SlideShare a Scribd company logo
THE PROJECT MANAGERS COOKBOOK Volume 2
FIRST EDITION
THE KITCHEN IS NUCLEAR
ALIGNED WITH THE PMBOK GUIDE, 5TH EDITION
THE PMP WHISPERER
The Project Manager’s Cookbook Process Themes
Deconstructing
The PMBOK
Chapter 5
Test Question
The PMI PMP Exam is not and will never be your friendly neighborhood multiple choice exam. At 50 questions per hour,
for 4 hours, the exam tests the test takers endurance, reading comprehension ability, concept recognition, fault
identification skills, proper sequencing of process steps, and most importantly their level of confidence.
There are many PMP Exam questions which contain similar choices, A tactic which opens the door to the possibility of
multiple “true” choices. This requires the test taker to understand where they are at on the Project Management Process
Group and Knowledge Area Map in order to quickly eliminate the wrong choices and identify the only “true” choice.
A truth in choice does not always correlate to the correct answer. Many PMP questions test the students ability to identify
all the wrong choices which within a double negative scenario means eliminating the one true choice in order to identify the
correct answer for that particular scenario. Try four hours of that and then attempt to have a normal day.
Utilizing the PMP Whisperer’s question deconstruction technique leads to clarity and efficiency during the pre-test
preparation period (2-weeks), arming the PMP certification candidiate with absolute confidence.
INTRODUCTION
Whisper Note
 Acknowledge that the
right answer is on the
screen. The test is
actually evaluating
your ability to quickly
identify the wrong
answers
Whisper Note
 When there are
multiple potential
correct choices
identify the choice
that satisfies the
single concept the
question is related to
Whisper Note
 Align the question
with the available
choices via a common
statement. Select the
answer that makes the
statement true
Whisper Note
 Go to the call. Try to
answer the question
without reading
further or looking at
the choices. If you
know the answer
locate it in the list of
choices
Whisper Note
 Know what each
multiple choice
question is asking.
 Evaluate each answer
to the multiple choice
question.
 Eliminate the obvious
wrong answer ASAP
Whisper Note
 Always start the
answer selection by
working from D
through A. Select the
answer that is the
most logically correct
MAKING THE INTANGIBLE TANGIBLE
Whisper Note
 Follow the single
question single
concept writing
pattern. Correctly
identify the situation
and its place within
the sequence of events
1. ID The Knowledge Area
2. ID The Process Group
3. ID The Process
4. ID The ITTO’s
5. Is it a Plan, Baseline, or Document
6. ID The Concept & Sequence of Events
Deconstructing the Question
1 2
3 4
5 6
During which project management process group might a Rough Order of
Magnitude (ROM) estimate be created?Question #1
1. The Knowledge
Areas
 The ROM is a top down
estimating technique
related to cost estimating
 Cost estimating occurs
within the Project Cost
Management Knowledge
Area
2. The Process Groups
 Cost estimates which
range from ROM’s,
budget estimates, and
definitive estimates, are
created within the
Planning Process Group
3. The Process
 Cost Estimates are
created within the
Estimate Costs Process
4. ITTO’s
 The ROM estimate is
an output of the
Estimate Costs Process
and is captured within
Activity Cost Estimate
(ACE) document
5. PBD
 The ROM ACE is a
project document and
identifies the
estimators educated
guess of cost when
utilizing limited or
historical information
6. The Concept
 The ROM concept
tests the students
understanding of why
and when estimates
increase in accuracy as
a project progresses
through its lifecycle
TAKE BREAKS
DURING THE EXAM
Who is responsible for determining the priority of projects within a company?Question #2
1. The Knowledge
Areas
 The timing of project
prioritizing and selection
occurs outside the
boundaries of project
management
2. The Process Groups
 The prioritizing of
projects is conducted by
senior leadership and
occurs prior to and after
the selection of projects
(continuous)
3. The Process
 There is no PMBOK
process that produces a
selected project as an
output.
4. ITTO’s
 Project prioritization
occurs outside of the
47 PMBOK processes
and is typically set and
re-assessed by senior
leadership
5. PBD
 Project prioritization is
not a formal PMBOK
plan, document, or
baseline
6. The Concept
 Strategic objectives
are established during
the strategic planning
process.
 Project prioritization
occurs as a result of
the senior leaderships
progression through
tactical and
operational planning
TAKE BREAKS
DURING THE EXAM
Question #3
The activity “ship container” in your network diagram has an early start date
of 17, a late start date of 22 and a late finish date of 37. What is the activity
duration?
PREPARATION
EQUALS SUCCESS
1. The Knowledge
Areas
 An activities duration can
be determined utilizing
the AON PDM which
supports the creation of
Schedule Network
Diagrams in the Project
Time Management
Knowledge Area
2. The Process Groups
 The Critical Path
Method technique is
utilized in the Planning
Process Group
3. The Process
 Activity early and late
start dates are
configured in the
Develop Project
Schedule Process
4. ITTO’s
 The Critical Path
Method (CPM) is a
technique in the
Develop Project
Schedule Process
5. PBD
The Critical Path is used to
create the Project Schedule
Network Diagram
document
6. The Concept
 The early and late
start dates can be
utilized with the late
finish date to
determine the early
finish date as the
variance between the
EF and LF dates is the
same as the variance
between the ES and LS
dates
 From here the activity
duration can be
calculated
Question #4
Activity “A” has an optimistic duration of 17 days, a most likely duration of 22
days, and a pessimistic duration of 33 days. What is the activities Standard
Deviation?
1. The Knowledge
Areas
 Activity Duration
Estimating occurs within
the Project Time
Management Knowledge
Area
2. The Process Groups
 Activity Duration
Estimating occurs within
the Planning Process
Group
3. The Process
 Activity duration
estimating occurs within
the Estimate Activity
Durations Process
4. ITTO’s
 PMBOK
acknowledges that the
PERT technique yields
the most accurate
Standard Deviation for
a range of estimates
5. PBD
The Standard Deviation for
a range of estimates is
neither a Plan, Baseline, or
Document
6. The Concept
 The PERT technique
uses three data points
(P, (4)ML, O) in order
to generate six
estimates which are
used to determine the
Standard Deviation.
Weighting the Most
Likely accounts for the
normal distribution of
random data and
minimizes the impact
of padding due to an
inflated Standard
Deviation
PROPER PREPARATION
EQUALS SUCCESS
Question #5
A major scope change has been formally proposed to the project team. The
next step the project manager should take is to?
1. The Knowledge
Areas
 Formal Change Control
occurs within the Project
Integration Knowledge
Area
2. The Process Groups
 Formal change control
occurs in the Monitor &
Control Process Group
3. The Process
 Formal change control
occurs within the
Perform Integrated
Change Control Process
4. ITTO’s
 The Project Managers
role in Formal Change
Control of a large
project is captured
within his/her Expert
Judgment
5. PBD
 The Project Managers
official position on the
change request is
documented in the
Change Log (Formal
Document)
6. The Concept
 The project managers
responsibilities are:
• #1 - Log the request
• #2 - Prevent
unnecessary change
through the formal
documentation of their
opinion
• #3 - Provide impact
• #4 - Deliver any viable
alternatives to the
CCB
START AT ANSWER
CHOICE “D” AND
WORK YOUR WAY UP
THERE CAN BE TWO
CORRECT ANSWERS
ONE MORE CORRECT
THAN THE OTHERS
Question #6 Which of the following techniques is used to evaluate the degree to which the data
about risks is useful for risk management?
1. The Knowledge
Areas
 The evaluation of risk
information occurs within
the Project Risk
Management Knowledge
Area.
2. The Process Groups
 Assessing the quality of
the risk information
under consideration for
analysis occurs in the
Planning Process Group
3. The Process
 The analysis of risk
information for validity
is a technique used in the
Perform Qualitative Risk
Analysis Process
4. ITTO’s
 The technique under
review is the Risk Data
Quality Assessment
technique
5. PBD
The analysis of risk
information is neither a
Plan, Baseline, or formal
Document. It is a
technique
6. The Concept
 The concept under
review is the student’s
understanding of the
impact of low and
high quality risk data
on the management of
risk reserves and the
resulting impact on
scope, schedule, and
cost
IN THE EVENT THERE ARE
TWO OR MORE CORRECT
ANSWERS
SELECT THE MOST
PRECISE ANSWER
Question #7
Sensitivity analysis is one of the tools/techniques utilized in performing
quantitative risk analysis. What are the advantages of using sensitivity
analysis?
1. The Knowledge
Areas
 Sensitivity Analysis
occurs within the Project
Risk Management
Knowledge Area
2. The Process Groups
 The use of the
sensitivity analysis
technique occurs within
the Planning Process
Group
3. The Process
 Sensitivity analysis is a
technique in the Perform
Quantitative Risk
Analysis Process
4. ITTO’s
 Sensitivity Analysis is
a technique used in the
Perform Quantitative
Risk Analysis Process
5. PBD
Quantitative Risk Analysis
is neither a Plan, Baseline,
or formal Document. It is
a technique
6. The Concept
 Areas of risk exposure
are rarely wholly
positive or wholly
negative.
 The degree of positive
and negative risk
exposure in each area
of identified risk is
visually captured in a
Tornado Diagram and
is important
information
ELIMINATE THE 2
OBVIOUS DISTRACTOR
CHOICES
IMMEDIATELY
THEY ARE LOGICALLY
IMPOSSIBLE TO BE THE
CORRECT ANSWER
Question #8 Which of the following is not one of Crosby’s Four Absolutes of Quality?
1. The Knowledge
Areas
 Crosby’s 4 Absolutes of
Quality are quality
success factors that are
generated outside the
PMBOK
2. The Process Groups
 Quality management
concepts are foundations
of quality management
and exist outside of the
(5) PMBOK Process
Groups
3. The Process
 The 4 Absolutes of
Quality are:
 1. Conformance to
requirements
 2. Prevention
 3. Zero Defects
 4. The cost of non-
conformance is the
measurement
4. ITTO’s
 Crosby’s 4 Absolutes
of Quality
Management are key
concepts which
influence Project
Quality Management
ITTO’s
5. PBD
 Crosby’s 4 Absolutes of
Quality are neither
Plans, Baselines, or
formal Documents.
They are key quality
management concepts
6. The Concept
 Quality concepts
identify key attributes
of quality management
which lead to the
successful
implementation and
sustainment of best
practices for project
quality management
THE FIRST SELECTION
IS STATISTICALLY THE
MOST LIKELY CORRECT
ANSWER
Question #9
You are in charge of developing a new product for an organization. Your quality
metrics are based on the 80th percentile of each of the last three products
developed. This is an example of?
1. The Knowledge
Areas
 The establishment of
quality metrics occurs
within the Project Quality
Management Knowledge
Area
2. The Process Groups
 The Identification of the
projects quality
measurements occurs
within the Planning
Process Group
3. The Process
 The establishment of the
projects quality metrics
occurs during the Plan
Quality Management
Process
4. ITTO’s
 The project team
utilizes the technique
of benchmarking to
establish quality
metrics which are
often based on best
practices and high
performance
5. PBD
 Quality Metrics are
Outputs of the Plan
Quality Management
Process which also
describes how Quality
Control will test to
ensure they were met
6. The Concept
 The concept under
review is the project
team’s effective use of
the benchmarking
technique to establish
quality metrics that
are based on
established high levels
of performance
THE FIRST SELECTION
IS STATISTICALLY THE
MOST LIKELY ANSWER
Question #10 Which of the following is the last step of project closing?
1. The Knowledge
Areas
 The closure of a project
or phase (a sub-project
supporting a much larger
project) occurs in the
Project Integration
Knowledge Area
2. The Process Groups
 Close Project or Phase
along with its supporting
activities occurs in the
Closing Process Group
3. The Process
 The proper closure of a
project or phase occurs
within the Close Project
or Phase Process
4. ITTO’s
 The outputs the Close
Project or Phase
process are the
transition of the final
product, service or
results to the customer
and OPA updates
5. PBD
 Project closure is a
document driven
endeavor that begins
with reconciliation of
customer acceptance
documents, the update
of project files, and
finally the archive of
historical information
and lessons learned into
the lessons learned
knowledge base
6. The Concept
 The concept under test
is the students
understanding of the
sequence of events and
activities
THE FIRST SELECTION
IS STATISTICALLY THE
MOST LIKELY ANSWER

More Related Content

What's hot

PMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_MaturityPMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_MaturityBob Zoller
 
PMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKPMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOK
skiltful
 
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
JustAcademy
 
PMP Exam Preparation Workshop
PMP Exam Preparation WorkshopPMP Exam Preparation Workshop
PMP Exam Preparation Workshop
Celtem Learning
 
The new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for itThe new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for it
PMIUKChapter
 
Maintaining PMP Credential
Maintaining PMP CredentialMaintaining PMP Credential
Maintaining PMP Credential
pritamdutt
 
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for TrainersPMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
Ready to Train
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overviewhouserdah
 
PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...
Shamil Habet
 
Anosha jamshed projectmanager
Anosha jamshed projectmanagerAnosha jamshed projectmanager
Anosha jamshed projectmanager
anosha jamshed
 
An introduction to prince2
An introduction to prince2An introduction to prince2
An introduction to prince2
Business Beam
 
Pmi dec 13
Pmi dec 13Pmi dec 13
Pmi dec 13
Vijay Raj
 
Green pmp exam prep questions answers explanations 2013 edition by christophe...
Green pmp exam prep questions answers explanations 2013 edition by christophe...Green pmp exam prep questions answers explanations 2013 edition by christophe...
Green pmp exam prep questions answers explanations 2013 edition by christophe...
mohamed mostafa
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
Ahmed Yousry Abdelaziz
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
Sayed Abdellah
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
GlobalSkillup
 
Prince2 for Value Driven Project Management
Prince2 for Value Driven Project ManagementPrince2 for Value Driven Project Management
Prince2 for Value Driven Project Management
Edureka!
 

What's hot (20)

PMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_MaturityPMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_Maturity
 
PMP
PMPPMP
PMP
 
PMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKPMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOK
 
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
 
PMP Exam Preparation Workshop
PMP Exam Preparation WorkshopPMP Exam Preparation Workshop
PMP Exam Preparation Workshop
 
The new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for itThe new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for it
 
Maintaining PMP Credential
Maintaining PMP CredentialMaintaining PMP Credential
Maintaining PMP Credential
 
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for TrainersPMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
 
PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...
 
Anosha jamshed projectmanager
Anosha jamshed projectmanagerAnosha jamshed projectmanager
Anosha jamshed projectmanager
 
An introduction to prince2
An introduction to prince2An introduction to prince2
An introduction to prince2
 
Pmi dec 13
Pmi dec 13Pmi dec 13
Pmi dec 13
 
Green pmp exam prep questions answers explanations 2013 edition by christophe...
Green pmp exam prep questions answers explanations 2013 edition by christophe...Green pmp exam prep questions answers explanations 2013 edition by christophe...
Green pmp exam prep questions answers explanations 2013 edition by christophe...
 
Project managment 1
Project managment 1Project managment 1
Project managment 1
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
Prince2 for Value Driven Project Management
Prince2 for Value Driven Project ManagementPrince2 for Value Driven Project Management
Prince2 for Value Driven Project Management
 

Similar to Deconstructing the PMP Exam Question - The Deep Dive

50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
bspirashanth
 
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Adekunle Adeniyi PMI-(PMP, RMP, SP, ACP, PBA) MCTS
 
50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
Achintya Kumar
 
50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
Achintya Kumar
 
Using the test process improvement models. Case study based on TPI Next model...
Using the test process improvement models. Case study based on TPI Next model...Using the test process improvement models. Case study based on TPI Next model...
Using the test process improvement models. Case study based on TPI Next model...
Sigma Software
 
Антон Мужайло, «Using the test process improvement models. Case study based o...
Антон Мужайло, «Using the test process improvement models. Case study based o...Антон Мужайло, «Using the test process improvement models. Case study based o...
Антон Мужайло, «Using the test process improvement models. Case study based o...
Sigma Software
 
Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01PMI_IREP_TP
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
Pankaj Aher
 
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptxit-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
ssuserf016f4
 
Advanced concept of project risk management project report
Advanced concept of project risk management project reportAdvanced concept of project risk management project report
Advanced concept of project risk management project report
ramesh roy
 
Survey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation ProblemsSurvey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation Problems
IJERA Editor
 
Test management
Test managementTest management
Test management
Miftahul Jannaty
 
Pmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questionsPmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questions
OlgaZelenina2
 
Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02
Loriebel Manabat
 
Chapter 13 An evaluation framework
Chapter 13 An evaluation frameworkChapter 13 An evaluation framework
Chapter 13 An evaluation framework
vuongdq93
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
Vaidehi Malvi
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementation
Sk. Mohtasim Billah
 
Pmstudy exam 4
Pmstudy exam 4Pmstudy exam 4
Pmstudy exam 4
Mohamed Saeed
 
Jayanto bose prashantshrivastava
Jayanto bose prashantshrivastavaJayanto bose prashantshrivastava
Jayanto bose prashantshrivastavaPMI2011
 
Jayantobose prashantshrivastava-131008015757-phpapp01
Jayantobose prashantshrivastava-131008015757-phpapp01Jayantobose prashantshrivastava-131008015757-phpapp01
Jayantobose prashantshrivastava-131008015757-phpapp01PMI_IREP_TP
 

Similar to Deconstructing the PMP Exam Question - The Deep Dive (20)

50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
 
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
 
50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
 
50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
 
Using the test process improvement models. Case study based on TPI Next model...
Using the test process improvement models. Case study based on TPI Next model...Using the test process improvement models. Case study based on TPI Next model...
Using the test process improvement models. Case study based on TPI Next model...
 
Антон Мужайло, «Using the test process improvement models. Case study based o...
Антон Мужайло, «Using the test process improvement models. Case study based o...Антон Мужайло, «Using the test process improvement models. Case study based o...
Антон Мужайло, «Using the test process improvement models. Case study based o...
 
Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
 
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptxit-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
 
Advanced concept of project risk management project report
Advanced concept of project risk management project reportAdvanced concept of project risk management project report
Advanced concept of project risk management project report
 
Survey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation ProblemsSurvey Based Reviewof Elicitation Problems
Survey Based Reviewof Elicitation Problems
 
Test management
Test managementTest management
Test management
 
Pmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questionsPmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questions
 
Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02
 
Chapter 13 An evaluation framework
Chapter 13 An evaluation frameworkChapter 13 An evaluation framework
Chapter 13 An evaluation framework
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementation
 
Pmstudy exam 4
Pmstudy exam 4Pmstudy exam 4
Pmstudy exam 4
 
Jayanto bose prashantshrivastava
Jayanto bose prashantshrivastavaJayanto bose prashantshrivastava
Jayanto bose prashantshrivastava
 
Jayantobose prashantshrivastava-131008015757-phpapp01
Jayantobose prashantshrivastava-131008015757-phpapp01Jayantobose prashantshrivastava-131008015757-phpapp01
Jayantobose prashantshrivastava-131008015757-phpapp01
 

Recently uploaded

Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
narasimhamurthyh4
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 

Recently uploaded (20)

Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 

Deconstructing the PMP Exam Question - The Deep Dive

  • 1. THE PROJECT MANAGERS COOKBOOK Volume 2 FIRST EDITION THE KITCHEN IS NUCLEAR ALIGNED WITH THE PMBOK GUIDE, 5TH EDITION THE PMP WHISPERER
  • 2. The Project Manager’s Cookbook Process Themes Deconstructing The PMBOK Chapter 5 Test Question
  • 3. The PMI PMP Exam is not and will never be your friendly neighborhood multiple choice exam. At 50 questions per hour, for 4 hours, the exam tests the test takers endurance, reading comprehension ability, concept recognition, fault identification skills, proper sequencing of process steps, and most importantly their level of confidence. There are many PMP Exam questions which contain similar choices, A tactic which opens the door to the possibility of multiple “true” choices. This requires the test taker to understand where they are at on the Project Management Process Group and Knowledge Area Map in order to quickly eliminate the wrong choices and identify the only “true” choice. A truth in choice does not always correlate to the correct answer. Many PMP questions test the students ability to identify all the wrong choices which within a double negative scenario means eliminating the one true choice in order to identify the correct answer for that particular scenario. Try four hours of that and then attempt to have a normal day. Utilizing the PMP Whisperer’s question deconstruction technique leads to clarity and efficiency during the pre-test preparation period (2-weeks), arming the PMP certification candidiate with absolute confidence. INTRODUCTION
  • 4. Whisper Note  Acknowledge that the right answer is on the screen. The test is actually evaluating your ability to quickly identify the wrong answers Whisper Note  When there are multiple potential correct choices identify the choice that satisfies the single concept the question is related to Whisper Note  Align the question with the available choices via a common statement. Select the answer that makes the statement true Whisper Note  Go to the call. Try to answer the question without reading further or looking at the choices. If you know the answer locate it in the list of choices Whisper Note  Know what each multiple choice question is asking.  Evaluate each answer to the multiple choice question.  Eliminate the obvious wrong answer ASAP Whisper Note  Always start the answer selection by working from D through A. Select the answer that is the most logically correct MAKING THE INTANGIBLE TANGIBLE Whisper Note  Follow the single question single concept writing pattern. Correctly identify the situation and its place within the sequence of events
  • 5. 1. ID The Knowledge Area 2. ID The Process Group 3. ID The Process 4. ID The ITTO’s 5. Is it a Plan, Baseline, or Document 6. ID The Concept & Sequence of Events Deconstructing the Question 1 2 3 4 5 6
  • 6. During which project management process group might a Rough Order of Magnitude (ROM) estimate be created?Question #1
  • 7. 1. The Knowledge Areas  The ROM is a top down estimating technique related to cost estimating  Cost estimating occurs within the Project Cost Management Knowledge Area 2. The Process Groups  Cost estimates which range from ROM’s, budget estimates, and definitive estimates, are created within the Planning Process Group 3. The Process  Cost Estimates are created within the Estimate Costs Process 4. ITTO’s  The ROM estimate is an output of the Estimate Costs Process and is captured within Activity Cost Estimate (ACE) document 5. PBD  The ROM ACE is a project document and identifies the estimators educated guess of cost when utilizing limited or historical information 6. The Concept  The ROM concept tests the students understanding of why and when estimates increase in accuracy as a project progresses through its lifecycle TAKE BREAKS DURING THE EXAM
  • 8. Who is responsible for determining the priority of projects within a company?Question #2
  • 9. 1. The Knowledge Areas  The timing of project prioritizing and selection occurs outside the boundaries of project management 2. The Process Groups  The prioritizing of projects is conducted by senior leadership and occurs prior to and after the selection of projects (continuous) 3. The Process  There is no PMBOK process that produces a selected project as an output. 4. ITTO’s  Project prioritization occurs outside of the 47 PMBOK processes and is typically set and re-assessed by senior leadership 5. PBD  Project prioritization is not a formal PMBOK plan, document, or baseline 6. The Concept  Strategic objectives are established during the strategic planning process.  Project prioritization occurs as a result of the senior leaderships progression through tactical and operational planning TAKE BREAKS DURING THE EXAM
  • 10. Question #3 The activity “ship container” in your network diagram has an early start date of 17, a late start date of 22 and a late finish date of 37. What is the activity duration?
  • 11. PREPARATION EQUALS SUCCESS 1. The Knowledge Areas  An activities duration can be determined utilizing the AON PDM which supports the creation of Schedule Network Diagrams in the Project Time Management Knowledge Area 2. The Process Groups  The Critical Path Method technique is utilized in the Planning Process Group 3. The Process  Activity early and late start dates are configured in the Develop Project Schedule Process 4. ITTO’s  The Critical Path Method (CPM) is a technique in the Develop Project Schedule Process 5. PBD The Critical Path is used to create the Project Schedule Network Diagram document 6. The Concept  The early and late start dates can be utilized with the late finish date to determine the early finish date as the variance between the EF and LF dates is the same as the variance between the ES and LS dates  From here the activity duration can be calculated
  • 12. Question #4 Activity “A” has an optimistic duration of 17 days, a most likely duration of 22 days, and a pessimistic duration of 33 days. What is the activities Standard Deviation?
  • 13. 1. The Knowledge Areas  Activity Duration Estimating occurs within the Project Time Management Knowledge Area 2. The Process Groups  Activity Duration Estimating occurs within the Planning Process Group 3. The Process  Activity duration estimating occurs within the Estimate Activity Durations Process 4. ITTO’s  PMBOK acknowledges that the PERT technique yields the most accurate Standard Deviation for a range of estimates 5. PBD The Standard Deviation for a range of estimates is neither a Plan, Baseline, or Document 6. The Concept  The PERT technique uses three data points (P, (4)ML, O) in order to generate six estimates which are used to determine the Standard Deviation. Weighting the Most Likely accounts for the normal distribution of random data and minimizes the impact of padding due to an inflated Standard Deviation PROPER PREPARATION EQUALS SUCCESS
  • 14. Question #5 A major scope change has been formally proposed to the project team. The next step the project manager should take is to?
  • 15. 1. The Knowledge Areas  Formal Change Control occurs within the Project Integration Knowledge Area 2. The Process Groups  Formal change control occurs in the Monitor & Control Process Group 3. The Process  Formal change control occurs within the Perform Integrated Change Control Process 4. ITTO’s  The Project Managers role in Formal Change Control of a large project is captured within his/her Expert Judgment 5. PBD  The Project Managers official position on the change request is documented in the Change Log (Formal Document) 6. The Concept  The project managers responsibilities are: • #1 - Log the request • #2 - Prevent unnecessary change through the formal documentation of their opinion • #3 - Provide impact • #4 - Deliver any viable alternatives to the CCB START AT ANSWER CHOICE “D” AND WORK YOUR WAY UP THERE CAN BE TWO CORRECT ANSWERS ONE MORE CORRECT THAN THE OTHERS
  • 16. Question #6 Which of the following techniques is used to evaluate the degree to which the data about risks is useful for risk management?
  • 17. 1. The Knowledge Areas  The evaluation of risk information occurs within the Project Risk Management Knowledge Area. 2. The Process Groups  Assessing the quality of the risk information under consideration for analysis occurs in the Planning Process Group 3. The Process  The analysis of risk information for validity is a technique used in the Perform Qualitative Risk Analysis Process 4. ITTO’s  The technique under review is the Risk Data Quality Assessment technique 5. PBD The analysis of risk information is neither a Plan, Baseline, or formal Document. It is a technique 6. The Concept  The concept under review is the student’s understanding of the impact of low and high quality risk data on the management of risk reserves and the resulting impact on scope, schedule, and cost IN THE EVENT THERE ARE TWO OR MORE CORRECT ANSWERS SELECT THE MOST PRECISE ANSWER
  • 18. Question #7 Sensitivity analysis is one of the tools/techniques utilized in performing quantitative risk analysis. What are the advantages of using sensitivity analysis?
  • 19. 1. The Knowledge Areas  Sensitivity Analysis occurs within the Project Risk Management Knowledge Area 2. The Process Groups  The use of the sensitivity analysis technique occurs within the Planning Process Group 3. The Process  Sensitivity analysis is a technique in the Perform Quantitative Risk Analysis Process 4. ITTO’s  Sensitivity Analysis is a technique used in the Perform Quantitative Risk Analysis Process 5. PBD Quantitative Risk Analysis is neither a Plan, Baseline, or formal Document. It is a technique 6. The Concept  Areas of risk exposure are rarely wholly positive or wholly negative.  The degree of positive and negative risk exposure in each area of identified risk is visually captured in a Tornado Diagram and is important information ELIMINATE THE 2 OBVIOUS DISTRACTOR CHOICES IMMEDIATELY THEY ARE LOGICALLY IMPOSSIBLE TO BE THE CORRECT ANSWER
  • 20. Question #8 Which of the following is not one of Crosby’s Four Absolutes of Quality?
  • 21. 1. The Knowledge Areas  Crosby’s 4 Absolutes of Quality are quality success factors that are generated outside the PMBOK 2. The Process Groups  Quality management concepts are foundations of quality management and exist outside of the (5) PMBOK Process Groups 3. The Process  The 4 Absolutes of Quality are:  1. Conformance to requirements  2. Prevention  3. Zero Defects  4. The cost of non- conformance is the measurement 4. ITTO’s  Crosby’s 4 Absolutes of Quality Management are key concepts which influence Project Quality Management ITTO’s 5. PBD  Crosby’s 4 Absolutes of Quality are neither Plans, Baselines, or formal Documents. They are key quality management concepts 6. The Concept  Quality concepts identify key attributes of quality management which lead to the successful implementation and sustainment of best practices for project quality management THE FIRST SELECTION IS STATISTICALLY THE MOST LIKELY CORRECT ANSWER
  • 22. Question #9 You are in charge of developing a new product for an organization. Your quality metrics are based on the 80th percentile of each of the last three products developed. This is an example of?
  • 23. 1. The Knowledge Areas  The establishment of quality metrics occurs within the Project Quality Management Knowledge Area 2. The Process Groups  The Identification of the projects quality measurements occurs within the Planning Process Group 3. The Process  The establishment of the projects quality metrics occurs during the Plan Quality Management Process 4. ITTO’s  The project team utilizes the technique of benchmarking to establish quality metrics which are often based on best practices and high performance 5. PBD  Quality Metrics are Outputs of the Plan Quality Management Process which also describes how Quality Control will test to ensure they were met 6. The Concept  The concept under review is the project team’s effective use of the benchmarking technique to establish quality metrics that are based on established high levels of performance THE FIRST SELECTION IS STATISTICALLY THE MOST LIKELY ANSWER
  • 24. Question #10 Which of the following is the last step of project closing?
  • 25. 1. The Knowledge Areas  The closure of a project or phase (a sub-project supporting a much larger project) occurs in the Project Integration Knowledge Area 2. The Process Groups  Close Project or Phase along with its supporting activities occurs in the Closing Process Group 3. The Process  The proper closure of a project or phase occurs within the Close Project or Phase Process 4. ITTO’s  The outputs the Close Project or Phase process are the transition of the final product, service or results to the customer and OPA updates 5. PBD  Project closure is a document driven endeavor that begins with reconciliation of customer acceptance documents, the update of project files, and finally the archive of historical information and lessons learned into the lessons learned knowledge base 6. The Concept  The concept under test is the students understanding of the sequence of events and activities THE FIRST SELECTION IS STATISTICALLY THE MOST LIKELY ANSWER