NOTABLE PROJECTS
OF BOBBY G. SKAGGS
2006-2015 CITYOF OKLAHOMA CITYPRIMARYCONTROL NETWORK
Job Title: Chief Surveyor
Role: Conducted 400+ static GPS surveys; a combination of post processed with Trimble Business Center,most
post processed through NGS’s OPUS. Analyzed, weighted and adjusted results for reporting. Since 2006, this has
been a routine and ongoing process and since 2008 the process has been Trimble R8 and R10 GPS rovers operating
on the WDS RTN Network.
Role: Planned, managed, established QAQC measures,developed a long range plan for perpetuation
2001-Present CITYOF OKLAHOMA CITYUntold miles ofRight ofWay Surveys
Job Title: Chief Surveyor
Role: Performed a wide variety of right of way surveys, for acquisition and
2007-Present OKLAHOMARIVER HYDROGRAPHICBATHYMETRICSURVEYS
Employer: City of Oklahoma City
Job Title: Chief Surveyor
Role: Performed semiannual bathymetric surveys of the Oklahoma River on all three basins; 7.5 miles per survey.
2001-Present CITY OF OKLAHOMA CITYToo many EngineeringTopographic surveys to list.
Job Title: Chief Surveyor
Role: Administer and manage engineering, construction, and land surveys and a team of
2000-2001 Clour Engineering and self-employed, Priority Land Surveying-More than 80 ALTA surveys for
cellular towers across Oklahoma, mostofwhich required FAA 1A and 2C certifications.
Job Title: Surveyor
Role: Survey Manager
2000 OKLAHOMATURNPIKEAUTHORITY-Kilpatrick Turnpike extension
Employer: Duitt Constrction
Job Title: Surveyor
Role: Construction Staking, alignment, slope staking, base,sub-base, paving, drainage, etc.
1996-1999 Residential and Commercial Development-
Employer: Design EngineersThe Benham Group
Job Title: Construction ManagerSurvey Coordinator
Role: Manage and Inspect, coordinate surveys for residential and commercial developments throughout the
Oklahoma City metro area and across the state.
1996 CITYOF CLINTON,OK WATERLINE IMPROVEMENTS- 17 miles of 24” waterline, river and creek
crossing, appurtenances.
Employer: Glenn Briggs and Associates
Job Title: Construction Inspector
Role: Construction inspection of a cross country DIP waterline, including highway and railroad bores, creek and
river crossings.
1995-1996 OKLAHOMA TURNPIKE AUTHORITY-AnnualFacilitiesMaintenance Inspection and Evaluation
on the H.E. Baily and Kilpatrick turnpikes.
Employer: Poe and Associates
Job Title: FacilitiesConstruction Inspector
Role: Inspect, evaluate and report condition of PCC and AC paving, joints, drainage structures,etc.
1996 WILL ROGERS WORLD AIRPORT-AnnualFacilitiesMaintenance Inspection and Evaluation
Employer: Poe and Associates
Job Title: Facilities Inspector
Role: Inspect, evaluate and report condition of runways and taxiways, concrete paving, joints, drainage structures,
etc.
1991-1993 CITYOF ANADARKO WASTEWATER TREATMENT FACILITIES - A WWTF plant
expansion; clarifiers, lift station, outfall line, headworks, etc.
Employer: Poe and Associates
Job Title: Construction Inspector
Role: Coordinate construction, inspection, submittal review, concrete testing, process change orders
1992-1993 DEER CREEK RESERVOIR(later named WESS WATKINS RESERVOIR)
Employer: Merco Consultants for Pottawattamie Development Authority.
Job Title: Survey Party Chief, Engineering Technician,draftsman
Role: Topographic and boundary survey for an SCS funded1800 acre reservoir
1991-1993 CITYOF OKC DRAPER WATER LINE EXTENSION
Job Title: Construction Manager
Role: Coordinate construction, inspection, submittal review, plant inspection of PSCCP,review and process change
orders, conduct construction meetings.
1989-1990 CITYOF ARDMORE WASTEWATER TREATMENT FACILITIES AND LIFT STATION D-
A WWTF plant expansion; clarifiers, lift station, outfall line, headworks, etc.
Employer: Merco Consultants
Job Title: Chief InspectorConstruction Manager
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders
1989-1991 CITYOF MOOREWASTEWATER TREATMENT FACILITIES (two phases) - A WWTF plant
expansion; clarifiers, RBC & structures,lift station, yard piping, headworks, etc.
Employer: Merco Consultants
Job Title: Chief InspectorProject Manager
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct
construction meetings. set up filerecord system to comply with Federally funded project (EPA)
1986-1990 MIDWEST CITYWASTEWATER TREATMENT FACILITIES(two phases) - A WWTF plant
expansion; clarifiers, RBC & structures,lift station, yard piping, headworks, etc.
Employer: Merco Consultants
Job Title: Chief Inspector
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct
construction meetings. set up filerecord system to comply with Federally funded project (EPA)
1988-89 HUGO, OK WASTEWATER TREATMENT FACILITIES - A WWTF plant expansion; clarifiers,
structures,lift station, yard piping, headworks, etc.
Employer: Merco Consultants
Job Title: Chief InspectorResident Engineer
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct
construction meetings.
1987-1989 OKC MID-URBAN INTERCEPTOR (six phases – 7 miles of 48”-96” sanitary sewer lines, street and
highway tunnels, with a 3 barrel inverted siphon across the North Canadian River
Employer: Merco Consultants
Job Title: Chief InspectorResident Engineer
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, initiate
Field Change Orders, conduct construction meetings, set up filerecord system to comply with Federally funded
project (EPA)
1987-88 DEL CITY, OK- A WWTF plant expansion; clarifiers, RBC & structures,lift station, yard piping,
headworks, etc.
Employer: Merco Consultants
Job Title: Chief InspectorResident Engineer
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct
construction meetings. set up filerecord system to comply with Federally funded project (EPA)
1987-88 OKC CowCreek WWTF- A WWTF plant facilities; clarifiers, Filters, Sequencing Batch Reactor
(SBR), extended aeration & structures, lift station, yard piping, headworks, etc.
Employer: Merco Consultants
Job Title: Chief InspectorResident Engineer
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct
construction meetings. set up filerecord system to comply with Federally funded project (EPA)
1982-1984 Newcastle,Ok Water Treatment Facilities and waterline-(Two phases) clearwell,clarifiers, gravity
filters, High Service pumps, Pipe gallery and control piping, yard piping, etc.
Employer: Poe and Associates
Job Title: Resident Construction Inspector
Role: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs,monthly estimates,
etc.
1982-1984 Norman, Ok Water Treatment Facilities-(Two phases) 6.5 MGreinforced concrete clearwell,
clarifiers, gravity filters, High Service pumps, Pipe gallery and control piping, yard piping, etc.
Employer: Poe and Associates
Job Title: Resident Construction Inspector
Role: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs,monthly estimates,
etc.
1980-1982 Mustang Water Improvements-(Three phases) A one million gallon storage tank, booster pump
station, 6 deep (500’-800’ Garber-Wellington) wells and 16+ miles of 6”-16” DIP water line, bores, etc.
Job Title: Resident Construction Inspector
Role: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs, monthly estimates,
etc.
1980 CITYOF SULPHUR, OK Outfall S.S. and Inverted Siphon - A Sanitary Sewer Outfall Sewer line with
an 3 barrelinverted siphon across a creek.
Employer: Poe and Associates
Job Title: Construction Inspector
Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct
construction meetings. set up filerecord system to comply with Federally funded project (EPA)
1979-1980 Tulsa International Airport-TaxiwayRunway construction, drainage, lighting, PCC reinforced and
non reinforced paving, etc.
Employer: Howard Needles, Tammen & Bergondoff
Job Title: Resident Construction Inspector
Role: Resident Inspection, evaluate and report, monthly estimates, etc.

NOTABLE PROJECTS

  • 1.
    NOTABLE PROJECTS OF BOBBYG. SKAGGS 2006-2015 CITYOF OKLAHOMA CITYPRIMARYCONTROL NETWORK Job Title: Chief Surveyor Role: Conducted 400+ static GPS surveys; a combination of post processed with Trimble Business Center,most post processed through NGS’s OPUS. Analyzed, weighted and adjusted results for reporting. Since 2006, this has been a routine and ongoing process and since 2008 the process has been Trimble R8 and R10 GPS rovers operating on the WDS RTN Network. Role: Planned, managed, established QAQC measures,developed a long range plan for perpetuation 2001-Present CITYOF OKLAHOMA CITYUntold miles ofRight ofWay Surveys Job Title: Chief Surveyor Role: Performed a wide variety of right of way surveys, for acquisition and 2007-Present OKLAHOMARIVER HYDROGRAPHICBATHYMETRICSURVEYS Employer: City of Oklahoma City Job Title: Chief Surveyor Role: Performed semiannual bathymetric surveys of the Oklahoma River on all three basins; 7.5 miles per survey. 2001-Present CITY OF OKLAHOMA CITYToo many EngineeringTopographic surveys to list. Job Title: Chief Surveyor Role: Administer and manage engineering, construction, and land surveys and a team of 2000-2001 Clour Engineering and self-employed, Priority Land Surveying-More than 80 ALTA surveys for cellular towers across Oklahoma, mostofwhich required FAA 1A and 2C certifications. Job Title: Surveyor Role: Survey Manager 2000 OKLAHOMATURNPIKEAUTHORITY-Kilpatrick Turnpike extension Employer: Duitt Constrction Job Title: Surveyor Role: Construction Staking, alignment, slope staking, base,sub-base, paving, drainage, etc. 1996-1999 Residential and Commercial Development- Employer: Design EngineersThe Benham Group Job Title: Construction ManagerSurvey Coordinator Role: Manage and Inspect, coordinate surveys for residential and commercial developments throughout the Oklahoma City metro area and across the state. 1996 CITYOF CLINTON,OK WATERLINE IMPROVEMENTS- 17 miles of 24” waterline, river and creek crossing, appurtenances. Employer: Glenn Briggs and Associates Job Title: Construction Inspector Role: Construction inspection of a cross country DIP waterline, including highway and railroad bores, creek and river crossings.
  • 2.
    1995-1996 OKLAHOMA TURNPIKEAUTHORITY-AnnualFacilitiesMaintenance Inspection and Evaluation on the H.E. Baily and Kilpatrick turnpikes. Employer: Poe and Associates Job Title: FacilitiesConstruction Inspector Role: Inspect, evaluate and report condition of PCC and AC paving, joints, drainage structures,etc. 1996 WILL ROGERS WORLD AIRPORT-AnnualFacilitiesMaintenance Inspection and Evaluation Employer: Poe and Associates Job Title: Facilities Inspector Role: Inspect, evaluate and report condition of runways and taxiways, concrete paving, joints, drainage structures, etc. 1991-1993 CITYOF ANADARKO WASTEWATER TREATMENT FACILITIES - A WWTF plant expansion; clarifiers, lift station, outfall line, headworks, etc. Employer: Poe and Associates Job Title: Construction Inspector Role: Coordinate construction, inspection, submittal review, concrete testing, process change orders 1992-1993 DEER CREEK RESERVOIR(later named WESS WATKINS RESERVOIR) Employer: Merco Consultants for Pottawattamie Development Authority. Job Title: Survey Party Chief, Engineering Technician,draftsman Role: Topographic and boundary survey for an SCS funded1800 acre reservoir 1991-1993 CITYOF OKC DRAPER WATER LINE EXTENSION Job Title: Construction Manager Role: Coordinate construction, inspection, submittal review, plant inspection of PSCCP,review and process change orders, conduct construction meetings. 1989-1990 CITYOF ARDMORE WASTEWATER TREATMENT FACILITIES AND LIFT STATION D- A WWTF plant expansion; clarifiers, lift station, outfall line, headworks, etc. Employer: Merco Consultants Job Title: Chief InspectorConstruction Manager Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders 1989-1991 CITYOF MOOREWASTEWATER TREATMENT FACILITIES (two phases) - A WWTF plant expansion; clarifiers, RBC & structures,lift station, yard piping, headworks, etc. Employer: Merco Consultants Job Title: Chief InspectorProject Manager Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up filerecord system to comply with Federally funded project (EPA) 1986-1990 MIDWEST CITYWASTEWATER TREATMENT FACILITIES(two phases) - A WWTF plant expansion; clarifiers, RBC & structures,lift station, yard piping, headworks, etc. Employer: Merco Consultants Job Title: Chief Inspector Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up filerecord system to comply with Federally funded project (EPA)
  • 3.
    1988-89 HUGO, OKWASTEWATER TREATMENT FACILITIES - A WWTF plant expansion; clarifiers, structures,lift station, yard piping, headworks, etc. Employer: Merco Consultants Job Title: Chief InspectorResident Engineer Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. 1987-1989 OKC MID-URBAN INTERCEPTOR (six phases – 7 miles of 48”-96” sanitary sewer lines, street and highway tunnels, with a 3 barrel inverted siphon across the North Canadian River Employer: Merco Consultants Job Title: Chief InspectorResident Engineer Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, initiate Field Change Orders, conduct construction meetings, set up filerecord system to comply with Federally funded project (EPA) 1987-88 DEL CITY, OK- A WWTF plant expansion; clarifiers, RBC & structures,lift station, yard piping, headworks, etc. Employer: Merco Consultants Job Title: Chief InspectorResident Engineer Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up filerecord system to comply with Federally funded project (EPA) 1987-88 OKC CowCreek WWTF- A WWTF plant facilities; clarifiers, Filters, Sequencing Batch Reactor (SBR), extended aeration & structures, lift station, yard piping, headworks, etc. Employer: Merco Consultants Job Title: Chief InspectorResident Engineer Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up filerecord system to comply with Federally funded project (EPA) 1982-1984 Newcastle,Ok Water Treatment Facilities and waterline-(Two phases) clearwell,clarifiers, gravity filters, High Service pumps, Pipe gallery and control piping, yard piping, etc. Employer: Poe and Associates Job Title: Resident Construction Inspector Role: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs,monthly estimates, etc. 1982-1984 Norman, Ok Water Treatment Facilities-(Two phases) 6.5 MGreinforced concrete clearwell, clarifiers, gravity filters, High Service pumps, Pipe gallery and control piping, yard piping, etc. Employer: Poe and Associates Job Title: Resident Construction Inspector Role: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs,monthly estimates, etc. 1980-1982 Mustang Water Improvements-(Three phases) A one million gallon storage tank, booster pump station, 6 deep (500’-800’ Garber-Wellington) wells and 16+ miles of 6”-16” DIP water line, bores, etc. Job Title: Resident Construction Inspector Role: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs, monthly estimates, etc.
  • 4.
    1980 CITYOF SULPHUR,OK Outfall S.S. and Inverted Siphon - A Sanitary Sewer Outfall Sewer line with an 3 barrelinverted siphon across a creek. Employer: Poe and Associates Job Title: Construction Inspector Role: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up filerecord system to comply with Federally funded project (EPA) 1979-1980 Tulsa International Airport-TaxiwayRunway construction, drainage, lighting, PCC reinforced and non reinforced paving, etc. Employer: Howard Needles, Tammen & Bergondoff Job Title: Resident Construction Inspector Role: Resident Inspection, evaluate and report, monthly estimates, etc.