Best Of The World In Security Conference
Best Of The World In Security
12-13 November 2020
Cybersecurity Governance
Zainab AL.Sheheimi
Etteqa for Cybersecurity
Chief Executive Officer
Twitter: @zainab_oman
Best Of The World In Security Conference
• Work experience more than 19 years
• Interesting in ISO implementation and GRC
- Team leader for GRC section
- CISO for Implementing ISO27001:2013
• Master in management and entrepreneurship
• Certified C|CISO, ISO27001 Lead Auditors, CISSP & Consultant Trainer
• CEO & Training Consultant at Etteqa for Cybersecurity services LLC
- Cyber Risk Management
- ISO Internal Audit
- Offering Trainers
Zainab Al.Sheheimi
Best Of The World In Security Conference
• What is Cybersecurity Governance?
• Cybersecurity Governance Principles
• Cybersecurity Transformation
• Establishing Cybersecurity Governance
Agenda
Best Of The World In Security Conference
Best Of The World In Security Conference
The potential consequences of a realized threat are extensive, and that has
catapulted cybersecurity into the boardroom. This increased focus on
cybersecurity can mainly be attributed to the technological transformation we are
going through with the emergence of cloud, analytics, mobile and social (CAMS)
as a mainstream focus. It’s also creating a pressing need for some formal
guidance and well-defined regulations, which can help organizations drive their
cybersecurity defense programs more effectively. The National Institute of
Standards and Technology (NIST) Cybersecurity Framework is one such effort to
provide guidance in the field of cybersecurity. This framework is a good starting
point for organizations who want to define, adopt and refine an infrastructure for
their own needs while at the same time follow industry standards and norms.
Introduction
Best Of The World In Security Conference
Now that the importance of a cybersecurity governance framework has been
established, I will focus on the key components of such a structure. A
cybersecurity framework actually contains a whole set of management tools, a
comprehensive risk management approach and, more importantly, a security
awareness program covering everyone in the organization from top to bottom. In
other words, every organization needs to have a complete cybersecurity
governance framework to fully address all of their cybersecurity needs.
Best Of The World In Security Conference
What is Cybersecurity Governance?
• The approach to making cybersecurity, the responsibility and
direction of upper levels of management, to include any boards of
directors is called governance.
• Governance is the set of responsibilities and practices exercised by
the board and executive management with the goal of providing
strategic direction ensuring that objectives are achieved ascertaining
that risks are managed appropriately and verifying that the
enterprise's resources are used responsibly.
Best Of The World In Security Conference
• Information security governance needs to be integrated into the overall enterprise
governance structure to ensure that the organizational goals are supported by the
information security program. The governance framework is an outline or skeleton of
interlinked items that supports a particular approach to a specific objective as stated in
the strategy. Several governance frameworks may be suitable for an organization to
implement, including COBIT 5 and ISO/IEC 27000. High-level architecture can serve as a
framework as well. The framework will serve to integrate and guide activities needed to
implement the information security strategy.
• Information security governance is a subset of corporate governance and must be
consistent with the enterprise’s governance. If enterprise governance is structured using a
particular framework, it would make sense to use the same framework for information
security governance to facilitate integration.
What is Cybersecurity Governance?
Best Of The World In Security Conference
As threats to cyber security become increasingly ominous, sophisticated
and unpredictable, CIOs must address risks ranging from denial of service
attacks to natural disasters to disgruntled employees. Global organizations
must also manage complex networks of service providers and scores of
third-party suppliers, many of whom have access to customers, sensitive
data and critical technology.
What is Cybersecurity Governance?
Best Of The World In Security Conference
What is Cybersecurity Governance?
Best Of The World In Security Conference
1.Capital One breach
2.The Weather Channel ransomware
3.U.S. Customs and Border
Protection/Perceptics
4.Citrix breach
5.Texas ransomware attacks
6.WannaCry
7.NotPetya
8.Ethereum
9.Equifax
10.Yahoo
11.GitHub
Example of cyber attacks in recent history
Best Of The World In Security Conference
In July of 2019, online banking giant Capitol One realized that its data had been
hacked. Hundreds of thousands of credit card applications, which included
personally identifying information like birthdates and Social Security numbers, were
exposed. No bank account numbers were stolen, but the sheer scale was extremely
worrying. Things followed the usual script, with Capitol One making shamefaced
amends and offering credit monitoring to those affected.
The Weather Channel ransomware
The Weather Channel may not seem like a crucial piece of infrastructure, but for
many people it's a lifeline — and in April 2019, during a stretch of tornado strikes
across the American south, many people were tuning in. But one Thursday morning
the channel ceased live broadcasting for nearly 90 minutes, something almost
unheard of in the world of broadcast television.
It turns out The Weather Channel had fallen victim to a ransomware attack, and
while there's been no confirmation of the attack vector, rumors are that it was via
phishing attack, one of the most common causes of ransomware infection.
Example of cyber attacks in recent history
Best Of The World In Security Conference
A subset of enterprise governance that provides strategic direction,
ensures objectives are achieved, manages risk and uses organizational
resources responsibility and monitors the success of failure of the
enterprise security program.
Top managment responsibility
Best Of The World In Security Conference
Cybersecurity Governance Structure
Best Of The World In Security Conference
• Virus and malware defence has long been viewed as a purely IT problem. Some
organizations do appoint Chief Information Security Officers (CISO), however
information security is often viewed as a challenge that lies well below board or
C-level attention.
• The events of recent years have highlighted the danger of this viewpoint. With
the FBI warning corporations that they are at risk and so many high-profile
victims in the news, organizations, led by their CEO, must integrate cyber risk
management into day-to-day operations.
• Additionally, companies must take reasonable measures to prevent cyber-
incidents and mitigate the impact of inevitable breaches. The concept of acting
“reasonably” is used in many state and federal laws in the United States,
Australia, and other countries.
• A cyber breach could potentially cause the loss of a bid on a large contract, could
compromise intellectual property (IP) and loss of revenue, to name just a few of
the repercussions. That places cybersecurity firmly at the top of the
organizational chart, similar to all other forms of corporate risk.
What is Cybersecurity Governance?
Best Of The World In Security Conference
• Developing a cybersecurity governance strategy requires
understanding and defining the enterprise’s risk posture in the
context of the overall environment.
• Many cybersecurity governance strategies adhere to an obsolete
“weakest link” strategy of identifying and mitigating specific, discrete
risks. The reality is that organizations today confront potentially
dozens of constantly changing weakest links, each of which can pose a
significant threat.
What is Cybersecurity Governance?
Best Of The World In Security Conference
The GRC Approach to Managing Cybersecurity
Best Of The World In Security Conference
Governing, managing and maintaining cybersecurity arrangements are a challenge
for business managers, security managers and auditors alike. To demonstrate the
business value of cybersecurity and to balance the risk associated with attacks or
breaches, the following guiding principles should be applied. While these principles
are set at a high level and not exhaustive, they provide a reasonable basis for
cybersecurity as an integral part of overall information security.
Cybersecurity Governance Principles
Best Of The World In Security Conference
The concept of cybersecurity should be seen considering potential damage and the
wide-ranging impacts of cybercrime and cyberwarfare. To adequately manage
cybersecurity, the tolerable levels of risk and business impact must be known or
conservatively estimated. This includes in‐depth knowledge about the way in which
end users may be targeted and affected by cybersecurity attacks and incidents.
1. Know the potential impact of cybercrime and cyberwarfare.
Best Of The World In Security Conference
CYBERWARFARE
•As part of the attack landscape, cyberwarfare extends the idea of APTs. Where nation
states or agencies engage in attacks on critical infrastructures or organizations, the
threats are augmented by the fact that the attackers may have—by definition—
unlimited resources at their disposal. This includes time as a resource, given that
military or government operations may take several years from the initial idea to
deployment.
•From a technical and managerial point of view, cyberwarfare nevertheless represents
just another form of APT, notwithstanding the legal and social ramifications.
•Cybersecurity should, therefore, include the possibility of direct or indirect
consequences from targeted military or government activity directed against the
organization, its associates or its surrounding critical infrastructure. In terms of impact,
the results of open or covert warfare are fairly similar to those of criminal acts or
politically motivated “hacktivism.”
1. Know the potential impact of cybercrime and cyberwarfare.
Best Of The World In Security Conference
Business value and business risk relating to cybersecurity arrangements are
strongly influenced by organizational and individual culture. This is expressed by
end user behavior patterns, habits and social interactions. In governing and
managing cybersecurity, these factors should be taken into account and
incorporated into strategic, tactical and operational security measures.
2. Understand organizational and individual culture and behavior patterns.
Best Of The World In Security Conference
The business case in terms of expected value and tolerable risk will determine the
overall cybersecurity strategy adopted by the enterprise: the requisite effort and
investment of zero tolerance vs. the corresponding residual risk of living with it. To
provide adequate and appropriate security, the business case must be clearly
defined and fully understood by all levels of management. This includes
cost‐benefit considerations as well as the prevailing organizational culture and
values relative to cybersecurity.
3. Clearly state the business case for cybersecurity, and the risk appetite of the enterprise.
Best Of The World In Security Conference
Every organization has a particular risk capacity, defined as the objective amount of
loss an enterprise can tolerate without its continued existence being called into
question. Subject to the absolute maximum imposed by this risk capacity, the
owners or board of directors of an organization set the risk appetite for the
organization. Risk appetite is defined as the amount of risk, on a broad basis, that
an entity is willing to accept in pursuit of its mission.
In some cases, setting the risk appetite may be delegated by the board of directors
to senior management as part of strategic planning. Acceptable risk determination
or risk appetite and the criteria by which it can be assessed is an essential element
for virtually all aspects of information security as well as most other aspects of
organizational activities.
It will determine many aspects of strategy including control objectives, control
implementation, baseline security, cost benefit calculations, risk management
options, severity criteria determinations, required incident response capabilities,
insurance requirements and feasibility assessments, among others. Risk appetite is
translated into a number of standards and policies to contain the risk level within
the boundaries set by the risk appetite.
3. Clearly state the business case for cybersecurity, and the risk appetite of the enterprise.
Best Of The World In Security Conference
4. Establish cybersecurity governance.
• Cybersecurity exists, and is
transformed, within the values and
objectives of the enterprise and its
members. As such, cybersecurity is
subject to clear governance rules that
provide a sense of direction as well as
reasonable boundaries. This includes
adopting and improving the
organizational governance framework
for cybersecurity.
Best Of The World In Security Conference
• Governance plays an extremely important role in achieving the security
objective of the organization not only for current needs, but also to ensure
well-drafted mitigation plans for future challenges. To address current
issues, the governance framework covers improvements to security
policies; the implementation of technical controls; audits and assessments;
and driving awareness among people to shape their attitude toward secure
behaviors. For future challenges, the governance framework must
continually focus on emerging threat factors, fast-moving changes in the
technological landscape, people’s views and behavior.
4. Establish cybersecurity governance.
Best Of The World In Security Conference
How to establish cybersecurity program?
Best Of The World In Security Conference
• Security policies are designed to mitigate risk and are usually
developed in response to an actual or perceived threat. Policies state
management intent and direction at a high level. With the
development of an information security strategy, the policies have to
be developed or modified to support the strategic objectives.
Standards are developed or modified to set boundaries for people,
processes, procedures and technologies to maintain compliance with
policies and support the achievement of the organization’s goals and
objectives. There are usually several standards for each policy,
depending on the classification levels of the asset related to the
standard. Collectively, standards are combined with other controls
(i.e., technical, physical, administrative) to create the security
baselines.
4. Establish cybersecurity governance.
Best Of The World In Security Conference
• Baseline security, control objectives, acceptable risk, risk appetite and
residual risk are related to one another. Control objectives are set to
fall within the boundaries of acceptable risk. Risk mitigation should
keep the organization within the level of acceptable risk and achieving
the control objectives. Residual risk levels set the security baselines.
• New information security projects should support the information
security strategy. A business case is used to capture the business
reasoning for initiating a project or task. In the context of information
security, it should concisely identify the needs and the business
purpose for implementing various governance processes, including
technologies and the cost benefit (i.e., the value proposition) of doing
so.
4. Establish cybersecurity governance.
Best Of The World In Security Conference
Cybersecurity covers multiple aspects and specialized areas within overall
information security. To provide assurance over cybersecurity, the assurance
universe is known, defined and within the organizational sphere of interest.
Assurance objectives are clear, plausible and manageable. As many cybersecurity
aspects may be outside the organizational perimeter, the associated risk and
assurance issues are considered.
5. Know the cybersecurity assurance universe and objectives.
Best Of The World In Security Conference
• Taking the time to safeguard oneself and one’s organization, from all
possible threats, is the best way to avoid the loss of identity, personal
and confidential data, vital financial information, intellectual property,
creations, money, etc. Perhaps the biggest burden of being the victim
of a hack or cyberattack is the stress that comes with it.
5. Know the cybersecurity assurance universe and objectives.
Best Of The World In Security Conference
Cybercrime, cyberwarfare and related attacks or breaches target the weakest link in
the system. As a result, cybersecurity must be understood as a system of
interdependent elements and links between these elements. Optimized
cybersecurity requires complete understanding of this dynamic system and the
realization that security governance, management and assurance cannot be seen in
isolation.
6. Establish and evolve systemic cybersecurity.
Best Of The World In Security Conference
•like any other long‐term process, is based on continuous improvement and a
succession through various levels of maturity.
•It is the strategy, and its detailed parts will need to be reviewed and validated at
regular intervals, considering any changes to the risk profile as well as the risk
appetite defined by the enterprise.
•It is systemic shift from one stable state of the overall system to its next stable
state. In between, any number of changes may happen spontaneously or in a
controlled manner.
Cybersecurity Transformation
Best Of The World In Security Conference
•Cybersecurity transformation, just like any other long‐term process, is based on
continuous improvement and a succession through various levels of maturity. This
also means that the strategy and its detailed parts will need to be reviewed and
validated at regular intervals, considering any changes to the risk profile as well as
the risk appetite defined by the enterprise.
Cybersecurity Transformation
Best Of The World In Security Conference
•Transformation is usually defined as a systemic shift from one stable state of the
overall system to its next stable state. In between, any number of changes may
happen spontaneously or in a controlled manner. In cybersecurity, transformation
can be defined as progressing the overall system of governing provisions,
management activities, controls and other elements from its current state to the
next (target) stable state, usually by means of controlled change to certain parts,
processes and other components. While this is useful as a high‐level definition,
some examples may help in understanding the transformation process.
Cybersecurity Transformation
Best Of The World In Security Conference
•As a first step, the current state of cybersecurity and the existing governance
model should be assessed and established. This means that, beyond the
assumptions that may have existed before, cybersecurity in its present state should
be described “as is,” including all weaknesses and deficiencies. Typically, this
includes any systemic weaknesses previously identified (see previous section) and
the pain points that have triggered the need for transformation. The underlying
objective is to go from the initial observation that “we cannot go on like this” to a
more constructive view of existing information security governance, management
and assurance.
1- ESTABLISH CURRENT STATE
Best Of The World In Security Conference
•The current state review will also reveal any weaknesses in management attitudes.
As described previously, neither the minimalist nor the “zero tolerance” attitude are
likely to lead to success. Part of establishing the current state of cybersecurity is to
identify the exact position of the enterprise in terms of attitudes, beliefs and security
spending behavior. In summary, the governance model selected by the enterprise is
likely to provide a lot of insight on what may have led to the, apparently
unsatisfactory, current state.
•Taking stock in this manner may be a painful exercise. However, it is indispensable as
a starting point in transforming cybersecurity. Only where weaknesses have been
recognized beyond doubt, and clearly articulated, will the enterprise be able to
transition to an improved way of governing cybersecurity.
1- ESTABLISH CURRENT STATE
Best Of The World In Security Conference
•Once the existing state of cybersecurity is known and fully acknowledged, the future
or target state may be defined based on weaknesses and deficiencies, risk and
vulnerabilities, and the extent to which the enterprise will be able to change and
adapt to the trends in attacks, breaches and incidents. Where the target state is not
clearly understood, it is unlikely that a transformation approach will be successful.
•Typical pitfalls include:
• Lack of realism—The target state is formulated as a wish list for perfection, rather
than the next obvious (and stable) state of overall cybersecurity.
2. DEFINE TARGET STATE
Best Of The World In Security Conference
•In transformation thinking, the target from a governance perspective is
to identify the next stable—and, therefore, achievable—level at which
cybersecurity will be able to meet the needs of stakeholders, and at
which there will be a reasonable level of protection against attacks and
breaches. Transforming cybersecurity is a repetitive and iterative exercise
that resembles a life cycle rather than a one‐off project.
2. DEFINE TARGET STATE
Best Of The World In Security Conference
• Escalating commitment—The target state is defined as “just a little more of what
we are doing now,” without incorporating the changed threat and vulnerability
landscape, not to mention actual attacks and breaches.
• Blurred vision—The target state is defined based on wrong assumptions—e.g.,
where organizational management does not incorporate future trends in
cybercrime and cyberwarfare.
• Governance model bias—The current governance model (e.g., “zero tolerance” or
“we are insured”) is maintained, ignoring strong signals that it may be
dysfunctional.
2. DEFINE TARGET STATE
Best Of The World In Security Conference
•The distance between the current and future states of overall cybersecurity is
subject to governance as well as management.
•Transforming cybersecurity in a systemic way also means that any changes will
need to be examined with regard to unwelcome side effects.
3. STRATEGIC AND SYSTEMIC TRANSFORMATION
Best Of The World In Security Conference
•The distance between the current and future states of overall cybersecurity is subject
to governance as well as management. Once the target state has been identified and
defined, there are two dimensions of change that need to be planned, managed and
monitored. The strategic dimension covers setting strategy, planning and
implementing high‐level steps, and initiating a program and related portfolio of
cybersecurity projects. The systemic dimension addresses dependencies between
parts of the cybersecurity system that will have an impact on how change will be
achieved and what will be the immediate and secondary effects.
3. STRATEGIC AND SYSTEMIC TRANSFORMATION
Best Of The World In Security Conference
•Transforming cybersecurity in a systemic way also means that any changes will need
to be examined with regard to unwelcome side effects. As an example, the
deployment of an awareness program for employees may be beneficial in terms of
improving vigilance and attention to detail. However, an unwelcome secondary result
might be that a large number of “false positives” increases the cost of incident
management and distracts attention from real (but unobtrusive) APT attacks. More
complex dependencies may exist in cybersecurity systems that will only come to light
if the transformation is seen as a systemic and holistic exercise.
3. STRATEGIC AND SYSTEMIC TRANSFORMATION
Best Of The World In Security Conference
•Information security governance in general sets the framework and boundaries for
security management and related solutions. This necessarily includes formal
policies, procedures and other elements of guidance that the agencies are required
to follow. However, where governance in its best sense means “doing the right
things,” it needs to take into account that a large part of cybersecurity is concerned
with handling unexpected events and incidents.
Establishing Cybersecurity Governance
Best Of The World In Security Conference
•Cybersecurity governance is both preventive and corrective. It covers the
preparations and precautions taken against cybercrime, cyberwarfare and other
relevant forms of attack. At the same time, cybersecurity governance determines
the processes and procedures needed to deal with actual incidents caused by an
attack or security breach. In this context, governance principles and provisions
must be reasonably flexible to allow for the fact that attacks are often
unconventional, generally against the rules, and most often designed to circumvent
exactly those procedures and common understandings within the organization that
keep the business running.
Establishing Cybersecurity Governance
Best Of The World In Security Conference
Establish Cybersecurity governance with following six‐step approach as explained
below:
Step 1: IDENTIFY STAKEHOLDER NEEDS
Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY.
Step 3: DEFINE CYBERSECURITY STRUCTURE
Step 4: MANAGE CYBERSECURITY RISKS
Step 5: OPTIMIZE CYBERSECURITY RESOURCES
Step 6: MONITOR CYBERSECURITY EFFECTIVENESS
Establish Cybersecurity governance
Best Of The World In Security Conference
Step 1: IDENTIFY STAKEHOLDER NEEDS
• Determine the internal and external (usually
restricted) stakeholders and their interest in
organizational Cybersecurity.
• Incorporate confidentiality needs and
mandated secrecy in the identification
process.
• Understand how cybersecurity should
support overall enterprise objectives and
protect stakeholder interests.
• Identify reporting requirements for
communicating and reporting about
cybersecurity (contents, detail).
• Clearly define and articulate instances of
reliance on the work of others (for external
auditors).
• Define and formally note confidentiality and
secrecy requirements for external auditors.
Best Of The World In Security Conference
Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY.
Best Of The World In Security Conference
• Review legal and regulatory provisions in cybercrime and cyberwarfare
• Identify the senior management tolerance level in relation to attacks and breaches.
• Validate business needs (express and implied) with regard to attacks and breaches
• Identify and articulate any game changers or paradigm shifts in cybersecurity.
• Document systemic weaknesses in cybersecurity as regards the business and its
objectives
• Identify and validate strategy for cybersecurity (“zero tolerance” vs. “living with it”)
Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY.
Best Of The World In Security Conference
• Identify adaptability, responsiveness and resilience of strategy in terms of
cybersecurity attacks and breaches
• Identify any rigid/brittle governance elements that may inadvertently be conducive to
cybercrime and cyberwarfare (e.g., instances of over control)
• Define the expectations, in alignment with strategy (“zero tolerance” vs. “living with
it”), with regard to cybersecurity, including ethics and culture.
• Highlight any ethical/cultural discontinuities that exist or emerge.
• Define the target culture for cybersecurity, and develop a cybersecurity awareness
program.
• Obtain management commitment for the selected strategy
Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY.
Best Of The World In Security Conference
Step 3: DEFINE CYBERSECURITY STRUCTURE
Best Of The World In Security Conference
•Structure
• Define the Cybersecurity organizational structure–an appropriate platform/committee, in alignment
with information security and information risk functions.
• Highlight any barriers or other organizational segregation of duties/information.
• Mandate an appropriate cybersecurity function, including incident and attack response
•Roles and Responsibilities
• Determine an optimal decision‐making model for cybersecurity— this may be distinct and different
from “ordinary” information security
• Define high‐level RACI (responsible, accountable, consulted, informed) model for cybersecurity
function, including any external resources.
• Consider any extended decision rights that may be applicable in crisis/ incident handling situations.
• Determinecybersecurity obligations, responsibilities and tasks of other organizational roles (including groups
and individuals).
• Ensure cybersecurity participation at the steering committee level.
• Embed cybersecurity transformation activities in the steering committee agenda.
Step 3: DEFINE CYBERSECURITY STRUCTURE
Best Of The World In Security Conference
•Communications
• Establish escalation points for attacks, breaches and incidents (information security,
crisis management, etc.).
• Define escalation paths for cybersecurity activities and transformational steps (e.g.,
new vulnerabilities and threats).
• Establish fast‐track/crisis mode decision procedures with escalation to senior
management.
• Identify the means and channels to communicate cybersecurity issues and
information.
Step 3: DEFINE CYBERSECURITY STRUCTURE
Best Of The World In Security Conference
•Integration
• Integrate, to the appropriate extent, the cybersecurity direction into the overall
information security direction, and highlight areas of cybersecurity that are
deliberately kept separate and distinct.
• Establish interfaces between the cybersecurity function and other information
security roles.
• Embed cybersecurity reporting into the generic reporting methods for information
security.
Step 3: DEFINE CYBERSECURITY STRUCTURE
Best Of The World In Security Conference
• Determine risk appetite/tolerance levels in terms of cybercrime and
cyberwarfare attacks and breaches at the board/management level.
• Align risk tolerance levels against the overall strategy (“zero tolerance” vs. “living
with it”).
• Compare cybersecurity and generic information security risk tolerance levels and
highlight inconsistencies.
• Integrate cybersecurity risk assessment and management within overall
information security management.
Step 4: MANAGE CYBERSECURITY RISKS
Best Of The World In Security Conference
• Evaluate the effectiveness of cybersecurity resources in comparison with
information security and information risk needs.
• Validate cybersecurity resources in terms of specific goals and objectives.
• Ensure that cybersecurity resource management is aligned to overarching
information security needs.
• Include external resource management.
Step 5: OPTIMIZE CYBERSECURITY RESOURCES
Best Of The World In Security Conference
• Track cybersecurity outcomes and effects, particularly with a view to changes in
attacks/breaches/incidents.
• Compare outcomes against transformation steps and milestones – initial (current
state) and future (target state) expectations.
• Integrate cybersecurity measurements and metrics into routine compliance check
mechanisms.
• Evaluate threats and vulnerabilities relevant to cybersecurity, and incorporate the
changing threat landscape into cybersecurity strategy.
• Monitor the risk profile for attacks/breaches and the corresponding risk appetite
to achieve optimal balance between cybersecurity risk and business opportunities.
• Measure the effectiveness of cybersecurity resources (internal and external) against
defined information security needs, goals and objectives
Step 6: MONITOR CYBERSECURITY EFFECTIVENESS
Best Of The World In Security Conference
Your Slide Title
Best Of The World In Security Conference
Governance Desired Outcomes
Best Of The World In Security Conference
• The first step in establishing information security governance is senior
management determining the outcomes it wants from the
information security program. Often, those outcomes are stated in
terms of risk management and the levels of acceptable risk. This can
be accomplished through a set of facilitated meetings with senior
management and business unit leaders. The information security
manager then has the information needed to develop a set of
requirements for a security program. This is followed by setting a
series of specific objectives that, when achieved, will satisfy the
requirements.
Governance Outcomes
Best Of The World In Security Conference
Thank you
Zainab AL.Sheheimi
@zainab_oman
www.etteqa.com

Cyber Security Governance

  • 1.
    Best Of TheWorld In Security Conference Best Of The World In Security 12-13 November 2020 Cybersecurity Governance Zainab AL.Sheheimi Etteqa for Cybersecurity Chief Executive Officer Twitter: @zainab_oman
  • 2.
    Best Of TheWorld In Security Conference • Work experience more than 19 years • Interesting in ISO implementation and GRC - Team leader for GRC section - CISO for Implementing ISO27001:2013 • Master in management and entrepreneurship • Certified C|CISO, ISO27001 Lead Auditors, CISSP & Consultant Trainer • CEO & Training Consultant at Etteqa for Cybersecurity services LLC - Cyber Risk Management - ISO Internal Audit - Offering Trainers Zainab Al.Sheheimi
  • 3.
    Best Of TheWorld In Security Conference • What is Cybersecurity Governance? • Cybersecurity Governance Principles • Cybersecurity Transformation • Establishing Cybersecurity Governance Agenda
  • 4.
    Best Of TheWorld In Security Conference
  • 5.
    Best Of TheWorld In Security Conference The potential consequences of a realized threat are extensive, and that has catapulted cybersecurity into the boardroom. This increased focus on cybersecurity can mainly be attributed to the technological transformation we are going through with the emergence of cloud, analytics, mobile and social (CAMS) as a mainstream focus. It’s also creating a pressing need for some formal guidance and well-defined regulations, which can help organizations drive their cybersecurity defense programs more effectively. The National Institute of Standards and Technology (NIST) Cybersecurity Framework is one such effort to provide guidance in the field of cybersecurity. This framework is a good starting point for organizations who want to define, adopt and refine an infrastructure for their own needs while at the same time follow industry standards and norms. Introduction
  • 6.
    Best Of TheWorld In Security Conference Now that the importance of a cybersecurity governance framework has been established, I will focus on the key components of such a structure. A cybersecurity framework actually contains a whole set of management tools, a comprehensive risk management approach and, more importantly, a security awareness program covering everyone in the organization from top to bottom. In other words, every organization needs to have a complete cybersecurity governance framework to fully address all of their cybersecurity needs.
  • 7.
    Best Of TheWorld In Security Conference What is Cybersecurity Governance? • The approach to making cybersecurity, the responsibility and direction of upper levels of management, to include any boards of directors is called governance. • Governance is the set of responsibilities and practices exercised by the board and executive management with the goal of providing strategic direction ensuring that objectives are achieved ascertaining that risks are managed appropriately and verifying that the enterprise's resources are used responsibly.
  • 8.
    Best Of TheWorld In Security Conference • Information security governance needs to be integrated into the overall enterprise governance structure to ensure that the organizational goals are supported by the information security program. The governance framework is an outline or skeleton of interlinked items that supports a particular approach to a specific objective as stated in the strategy. Several governance frameworks may be suitable for an organization to implement, including COBIT 5 and ISO/IEC 27000. High-level architecture can serve as a framework as well. The framework will serve to integrate and guide activities needed to implement the information security strategy. • Information security governance is a subset of corporate governance and must be consistent with the enterprise’s governance. If enterprise governance is structured using a particular framework, it would make sense to use the same framework for information security governance to facilitate integration. What is Cybersecurity Governance?
  • 9.
    Best Of TheWorld In Security Conference As threats to cyber security become increasingly ominous, sophisticated and unpredictable, CIOs must address risks ranging from denial of service attacks to natural disasters to disgruntled employees. Global organizations must also manage complex networks of service providers and scores of third-party suppliers, many of whom have access to customers, sensitive data and critical technology. What is Cybersecurity Governance?
  • 10.
    Best Of TheWorld In Security Conference What is Cybersecurity Governance?
  • 11.
    Best Of TheWorld In Security Conference 1.Capital One breach 2.The Weather Channel ransomware 3.U.S. Customs and Border Protection/Perceptics 4.Citrix breach 5.Texas ransomware attacks 6.WannaCry 7.NotPetya 8.Ethereum 9.Equifax 10.Yahoo 11.GitHub Example of cyber attacks in recent history
  • 12.
    Best Of TheWorld In Security Conference In July of 2019, online banking giant Capitol One realized that its data had been hacked. Hundreds of thousands of credit card applications, which included personally identifying information like birthdates and Social Security numbers, were exposed. No bank account numbers were stolen, but the sheer scale was extremely worrying. Things followed the usual script, with Capitol One making shamefaced amends and offering credit monitoring to those affected. The Weather Channel ransomware The Weather Channel may not seem like a crucial piece of infrastructure, but for many people it's a lifeline — and in April 2019, during a stretch of tornado strikes across the American south, many people were tuning in. But one Thursday morning the channel ceased live broadcasting for nearly 90 minutes, something almost unheard of in the world of broadcast television. It turns out The Weather Channel had fallen victim to a ransomware attack, and while there's been no confirmation of the attack vector, rumors are that it was via phishing attack, one of the most common causes of ransomware infection. Example of cyber attacks in recent history
  • 13.
    Best Of TheWorld In Security Conference A subset of enterprise governance that provides strategic direction, ensures objectives are achieved, manages risk and uses organizational resources responsibility and monitors the success of failure of the enterprise security program. Top managment responsibility
  • 14.
    Best Of TheWorld In Security Conference Cybersecurity Governance Structure
  • 15.
    Best Of TheWorld In Security Conference • Virus and malware defence has long been viewed as a purely IT problem. Some organizations do appoint Chief Information Security Officers (CISO), however information security is often viewed as a challenge that lies well below board or C-level attention. • The events of recent years have highlighted the danger of this viewpoint. With the FBI warning corporations that they are at risk and so many high-profile victims in the news, organizations, led by their CEO, must integrate cyber risk management into day-to-day operations. • Additionally, companies must take reasonable measures to prevent cyber- incidents and mitigate the impact of inevitable breaches. The concept of acting “reasonably” is used in many state and federal laws in the United States, Australia, and other countries. • A cyber breach could potentially cause the loss of a bid on a large contract, could compromise intellectual property (IP) and loss of revenue, to name just a few of the repercussions. That places cybersecurity firmly at the top of the organizational chart, similar to all other forms of corporate risk. What is Cybersecurity Governance?
  • 16.
    Best Of TheWorld In Security Conference • Developing a cybersecurity governance strategy requires understanding and defining the enterprise’s risk posture in the context of the overall environment. • Many cybersecurity governance strategies adhere to an obsolete “weakest link” strategy of identifying and mitigating specific, discrete risks. The reality is that organizations today confront potentially dozens of constantly changing weakest links, each of which can pose a significant threat. What is Cybersecurity Governance?
  • 17.
    Best Of TheWorld In Security Conference The GRC Approach to Managing Cybersecurity
  • 18.
    Best Of TheWorld In Security Conference Governing, managing and maintaining cybersecurity arrangements are a challenge for business managers, security managers and auditors alike. To demonstrate the business value of cybersecurity and to balance the risk associated with attacks or breaches, the following guiding principles should be applied. While these principles are set at a high level and not exhaustive, they provide a reasonable basis for cybersecurity as an integral part of overall information security. Cybersecurity Governance Principles
  • 19.
    Best Of TheWorld In Security Conference The concept of cybersecurity should be seen considering potential damage and the wide-ranging impacts of cybercrime and cyberwarfare. To adequately manage cybersecurity, the tolerable levels of risk and business impact must be known or conservatively estimated. This includes in‐depth knowledge about the way in which end users may be targeted and affected by cybersecurity attacks and incidents. 1. Know the potential impact of cybercrime and cyberwarfare.
  • 20.
    Best Of TheWorld In Security Conference CYBERWARFARE •As part of the attack landscape, cyberwarfare extends the idea of APTs. Where nation states or agencies engage in attacks on critical infrastructures or organizations, the threats are augmented by the fact that the attackers may have—by definition— unlimited resources at their disposal. This includes time as a resource, given that military or government operations may take several years from the initial idea to deployment. •From a technical and managerial point of view, cyberwarfare nevertheless represents just another form of APT, notwithstanding the legal and social ramifications. •Cybersecurity should, therefore, include the possibility of direct or indirect consequences from targeted military or government activity directed against the organization, its associates or its surrounding critical infrastructure. In terms of impact, the results of open or covert warfare are fairly similar to those of criminal acts or politically motivated “hacktivism.” 1. Know the potential impact of cybercrime and cyberwarfare.
  • 21.
    Best Of TheWorld In Security Conference Business value and business risk relating to cybersecurity arrangements are strongly influenced by organizational and individual culture. This is expressed by end user behavior patterns, habits and social interactions. In governing and managing cybersecurity, these factors should be taken into account and incorporated into strategic, tactical and operational security measures. 2. Understand organizational and individual culture and behavior patterns.
  • 22.
    Best Of TheWorld In Security Conference The business case in terms of expected value and tolerable risk will determine the overall cybersecurity strategy adopted by the enterprise: the requisite effort and investment of zero tolerance vs. the corresponding residual risk of living with it. To provide adequate and appropriate security, the business case must be clearly defined and fully understood by all levels of management. This includes cost‐benefit considerations as well as the prevailing organizational culture and values relative to cybersecurity. 3. Clearly state the business case for cybersecurity, and the risk appetite of the enterprise.
  • 23.
    Best Of TheWorld In Security Conference Every organization has a particular risk capacity, defined as the objective amount of loss an enterprise can tolerate without its continued existence being called into question. Subject to the absolute maximum imposed by this risk capacity, the owners or board of directors of an organization set the risk appetite for the organization. Risk appetite is defined as the amount of risk, on a broad basis, that an entity is willing to accept in pursuit of its mission. In some cases, setting the risk appetite may be delegated by the board of directors to senior management as part of strategic planning. Acceptable risk determination or risk appetite and the criteria by which it can be assessed is an essential element for virtually all aspects of information security as well as most other aspects of organizational activities. It will determine many aspects of strategy including control objectives, control implementation, baseline security, cost benefit calculations, risk management options, severity criteria determinations, required incident response capabilities, insurance requirements and feasibility assessments, among others. Risk appetite is translated into a number of standards and policies to contain the risk level within the boundaries set by the risk appetite. 3. Clearly state the business case for cybersecurity, and the risk appetite of the enterprise.
  • 24.
    Best Of TheWorld In Security Conference 4. Establish cybersecurity governance. • Cybersecurity exists, and is transformed, within the values and objectives of the enterprise and its members. As such, cybersecurity is subject to clear governance rules that provide a sense of direction as well as reasonable boundaries. This includes adopting and improving the organizational governance framework for cybersecurity.
  • 25.
    Best Of TheWorld In Security Conference • Governance plays an extremely important role in achieving the security objective of the organization not only for current needs, but also to ensure well-drafted mitigation plans for future challenges. To address current issues, the governance framework covers improvements to security policies; the implementation of technical controls; audits and assessments; and driving awareness among people to shape their attitude toward secure behaviors. For future challenges, the governance framework must continually focus on emerging threat factors, fast-moving changes in the technological landscape, people’s views and behavior. 4. Establish cybersecurity governance.
  • 26.
    Best Of TheWorld In Security Conference How to establish cybersecurity program?
  • 27.
    Best Of TheWorld In Security Conference • Security policies are designed to mitigate risk and are usually developed in response to an actual or perceived threat. Policies state management intent and direction at a high level. With the development of an information security strategy, the policies have to be developed or modified to support the strategic objectives. Standards are developed or modified to set boundaries for people, processes, procedures and technologies to maintain compliance with policies and support the achievement of the organization’s goals and objectives. There are usually several standards for each policy, depending on the classification levels of the asset related to the standard. Collectively, standards are combined with other controls (i.e., technical, physical, administrative) to create the security baselines. 4. Establish cybersecurity governance.
  • 28.
    Best Of TheWorld In Security Conference • Baseline security, control objectives, acceptable risk, risk appetite and residual risk are related to one another. Control objectives are set to fall within the boundaries of acceptable risk. Risk mitigation should keep the organization within the level of acceptable risk and achieving the control objectives. Residual risk levels set the security baselines. • New information security projects should support the information security strategy. A business case is used to capture the business reasoning for initiating a project or task. In the context of information security, it should concisely identify the needs and the business purpose for implementing various governance processes, including technologies and the cost benefit (i.e., the value proposition) of doing so. 4. Establish cybersecurity governance.
  • 29.
    Best Of TheWorld In Security Conference Cybersecurity covers multiple aspects and specialized areas within overall information security. To provide assurance over cybersecurity, the assurance universe is known, defined and within the organizational sphere of interest. Assurance objectives are clear, plausible and manageable. As many cybersecurity aspects may be outside the organizational perimeter, the associated risk and assurance issues are considered. 5. Know the cybersecurity assurance universe and objectives.
  • 30.
    Best Of TheWorld In Security Conference • Taking the time to safeguard oneself and one’s organization, from all possible threats, is the best way to avoid the loss of identity, personal and confidential data, vital financial information, intellectual property, creations, money, etc. Perhaps the biggest burden of being the victim of a hack or cyberattack is the stress that comes with it. 5. Know the cybersecurity assurance universe and objectives.
  • 31.
    Best Of TheWorld In Security Conference Cybercrime, cyberwarfare and related attacks or breaches target the weakest link in the system. As a result, cybersecurity must be understood as a system of interdependent elements and links between these elements. Optimized cybersecurity requires complete understanding of this dynamic system and the realization that security governance, management and assurance cannot be seen in isolation. 6. Establish and evolve systemic cybersecurity.
  • 32.
    Best Of TheWorld In Security Conference •like any other long‐term process, is based on continuous improvement and a succession through various levels of maturity. •It is the strategy, and its detailed parts will need to be reviewed and validated at regular intervals, considering any changes to the risk profile as well as the risk appetite defined by the enterprise. •It is systemic shift from one stable state of the overall system to its next stable state. In between, any number of changes may happen spontaneously or in a controlled manner. Cybersecurity Transformation
  • 33.
    Best Of TheWorld In Security Conference •Cybersecurity transformation, just like any other long‐term process, is based on continuous improvement and a succession through various levels of maturity. This also means that the strategy and its detailed parts will need to be reviewed and validated at regular intervals, considering any changes to the risk profile as well as the risk appetite defined by the enterprise. Cybersecurity Transformation
  • 34.
    Best Of TheWorld In Security Conference •Transformation is usually defined as a systemic shift from one stable state of the overall system to its next stable state. In between, any number of changes may happen spontaneously or in a controlled manner. In cybersecurity, transformation can be defined as progressing the overall system of governing provisions, management activities, controls and other elements from its current state to the next (target) stable state, usually by means of controlled change to certain parts, processes and other components. While this is useful as a high‐level definition, some examples may help in understanding the transformation process. Cybersecurity Transformation
  • 35.
    Best Of TheWorld In Security Conference •As a first step, the current state of cybersecurity and the existing governance model should be assessed and established. This means that, beyond the assumptions that may have existed before, cybersecurity in its present state should be described “as is,” including all weaknesses and deficiencies. Typically, this includes any systemic weaknesses previously identified (see previous section) and the pain points that have triggered the need for transformation. The underlying objective is to go from the initial observation that “we cannot go on like this” to a more constructive view of existing information security governance, management and assurance. 1- ESTABLISH CURRENT STATE
  • 36.
    Best Of TheWorld In Security Conference •The current state review will also reveal any weaknesses in management attitudes. As described previously, neither the minimalist nor the “zero tolerance” attitude are likely to lead to success. Part of establishing the current state of cybersecurity is to identify the exact position of the enterprise in terms of attitudes, beliefs and security spending behavior. In summary, the governance model selected by the enterprise is likely to provide a lot of insight on what may have led to the, apparently unsatisfactory, current state. •Taking stock in this manner may be a painful exercise. However, it is indispensable as a starting point in transforming cybersecurity. Only where weaknesses have been recognized beyond doubt, and clearly articulated, will the enterprise be able to transition to an improved way of governing cybersecurity. 1- ESTABLISH CURRENT STATE
  • 37.
    Best Of TheWorld In Security Conference •Once the existing state of cybersecurity is known and fully acknowledged, the future or target state may be defined based on weaknesses and deficiencies, risk and vulnerabilities, and the extent to which the enterprise will be able to change and adapt to the trends in attacks, breaches and incidents. Where the target state is not clearly understood, it is unlikely that a transformation approach will be successful. •Typical pitfalls include: • Lack of realism—The target state is formulated as a wish list for perfection, rather than the next obvious (and stable) state of overall cybersecurity. 2. DEFINE TARGET STATE
  • 38.
    Best Of TheWorld In Security Conference •In transformation thinking, the target from a governance perspective is to identify the next stable—and, therefore, achievable—level at which cybersecurity will be able to meet the needs of stakeholders, and at which there will be a reasonable level of protection against attacks and breaches. Transforming cybersecurity is a repetitive and iterative exercise that resembles a life cycle rather than a one‐off project. 2. DEFINE TARGET STATE
  • 39.
    Best Of TheWorld In Security Conference • Escalating commitment—The target state is defined as “just a little more of what we are doing now,” without incorporating the changed threat and vulnerability landscape, not to mention actual attacks and breaches. • Blurred vision—The target state is defined based on wrong assumptions—e.g., where organizational management does not incorporate future trends in cybercrime and cyberwarfare. • Governance model bias—The current governance model (e.g., “zero tolerance” or “we are insured”) is maintained, ignoring strong signals that it may be dysfunctional. 2. DEFINE TARGET STATE
  • 40.
    Best Of TheWorld In Security Conference •The distance between the current and future states of overall cybersecurity is subject to governance as well as management. •Transforming cybersecurity in a systemic way also means that any changes will need to be examined with regard to unwelcome side effects. 3. STRATEGIC AND SYSTEMIC TRANSFORMATION
  • 41.
    Best Of TheWorld In Security Conference •The distance between the current and future states of overall cybersecurity is subject to governance as well as management. Once the target state has been identified and defined, there are two dimensions of change that need to be planned, managed and monitored. The strategic dimension covers setting strategy, planning and implementing high‐level steps, and initiating a program and related portfolio of cybersecurity projects. The systemic dimension addresses dependencies between parts of the cybersecurity system that will have an impact on how change will be achieved and what will be the immediate and secondary effects. 3. STRATEGIC AND SYSTEMIC TRANSFORMATION
  • 42.
    Best Of TheWorld In Security Conference •Transforming cybersecurity in a systemic way also means that any changes will need to be examined with regard to unwelcome side effects. As an example, the deployment of an awareness program for employees may be beneficial in terms of improving vigilance and attention to detail. However, an unwelcome secondary result might be that a large number of “false positives” increases the cost of incident management and distracts attention from real (but unobtrusive) APT attacks. More complex dependencies may exist in cybersecurity systems that will only come to light if the transformation is seen as a systemic and holistic exercise. 3. STRATEGIC AND SYSTEMIC TRANSFORMATION
  • 43.
    Best Of TheWorld In Security Conference •Information security governance in general sets the framework and boundaries for security management and related solutions. This necessarily includes formal policies, procedures and other elements of guidance that the agencies are required to follow. However, where governance in its best sense means “doing the right things,” it needs to take into account that a large part of cybersecurity is concerned with handling unexpected events and incidents. Establishing Cybersecurity Governance
  • 44.
    Best Of TheWorld In Security Conference •Cybersecurity governance is both preventive and corrective. It covers the preparations and precautions taken against cybercrime, cyberwarfare and other relevant forms of attack. At the same time, cybersecurity governance determines the processes and procedures needed to deal with actual incidents caused by an attack or security breach. In this context, governance principles and provisions must be reasonably flexible to allow for the fact that attacks are often unconventional, generally against the rules, and most often designed to circumvent exactly those procedures and common understandings within the organization that keep the business running. Establishing Cybersecurity Governance
  • 45.
    Best Of TheWorld In Security Conference Establish Cybersecurity governance with following six‐step approach as explained below: Step 1: IDENTIFY STAKEHOLDER NEEDS Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY. Step 3: DEFINE CYBERSECURITY STRUCTURE Step 4: MANAGE CYBERSECURITY RISKS Step 5: OPTIMIZE CYBERSECURITY RESOURCES Step 6: MONITOR CYBERSECURITY EFFECTIVENESS Establish Cybersecurity governance
  • 46.
    Best Of TheWorld In Security Conference Step 1: IDENTIFY STAKEHOLDER NEEDS • Determine the internal and external (usually restricted) stakeholders and their interest in organizational Cybersecurity. • Incorporate confidentiality needs and mandated secrecy in the identification process. • Understand how cybersecurity should support overall enterprise objectives and protect stakeholder interests. • Identify reporting requirements for communicating and reporting about cybersecurity (contents, detail). • Clearly define and articulate instances of reliance on the work of others (for external auditors). • Define and formally note confidentiality and secrecy requirements for external auditors.
  • 47.
    Best Of TheWorld In Security Conference Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY.
  • 48.
    Best Of TheWorld In Security Conference • Review legal and regulatory provisions in cybercrime and cyberwarfare • Identify the senior management tolerance level in relation to attacks and breaches. • Validate business needs (express and implied) with regard to attacks and breaches • Identify and articulate any game changers or paradigm shifts in cybersecurity. • Document systemic weaknesses in cybersecurity as regards the business and its objectives • Identify and validate strategy for cybersecurity (“zero tolerance” vs. “living with it”) Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY.
  • 49.
    Best Of TheWorld In Security Conference • Identify adaptability, responsiveness and resilience of strategy in terms of cybersecurity attacks and breaches • Identify any rigid/brittle governance elements that may inadvertently be conducive to cybercrime and cyberwarfare (e.g., instances of over control) • Define the expectations, in alignment with strategy (“zero tolerance” vs. “living with it”), with regard to cybersecurity, including ethics and culture. • Highlight any ethical/cultural discontinuities that exist or emerge. • Define the target culture for cybersecurity, and develop a cybersecurity awareness program. • Obtain management commitment for the selected strategy Step 2: MANAGE CYBERSECURITY TRANSFORMATION STRATEGY.
  • 50.
    Best Of TheWorld In Security Conference Step 3: DEFINE CYBERSECURITY STRUCTURE
  • 51.
    Best Of TheWorld In Security Conference •Structure • Define the Cybersecurity organizational structure–an appropriate platform/committee, in alignment with information security and information risk functions. • Highlight any barriers or other organizational segregation of duties/information. • Mandate an appropriate cybersecurity function, including incident and attack response •Roles and Responsibilities • Determine an optimal decision‐making model for cybersecurity— this may be distinct and different from “ordinary” information security • Define high‐level RACI (responsible, accountable, consulted, informed) model for cybersecurity function, including any external resources. • Consider any extended decision rights that may be applicable in crisis/ incident handling situations. • Determinecybersecurity obligations, responsibilities and tasks of other organizational roles (including groups and individuals). • Ensure cybersecurity participation at the steering committee level. • Embed cybersecurity transformation activities in the steering committee agenda. Step 3: DEFINE CYBERSECURITY STRUCTURE
  • 52.
    Best Of TheWorld In Security Conference •Communications • Establish escalation points for attacks, breaches and incidents (information security, crisis management, etc.). • Define escalation paths for cybersecurity activities and transformational steps (e.g., new vulnerabilities and threats). • Establish fast‐track/crisis mode decision procedures with escalation to senior management. • Identify the means and channels to communicate cybersecurity issues and information. Step 3: DEFINE CYBERSECURITY STRUCTURE
  • 53.
    Best Of TheWorld In Security Conference •Integration • Integrate, to the appropriate extent, the cybersecurity direction into the overall information security direction, and highlight areas of cybersecurity that are deliberately kept separate and distinct. • Establish interfaces between the cybersecurity function and other information security roles. • Embed cybersecurity reporting into the generic reporting methods for information security. Step 3: DEFINE CYBERSECURITY STRUCTURE
  • 54.
    Best Of TheWorld In Security Conference • Determine risk appetite/tolerance levels in terms of cybercrime and cyberwarfare attacks and breaches at the board/management level. • Align risk tolerance levels against the overall strategy (“zero tolerance” vs. “living with it”). • Compare cybersecurity and generic information security risk tolerance levels and highlight inconsistencies. • Integrate cybersecurity risk assessment and management within overall information security management. Step 4: MANAGE CYBERSECURITY RISKS
  • 55.
    Best Of TheWorld In Security Conference • Evaluate the effectiveness of cybersecurity resources in comparison with information security and information risk needs. • Validate cybersecurity resources in terms of specific goals and objectives. • Ensure that cybersecurity resource management is aligned to overarching information security needs. • Include external resource management. Step 5: OPTIMIZE CYBERSECURITY RESOURCES
  • 56.
    Best Of TheWorld In Security Conference • Track cybersecurity outcomes and effects, particularly with a view to changes in attacks/breaches/incidents. • Compare outcomes against transformation steps and milestones – initial (current state) and future (target state) expectations. • Integrate cybersecurity measurements and metrics into routine compliance check mechanisms. • Evaluate threats and vulnerabilities relevant to cybersecurity, and incorporate the changing threat landscape into cybersecurity strategy. • Monitor the risk profile for attacks/breaches and the corresponding risk appetite to achieve optimal balance between cybersecurity risk and business opportunities. • Measure the effectiveness of cybersecurity resources (internal and external) against defined information security needs, goals and objectives Step 6: MONITOR CYBERSECURITY EFFECTIVENESS
  • 57.
    Best Of TheWorld In Security Conference Your Slide Title
  • 58.
    Best Of TheWorld In Security Conference Governance Desired Outcomes
  • 59.
    Best Of TheWorld In Security Conference • The first step in establishing information security governance is senior management determining the outcomes it wants from the information security program. Often, those outcomes are stated in terms of risk management and the levels of acceptable risk. This can be accomplished through a set of facilitated meetings with senior management and business unit leaders. The information security manager then has the information needed to develop a set of requirements for a security program. This is followed by setting a series of specific objectives that, when achieved, will satisfy the requirements. Governance Outcomes
  • 60.
    Best Of TheWorld In Security Conference Thank you Zainab AL.Sheheimi @zainab_oman www.etteqa.com