This document contains the CV of Mohamed Hussein Morsy Zamel. It includes his personal details such as name, date of birth, address and contact information. It also lists his education qualifications which are a BSc in civil engineering from Zagazig University and a preliminary master's degree in project management. The bulk of the document outlines his extensive career history working on various construction projects in roles such as site engineer, technical office engineer, project manager and technical office manager since 1987. It provides details of the responsibilities in each role and projects worked on.
Ability of Household Food Insecurity Measures to Capture Vulnerability & Resi...TransferProjct
Using evidence from a cash transfer program in Zimbabwe, the presentation covers how quantitative measures can capture vulnerability and resilience at the household level
Cash for Women's Empowerment? A Mixed-Methods Evaluation of the Government of...TransferProjct
This presentation reviews findings from the team's paper evaluating the impact of the Zambian Child Grant Program (CGP) on women's decision-making and empowerment.
The primary objective of the project is to understand the process of Project Appraisal for Term Loan & assessment for Working Capital Requirements. This includes evaluation of Financial Statements, Purpose for which facility is availed, Technical & Financial feasibility of project, Credit History, Managerial Competence and Past Experience in case of Term Loan.
Profit Forest - Indian Language presentationShivani Shah
Profit Forest Explained in Indian Language ( Hindi)
Please Join with me and I will teach you how to earn maximum from the same
http://www.profitforest.com/ref/shivani
Key Qualifications :
Extensive Experience in Construction Management , Managing and Directing Operations , and insuring smooth operation and lines of communication with clients and other parties in Egypt ,KSA , Oman and Yemen . Eng. Hablas has over 30 years experience in Managing of Operations , Design coordination activities and Construction Management for major International Housing and infrastructure projects .
His responsibilities include directing project teams , ensuring allocation of suitable resources for smooth operation , resolving any problems that may arise to hinder work progress and ensuring quality control of documents products. Extensive experience as Managing Director Engineer , leading project teams and maintaining close liaison with authorities concerned with the various projects he Operated / Supervised . His responsibilities included providing support to data collection teams , obtaining approval and permits , providing support and assistance to the design teams , responding to queries and presenting clarifications to the client. His duties comprised assuring smooth operation and maintaining open communication channels between all parties related to the project .
In addition Eng. Hablas has extensive experience in Housing and infrastructure projects through their different phasing starting with Master Plan , Feasibility Study , Preliminary and Detailed Design , construction supervision and construction management of Housing , water and wastewater collection and treatment system projects. His responsibilities in supervision of similar projects over more than 30 years experience covered the following tasks , coordination of construction activities , directing supervision team on site , review and approval of shop drawings , submittals and materials .
He has extensive experience in, Review, analysis of claims and variation orders Submitted by Contractor , Review, Follow up and updating of construction program , Review and analysis of claims under Federation International des Ingenieurs Conseils ( FIDIC ) , and variation orders Submitted by the Contractor , Assisting the Employer in dealing with the settlement of all disputes that arise between the Employer and the Contractor , Promptly examine and prepare recommendations on claims from
the Contractor for : Extension of time, payment for extra work, and other similar matters , And negotiate with the Contractor on the rates for any unscheduled items or work which arise and submit recommendations on these to the client for approval , Verify Contractor's invoices , and issue interim and final certificates for payments to the Contractor and submit these to the client for approval; arrange for the management meeting and prepare and monitor all reports submitted to the client and the donors.
1. c.v
Personal data:
Name : Mohamed Hussein Morsy Zamel
Date of birth : 13/02/1965
Marital status : Married
Nationality : Egyptian
Mailing address: belbeis, nour el-eslam s.t, behind el-ghandourhospital,
Mohamed zamel building
Mobile : 01223937425
Telephone : 055/2847015(home)
E-mail : zamelho2007@yahoo.com
Education certificates:
B.Sc in civil engineering
May 1987,grade"very good with honor"
Faculty of engineering,zagazig university -Preliminary master
degree in projectmanagement with grade "very good " in 1989
Career summary:
01/12/2008 till now : misr consult"projectmanager"
01/01/2008 to 30/11/2008: seeco consult" projectmanager"
01/11/1999 to 31/12/2007: canal harbour&greatprojects
co.(chp)technicaloffice manager
01/08/1998 to 31/10/1999: el bonian contracting co. Project
manager
01/04/1993 to 31/07/1998: canal harbour&greatprojects
co.(chp)technicaloffice engineer
01/04/1992 to 31/03/1993: canal harbour&greatprojects
co.(chp)technical&site office engineer
2. 01/04/1989 to 31/03/1992: canal harbour&greatprojects
co.(chp)technical office engineer
01/07/1987 to31/03/1989:bazan contracting co. site engineer
Training courses:
projectmanagement (IMPA)
autocad2007
Microsoftoffice "word + excel"
Professional experience:
from 18/10/2011 tillnow:projectmanager "misr consult"
For main water pipes networks in the new Cairo extension with
sum(440 million E.P)
from 01/07/2011 to17/10/2011:P.M.for the following projects :
1. sewagenetwork for pump station(1) in new Cairo extension
with sum(36581600E.P) sub contractor "koncord"
2. sewagenetwork for pump station(14) in new Cairo
extension with sum(211229200E.P) sub contractor
"koncord"
3. sewagenetwork for pump station(7&9&12)with sum
(105042330E.P) sub-contractor "Mokhtar Ibrahim"
from11/05/2009 to30/06/2011:P.M.insharkia governorate for
the following projects:
1. water treatment plant and pipe network of belbeis
plant capacity 2400lit/sec
length of network "110 k.m" of diameters from200
to 2000mm with sum(500,000,000E.P)
2. mashtoulel-souk water treatment plant
plant capacity 800 lit /sec
with sum(142,000,000E.P)
3. sewagetreatment plant and its networks of "awlad seif
village "with sum(35,000,000E.P)
4. sewagetreatment plant and its networks of "meet gaber
village "with sum(35,000,000E.P)
from01/12/2008 to10/05/2009:P.M.of hehia water treatment
plant and its networks with sum(300,000,000E.P)
from01/01/2008 to30/11/2008:P.M.in seeco consultfor "shebien
el-kanater "water treatment plant and its pipes networks with
sum(350,000,000E.P)
3. 1. sewagenetworks pipes and sewagelifting pump of
"Sawalha Arab" with sum (20,000,000E.P)
2. sewagenetworks pipes and sewagelifting pump of "Gohyna
Arab " with sum(20,000,000E.P)
from 01/11/1999 to31/12/2007: canal harbour&great projects
co.(chp)affiliatedto Suez canal authority
Constructionof 19 waste water treatment plants project
Budget:500,000,000E.P
Technical office manager: is responsible for:
1. Supervising the construction of plants in " kureen , kenayat ,
Abu hammad&el-ebrahimia (sharkia governorate)"
2. Issuing tenders to sub contractors
3. Establishing time schedule and s-curve
4. Giving special attention to the critical path of the project
throughoutthe duration of the project
5. Reviewing the technical performance of the project
according to the time schedule
6. Ensuring that the projectis completed on time and within
the project's limits and constrains
7. Collaborating with the project team to execute the project
8. Acting as liaison with the top management and the
customer
9. Monitoring the progress of the project
10.Ensuring that the project satisfies both customers and the
organization
11.Preparing the payment certificates
12.Preparing documents for variation orders and claims
13.Attending coordination meetings between the Contractor,
the Employer and the Engineer
14.Keeping records of meetings , telephones ,conversations,
Agreements&contracts
15.Preparing and submittingprogress reports
From 01/08/1998 to31/10/1999: El Bonian contracting co
Increase the efficiency of hospitals &medical centers insharkia
governorate P.M. : is responsible for:
1. Selecting the project team
2. Creating the projectorganization chart
3. Collaborating with the project team to execute the project
4. Reviewing the technical performanceof the project
according to the time schedule
4. 5. Ensuring that the projectis completed on time and within
the project's limits and constrains
6. Maintaining current milestone chart that displays planned
milestones &actual achievement of them
7. Reviewing the payment certificates
8. Setting limits on staffing & spending
9. Establishing control system which anticipates &reports
deviations to take the immediate correctiveactions
10.c
11.Attending coordination meetings between the Contractor,
the Employer and the Engineer
12.Preparing and submittingprogress reports
13.Evaluating the performanceof projectteam
from 01/11/1999 to31/12/2007: canal harbour&great projects
co.(chp) Constructionof 19 waste water treatment plants project
Budget:500,000,000E.P
Technical office engineer:is responsiblefor:
1. Establishing time schedule and s-curve
2. Maintaining current milestone chart that displays planned
milestones &actual achievement of them
3. Reviewing the technical performanceof the project
according to the time schedule
4. Facilitating the project processes
5. Collaborating with the project team to execute the project
6. Preparing the payment certificates
7. Preparing documents for variation orders and claims
8. Keeping records of meetings , telephones ,conversations,
Agreements&contracts
9. Attending coordination meetings between the Contractor,
the Employer and the Engineer
10.Preparing and submittingprogress reports
from 01/04/1992 to31/03/1993:canal harbour&great projects
co.(chp) Constructionof 19 waste water treatment plants project
Budget:500,000,000E.P
Site & Technical office engineer:is responsiblefor:
1. Ensuring that his part of the projectwork gets completed on
time
2. Acting as liaison with project manager
3. Supervising all site activities
5. 4. Preparing the payment certificates
5. Communicating with subcontractors
6. Coordinating with subcontractors
7. Follow up the material delivery program
8. Preparing repots to the management
9. Performing duties as assigned
from 01/04/1989to31/03/1992:canal harbour&great projects
co.(chp) Constructionof kafr el-shiekhgovernorate potable
water trunk project
Budget: 10,000,000E.P
Technical office engineer:is responsiblefor:
1. preparing time schedule and s-curve
2. Reviewing the technical performanceof the project
according to the time schedule
3. Facilitating the project processes
4. Reengineering the layout of pipeline if necessary
5. Preparing the payment certificates
6. Keeping records of project's documents
7. Preparing and submittingprogress reports
from 01/07/1987to31/03/1989:Bazancontracting co.
site Engineer
construction of macaroni factor of belbies-10 Ramadan road