Muzamil Noonari
Nationality: Pakistan
Cell: +92334-2700628
E-mail: muzamilnoonari@gmail.com
Dear Sir:-
I am interested to get practical knowledge about my field that is Electrical
Engineering, as I have passed B.E (Electrical), for this purpose I am applying for the position which
you have vacant in your Organization, and I believe that I would be the person who may be best fit in
your organization.
I am capable of any work environment where I can use my research skills,
human relations, technology, management, and creativity. I am hoping to work with colleagues who
are enthusiastic, hardworking and willing to share their knowledge with me. So I am sure that I will
prove myself as the best.
Thank you for your consideration of my application.
I hope this letter is sufficient to indicate my deep interest in your Organization. If you require any
further information, please contact me, either by return email, or on the Cell number above
mentioned. I look forward to hearing from you.
Yours sincerely
Muzamil Noonari
MUZAMIL NOONARI
(Electrical Engineer)
Ftate No: 03,1st Floor Plot No:2-C,25th
Street Tauheed Commercial Area DHA V Karachi
Mobile No: +92334-2700628
E-mail: muzamilnoonari@gmail.com
OBJECTIVE
To join a progressive organization in the field of Electrical Engineering to enhance my skills and use the skills
as a team player for the betterment of organization and to grow as a proficient, innovative and committed
person.
PERSONAL
Father’s name : Ahmed Nawaz
PEC No : ELECT/27730
NIC No : 43503-0360119-1
Passport No : AD0851191
Date of Birth : 01-08-1987
Religion : Islam
Nationality : Pakistani
Marital Status : Married
EDUCATION
• B.E (Electrical) from QUEST, Nawabshah in 2009
• HSC (Pre Engineering) from B.I.S.E Larkana in 2004
• Matric (Science) from B.I.S.E Larkana in 2002
EXPERIENCE
DESIGNATION: Assistant Manager Technical (From June, 2013 to Present)
COMPANY: KESC (Karachi Electric Supply Company Pvt Ltd)
Job Descriptions:
• Supervision and execution of Ongoing Project
• Correspondence with customers on Technical matters and clarifications.
• Maintenance of underground cables & fault removed
• Installation of (Single & Three) Phase meters through small and large in multi story
buildings.
• Monitoring of PMTs
• Monitoring of Energy Meters
• Random Inspection of Installed LT and HT Meters with Time Observing, Consumption
of electricity, measuring of Load on cable of main Breakers by using of testing Equipments
of Small and Large Industries as per policy of KESC policy and NEPRA.
• Review of technical feasibility of HT feeders and LT Lines to initiate for system
improvement.
DESIGNATION: Site Engineer (From DEC, 2012 to May, 2013)
COMPANY: Mehran University Centre For Energy & Development (MUCED) .
PROJECT: WB-HESCO-ELR-05 Project
• Calculation of Losses H.T feeders and L.T lines through SINCAL Software.
• Monitoring of ABC installation
• Monitoring of PMTs
• Monitoring of Energy Meters
• Design of Schemes for reduction of technical and commercial losses.
• Activities related with Proper Billing to consumers and reduction of losses in the system,
energy audit of feeders, curbing of electricity thefts.
• Ensuring timely and proper billing to the consumers.
• Consumer Relation Management.
DESIGNATION: Electrical Engineer (From Jan, 2011 to Oct,2012)
COMPANY: Zealcon engineering pvt. Ltd
PROJECT: 50F 101 Flue gas Stack ,BYCO Refinery, HUB-Baluchistan, Pakistan
Major responsibilities:
• Study the design to prepare construction methodologies in consultation with construction
Management Team.
• Installation of Earthing, lightening, cable try, conduit pipes etc
• Prepare/monitor working plans & prepare weekly, monthly and quarterly look ahead plans
• Attain approvals for materials from Client/Consultant.
• Align supervisory work force to carry out daily activities.
• Target orientation to the supervisory force.
• Monitoring overall project progress.
• Preparation of project handing over Pre/Post commissioning protocols.
• Responsible also to ensure maintenance of good quality and safety standard at site.
DESIGNATION: Assistant Engineer (From Feb, 2009. to Dec,2010)
COMPANY: DESCON engineering pvt. Ltd
PROJECT: Engro Chemical Project Limited (ECPL) ENVEN 1.3 Daharki Sindh, Pakistan
• Study the design to prepare construction methodologies in consultation with construction
Management Team.
• Prepare/monitor working plans & prepare weekly, monthly and quarterly look ahead plans
• Attain approvals for materials from Client/Consultant.
• Preparation of QA/QC Execution Module & QITP’s for project execution.
• Coordination facilitator between the teams of Execution &QA/QC.
• QHSE Facilitator for E&I Team.
• Align supervisory work force to carry out daily activities.
• Target orientation to the supervisory force.
• Overall supervision of all electrical and instrumentation Pre/Post installation Testing.
• Overall supervision of all electrical and instrumentation installations.
• Preparation of all weekly & monthly progress reports.
• Handling progress invoicing.
• Monitoring overall project progress.
• Preparation of project handing over Pre/Post commissioning protocols.
• Responsible also to ensure maintenance of good quality and safety standard at site.
A BRIEF DUTIES AS UNDER:
• To supervise the installation and maintenance activities of the followings
• MV Switchgears
• LV Panels
• Transformers.
• Motors (LV,MV).
• UPS System.
• DC Batteries upto (1600AH).
• Battery Chargers.
• Motor Operated Valves.
• Cable Trays Installation
• Electric Lights Installation.
• MV / LV Cable Laying, & Terminations
COMPUTER SKILLS
• SAP
• MS Office(Word, Excel, Power Point, Access, Project)
• Mat lab (2007) and PLC
INTERNSHIP
• Two month Worked as Internee at Guddu Thermal Power Plant Guddu (2005, 2006).
• One month Worked as Internee at Hesco Regional Training Center Hyderabad (2008).
PROJECTS/ THESIS
• Protection of electrical equipments at TNB liberty power plant Mirpur
Mathelo.
• Cable Trays Installation
• Electric Lights Installation.
• MV / LV Cable Laying, & Terminations
COMPUTER SKILLS
• SAP
• MS Office(Word, Excel, Power Point, Access, Project)
• Mat lab (2007) and PLC
INTERNSHIP
• Two month Worked as Internee at Guddu Thermal Power Plant Guddu (2005, 2006).
• One month Worked as Internee at Hesco Regional Training Center Hyderabad (2008).
PROJECTS/ THESIS
• Protection of electrical equipments at TNB liberty power plant Mirpur
Mathelo.

CV ( Muzamil)

  • 1.
    Muzamil Noonari Nationality: Pakistan Cell:+92334-2700628 E-mail: muzamilnoonari@gmail.com Dear Sir:- I am interested to get practical knowledge about my field that is Electrical Engineering, as I have passed B.E (Electrical), for this purpose I am applying for the position which you have vacant in your Organization, and I believe that I would be the person who may be best fit in your organization. I am capable of any work environment where I can use my research skills, human relations, technology, management, and creativity. I am hoping to work with colleagues who are enthusiastic, hardworking and willing to share their knowledge with me. So I am sure that I will prove myself as the best. Thank you for your consideration of my application. I hope this letter is sufficient to indicate my deep interest in your Organization. If you require any further information, please contact me, either by return email, or on the Cell number above mentioned. I look forward to hearing from you. Yours sincerely
  • 2.
    Muzamil Noonari MUZAMIL NOONARI (ElectricalEngineer) Ftate No: 03,1st Floor Plot No:2-C,25th Street Tauheed Commercial Area DHA V Karachi Mobile No: +92334-2700628 E-mail: muzamilnoonari@gmail.com OBJECTIVE To join a progressive organization in the field of Electrical Engineering to enhance my skills and use the skills as a team player for the betterment of organization and to grow as a proficient, innovative and committed person. PERSONAL Father’s name : Ahmed Nawaz PEC No : ELECT/27730 NIC No : 43503-0360119-1 Passport No : AD0851191 Date of Birth : 01-08-1987 Religion : Islam Nationality : Pakistani Marital Status : Married EDUCATION • B.E (Electrical) from QUEST, Nawabshah in 2009 • HSC (Pre Engineering) from B.I.S.E Larkana in 2004 • Matric (Science) from B.I.S.E Larkana in 2002 EXPERIENCE DESIGNATION: Assistant Manager Technical (From June, 2013 to Present) COMPANY: KESC (Karachi Electric Supply Company Pvt Ltd)
  • 3.
    Job Descriptions: • Supervisionand execution of Ongoing Project • Correspondence with customers on Technical matters and clarifications. • Maintenance of underground cables & fault removed • Installation of (Single & Three) Phase meters through small and large in multi story buildings. • Monitoring of PMTs • Monitoring of Energy Meters • Random Inspection of Installed LT and HT Meters with Time Observing, Consumption of electricity, measuring of Load on cable of main Breakers by using of testing Equipments of Small and Large Industries as per policy of KESC policy and NEPRA. • Review of technical feasibility of HT feeders and LT Lines to initiate for system improvement. DESIGNATION: Site Engineer (From DEC, 2012 to May, 2013) COMPANY: Mehran University Centre For Energy & Development (MUCED) . PROJECT: WB-HESCO-ELR-05 Project • Calculation of Losses H.T feeders and L.T lines through SINCAL Software. • Monitoring of ABC installation • Monitoring of PMTs • Monitoring of Energy Meters • Design of Schemes for reduction of technical and commercial losses. • Activities related with Proper Billing to consumers and reduction of losses in the system, energy audit of feeders, curbing of electricity thefts. • Ensuring timely and proper billing to the consumers. • Consumer Relation Management. DESIGNATION: Electrical Engineer (From Jan, 2011 to Oct,2012) COMPANY: Zealcon engineering pvt. Ltd PROJECT: 50F 101 Flue gas Stack ,BYCO Refinery, HUB-Baluchistan, Pakistan Major responsibilities: • Study the design to prepare construction methodologies in consultation with construction Management Team. • Installation of Earthing, lightening, cable try, conduit pipes etc • Prepare/monitor working plans & prepare weekly, monthly and quarterly look ahead plans • Attain approvals for materials from Client/Consultant.
  • 4.
    • Align supervisorywork force to carry out daily activities. • Target orientation to the supervisory force. • Monitoring overall project progress. • Preparation of project handing over Pre/Post commissioning protocols. • Responsible also to ensure maintenance of good quality and safety standard at site. DESIGNATION: Assistant Engineer (From Feb, 2009. to Dec,2010) COMPANY: DESCON engineering pvt. Ltd PROJECT: Engro Chemical Project Limited (ECPL) ENVEN 1.3 Daharki Sindh, Pakistan • Study the design to prepare construction methodologies in consultation with construction Management Team. • Prepare/monitor working plans & prepare weekly, monthly and quarterly look ahead plans • Attain approvals for materials from Client/Consultant. • Preparation of QA/QC Execution Module & QITP’s for project execution. • Coordination facilitator between the teams of Execution &QA/QC. • QHSE Facilitator for E&I Team. • Align supervisory work force to carry out daily activities. • Target orientation to the supervisory force. • Overall supervision of all electrical and instrumentation Pre/Post installation Testing. • Overall supervision of all electrical and instrumentation installations. • Preparation of all weekly & monthly progress reports. • Handling progress invoicing. • Monitoring overall project progress. • Preparation of project handing over Pre/Post commissioning protocols. • Responsible also to ensure maintenance of good quality and safety standard at site. A BRIEF DUTIES AS UNDER: • To supervise the installation and maintenance activities of the followings • MV Switchgears • LV Panels • Transformers. • Motors (LV,MV). • UPS System. • DC Batteries upto (1600AH). • Battery Chargers. • Motor Operated Valves.
  • 5.
    • Cable TraysInstallation • Electric Lights Installation. • MV / LV Cable Laying, & Terminations COMPUTER SKILLS • SAP • MS Office(Word, Excel, Power Point, Access, Project) • Mat lab (2007) and PLC INTERNSHIP • Two month Worked as Internee at Guddu Thermal Power Plant Guddu (2005, 2006). • One month Worked as Internee at Hesco Regional Training Center Hyderabad (2008). PROJECTS/ THESIS • Protection of electrical equipments at TNB liberty power plant Mirpur Mathelo.
  • 6.
    • Cable TraysInstallation • Electric Lights Installation. • MV / LV Cable Laying, & Terminations COMPUTER SKILLS • SAP • MS Office(Word, Excel, Power Point, Access, Project) • Mat lab (2007) and PLC INTERNSHIP • Two month Worked as Internee at Guddu Thermal Power Plant Guddu (2005, 2006). • One month Worked as Internee at Hesco Regional Training Center Hyderabad (2008). PROJECTS/ THESIS • Protection of electrical equipments at TNB liberty power plant Mirpur Mathelo.