4. Integrated Commissioning Checklist starting point Commissioning Scope Master Check List Power Test Cooling Test Fire Suppression and Security Test Infrastructure Monitor Systems and Control Tests High Density Load Testing (using independent Rack Heaters ) Systems Grounding Chillers Pipes Power Monitoring System Power Distribution installation UPS Chilled water Pumps sprinklers CRAC Monitoring System Hot/Cold Aisle air flow Automatic Transfer Switch (ATS) Cooling Tower Gauges Humidity Sensors Rack Hot air flow patterns Integrated Power Systems Condenser Water Pumps Pumps Temperature Sensors Rack mounted outlets in the rack EPO Piping Automatic Alarms Motion Detection sensors PDU serving the rack heat exchanger Smoke Detection Building Management System CRAC (like) Electronics Ducting and air flow Man Traps integrated cooling systems Door Lock Systems Test power and Cooling together Test power and Cooling together Security Camera