Tomasz Najder worked as a senior consultant on an underground tunnel repair project in Dammam, Saudi Arabia from 2008-2009. The project involved inspecting and repairing cracks, joints, and leaks in the tunnel structure through grouting methods. Najder provided engineering services and developed method statements for the grouting work. He also proposed a monitoring system to track the tunnel's performance over several years after completion. The document provides details on Najder's role, the tunnel repair scope, grouting activities, and engineering drawings and photos from the site.
CV Tomasz Najder Part 6 2016.01.17 2016Tomasz Najder
This document provides biographical information about Tomasz Najder and details his professional experience as a civil engineer. It lists his personal details, employment as co-owner and managing director of Najder Engineering AB since 2014, and experience on various tunneling, foundation, and infrastructure projects between 2008-2016 in Scandinavia, Europe, the Middle East, Asia, and Africa. The projects involved tasks such as grouting, underpinning, dam and slope stabilization.
CV Tomasz Najder Part 2 2009.09.17 2016Tomasz Najder
Tomasz Najder is a senior consultant and grouting engineer based in Sweden. He has over 30 years of experience in tunneling projects. Some of his roles include senior grouting engineer for the Kárahnjúkar Hydroelectric Project in Iceland and vice president of Stabilator AB in Sweden. He specializes in grouting activities like pre-grouting, curtain grouting, concrete repairs, and sealing tunnels. Tomasz Najder provides consulting services and recommendations on grout compositions, procedures, and equipment for various tunneling and dam projects internationally.
CV Tomasz Najder Part 4 2009.06.07 2016Tomasz Najder
Tomasz Najder is a senior consultant based in Stockholm, Sweden. He has worked as a consultant for Norconsult SA on the Greater Istanbul Water Supply Project from 2008-2009. This involved tunnel construction using an Earth Pressure Balance TBM underneath the Bosphorus strait. The TBM tunnel was 3.3km long and constructed the first tunnel between two continents, connecting Asia and Europe under the Bosphorus channel. Najder's role involved oversight of grouting activities to stabilize the ground and prevent water inflow during tunnel construction.
CV Tomasz Najder Part 3 2009.06.07 2016Tomasz Najder
This document contains a resume for Tomasz Najder, a senior consultant and grouting contractor. It summarizes his role on two tunneling projects in Iceland from 2007-2009. The Siglufjörður and Ólafsfjörður tunnels involved mining through basalt rock with varying water inflows. Najder's responsibilities included pre-grouting, refilling caverns, post-grouting, and stopping water under high pressure. The document provides details on the tunnel lengths, diameters, gradients, and geology encountered on each project.
Najder Engineering Södra Länken - grouting for repairs 2014.11.01Tomasz Najder
This document is a 27 page report on the sealing of shotcrete tunnel linings for the Södra Länken project in Stockholm using polyurethane resins. It describes the project, shows photos of the tunnel construction, and details the process of drilling holes in the rock and using pumps to inject two-component polyurethane resins to seal cracks in the lining and grout the surrounding rock.
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.Tomasz Najder
This document contains biographical information about Tomasz Najder and details two tunneling projects he worked on in Iceland:
1. The Siglufjörður and Ólafsfjörður Tunnels. The Siglufjörður Tunnel is 3.875 meters long and the Ólafsfjörður Tunnel is 7.150 meters long. Both tunnels required grouting activities like pre-grouting and post-grouting to seal cracks and stabilize the rock.
2. Tomasz Najder's roles and responsibilities in the projects as a senior grouting consultant and contractor's representative from April 2007 to February 2009. He performed grouting
This document describes NEW TSM Ceramic Ltd., an innovative energy-saving material for heat insulation. It discusses the composition of NEW TSM Ceramic, which consists of a styrene-acrylic latex membrane and ceramic microspheres that insulate heat. The document provides details on the material's properties and technical specifications, and outlines its applications for heat insulation of buildings, pipelines, vehicles, and more. Calculations for determining the appropriate thickness of NEW TSM Ceramic coating are also presented.
CV Tomasz Najder Part 6 2016.01.17 2016Tomasz Najder
This document provides biographical information about Tomasz Najder and details his professional experience as a civil engineer. It lists his personal details, employment as co-owner and managing director of Najder Engineering AB since 2014, and experience on various tunneling, foundation, and infrastructure projects between 2008-2016 in Scandinavia, Europe, the Middle East, Asia, and Africa. The projects involved tasks such as grouting, underpinning, dam and slope stabilization.
CV Tomasz Najder Part 2 2009.09.17 2016Tomasz Najder
Tomasz Najder is a senior consultant and grouting engineer based in Sweden. He has over 30 years of experience in tunneling projects. Some of his roles include senior grouting engineer for the Kárahnjúkar Hydroelectric Project in Iceland and vice president of Stabilator AB in Sweden. He specializes in grouting activities like pre-grouting, curtain grouting, concrete repairs, and sealing tunnels. Tomasz Najder provides consulting services and recommendations on grout compositions, procedures, and equipment for various tunneling and dam projects internationally.
CV Tomasz Najder Part 4 2009.06.07 2016Tomasz Najder
Tomasz Najder is a senior consultant based in Stockholm, Sweden. He has worked as a consultant for Norconsult SA on the Greater Istanbul Water Supply Project from 2008-2009. This involved tunnel construction using an Earth Pressure Balance TBM underneath the Bosphorus strait. The TBM tunnel was 3.3km long and constructed the first tunnel between two continents, connecting Asia and Europe under the Bosphorus channel. Najder's role involved oversight of grouting activities to stabilize the ground and prevent water inflow during tunnel construction.
CV Tomasz Najder Part 3 2009.06.07 2016Tomasz Najder
This document contains a resume for Tomasz Najder, a senior consultant and grouting contractor. It summarizes his role on two tunneling projects in Iceland from 2007-2009. The Siglufjörður and Ólafsfjörður tunnels involved mining through basalt rock with varying water inflows. Najder's responsibilities included pre-grouting, refilling caverns, post-grouting, and stopping water under high pressure. The document provides details on the tunnel lengths, diameters, gradients, and geology encountered on each project.
Najder Engineering Södra Länken - grouting for repairs 2014.11.01Tomasz Najder
This document is a 27 page report on the sealing of shotcrete tunnel linings for the Södra Länken project in Stockholm using polyurethane resins. It describes the project, shows photos of the tunnel construction, and details the process of drilling holes in the rock and using pumps to inject two-component polyurethane resins to seal cracks in the lining and grout the surrounding rock.
Najder Eng. CV Tomasz Najder Part 3 2009.06.07 pdf.Tomasz Najder
This document contains biographical information about Tomasz Najder and details two tunneling projects he worked on in Iceland:
1. The Siglufjörður and Ólafsfjörður Tunnels. The Siglufjörður Tunnel is 3.875 meters long and the Ólafsfjörður Tunnel is 7.150 meters long. Both tunnels required grouting activities like pre-grouting and post-grouting to seal cracks and stabilize the rock.
2. Tomasz Najder's roles and responsibilities in the projects as a senior grouting consultant and contractor's representative from April 2007 to February 2009. He performed grouting
This document describes NEW TSM Ceramic Ltd., an innovative energy-saving material for heat insulation. It discusses the composition of NEW TSM Ceramic, which consists of a styrene-acrylic latex membrane and ceramic microspheres that insulate heat. The document provides details on the material's properties and technical specifications, and outlines its applications for heat insulation of buildings, pipelines, vehicles, and more. Calculations for determining the appropriate thickness of NEW TSM Ceramic coating are also presented.
This document contains the resume of Vikas Kamboj seeking a role in structural engineering. It summarizes his educational qualifications including a B.E. in Civil Engineering and outlines his professional experience over 4.6 years designing RCC and steel structures for various projects using software like AutoCAD, STAAD-Pro, and SAP2000. It also lists his technical skills, personal details, and contact information.
Los alumnos de la clase de Inglés de Laura en la escuela C.R.A. GUAREÑA en Guarrate, Zamora, crearon libros gigantes para participar en un concurso de la Dirección Provincial de Educación de Zamora. Ellos elaboraron libros para Educación Infantil, el Primer Ciclo, Segundo Ciclo y Tercer Ciclo de Educación Primaria y ahora esperan conocer los resultados del concurso.
Este documento presenta un ejercicio sobre el Renacimiento que pide al estudiante: 1) identificar 5 imágenes del Renacimiento mediante número, características, periodo Cuattrocento o Cinquecento, obra y autor; y 2) redactar al menos 5 líneas sobre las relaciones entre las obras visualizadas y las novedades de la Edad Moderna, dando ejemplos.
BLDC motors operate more reliably and efficiently than brushed DC motors due to their brushless design. A BLDC motor's rotor contains permanent magnets while the stator contains coils arranged in a pattern. The motor works by using an electronic controller and sensor to determine rotor position and energize the appropriate coils in sequence, causing the rotor to rotate in a continuous motion similar to a donkey chasing a carrot. BLDC motors can be modified to energize two coils at a time, improving torque and power output.
Common Challenges & Best Practices for TDD on iOSDerek Lee Boire
Presented at the June 2016 Tokyo iOS Meetup on 6/11/2016, in this presentation I give an overview of test driven development and how it can be used when developing for iOS / Swift.
TDD is an enormous topic so this really just scratches the surface to give an expansive glimpse into the journey that TDD truly is. Those unfamiliar with TDD will hopefully have a desire to learn more about it while those familiar will hopefully learn something new.
Este documento describe el trabajo en la web 2.0 de Marian Calvo en los últimos dos años, incluyendo 13 blogs y sitios web que cubren su identidad digital, materiales educativos, experiencias en el aula, formación docente, y blogs de centro y de aula. El trabajo de Marian Calvo se centra en aplicar las TICs en el aula y compartir recursos educativos.
This document provides an overview of laser theory and applications across 4 chapters. Chapter 1 discusses the theory of lasing, including Einstein's theory of stimulated emission and how a population inversion enables light amplification in a laser medium. Chapter 2 will cover characteristics of laser beams. Chapter 3 will describe different types of laser sources. And Chapter 4 will discuss applications of laser technology.
The article proposes a framework of 9 tests to evaluate organizational design effectiveness. The tests are grouped into 4 tests of fit between the design and key drivers like strategy and people. There are also 5 tests of good design principles around specialization, coordination, knowledge, control, and flexibility. Applying the tests highlights tradeoffs and issues to refine organizational structure, processes, and leadership to best support the business goals.
The document discusses factors that affect a company's capital structure and the types of securities it issues. It identifies 12 key considerations: 1) the nature of the business, 2) money market conditions, 3) stability of earnings, 4) capital requirements, 5) retaining control, 6) long-term interests of the company, 7) legal restrictions, 8) nature of assets, 9) general interest rates, 10) attitudes of investors, 11) taxation policy, and 12) cost of financing. The types of securities issued should take all these factors into account to determine the optimal capital structure for the company.
CV Tomasz Najder Part 1 2009.09.15 2016Tomasz Najder
Tomasz Najder is a civil engineer from Poland with over 40 years of experience in geotechnical engineering. He has worked as a consultant, contractor, and lecturer on projects in Sweden, Poland, Iceland and other countries. Some of his areas of expertise include soil improvement techniques, ground anchors, micropiles, grouting, and underpinning of historical structures. He is currently a senior consultant at his own firm, Najder Engineering, in Sweden.
The document is a copyright notice for Najder Engineering that repeats for 68 pages. It states contact information for Najder Engineering and prohibits unauthorized copying of the document in whole or in part by any means without prior written permission.
Ppt summer presentation on finishing Of Police Station Construction SiteAlok Mishra
finishing Works at Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)
This document provides a standard operating procedure for expansion joints between concrete structures like columns, beams, and slabs. It outlines the materials, responsibilities, and step-by-step procedure for installing extruded aluminum plates and Shailtex boards for expansion joints that are 50mm or 100mm thick. The procedure involves surface preparation, cutting the Shailtex boards to size, placing them in the groove flush with the surface, securing them, cleaning the surface, and applying sealants. Records to be documented include request for inspections, level sheets, technical data sheets, and material test certificates.
This document is a resume for Husam Eldin Mohammed-saeed Ahmed summarizing his work experience and qualifications. He has over 11 years of experience in the construction field, particularly working on power projects in Saudi Arabia and Sudan. His most recent role was as a Senior Site Civil Consultant Engineer in Saudi Arabia from 2014 to present, where he supervised civil works and ensured quality control on several substation projects. Prior to that, he held roles in Sudan as a Senior Site Civil Engineer and Site Manager, overseeing civil works and projects.
The document describes a point connection system called Greenflex for precast insulated sandwich panels. Greenflex is made of glass fiber reinforced polymer and connects the two layers of insulated sandwich panels. It comes in three heights and thicknesses to fit various panel geometries up to 13 meters long and 3.5 meters wide. Greenflex allows for fast and flexible installation, reduces thermal bridging, and permits thermal expansion of the external panel layer while keeping the layers connected as a composite panel. It enhances insulation and reduces costs.
Vietnam Glocoating Engineering JSC (VGCE) is an anti-corrosion and fabrication company located in Vung Tau City, Vietnam. It was established in 2002 and provides services throughout Southeast Asia. VGCE has 150 employees and is the licensed distributor for Corrocoat UK coatings. It specializes in offshore platform and rig maintenance including inspection, blasting, coating application, and steel repair/replacement. VGCE has completed numerous projects for oil and gas companies in Vietnam. Its services aim to provide total commitment to quality and flexibility to meet client needs.
This document provides a summary of Ahmed Yehia Aly Hussain's personal and employment details. It includes his contact information, objective, and employment history from 2014 to 2007 working on various construction projects in Egypt as a site engineer and project manager. His roles involved managing civil works like excavation, foundations, formwork, steel fixing, and concrete works. He achieved projects on time and under budget through efficient planning and coordination of labor resources.
Ferdenand Bodiongan Jagmoc is a civil engineer with over 10 years of experience in tunneling, underground construction, and civil works projects. He is currently a civil site engineer for the Jurong Rock Cavern Phase 1 project in Singapore, where he supervises 150 workers and leads structural concrete works. Previously he has held civil engineering and supervisory roles in the Philippines for projects such as an underground hydrometallurgical plant and subway tunnel construction.
The document is a report on an industrial training project at a hospital construction site in Chennai by URC Constructions Private Limited. It provides details of the project such as constructing a basement parking facility, 8 floors and other areas on a site located in Perungudi, Chennai. It describes the soil conditions, foundation design, construction stages, safety measures, and estimates for the project. The traineeship provided hands-on experience in construction practices, challenges, and learning.
This document contains contact information for the head office and branches of Adenco Electrical Engineering Contractors. It also confirms that Mr. JJ De Bruin was employed by Adenco as a meter auditor for Saldanha Bay Municipality from July 2012 to November 2013 to perform meter audits. The duties of the meter auditor position are described as entering installation information electronically, testing meters and distribution boards, checking for tampering, bypassing or safety issues, and updating as-built drawings.
This document contains the resume of Vikas Kamboj seeking a role in structural engineering. It summarizes his educational qualifications including a B.E. in Civil Engineering and outlines his professional experience over 4.6 years designing RCC and steel structures for various projects using software like AutoCAD, STAAD-Pro, and SAP2000. It also lists his technical skills, personal details, and contact information.
Los alumnos de la clase de Inglés de Laura en la escuela C.R.A. GUAREÑA en Guarrate, Zamora, crearon libros gigantes para participar en un concurso de la Dirección Provincial de Educación de Zamora. Ellos elaboraron libros para Educación Infantil, el Primer Ciclo, Segundo Ciclo y Tercer Ciclo de Educación Primaria y ahora esperan conocer los resultados del concurso.
Este documento presenta un ejercicio sobre el Renacimiento que pide al estudiante: 1) identificar 5 imágenes del Renacimiento mediante número, características, periodo Cuattrocento o Cinquecento, obra y autor; y 2) redactar al menos 5 líneas sobre las relaciones entre las obras visualizadas y las novedades de la Edad Moderna, dando ejemplos.
BLDC motors operate more reliably and efficiently than brushed DC motors due to their brushless design. A BLDC motor's rotor contains permanent magnets while the stator contains coils arranged in a pattern. The motor works by using an electronic controller and sensor to determine rotor position and energize the appropriate coils in sequence, causing the rotor to rotate in a continuous motion similar to a donkey chasing a carrot. BLDC motors can be modified to energize two coils at a time, improving torque and power output.
Common Challenges & Best Practices for TDD on iOSDerek Lee Boire
Presented at the June 2016 Tokyo iOS Meetup on 6/11/2016, in this presentation I give an overview of test driven development and how it can be used when developing for iOS / Swift.
TDD is an enormous topic so this really just scratches the surface to give an expansive glimpse into the journey that TDD truly is. Those unfamiliar with TDD will hopefully have a desire to learn more about it while those familiar will hopefully learn something new.
Este documento describe el trabajo en la web 2.0 de Marian Calvo en los últimos dos años, incluyendo 13 blogs y sitios web que cubren su identidad digital, materiales educativos, experiencias en el aula, formación docente, y blogs de centro y de aula. El trabajo de Marian Calvo se centra en aplicar las TICs en el aula y compartir recursos educativos.
This document provides an overview of laser theory and applications across 4 chapters. Chapter 1 discusses the theory of lasing, including Einstein's theory of stimulated emission and how a population inversion enables light amplification in a laser medium. Chapter 2 will cover characteristics of laser beams. Chapter 3 will describe different types of laser sources. And Chapter 4 will discuss applications of laser technology.
The article proposes a framework of 9 tests to evaluate organizational design effectiveness. The tests are grouped into 4 tests of fit between the design and key drivers like strategy and people. There are also 5 tests of good design principles around specialization, coordination, knowledge, control, and flexibility. Applying the tests highlights tradeoffs and issues to refine organizational structure, processes, and leadership to best support the business goals.
The document discusses factors that affect a company's capital structure and the types of securities it issues. It identifies 12 key considerations: 1) the nature of the business, 2) money market conditions, 3) stability of earnings, 4) capital requirements, 5) retaining control, 6) long-term interests of the company, 7) legal restrictions, 8) nature of assets, 9) general interest rates, 10) attitudes of investors, 11) taxation policy, and 12) cost of financing. The types of securities issued should take all these factors into account to determine the optimal capital structure for the company.
CV Tomasz Najder Part 1 2009.09.15 2016Tomasz Najder
Tomasz Najder is a civil engineer from Poland with over 40 years of experience in geotechnical engineering. He has worked as a consultant, contractor, and lecturer on projects in Sweden, Poland, Iceland and other countries. Some of his areas of expertise include soil improvement techniques, ground anchors, micropiles, grouting, and underpinning of historical structures. He is currently a senior consultant at his own firm, Najder Engineering, in Sweden.
The document is a copyright notice for Najder Engineering that repeats for 68 pages. It states contact information for Najder Engineering and prohibits unauthorized copying of the document in whole or in part by any means without prior written permission.
Ppt summer presentation on finishing Of Police Station Construction SiteAlok Mishra
finishing Works at Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)
This document provides a standard operating procedure for expansion joints between concrete structures like columns, beams, and slabs. It outlines the materials, responsibilities, and step-by-step procedure for installing extruded aluminum plates and Shailtex boards for expansion joints that are 50mm or 100mm thick. The procedure involves surface preparation, cutting the Shailtex boards to size, placing them in the groove flush with the surface, securing them, cleaning the surface, and applying sealants. Records to be documented include request for inspections, level sheets, technical data sheets, and material test certificates.
This document is a resume for Husam Eldin Mohammed-saeed Ahmed summarizing his work experience and qualifications. He has over 11 years of experience in the construction field, particularly working on power projects in Saudi Arabia and Sudan. His most recent role was as a Senior Site Civil Consultant Engineer in Saudi Arabia from 2014 to present, where he supervised civil works and ensured quality control on several substation projects. Prior to that, he held roles in Sudan as a Senior Site Civil Engineer and Site Manager, overseeing civil works and projects.
The document describes a point connection system called Greenflex for precast insulated sandwich panels. Greenflex is made of glass fiber reinforced polymer and connects the two layers of insulated sandwich panels. It comes in three heights and thicknesses to fit various panel geometries up to 13 meters long and 3.5 meters wide. Greenflex allows for fast and flexible installation, reduces thermal bridging, and permits thermal expansion of the external panel layer while keeping the layers connected as a composite panel. It enhances insulation and reduces costs.
Vietnam Glocoating Engineering JSC (VGCE) is an anti-corrosion and fabrication company located in Vung Tau City, Vietnam. It was established in 2002 and provides services throughout Southeast Asia. VGCE has 150 employees and is the licensed distributor for Corrocoat UK coatings. It specializes in offshore platform and rig maintenance including inspection, blasting, coating application, and steel repair/replacement. VGCE has completed numerous projects for oil and gas companies in Vietnam. Its services aim to provide total commitment to quality and flexibility to meet client needs.
This document provides a summary of Ahmed Yehia Aly Hussain's personal and employment details. It includes his contact information, objective, and employment history from 2014 to 2007 working on various construction projects in Egypt as a site engineer and project manager. His roles involved managing civil works like excavation, foundations, formwork, steel fixing, and concrete works. He achieved projects on time and under budget through efficient planning and coordination of labor resources.
Ferdenand Bodiongan Jagmoc is a civil engineer with over 10 years of experience in tunneling, underground construction, and civil works projects. He is currently a civil site engineer for the Jurong Rock Cavern Phase 1 project in Singapore, where he supervises 150 workers and leads structural concrete works. Previously he has held civil engineering and supervisory roles in the Philippines for projects such as an underground hydrometallurgical plant and subway tunnel construction.
The document is a report on an industrial training project at a hospital construction site in Chennai by URC Constructions Private Limited. It provides details of the project such as constructing a basement parking facility, 8 floors and other areas on a site located in Perungudi, Chennai. It describes the soil conditions, foundation design, construction stages, safety measures, and estimates for the project. The traineeship provided hands-on experience in construction practices, challenges, and learning.
This document contains contact information for the head office and branches of Adenco Electrical Engineering Contractors. It also confirms that Mr. JJ De Bruin was employed by Adenco as a meter auditor for Saldanha Bay Municipality from July 2012 to November 2013 to perform meter audits. The duties of the meter auditor position are described as entering installation information electronically, testing meters and distribution boards, checking for tampering, bypassing or safety issues, and updating as-built drawings.
Ha Minh Tin has over 15 years of experience in non-destructive testing, welding inspection, and quality control. He holds numerous certifications including Level III in MT and PT and Level II in RI, UT, and welding inspection. Currently he works as an NDT Level III and Level II inspector, welding inspector, and QA/QC inspector for PVD Offshore in Vietnam and has experience working on offshore rig and pipeline projects.
The document provides details on a proposal for a 4 hectare greenhouse project in Romania including:
- Dimensions and specifications of 4 greenhouses totaling 40,432 square meters
- Description of the greenhouse structure materials and design
- Overview of the equipment and systems included such as covering, crop supports, ventilation, irrigation, climate control, and electricity
- Total project costs and terms of delivery and payment
This document contains a resume for Issam Khoder Agha, a Lebanese civil engineer born in 1984. It lists his educational background including degrees from universities in Lebanon and Belize. It then outlines his professional experience as a project manager, construction manager, and project engineer for various construction companies in Oman, Saudi Arabia, and the UAE since 2007. It provides details on several infrastructure projects he has managed including sewage plants, power plants, and shipyards. It also lists his linguistic skills, computer skills, and offers a reference.
Peter McElwee is a British construction superintendent/supervisor with over 30 years of experience in piping and mechanical industries, including 20 years in management positions. He has worked on a wide range of projects from petrochemical plants to offshore construction. His duties have included organizing workforces, ordering materials, arranging permits, and liaising with management on technical issues with an emphasis on safety. He has experience in the UK, Spain, Tunisia, Holland, and Norway.
This document outlines standards and procedures for transmission line route surveys. It discusses responsibilities, survey methods, drawings, and other documentation required. Some key points:
- The contractor is responsible for selecting the transmission line route based on criteria like minimum length, cost, and environmental impact. They must perform preliminary and detailed surveys.
- Surveying methods include establishing angle points, profiling the terrain, and noting obstacles. Data is recorded on plan and profile drawings.
- Drawings include general layouts, detailed plans and profiles, and crossings. Profile stationing starts from the power source.
- The contractor must ensure accurate structure placement within specified tolerances based on the survey data.
This curriculum vitae outlines the professional experience of Manuel Ramos de Campos Abreu Bartilotti. He has over 30 years of experience in piping and steel structures construction for various industrial projects. His roles have included pipe fitter, foreman, supervisor, and field engineer. He has worked on projects in Portugal, South Africa, Netherlands, Belgium, Spain, Canada, Qatar, Algeria, and other countries. His responsibilities have included piping fabrication, erection, inspection, planning, and project coordination.
Anese began its activities in the agricultural field, later branching into works connected with irrigation and flood management, together with earth movements and the removal of lithoid materials.
Experience and skills earned through time and the level of precision realised have allowed the company to widen its horizons in the field of road construction and urban planning, aqueducts and sewage management as well as other specialised fields, both private and public including prompt emergency assistance to the "Protezione Civile" in the event of natural disasters. In an afford to diversify their technical/commercial competence, the field of work has recently been extended to include projects in horizontal directional drilling.
Another sector of special application is land stabilisation using new technologies for the recycling of terrain, and land reclamation. This application can be employed for road and railway civil engineering (embankments etc..) as well as for the construction of airports and other infrastructural works.
Anese also offers important technical contributions to the field of agriculture in the creation of underground drainage systems to avoid the accumulation of surface water owing to rainfall, maintaining a constant underground water level during periods of heavy rainfall. The result of this is increased land productivity.
C O V E R L E T T E R
Dear Madam / Sir,
I take the opportunity to write this cover letter in which I present my arguments, motives and incentives to work in your company.
As your business grows, you will need professionals who can serve qualitatively new and current users. It is precisely these skills will find in my CV. My observations on your type of services showed that one of the most difficult things is to be choice machines at dependence from electro-mechanical parameters of base the added conformable with economic valuation also motivated ordinary workers to distribute them and uncompromising quality. In its practice I managed to do that, thanks to intensive work with my clients and repairs that I perform.
What attracts me to that position you – mechanical engineer is a high technical level for working with electronic technical systems. On the basis of professional qualifications, experience and personal qualities of 18-19 years in engineering, concrete work in my factory in Institute of Welding-Sofia, Military-Repair works, in Targovishte, Teacher in Technical University city Ruse, General expert in Municipality Tutrakan, as also for refrigeration equipment, in Greece on the island Kriti. Crete, particularly new technologies that are implemented in Qatar, Barcelona, Libya make me think that I am suitable for your position. Certainly particularly strong incentive to continue to develop in this area! I would very much like to join your team in which I can apply my organizational and technical skills. If I am appointed I will give everything for efficient, quality work and prosperity of the company!
http://www.youtube.com/watch?v=hhpguw3Zlcs&feature=em-upload_owner
https://www.linkedin.com/profile/view?id=46389424&authType=name&authToken=CCs0&pvs=pp
https://www.facebook.com/anatoldukanov
https://twitter.com/avdukanov
https://www.xing.com/profile/Anatol_Dukanov?sc_o=mxb_p
I hope that it will be of interest to you my application! I will be happy to discuss my experience and professional qualifications as well as future development plans. I look forward to contact me email: anatoldukanov@yahoo.com or avdukanov@gmail.com , adukanov@hotmail.com , work e-mail: a_dukanov@viana-bg.com, messenger or adukanov@yahoo.com and mobile phone Bulgaria 00359877765176, 00359896199627, 00359887972936 work tel. 00359884200964 home tel. 0035986661047 for dialogize skype-anatoldukanov anatoldukanov anatoldukanov anatolvikentievdukanov or AIM- Anatol Dukanov in convenience for you.
Yours Faithfully: Engr. Anatol Dukanov
Herman Edano is a Filipino civil engineer with over 30 years of experience in structural design and project management roles for oil and gas projects around the world. He has extensive experience using PDMS software to design steel and concrete structures. His resume lists roles with companies such as Cofely Fabricom, IKM, CB&I, ABB, and Fluor, working on projects in Norway, Singapore, Philippines, and other locations. He is currently employed as a Senior Structural PDMS Designer by Cofely Fabricom in Norway.
Similar to CV Tomasz Najder Part 5 2010.02.12 2016 (20)
ö New Orleans 2012 draft paper 2011.01.27Tomasz Najder
This document provides information on rock grouting projects using polyurethane (PUR) resins in Iceland and Turkey. It summarizes projects from 1993-2009 that involved grouting in extreme geological and weather conditions. PUR and other resins like urea-silicate were used for grouting to improve rock stability, seal cracks, and fill cavities in complex basalt formations with high water flows. The document discusses the chemical properties and applications of one-component and two-component PUR resins as well as urea-silicate hybrid resins. It also summarizes specific projects in Iceland that demonstrated the effectiveness of PUR for grouting in cold temperatures and high water pressures/flows.
Paper Aachen- Najder engineering 2008.04.17Tomasz Najder
This document summarizes rock grouting projects in Iceland that involved tunneling through complicated geological conditions. It describes an emergency rock grouting project to seal tunnels in Isafjordur that encountered major faults with water inflows over 1,000 liters/second. Improvements were made to grouting procedures including using quick-setting cement grouts and polyurethane resins to stabilize the rock and reduce water inflows. It also discusses a project in Botnsheiði Tunnel that intersected a fault with up to 1 cubic meter/second of water. Grouting methods were optimized using accelerated cement mixes, lightweight sand, and polyurethane resins to stabilize the rock and seal cracks in extreme cold and
Najder Engineering AB T-bana repairs 2016.03.22 compr.Tomasz Najder
The document is a 31-page report from Najder Engineering AB regarding repairs of subway tunnels using polyurethane resins. Each page contains contact information for Najder Engineering and a copyright notice. However, the document provides no other details on the tunnel repair project, as the content of the report is not shown beyond the first few pages which only contain boilerplate text.
- Grouting works were performed between an existing tailrace and new powerhouse excavation to address water ingress along a lineament. Initial drilling and grouting in September 2010 using GeoFoam had limited effect on water flow.
- Additional drilling and grouting was conducted in October 2010, including using cement grout and backfilling voids with concrete, gravel, and geotextiles. However, water flow continued to increase up to 20cm/sec.
- Final grouting in mid-October 2010 using two GeoFoam pumps injected over 12,000kg of GeoFoam into boreholes intersecting karstic cavities. This led to a measurable reduction in water flow, likely aided by previous ge
Water leak in karstic limestone at Theun-Hinboun Laos - 2010 compr. (2)Tomasz Najder
The document contains contact information for Najder engineering, an engineering company located in Saltsjöbaden, Sweden. It lists their address, phone numbers, email addresses, organization number, and website on each page for 40 pages. The information is repeated identically on each page.
0 Iceland - pictures from the tunnels 2010.01.09Tomasz Najder
The document reports on several tunneling projects in Iceland that encountered issues with water inflows and ground failures. These include the Breiđaldalur Tunnel and Botnsheiđi Tunnel projects in 1993 that experienced water inflows from faults, and several tunnels constructed as part of the Hydropower Kárahnjúkar Project from 2005-2007 that suffered from leaks, washouts, overbreaks and collapsing tunnel walls and crowns believed to be caused by faults in the ground.
The document discusses the Hedinsfjordur Tunnel project in Iceland. It provides details about the two tunnels that make up the project - the Olafs Tunnel which is 7.1km long, and the Siglu Tunnel which is 3.9km long. The tunnels presented construction challenges like water ingress pressures up to 32 bar and water temperatures as low as 2 degrees Celsius. Work on the project started in 2006 and the tunnels opened for traffic on October 2, 2010, providing an important new transportation link for Iceland.
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide showTomasz Najder
The document describes the Héðinsfjarðargöng Project, which involved constructing a 3,300m tunnel using an Earth Pressure Balance Type TBM. This was the first tunnel ever built between two continents, connecting Iceland and Greenland under the sea. During construction, leakage was observed at the face of the Ólafsfjördur Tunnel, which was part of this project. The document also discusses some of the speaker's past projects involving slope protections, gabion walls, and waterproofing systems.
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide showTomasz Najder
Tomasz Najder is a civil engineering consultant with over 40 years of experience in tunneling, mining, and related fields. He has worked on numerous major infrastructure projects around the world, including tunneling projects in Iceland, Poland, and Sweden. Some of his most notable work includes serving as the grouting expert on the Breiđalsheiđi and Botnsheiđi Road Project in Iceland, which involved tunneling through difficult rock conditions, and working as the senior grouting engineer on the massive Kárahnjúkar Hydropower Project in Iceland, which included over 70km of tunneling.
0. Part 00 EE, Extreme engineering. 2010.02.15 - part 1 slide show
CV Tomasz Najder Part 5 2010.02.12 2016
1. sid 1 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Stockholm, 12.02.2010 (2016)
TomaszNajder (Ph.D Civ. Eng.) - Part5
Personalia Date of birth: 1951-08-30
Address: Movägen 3, SE-133 36 Saltsjöbaden (Sweden)
Tel: 0046 (8) 717 57 14, fax: 0046 (8) 717 60 42, mobile: 0046 (0)704 217 012
E-mail: tomasz.najder@hotmail.com
Legal status: married, 2 children (adults).
Experience
Since 07/2005 Najder Engineering®
Stockholm
Senior Consultantwithin family company.
Activities as Senior Consultant for ISAM KABBANI & PARTNERS FOR CONSTRUCTION AND
MAINTENANCE
12/2008 –11/2009 for the project: UNDERPASS REPAIRS AT INTESECTION OF KING FAHD ROAD AND
PRINCE MOHAMMED BIN FAHD ROAD – DAMMAM (Saudi Arabia)
Client: KINGDOM OF SAUDI ARABIA – MINISTRY OF MUNICIPAL AND RURAL AFFAIRS,
MUNICIPALITY OF DAMAM – DEVELOPMENT AND PROJECTS DIRECTORATE
Tunnel Prime Contractor for concrete repairs: SINOPEC INTERNATIONAL PETROLEUM SERVICE
CORPORATION (China)
Tunnel Sub-contractor for concrete repairs (grouting): ISAM KABBANI & PARTNERS FOR
CONSTRUCTION AND MAINTENANCE (Jeddah – Saudi Arabia)
Work programme:
- The tunnel (underpass) repairs, commenced in April 2009, finished in February 2010.
Scope of work according to:
THE SUB-CONTRACT AGREEMENT
BETWEEN
SINOPEC INTERNATIONAL PETROLEUM SERVICE CORPORATION
(SAUDI BRANCH)
AND
ISAM KABBANI & PARTNERS FOR CONSTRUCTION AND MAINTENANCE
IN REGARDS TO
IMPROVEMENT OF INTERSECTION ALONG KING FAHED DAMMAM ROAD INTERSECTION
2. sid 2 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
“The Works to be carried out under this Subcontract shall include the following as stated in the Project Specification
(as per enclosed Annexure I), Project Drawings (as per enclosed Annexure II), Bill of Quantities (as per enclosed
Annexure III), and latest version of Sub-Contractor’s technical proposal as submitted to the Contractor and
Consultant, considered complimentary to each other.
1.1. Preparation and submittal of all technical documents describing the Works which include but are not
limited to detailed shop drawings, material technical data sheets, method statements.
1.2. Preparation of a structural inspection plan for the evaluation of the main structure frame of the Underpass.
Inspection shall concern top surface of bottom foundation slab and cold joints between original floor slab
and vertical walls.
1.3. Execution of all inspection works as described in inspection plan.
1.4. Preparation and submittal of inspection findings report and recommendation for further inspection
techniques if needed.
Additional assessment services not included in initial plan shall be considered as supplementary works not
covered by this Sub-Contract and shall require approval from all parties (Contractor, Consultant and
Owner) upon Sub-Contractor’s commercial and technical submittal.
Execution of repair works and remedial waterproofing shall begin after the submittal of inspection findings,
final review of technical details and revised material selection (if revision is needed).
1.5. Execution of repair works and treatment for all expansion joints in walls and raft through:
1.5.1. Injecting curtain grouting material as needed, treating possible anomalies and temporarily stop water
leakage.
1.5.2. Building up a permanent system for treatment of water leakage along with all required accessories
(i.e. sealing tape).
1.5.3. Preparation of expansion joints of walls is not included and is to be carried out by the Contractor
whereby joints must be opened over entire length and cleared of all foreign materials and debris until
a minimum depth of 20-30 cm.
Edges are also to be cleaned by the Contractor by use of high pressure water jet.
1.6. Execution of crack repair works through walls, tie rod holes and at top surface of existing bottom
foundation slab as follows:
1.6.1. All leaking/active cracks shall be injected with appropriate material according to the level of moisture
and crack parameters.
1.6.2. All non-leaking/inactive cracks shall be prepared and filled with plugging cementitious material.
1.6.3. Insertion of vapor phase inhibitor material through walls in order to protect reinforcement bars from
excessive corrosion.
1.7. Treatment of leaks at bottom longitudinal construction joints by installing water bars and post-injection
sealing system.
1.8. Submittal of recommended waterproofing admixture ratios for mix composition for 1 M3
(one cubic meter)
of fresh compacted concrete for Consultant’s approval.
1.9. Supply, place and supervision of waterproofing admixture in new mass concrete at approved rate currently
estimated at 7Kg/M3
for 350Kg of cement per M3
.
Application of envelope system whereby 63% of total concrete mass shall contain aforementioned
admixture ensuring slab protection from all directions and water-tightness.
3. sid 3 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
1.10. Preparation and waterproofing treatment of floor and wall surfaces through application of cementitious
slurry coating.
1.11. Design, engineering, supply, installation and initialization of a long term monitoring system to be used by
Owner for observing overall structural behavior of the Underpass and detecting any anomalies or failures
for duration no less than two years and not exceeding five years.
Initialization of system and training of Owner’s staffs on system operation.
Providing Owner with continuous technical support during lifetime of system.
Part of aforementioned system shall be installed at the beginning of the Works in order to monitor the
structural behavior of the Underpass during the project”.
Grouting activities:
The short list of grouting activities for repairs:
1. Sealing of transverse expansion joints in the bottom slab.
2. Filling of cavities under the bottom slab in combination with point 1 (optionally).
3. Sealing of construction joints (horizontal and vertical) in the bottom slab.
4. Sealing of expansion joints in the cantilever walls.
5. Sealing of construction joints between new bottom (top) slab and cantilever walls and leaking horizontal
construction joints within cantilever walls.
6. Sealing of vertical cracks in the lower bottom slab and in cantilever walls.
7. Re-grouting of injection hoses (optionally – as completion to points 1, 3, 4, and 5).
4. sid 4 av 13
Najder engineering®
Movägen 3; SE-133 36 Saltsjöbaden/Sweden
Tel: +46 8 717 5714 Fax: +46 8 717 6042 Mobil: +46 (0)704 217 012
Org. no: 490911-2148 VAT-no: SE490911214801 E-mail: tomasz.najder@hotmail.com http://najder.se/
Method Statement - grouting of construction joints:
- This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water
leakages in the construction joints within concrete bottom slab and cantilever walls.
Method Statement – grouting of expansion joints:
- This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water
leakages in the expansion joints within concrete bottom slab and cantilever walls.
Method Statement - grouting for sealing cracks:
- This Method Statement concerned the choice of grouting method and materials for grouting to eliminate the water
leakages in the cracks of concrete bottom slab and cantilever walls.
Method Statement - grouting for soil improvement by undersealing:
- This Method Statement concerned the choice of grouting methods and materials for undersealing grouting (grouting
in the soil to increase Relative Density (Dr) (%) in the silty-sandy layer just under the reinforced concrete slab).