, impact on whole organization, product management and product planning. Co-sponsored by AccuRev, Coverity, Electric Cloud, Enthiosys, Rally and Agile Journal.
Is User Centered Design a buzzword, a technique, or a methodology? Why does "UCD" get so much attention? How has it changed how teams approach web application usability efforts? Is UCD right for you?
1. User Centered Design: Evolving from Dot-Com to Web 2.0
2. Why UCD? (Development, Business, Design benefits)
3. Development process: UCD vs. Agile vs. Waterfall
4. Case Studies: User Centered Design success stories
5. Is UCD right for you?: Planning a UCD process for your product
6. Q & A
Prezentacja autorstwa Aleksandra Wyki przedstawiona na I Panelu BizDevOps. Omawia:
- Business Architecture - jak Business Capabilities, Value Streams, Business Model I Operating Model mogÄ… wspomĂłc wdraĹĽanie koncepcji BizDevOps
- Agile Architecture a koncepcja BizDevOps
Principle 11 needs to go! by Ken France at #AgileIndia2019Agile India
Â
The Principles in the Agile Manifesto provide us guidance on how to have an Agile mindset in our organizations. Principle 11 within the Manifesto states "The best architectures, requirements, and designs emerge from self-organizing teams". While this works well for autonomous teams, it proves to be challenging for large organizations with dozens or even hundreds of teams who need to share common architectures and design patterns.
This talk will present a case study of a large retail organization and explore their journey from a highly centralized/governance-based technology organization to a more distributed/collaborative one and explore their lessons learned and success/failure patterns along the way. In the end, we'll answer the question about whether or not Principle 11 scales!
More details:
https://confengine.com/agile-india-2019/proposal/9281/principle-11-needs-to-go
Conference link: https://2019.agileindia.org
Maximize Your Enterprise DevOps Efforts and Outcomes with Value StreamsDevOps.com
Â
Enterprise software organizations need to modernize and transform their software development processes to gain and keep their competitive advantage by accelerating delivery of business value to customers to meet the market and customer demands. Cloud services, big data/analytics, mobile devices and apps, artificial intelligence, automation and other emerging innovations can help businesses achieve this success.
Join the editor in chief of DevOps, Alan Shimel, and Eric Robertson, Vice President Product Management from CollabNet, in a live chat session that will provide you with the valuable insights needed for Value Stream Management (VSM) for enterprises to stay ahead in today’s market. You will learn more about:
How VSM Relates to DevOps
How VSM Benefits Business and Technology Stakeholders
The Specific Advantages of VSM
How VSM Applies to the Emerging Internet of Things
Similar to Developing an Agile Schedule in Microsoft Project - It is Possible! (20)
Do you have Microsoft Project 2010/13, and are using an Agile or Hybrid Agile method and can’t figure out how to build an Agile Microsoft Project schedule? This dynamic webinar will help, by first contrasting plan-driven or waterfall and agile methods of scheduling. This will then be followed by demonstrating, using a unique Microsoft Project template, how to build and effectively communicate your Agile Microsoft Project Schedule.
Most project managers understand that effective communication is essential to project success. And most are familiar with and use Microsoft Project. However, many project managers are not aware of the rich functional benefits that can be realized from Microsoft’s integration of its products. This webinar will expose and demonstrate why and how the application of integrated Microsoft tools can dramatically improve your communication skills and increase project delivery success.
In March 2014, the Project Management Institute (PMI) introduced a new certification called the PMI Professional in Business Analysis (PMI-PBA). The business analyst field has had two certifications up until this point: the Certified Business Analysis Professional™ (CBAP®) and the Certification of Competency in Business Analysis™ (CCBA®), both administered by the International Institute of Business Analysis (IIBA).
This webinar details the differences between the CBAP, CCBA, and PMI-PBA certifications, explains why a PMI-PBA certification makes sense, and defines what you need to do to become certified.
About the Webinar
This presentation provides an update on the Project Management Institute’s Continuing Certification Requirements (CCR) and provides information on how to maintain professional certification.
Benefits
After attending this webinar, participants will:
• Understand the new CCR guidelines
• Recognize the differences in the previous guidelines to the new guidelines
• See what must be done to maintain PMI professional certification(s)
• Know what is required to maintain multiple PMI professional certifications -- when an individual holds more than one PMI professional certification
• Realize what is necessary to re-establish PMI professional certification in the event that it has lapsed due to not fulfilling annual certification maintenance requirements
• Comprehend how to earn PDUs and potentially apply them to more than one certification, i.e., a PMI certification and non-PMI certifications (other certification programs that require certification maintenance which can be accomplished by taking relevant courses each year)
Coaching. It’s the word on everyone’s lips right now. There also seem to be a lot of different definitions of what it actually is and what it can do for you. This webinar is about demystifying the world of coaching and demonstrating how you can leverage the power of coaching in your project and/or business environment, simply by using some of the core skills and techniques.
Two large corporations have been crippled by recent information security breaches. It may not be hard to quantify the losses in terms of lost revenue and profits but what will be hard to quantify are the losses to reputation. Cited as two of the most damaging cyber-attacks on corporate America, this presentation looks at what went wrong and what could have been done to prevent these situations.
Lean Six Sigma applications in healthcare require an understanding of how the tools and methodologies translate to the people-intensive processes of patient care. Once applied, the possibilities are endless. Using real-world examples of the most common types of errors in clinical services, participants will learn how the DMAIC structure within Lean Six Sigma will lead them to solutions that will prevent future errors.
This presentation explores the following:
• Define the concept of business etiquette
• Recognize the components of business etiquette
• Realize the importance of appearance, behavior and communication in first impressions
• Understand the value of professional attire
• Recognise the attributes of social networking
• Manage formal dining manners
Multiple project environments have become the norm; however, managing resources in such an environment remains a challenge to most organizations as well project managers. In this webinar, we examine this challenge and propose a few solutions.
The purpose of this webinar is to discuss project management of cloud computing. It demystifies terms and uncovers concepts associated with the cloud-based services. It discusses the evolution of the cloud by tracing its conceptualization back to earlier pioneers.
Writing skills that are taught in school are much different than the writing skills needed for effective business communications. Each business communication competes with multiple e-mails, memos and reports that come across our desks daily. This webinar will introduce a four-stage writing process that utilizes the techniques known as headlining, bottom lining and chunking to improve the effectiveness of your project, program and business communications.
This presentation will reveal what truly motivates people and the real reasons why conflict happens, both in the workplace and our personal life. Behavior is driven by motivation; motivation is something that is hard-wired into every human being. So the questions remain: What motivates people and how do I recognize this in my stakeholders? How do I leverage this so that I can achieve maximum productivity from our time spent developing requirements?
This presentation discusses emerging trends in PMO governance and addresses three domains: the Portfolio Management Office, Program Management Office and Project Management Office.
One of the most valued skill sets a project manager can develop is the ability to predict an outcome. Whether it is the outcome of a test, a process, a service, a product or all of the above – there are a few foundational concepts within Lean Six Sigma that will improve your ability to predict project outcomes.
This session will demonstrate how the concept of variation applies to problem solving, and why management by fact is not just a luxury – it's a necessity. It will also demonstrate that while it is good to expect workers to do things right the first time, it is smart to make it impossible for them to do things wrong the first time.
Metric management seems to be one of the hottest topics in project management today. Unfortunately, rushing into metrics management without understanding what can go wrong can lead to detrimental results.
CAPM® Edge is an on-demand, interactive, story-based learning tool. It contains 24 hours of learning content that is designed to help prepare the learner to sit for and pass PMI’s Certified Associate in Project Management exam. Credits: 24 PDUs / 2.4 CEUs / 28.8 CPEs
bit.ly/1gJAXMG
This presentation discusses knowledge management principles for project managers and has application for Project Managers, Program Managers, and Portfolio Managers.
International Institute for Learning strategic adviser on sustainability Greg Balestrero takes us through the challenges of businesses in the future and the methods and strategies to overcome them.
More from International Institute for Learning (20)
Into the Box Keynote Day 2: Unveiling amazing updates and announcements for modern CFML developers! Get ready for exciting releases and updates on Ortus tools and products. Stay tuned for cutting-edge innovations designed to boost your productivity.
SOCRadar Research Team: Latest Activities of IntelBrokerSOCRadar
Â
The European Union Agency for Law Enforcement Cooperation (Europol) has suffered an alleged data breach after a notorious threat actor claimed to have exfiltrated data from its systems. Infamous data leaker IntelBroker posted on the even more infamous BreachForums hacking forum, saying that Europol suffered a data breach this month.
The alleged breach affected Europol agencies CCSE, EC3, Europol Platform for Experts, Law Enforcement Forum, and SIRIUS. Infiltration of these entities can disrupt ongoing investigations and compromise sensitive intelligence shared among international law enforcement agencies.
However, this is neither the first nor the last activity of IntekBroker. We have compiled for you what happened in the last few days. To track such hacker activities on dark web sources like hacker forums, private Telegram channels, and other hidden platforms where cyber threats often originate, you can check SOCRadar’s Dark Web News.
Stay Informed on Threat Actors’ Activity on the Dark Web with SOCRadar!
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...informapgpstrackings
Â
Keep tabs on your field staff effortlessly with Informap Technology Centre LLC. Real-time tracking, task assignment, and smart features for efficient management. Request a live demo today!
For more details, visit us : https://informapuae.com/field-staff-tracking/
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus
Â
As part of the DOE Integrated Research Infrastructure (IRI) program, NERSC at Lawrence Berkeley National Lab and ALCF at Argonne National Lab are working closely with General Atomics on accelerating the computing requirements of the DIII-D experiment. As part of the work the team is investigating ways to speedup the time to solution for many different parts of the DIII-D workflow including how they run jobs on HPC systems. One of these routes is looking at Globus Compute as a way to replace the current method for managing tasks and we describe a brief proof of concept showing how Globus Compute could help to schedule jobs and be a tool to connect compute at different facilities.
How to Position Your Globus Data Portal for Success Ten Good PracticesGlobus
Â
Science gateways allow science and engineering communities to access shared data, software, computing services, and instruments. Science gateways have gained a lot of traction in the last twenty years, as evidenced by projects such as the Science Gateways Community Institute (SGCI) and the Center of Excellence on Science Gateways (SGX3) in the US, The Australian Research Data Commons (ARDC) and its platforms in Australia, and the projects around Virtual Research Environments in Europe. A few mature frameworks have evolved with their different strengths and foci and have been taken up by a larger community such as the Globus Data Portal, Hubzero, Tapis, and Galaxy. However, even when gateways are built on successful frameworks, they continue to face the challenges of ongoing maintenance costs and how to meet the ever-expanding needs of the community they serve with enhanced features. It is not uncommon that gateways with compelling use cases are nonetheless unable to get past the prototype phase and become a full production service, or if they do, they don't survive more than a couple of years. While there is no guaranteed pathway to success, it seems likely that for any gateway there is a need for a strong community and/or solid funding streams to create and sustain its success. With over twenty years of examples to draw from, this presentation goes into detail for ten factors common to successful and enduring gateways that effectively serve as best practices for any new or developing gateway.
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns
Â
Unlocking Business Potential: Tailored Technology Solutions by Prosigns
Discover how Prosigns, a leading technology solutions provider, partners with businesses to drive innovation and success. Our presentation showcases our comprehensive range of services, including custom software development, web and mobile app development, AI & ML solutions, blockchain integration, DevOps services, and Microsoft Dynamics 365 support.
Custom Software Development: Prosigns specializes in creating bespoke software solutions that cater to your unique business needs. Our team of experts works closely with you to understand your requirements and deliver tailor-made software that enhances efficiency and drives growth.
Web and Mobile App Development: From responsive websites to intuitive mobile applications, Prosigns develops cutting-edge solutions that engage users and deliver seamless experiences across devices.
AI & ML Solutions: Harnessing the power of Artificial Intelligence and Machine Learning, Prosigns provides smart solutions that automate processes, provide valuable insights, and drive informed decision-making.
Blockchain Integration: Prosigns offers comprehensive blockchain solutions, including development, integration, and consulting services, enabling businesses to leverage blockchain technology for enhanced security, transparency, and efficiency.
DevOps Services: Prosigns' DevOps services streamline development and operations processes, ensuring faster and more reliable software delivery through automation and continuous integration.
Microsoft Dynamics 365 Support: Prosigns provides comprehensive support and maintenance services for Microsoft Dynamics 365, ensuring your system is always up-to-date, secure, and running smoothly.
Learn how our collaborative approach and dedication to excellence help businesses achieve their goals and stay ahead in today's digital landscape. From concept to deployment, Prosigns is your trusted partner for transforming ideas into reality and unlocking the full potential of your business.
Join us on a journey of innovation and growth. Let's partner for success with Prosigns.
Enhancing Research Orchestration Capabilities at ORNL.pdfGlobus
Â
Cross-facility research orchestration comes with ever-changing constraints regarding the availability and suitability of various compute and data resources. In short, a flexible data and processing fabric is needed to enable the dynamic redirection of data and compute tasks throughout the lifecycle of an experiment. In this talk, we illustrate how we easily leveraged Globus services to instrument the ACE research testbed at the Oak Ridge Leadership Computing Facility with flexible data and task orchestration capabilities.
AI Pilot Review: The World’s First Virtual Assistant Marketing SuiteGoogle
Â
AI Pilot Review: The World’s First Virtual Assistant Marketing Suite
👉👉 Click Here To Get More Info 👇👇
https://sumonreview.com/ai-pilot-review/
AI Pilot Review: Key Features
âś…Deploy AI expert bots in Any Niche With Just A Click
âś…With one keyword, generate complete funnels, websites, landing pages, and more.
âś…More than 85 AI features are included in the AI pilot.
âś…No setup or configuration; use your voice (like Siri) to do whatever you want.
✅You Can Use AI Pilot To Create your version of AI Pilot And Charge People For It…
âś…ZERO Manual Work With AI Pilot. Never write, Design, Or Code Again.
âś…ZERO Limits On Features Or Usages
âś…Use Our AI-powered Traffic To Get Hundreds Of Customers
âś…No Complicated Setup: Get Up And Running In 2 Minutes
âś…99.99% Up-Time Guaranteed
âś…30 Days Money-Back Guarantee
âś…ZERO Upfront Cost
See My Other Reviews Article:
(1) TubeTrivia AI Review: https://sumonreview.com/tubetrivia-ai-review
(2) SocioWave Review: https://sumonreview.com/sociowave-review
(3) AI Partner & Profit Review: https://sumonreview.com/ai-partner-profit-review
(4) AI Ebook Suite Review: https://sumonreview.com/ai-ebook-suite-review
Unleash Unlimited Potential with One-Time Purchase
BoxLang is more than just a language; it's a community. By choosing a Visionary License, you're not just investing in your success, you're actively contributing to the ongoing development and support of BoxLang.
Check out the webinar slides to learn more about how XfilesPro transforms Salesforce document management by leveraging its world-class applications. For more details, please connect with sales@xfilespro.com
If you want to watch the on-demand webinar, please click here: https://www.xfilespro.com/webinars/salesforce-document-management-2-0-smarter-faster-better/
Navigating the Metaverse: A Journey into Virtual Evolution"Donna Lenk
Â
Join us for an exploration of the Metaverse's evolution, where innovation meets imagination. Discover new dimensions of virtual events, engage with thought-provoking discussions, and witness the transformative power of digital realms."
First Steps with Globus Compute Multi-User EndpointsGlobus
Â
In this presentation we will share our experiences around getting started with the Globus Compute multi-user endpoint. Working with the Pharmacology group at the University of Auckland, we have previously written an application using Globus Compute that can offload computationally expensive steps in the researcher's workflows, which they wish to manage from their familiar Windows environments, onto the NeSI (New Zealand eScience Infrastructure) cluster. Some of the challenges we have encountered were that each researcher had to set up and manage their own single-user globus compute endpoint and that the workloads had varying resource requirements (CPUs, memory and wall time) between different runs. We hope that the multi-user endpoint will help to address these challenges and share an update on our progress here.
How Recreation Management Software Can Streamline Your Operations.pptxwottaspaceseo
Â
Recreation management software streamlines operations by automating key tasks such as scheduling, registration, and payment processing, reducing manual workload and errors. It provides centralized management of facilities, classes, and events, ensuring efficient resource allocation and facility usage. The software offers user-friendly online portals for easy access to bookings and program information, enhancing customer experience. Real-time reporting and data analytics deliver insights into attendance and preferences, aiding in strategic decision-making. Additionally, effective communication tools keep participants and staff informed with timely updates. Overall, recreation management software enhances efficiency, improves service delivery, and boosts customer satisfaction.
Software Engineering, Software Consulting, Tech Lead.
Spring Boot, Spring Cloud, Spring Core, Spring JDBC, Spring Security,
Spring Transaction, Spring MVC,
Log4j, REST/SOAP WEB-SERVICES.
Enhancing Project Management Efficiency_ Leveraging AI Tools like ChatGPT.pdfJay Das
Â
With the advent of artificial intelligence or AI tools, project management processes are undergoing a transformative shift. By using tools like ChatGPT, and Bard organizations can empower their leaders and managers to plan, execute, and monitor projects more effectively.