SlideShare a Scribd company logo
1 of 16
Download to read offline
INDEX
Third Party Inspection, Certi๏ฌcation of Electrical
Installations (ISO/IEC 17020)
Thermography Inspection & Testing
(NDT Level II)
Power Quality & Harmonic Analysis
Commercial & Industrial Electrical Testing Activities
Energy Auditing & Saving Analysis
Arc Flash Fault & Coordination Study
Electrical Safety Testing of Biomedical
Equipments
Temperature & Humidity Calibration
Force & Pressure Calibration
Mass & Dimension Calibration
Electrical Calibration
Physical Instruments Calibration
installation or electrical plant
design and safety codes
We are a Third party Inspection & Certifying Body for testing and calibration of Electrical &
and technology, along with accreditations to all major standards and regulations. That is why
our electrical installation certi๏ฌcation services may help you lots.
TRUSTED ELECTRICAL TESTING, INSPECTION AND CERTIFICATION SERVICES โ€“
FOR EVERY ASPECT OF YOUR INSTALLATION
Why
Carelabs?
Electrical installations inspection certi๏ฌcation โ€“ helps you comply with national and
international standards and ensure the reliable operation of your facilities.
installation or electrical plant
therefore must be periodically inspected and tested.
requirements
may require public inspection and testing of electrical installations
design and safety codes
Third Party
Inspection,
Certification of
Electrical Installations
(ISO/IEC 17020)
A useful addition to a Preventative Maintenance Program, Core Systems LLC can carry
one application for infrared thermography globally is electrical applications. 80% of
infrared radiation visible. Thermal imagers capture fully radiometric infrared images using
IR-Fusionยฎ technology, photographic images and will be included in a report.
cause a failure.
Thermography
Inspection
& Testing
(NDT Level II)
Power Quality
& Harmonic
Analysis
Most power systems can accommodate a certain level of power quality & harmonic
currents ut will e perience pro lems when harmonics ecome a si ni cant
component of the overall load.
generators, etc.
resonance
equipment, causing component failure and
shortened life span
penalties on monthly utility bills
Power Quality Measurements in IEC 61000-4-30:
Commercial
& Industrial
Electrical Testing
Activities
Energy Auditing
& Saving
Analysis
performed in accomplishing an effective energy
management program designed to improve
the energy ef๏ฌciency and reduce the energy
operating costs of a facility
how a facility uses energy, what the facility pays for that
energy, and ๏ฌnally, a recommended program for changes
in operating practices or energy consuming equipment that
will cost effectively save money on energy bills.
The analysis of building and utility data, including study of
the installed equipment and analysis of energy bills.
The understanding of the building behavior and of the interactions with weather,
occupancy and operating schedules.
The selection and evaluation of energy conservation measures.
The estimation of the energy saving potential
The identi๏ฌcation of customer concerns and needs
Energy Conservation Measures (ECMโ€™s) - are identi๏ฌed and evaluated to determine
their bene๏ฌts and cost effectiveness. ECMโ€™s are assessed in terms of their cost and
Energy action plan is created where certain ECMโ€™s are selected for implementation,
and the actual process of saving energy and money begins
Arc Flash Fault
& Coordination
Study
comply with OSHA & NFPA70-E
1584 standards
changes
Electrical Safety
Testing of
Biomedical
Equipments
As an independent, third-party testing laboratory, Carelabs uses its substantial
your medical device. Medical equipment safety testing, which demonstrates your
medical device poses.
Medical equipment safety testing, which demonstrates your compliance with
IEC and NFPA-99 standards.
Earth bond
Earth bond point to point
Electrical Safety Tests
IEC 62353 tests
NFPA-99 Tests
IEC 60601 Tests
IEC mains lead testing
Temperature
& Humidity
Calibration
Temperature
Digital Thermometers
Infra Red Thermometers
Thermal Imager
Calibrators
Temperature gauges
Regulated Baths
Muf๏ฌ‚e Furnace
Temperature Meter
Temperature Controllers
Temperature Recorders
Temperature Switches
Hot Cabinet
Bain Marie
Proofers
Humidity Recorders
Soldering Stations
Chillers
Tinytag Sensors
Blast Chillers
Refrigerated Transport
System
Humidity
Digital Indicator Probes
Psychrometers
Thermohygrographs
Whirling Hygrometers
Thermo Hygrometers
Pressure
Analog & Digital
Pressure Transmitters
Indicators
Pressure Switches
Manometers &
Micromanometers
Hand Held Pressure Pump
Pressure Calibrators
Pressure Chart Recorder
Process Calibrator
Dead Weight Testers
Discharge Pressure Switch
Suction Pressure Switch
Force
Torque Wrenches
Force &
Pressure
Calibration
Dimention
Mass
at receiving area
Mass &
Dimension
Calibration
Multi Meters
Clamp Meters
Insulation Testers
Process Calibrators
Panel Meters
Oscilloscopes
Counters
Primary/ Secondary Current
Injection Test Set
Frequency Meters
Ammeters
Earth Resistance Meters
Welding Machines
Phase Sequence Indicator
Document Process Calibrator
ELCB/ RCD Tester
LCR Meter
Ohmmeter
Power Supply
Current Transformer Test set
3-Phase Rotation Tester
Multi Funcion Primary Test System
Holiday Tester
dary Current
et
ers
rs
tors
Electrical
Calibration
Physical
Instruments
Calibration
Calibration
Calibration
Cross Hatch Adhesion Tester
P.O Box 232126, Dubai, UAE | Tel: +971 4 514 9730
Email: info@carelabs.ae | www.carelabs.ae

More Related Content

What's hot

Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...
Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...
Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...
Thorne & Derrick UK
ย 
Ee2201 measurement-and-instrumentation-lecture-notes
Ee2201 measurement-and-instrumentation-lecture-notesEe2201 measurement-and-instrumentation-lecture-notes
Ee2201 measurement-and-instrumentation-lecture-notes
Jayakumar T
ย 

What's hot (20)

Calibration introduction
Calibration introductionCalibration introduction
Calibration introduction
ย 
Cool while saving even in humid climate areas
Cool while saving even in humid climate areasCool while saving even in humid climate areas
Cool while saving even in humid climate areas
ย 
Power Systems of Hill PHOENIX, Inc.
Power Systems of Hill PHOENIX, Inc.Power Systems of Hill PHOENIX, Inc.
Power Systems of Hill PHOENIX, Inc.
ย 
Instrument Calibration
Instrument Calibration Instrument Calibration
Instrument Calibration
ย 
PTI Mountain West Mining Line Card
PTI Mountain West Mining Line CardPTI Mountain West Mining Line Card
PTI Mountain West Mining Line Card
ย 
High Efficiency Solutions EEV & Monitoring Systems
High Efficiency Solutions  EEV & Monitoring SystemsHigh Efficiency Solutions  EEV & Monitoring Systems
High Efficiency Solutions EEV & Monitoring Systems
ย 
IKIO One Pager
 IKIO One Pager IKIO One Pager
IKIO One Pager
ย 
Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...
Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...
Kamstrup RHI Compliant Heat Meters & Thermal Energy Measurement - Multical 60...
ย 
Luminaire Photometry External[1]
Luminaire Photometry External[1]Luminaire Photometry External[1]
Luminaire Photometry External[1]
ย 
Michel Reygaerts CV
Michel Reygaerts CVMichel Reygaerts CV
Michel Reygaerts CV
ย 
Voltmeter Calibration
Voltmeter CalibrationVoltmeter Calibration
Voltmeter Calibration
ย 
CAREL Hecu Sistema - The REAL capacity modulation for C-Stores
CAREL Hecu Sistema - The REAL capacity modulation for C-StoresCAREL Hecu Sistema - The REAL capacity modulation for C-Stores
CAREL Hecu Sistema - The REAL capacity modulation for C-Stores
ย 
CAREL cold room & convenience store solutions
CAREL cold room & convenience store solutionsCAREL cold room & convenience store solutions
CAREL cold room & convenience store solutions
ย 
Key areas for consideration in sample handling design
Key areas for consideration in sample handling designKey areas for consideration in sample handling design
Key areas for consideration in sample handling design
ย 
Ee2201 measurement-and-instrumentation-lecture-notes
Ee2201 measurement-and-instrumentation-lecture-notesEe2201 measurement-and-instrumentation-lecture-notes
Ee2201 measurement-and-instrumentation-lecture-notes
ย 
Asco solenoid valve temperature code explanation whitepaper
Asco solenoid valve temperature code explanation whitepaperAsco solenoid valve temperature code explanation whitepaper
Asco solenoid valve temperature code explanation whitepaper
ย 
202102 attaining proficiency in industrial pressure measurement r7
202102 attaining proficiency in industrial pressure measurement r7202102 attaining proficiency in industrial pressure measurement r7
202102 attaining proficiency in industrial pressure measurement r7
ย 
Electronics measurement and instrumentation ppt
Electronics measurement and instrumentation pptElectronics measurement and instrumentation ppt
Electronics measurement and instrumentation ppt
ย 
Calibrating the Measuring Chain
Calibrating the Measuring ChainCalibrating the Measuring Chain
Calibrating the Measuring Chain
ย 
Fluke Electrical Safety Seminar Slides
Fluke Electrical Safety Seminar SlidesFluke Electrical Safety Seminar Slides
Fluke Electrical Safety Seminar Slides
ย 

Similar to Carelabs-We Test,Calibrate,Inspect and Certify in GCC & Africa

UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
Pamela Bundros
ย 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
Suhas Bhosale
ย 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
Suhas Bhosale
ย 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdf
bkbk37
ย 
Qeraton Intro- Energy Audits
Qeraton Intro- Energy AuditsQeraton Intro- Energy Audits
Qeraton Intro- Energy Audits
Faisal Syed Muhammed
ย 

Similar to Carelabs-We Test,Calibrate,Inspect and Certify in GCC & Africa (20)

Sespl Profile for Energy Auditing
Sespl Profile for Energy AuditingSespl Profile for Energy Auditing
Sespl Profile for Energy Auditing
ย 
Calibration
CalibrationCalibration
Calibration
ย 
Energy adit microproject of chemical engineering
Energy adit microproject of chemical engineeringEnergy adit microproject of chemical engineering
Energy adit microproject of chemical engineering
ย 
Power quality analysis (2)
Power quality analysis (2)Power quality analysis (2)
Power quality analysis (2)
ย 
Nidec asi service infrared termography
Nidec asi service infrared termographyNidec asi service infrared termography
Nidec asi service infrared termography
ย 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)
ย 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
ย 
Energy Audit of a Food Industry
Energy Audit of a Food IndustryEnergy Audit of a Food Industry
Energy Audit of a Food Industry
ย 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
ย 
Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016Suhas Bhosale CV Document file 2016
Suhas Bhosale CV Document file 2016
ย 
Energy audit
Energy auditEnergy audit
Energy audit
ย 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2
ย 
[PME] Power Monitoring Expert & AHF.pdf
[PME] Power Monitoring Expert & AHF.pdf[PME] Power Monitoring Expert & AHF.pdf
[PME] Power Monitoring Expert & AHF.pdf
ย 
Amc presentation
Amc presentationAmc presentation
Amc presentation
ย 
TRANSDUCERS_chap_1-n.ppt
TRANSDUCERS_chap_1-n.pptTRANSDUCERS_chap_1-n.ppt
TRANSDUCERS_chap_1-n.ppt
ย 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdf
ย 
Electrical FM Compiled.pdf
Electrical  FM Compiled.pdfElectrical  FM Compiled.pdf
Electrical FM Compiled.pdf
ย 
KD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxKD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docx
ย 
Qeraton Intro- Energy Audits
Qeraton Intro- Energy AuditsQeraton Intro- Energy Audits
Qeraton Intro- Energy Audits
ย 
Hioki Field measuring instruments 2022 catalogue
Hioki Field measuring instruments 2022 catalogueHioki Field measuring instruments 2022 catalogue
Hioki Field measuring instruments 2022 catalogue
ย 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
ย 

Recently uploaded (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
ย 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 

Carelabs-We Test,Calibrate,Inspect and Certify in GCC & Africa

  • 1.
  • 2. INDEX Third Party Inspection, Certi๏ฌcation of Electrical Installations (ISO/IEC 17020) Thermography Inspection & Testing (NDT Level II) Power Quality & Harmonic Analysis Commercial & Industrial Electrical Testing Activities Energy Auditing & Saving Analysis Arc Flash Fault & Coordination Study Electrical Safety Testing of Biomedical Equipments Temperature & Humidity Calibration Force & Pressure Calibration Mass & Dimension Calibration Electrical Calibration Physical Instruments Calibration
  • 3. installation or electrical plant design and safety codes We are a Third party Inspection & Certifying Body for testing and calibration of Electrical & and technology, along with accreditations to all major standards and regulations. That is why our electrical installation certi๏ฌcation services may help you lots. TRUSTED ELECTRICAL TESTING, INSPECTION AND CERTIFICATION SERVICES โ€“ FOR EVERY ASPECT OF YOUR INSTALLATION Why Carelabs?
  • 4. Electrical installations inspection certi๏ฌcation โ€“ helps you comply with national and international standards and ensure the reliable operation of your facilities. installation or electrical plant therefore must be periodically inspected and tested. requirements may require public inspection and testing of electrical installations design and safety codes Third Party Inspection, Certification of Electrical Installations (ISO/IEC 17020)
  • 5. A useful addition to a Preventative Maintenance Program, Core Systems LLC can carry one application for infrared thermography globally is electrical applications. 80% of infrared radiation visible. Thermal imagers capture fully radiometric infrared images using IR-Fusionยฎ technology, photographic images and will be included in a report. cause a failure. Thermography Inspection & Testing (NDT Level II)
  • 6. Power Quality & Harmonic Analysis Most power systems can accommodate a certain level of power quality & harmonic currents ut will e perience pro lems when harmonics ecome a si ni cant component of the overall load. generators, etc. resonance equipment, causing component failure and shortened life span penalties on monthly utility bills Power Quality Measurements in IEC 61000-4-30:
  • 8. Energy Auditing & Saving Analysis performed in accomplishing an effective energy management program designed to improve the energy ef๏ฌciency and reduce the energy operating costs of a facility how a facility uses energy, what the facility pays for that energy, and ๏ฌnally, a recommended program for changes in operating practices or energy consuming equipment that will cost effectively save money on energy bills. The analysis of building and utility data, including study of the installed equipment and analysis of energy bills. The understanding of the building behavior and of the interactions with weather, occupancy and operating schedules. The selection and evaluation of energy conservation measures. The estimation of the energy saving potential The identi๏ฌcation of customer concerns and needs Energy Conservation Measures (ECMโ€™s) - are identi๏ฌed and evaluated to determine their bene๏ฌts and cost effectiveness. ECMโ€™s are assessed in terms of their cost and Energy action plan is created where certain ECMโ€™s are selected for implementation, and the actual process of saving energy and money begins
  • 9. Arc Flash Fault & Coordination Study comply with OSHA & NFPA70-E 1584 standards changes
  • 10. Electrical Safety Testing of Biomedical Equipments As an independent, third-party testing laboratory, Carelabs uses its substantial your medical device. Medical equipment safety testing, which demonstrates your medical device poses. Medical equipment safety testing, which demonstrates your compliance with IEC and NFPA-99 standards. Earth bond Earth bond point to point Electrical Safety Tests IEC 62353 tests NFPA-99 Tests IEC 60601 Tests IEC mains lead testing
  • 11. Temperature & Humidity Calibration Temperature Digital Thermometers Infra Red Thermometers Thermal Imager Calibrators Temperature gauges Regulated Baths Muf๏ฌ‚e Furnace Temperature Meter Temperature Controllers Temperature Recorders Temperature Switches Hot Cabinet Bain Marie Proofers Humidity Recorders Soldering Stations Chillers Tinytag Sensors Blast Chillers Refrigerated Transport System Humidity Digital Indicator Probes Psychrometers Thermohygrographs Whirling Hygrometers Thermo Hygrometers
  • 12. Pressure Analog & Digital Pressure Transmitters Indicators Pressure Switches Manometers & Micromanometers Hand Held Pressure Pump Pressure Calibrators Pressure Chart Recorder Process Calibrator Dead Weight Testers Discharge Pressure Switch Suction Pressure Switch Force Torque Wrenches Force & Pressure Calibration
  • 13. Dimention Mass at receiving area Mass & Dimension Calibration
  • 14. Multi Meters Clamp Meters Insulation Testers Process Calibrators Panel Meters Oscilloscopes Counters Primary/ Secondary Current Injection Test Set Frequency Meters Ammeters Earth Resistance Meters Welding Machines Phase Sequence Indicator Document Process Calibrator ELCB/ RCD Tester LCR Meter Ohmmeter Power Supply Current Transformer Test set 3-Phase Rotation Tester Multi Funcion Primary Test System Holiday Tester dary Current et ers rs tors Electrical Calibration
  • 16. P.O Box 232126, Dubai, UAE | Tel: +971 4 514 9730 Email: info@carelabs.ae | www.carelabs.ae