SlideShare a Scribd company logo
1 | P a g e
Confidential
1
+91 9661110852
Shahnawaz-ali@outlook.com
alimcse2k3
Shahnawaz Ali
Career Summary
Versatile, results-driven IT management expert with 12+ years of extensive and diversified international
exposure with a successful career, creating vision and delivering most efficient support for current
operations and future needs. I have worked for companies involved in Marine, Shipping, Airport, Banking,
IT/Telecom, FMCG & Steel.
Exceptional at Strategic Performance Management (Datacenter planning, Server / Virtualization & Cloud
(IaaS), Microsoft, BCP/DRS, Storage Solutions (SAN), Networking, Security.
Worked extensively with Sr. Manager, Project Consultants and Audit Members in the areas of:
Project Development
ICT Technical Evaluation
Datacenter Planning and Management
Server, Network & Security Planning
Disaster Recovery and Business Continuity Plan
Highly skilled at managing business practices that strive toward zero breakdowns in process,
communication and the technical aspects of IT support methodology.
Core Competencies
- Azure Cloud & Office 365 - Windows Server Infrastructure
- VMware / Hyper-V virtualization - SAN Infrastructure Management
- Office 365, MFA & AirWatch - Network & Security Infrastructure
- Oracle/SQL ERP & Database - Enterprise Backup Management
- Antivirus/Spam/Archive - Technical Documentation
- Disaster Recovery & BCP - Relationship Management
- Vendor Management - Team Management
- Incident Management - Change Management
2 | P a g e
Confidential
2
Selected Achievements
• Successfully deployed Cloud Migration on Microsoft Azure for the Group.
• IBM Power8 (Server & Storage) and VMware Virtualization for SEWA Datacenter Project.
• IBM PureFlex Converged Infrastructure (Server & Storage) and VMware Virtualization for Qatar
International Bank for new Datacenter Project for DC & DR locations.
• Successfully deployed Cloud Migration (IaaS) on Microsoft Azure for Qatar International Bank.
• Successfully deployed Office 365, AirWatch & RSA for Qatar International Bank.
• Successfully Project design & deployed Microsoft Infrastructure (Server, Virtualization, Storage & Core
Banking Database) for Afghan United Bank.
• ICT Tender Evaluation Committee member for Abu Dhabi International Airport MTB Project.
• Successfully designed and deployed Bio-metric solution for access control and Attendance.
• Successfully designed and deployed DataCore Solution for Hyper Converged System.
• Successfully designed and deployed Active & Passive Network & Security for Data Centers.
• Successfully designed & deployed Server Virtualization on VMware for Data Centers.
• Successfully designed & develop DR/BCP project on VMware SRM 5.5.
• Successfully designed and deployed the Microsoft Technology Solution for numerous companies.
• Successfully designed & deployed Antivirus Server/Clients (Symantec, McAfee and TrendMicro).
• Successfully designed and deployed the Storage Solution on IBM / HP for numerous companies.
• Develop presentations for senior management for IT Infrastructure projects.
• Conducted gap analyses to identify IT resources availability issues.
• Developed and initiated IT auditing, and ISO 9001-2008 best-practices procedures.
Technical Responsibilities
▪ Business practices that strive toward zero breakdowns & SLA towards 98.99%.
▪ Suggest & build solutions to next generation IT transformation for different Tier Datacenters.
▪ Worked with Pre-sales teams to build solutions in response to RFPs, BOQ, Defend solutions.
▪ Develop & deploy Solution for Cloud (IaaS) on Microsoft Azure.
▪ Design & Deployed Microsoft Technology Solution (ADS, DNS, DHCP, Exchange Server).
▪ Design, Deployed VMware vSphere 6.0 in HA, FT, DRS and VM vMotion & Storage vMotion.
▪ Design, Deployed VMware Site Recovery Manager (SRM) with RPO and RTO.
▪ Design, Configure new Server Farm with Windows Server 2008/2012 R2 in multiple roles.
▪ Design, Configure multisite Exchange Server 2010 in (DAG) Database-Clustering with multiple
Roles Servers (Edge, HUB, CAS, Mailbox) at DC and DR Sites.
▪ Develop & deploy Servers/Nodes on IBM PureFlex/ Power8, HP c7000 & Dell m1000 Chassis.
▪ Deploy and configure SAN solutions on IBM V7000, DS8800 & EMC VMAX upto 40 PB storage.
▪ Design, Install & Configure WAN with Cisco 3900, 2900 Routers & Juniper M960 Router.
▪ Design, Install & Configure LAN with Cisco 6500/ 4500 / 3750/ 2950 & HP E5412/E2910.
▪ Design, Install & Configure Security with Palo Alto 850, FortiGate 500D Firewall in HA.
3 | P a g e
Confidential
3
Career Path
IT Infrastructure Development & Support Lead August 2017– till now
Shipping & Marine Management
• Evaluate, Capacity, Architecture planning for Azure Migration Project.
• Migrate on-premises Virtual Machines to Microsoft Azure Cloud (IaaS) using ASR.
• Prepare Azure ASR for Disaster Recovery Solution on Microsoft Azure (IaaS).
• Migrate Azure Subscription VMs to another Region subscriptions using Move tool.
• Plan and build new Office365 Subscription for Email, BI and Office Suite with Skype for Business.
• Manage current On-premises Virtualization on VMware vSphere 6.5 for Remote location Offices.
• Office 365 with MFA & AirWatch for Mobile Device management for the Group.
• Exchange Server 2010 in (DAG) cluster & Windows Server 2008 R2 (ADS,DNS,DHCP,DFS).
• Manage on-premises Datacenters between MU and MC replication and HP SAN.
• Responsible for the IT Infrastructure Service Delivery at Global level on ServiceNow.
• Develop IT staff for operational Service Desk support and manage Layer3 escalations.
Project Lead - IT Infrastructure
Infobhan Systems & Services, Qatar June 2017– July 2017
(Client: Qatar Steel) www.qatarsteel.com.qa (2 months contract-based)
Azure, DataCore, Windows Server 2008/2012 & Exchange Server 2010, VMware 6.0, Hyper-V 2012,
Barracuda ArchiveOne /Load balancer, Forcepoint, FireEye project for 2 months.
Project Manager July 2016 – May 2017
Sourcing Solution Technology, UAE
(Client: Sharjah Electricity Water Authority) www.sewa.gov.ae (11 months contract)
Design, Develop & Deployment:
• Capacity planning & evaluation for provisioning Datacenter.
• Develop migration for IBM Server, SAN and Virtualization.
• Prepare Azure ASR for Disaster Recovery Solution on Microsoft Azure (IaaS).
• Microsoft Exchange Online & AirWatch for SaaS Email & Security for MDM.
• Datacenter Virtualization on VMware 6.0 and migration Physical Server to virtual (P2V).
• Active Directory migration from Windows Server 2008 R2 to Windows Server 2012 R2.
• Microsoft SQL Server Always ON for block level database redundancy across DC.
• Enterprise Backup management on Veritas Net Backup for Server, Database & Cloud.
• PaloAlto Firewall for Network Security & F5 Load Balancers.
• Deployment of Tivoli Storage Manager for Server & Virtualization.
• Deployed Trend Micro Deep Security Antivirus for Server, Clients, Cloud Security.
• Develop IT staff for operational Service Desk support and manage Layer3 escalations.
•
4 | P a g e
Confidential
4
System Architect – IT Infrastructure Jan 2015 to March 2015
Crystal Solution, Doha, Qatar
(Client: Qatar International Islamic Bank) www.qiib.com.qa (3 months contract)
• Datacenter evaluation, planning for Disaster risk benchmarking.
• Migrate on-premises Virtual Machines to Microsoft Azure Cloud (IaaS) using ASR.
• Office 365 for Email, AirWatch for MDM & RSA two factor authentication.
• Server Virtualization on VMware vSphere 5.5
• IBM PureFlex Converged Infrastructure Blade (x240) & (p260) and V7000.
• Windows Server 2012 R2, Microsoft Exchange Server 2010, ADS & System Center 2012.
• Storage (SAN) on IBM storewize V7000 & DS 8800 for DC & DR Sites.
• Backup management on IBM Tivoli Storage Manager.
• Array based replication on IBM Storage to DR Site for VM and database.
• Disaster Recovery for Critical Servers on & VMware Site Recovery Manager 5.5
IT Project Manager Nov 2013 to Oct 2014
Arowana Consulting, Abu Dhabi, UAE
(Client: Abu Dhabi Int’ Airport MTB Project www.adac.ae/english/mtp
• Develop specifications for Airport IT infrastructure and DataCenters.
• Translate business objectives into RFI, RFQ, SOW and evaluate vendor proposals, materials
submittal and conduct vendor performance reviews and PoC..
• Contributed to Project Management Plan & owned the execution of same.
• Design, plan & own the test bed infrastructure for Data Center Virtualization.
• Capacity Planning and Technical Tender Evaluation of IT Infrastructure for deployment at Airport
Terminal, including but not limited to, Storage (SAN), Server infrastructure & Virtualization.
• Capacity Planning and Technical Evaluation for Active network and passive infrastructure cabling.
• Evaluate Storage Vendors (IBM XIV, EMC VMAX, HP 3PAR) for capacity & architecture for large
volume data & video seeding deployments (40PB & 60PB storage).
• Submits timely status reports to PMO & Committee according to the project communication plan.
• Conducts an IT Infrastructure assessment of vendor quality, expertise, and costs when selecting a
vendor.
5 | P a g e
Confidential
5
Section Head Network & Infrastructure Mar 2011 to Feb 2013
Oman Drydock Company S.A.O.C, Oman
www.omandrydock.com
Functional Responsibilities: Design, deploy & manage IT infrastructure
• Validate BOQ, evaluate vendor proposals negotiate contracts, conduct vendor performance,
reviews pre & post tender assignment.
• Suggest & build solutions to next generation IT transformation on premise Datacenter.
• Dell M1000e enclosure with multiple blade server for Virtual infrastructure on VMware.
• Exchange Server 2010 in (DAG) cluster & Windows Server 2008 R2 (ADS,DNS,DHCP,DFS).
• Server Virtualization on VMware vSphere 4.1 and VMware Site Recovery Manager (SRM).
• HP EVA 6400 SAN of 10 TB storage connected through Brocade SAN switches.
• ServiceDesk management on Symantec ServiceDesk 7.0 for 6000 end-users.
• FortiGate Firewall for Network Security & Barracuda Application Load Balancers.
• RFID Bio-metric installation & Maintenance to record attendance for building access and payroll.
• Design Cisco Core, Distribution & Access Switching for large Scale production environment.
• Design Cisco Router, Cisco ASA Firewalls & MPLS/ ILL for HO and remote.
• Design Fiber backbone in & out connectivity for Datacenter, Dark Fiber to outer-ring & Copper.
• Management of IT staff development, Training & Helpdesk tickets for operational support.
Sr. IT Infrastructure Engineer Aug 2010 to Dec 2010
Afghan United Bank, Kabul, Afghanistan
www.afghanunitedbank.com
• Create technical documentation, architecture design, change management, operations handbooks.
• Design, deploy & manage IT infrastructure
✓Windows Server 2008 R2 Hyper-V for Server Virtualization.
✓Microsoft Exchange 2007 in clusters for failover between Kabul & Dubai.
✓DC, Active Directory & File Server, Antivirus Server on Windows Server 2008 R2.
✓AIX Server & Oracle Database on IBM Blade Server.
✓Migrate Microsoft ISA Server 2006 to Microsoft Treat Management Gateway (TMG) 2010
• Technical support to Flexcube & SQL Database to Core Banking Solution.
• Disaster Recovery planning to support the business continuity plan.
Technical Consultant May 2009 to May 2010
iNetlink Technologies, Dubai & Afghanistan
• Create technical documentation, architecture design, change management, operations.
• Design & commission Cisco Nexus Switching for corporate LAN and WAN.
• Rollout Windows Server 2003/2008 on Hyper-V Server Virtualization.
• Disaster Recovery planning to support the business continuity plan.
• Deploy Windows 2003/2008 on HP & Dell Blades, configured on Raid-1 & 5
• Deploy Windows Server 2008 R2 clusters in multiple roles (ADS, DNS, DHCP, File/Print Servers)
6 | P a g e
Confidential
6
Network Engineer Dec 2006 – Feb 2009
Almarai Company, Jeddah, Saudi Arabia
www.almarai.com
• Inventory / license management and timely procurement.
• Configuration management of Cisco 2500/2600/2800 routers & 2950/3550/3560GL switches.
• Proactive monitoring & configuration management of server clusters comprising of Windows
Server 2003, Exchange 2003…
• Coordinate all network/link activities with Saudi Telecom (STC); our WAN network provider.
• Setup a Change Management Process and tracked adherence to limit operational impact.
• Setup KABA access control system for building Door and Entry for all staff and Visitors.
Network Administrator May 2006 - Dec 2006
TajOnline India Pvt. Ltd, Mumbai, India
Network Administrator June 2004 - Dec 2005
Sify. Ltd, Mumbai, India
Academic Credentials
Master’s in Business Administration (M.B.A) June 2010 – June 2012
Manav Bharti University, India (UAE Attested degree)
Bachelor of Arts (B.A) Sep 2001 – Sep 2004
Magadh University, India
Certification Credentials
❖ PRINCE2 (Project Management)
❖ ITIL V3 (IT Infrastructure Management)
❖ Microsoft Certified Solutions Expert: Productivity :2018
❖ Microsoft Certified Solutions Expert: Cloud Platform and Infrastructure :2018
❖ Microsoft Azure Specialist (Microsoft Cloud Infrastructure)
❖ Microsoft Windows Server 2012 Hyper-V and System Center Specialist
❖ DataCore Certified Implementation Engineer
❖ VCP 5.5 (VMware Certified Professional- Cloud)
❖ VCP 4.1 (VMware Certified Professional- Datacenter-V)
❖ MCTS (Microsoft Certified Technology Specialist)
❖ MCSE (Microsoft Certified Systems Engineer)
❖ MCSA (Microsoft Certified Systems Administrator)
❖ CCNA (Cisco Certified Network Associate)
7 | P a g e
Confidential
7
Trainings Attended
➢ DataCore (DCIE) Training, Mumbai, India
➢ Certified Auditor (ISO 9001-2008 & OHSAS 18001), ABS Group, UAE
➢ Windows Server 2012 Hyper-V and System Center Specialist, New Horizons, Dubai, UAE
➢ PRINCE2 & ITIL V3, (ProjectingIT), New Delhi, India
➢ Microsoft Azure (Cloud), Koenig Solutions, Delhi, India
➢ VMware vCenter Site Recovery Manager 6.0, Koenig Solutions, Bangalore, India
➢ VCP 4.1 (VMware Certified Professional), VTP, Pune, India
➢ EMC ISM Storage Workshop, Dubai, UAE
➢ Best Employee of the Year, Oman Drydock Company, Oman
Personal Details
Father Name Kalim Ahmad
Date of Birth 01st
March 1985
Marital Status Married
Languages Known Arabic, English, Hindi & Urdu
Nationality Indian
Religion Islam
Passport Details J5024362, valid till 23/12/2020
Driving License Valid – U.A.E & INDIA

More Related Content

What's hot

Logicalis Cloud Briefing
Logicalis Cloud BriefingLogicalis Cloud Briefing
Logicalis Cloud Briefing
Logicalis Australia
 
Ready solutions with Red Hat
Ready solutions with Red HatReady solutions with Red Hat
Ready solutions with Red Hat
Caio Candido
 
OCI Overview
OCI OverviewOCI Overview
OCI Overview
Kamil Wieczorek
 
VMworld 2013: SDDC is Here and Now: A Success Story
VMworld 2013: SDDC is Here and Now: A Success Story VMworld 2013: SDDC is Here and Now: A Success Story
VMworld 2013: SDDC is Here and Now: A Success Story
VMworld
 
Red Hat Container Strategy
Red Hat Container StrategyRed Hat Container Strategy
Red Hat Container Strategy
Red Hat Events
 
Infrastructure as a service (iaa s)
Infrastructure as a service (iaa s)Infrastructure as a service (iaa s)
Infrastructure as a service (iaa s)
johndorian555
 
Veritas - Software Defined Storage
Veritas - Software Defined StorageVeritas - Software Defined Storage
Veritas - Software Defined Storage
Jürgen Ambrosi
 
Microsoft ignite 2018 SQL server 2019 big data clusters - deep dive session
Microsoft ignite 2018 SQL server 2019 big data clusters - deep dive sessionMicrosoft ignite 2018 SQL server 2019 big data clusters - deep dive session
Microsoft ignite 2018 SQL server 2019 big data clusters - deep dive session
Travis Wright
 
20140510_ralph_padula_resume_v4
20140510_ralph_padula_resume_v420140510_ralph_padula_resume_v4
20140510_ralph_padula_resume_v4Ralph Padula
 
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
Sashikris
 
Akram siddiqui(1)
Akram siddiqui(1)Akram siddiqui(1)
Akram siddiqui(1)
Akram Siddiqui
 
Enabling the Software Defined Data Center for Hybrid IT
Enabling the Software Defined Data Center for Hybrid ITEnabling the Software Defined Data Center for Hybrid IT
Enabling the Software Defined Data Center for Hybrid IT
NetApp
 
Introduction to Java Cloud Service
Introduction to Java Cloud ServiceIntroduction to Java Cloud Service
Introduction to Java Cloud Service
Perficient, Inc.
 
Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...
Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...
Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...
Hitachi Vantara
 
Oracle Database Consolidation with FlexPod on Cisco UCS
Oracle Database Consolidation with FlexPod on Cisco UCSOracle Database Consolidation with FlexPod on Cisco UCS
Oracle Database Consolidation with FlexPod on Cisco UCS
NetApp
 
Storage Management with vRealize Operations
Storage Management with vRealize OperationsStorage Management with vRealize Operations
Storage Management with vRealize Operations
Virtualization and Cloud Management Solutions
 
Joint NetApp and Cisco Solutions for SAP: FlexPod and HANA
Joint NetApp and Cisco Solutions for SAP: FlexPod and HANAJoint NetApp and Cisco Solutions for SAP: FlexPod and HANA
Joint NetApp and Cisco Solutions for SAP: FlexPod and HANA
NetApp
 
22by7 and DellEMC Tech Day July 20 2017 - Isilon
22by7 and DellEMC Tech Day July 20 2017 - Isilon22by7 and DellEMC Tech Day July 20 2017 - Isilon
22by7 and DellEMC Tech Day July 20 2017 - Isilon
Sashikris
 

What's hot (20)

Logicalis Cloud Briefing
Logicalis Cloud BriefingLogicalis Cloud Briefing
Logicalis Cloud Briefing
 
Rackspace
RackspaceRackspace
Rackspace
 
Ready solutions with Red Hat
Ready solutions with Red HatReady solutions with Red Hat
Ready solutions with Red Hat
 
OCI Overview
OCI OverviewOCI Overview
OCI Overview
 
VMworld 2013: SDDC is Here and Now: A Success Story
VMworld 2013: SDDC is Here and Now: A Success Story VMworld 2013: SDDC is Here and Now: A Success Story
VMworld 2013: SDDC is Here and Now: A Success Story
 
Red Hat Container Strategy
Red Hat Container StrategyRed Hat Container Strategy
Red Hat Container Strategy
 
Infrastructure as a service (iaa s)
Infrastructure as a service (iaa s)Infrastructure as a service (iaa s)
Infrastructure as a service (iaa s)
 
Veritas - Software Defined Storage
Veritas - Software Defined StorageVeritas - Software Defined Storage
Veritas - Software Defined Storage
 
Microsoft ignite 2018 SQL server 2019 big data clusters - deep dive session
Microsoft ignite 2018 SQL server 2019 big data clusters - deep dive sessionMicrosoft ignite 2018 SQL server 2019 big data clusters - deep dive session
Microsoft ignite 2018 SQL server 2019 big data clusters - deep dive session
 
20140510_ralph_padula_resume_v4
20140510_ralph_padula_resume_v420140510_ralph_padula_resume_v4
20140510_ralph_padula_resume_v4
 
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
 
Akram siddiqui(1)
Akram siddiqui(1)Akram siddiqui(1)
Akram siddiqui(1)
 
Enabling the Software Defined Data Center for Hybrid IT
Enabling the Software Defined Data Center for Hybrid ITEnabling the Software Defined Data Center for Hybrid IT
Enabling the Software Defined Data Center for Hybrid IT
 
Introduction to Java Cloud Service
Introduction to Java Cloud ServiceIntroduction to Java Cloud Service
Introduction to Java Cloud Service
 
Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...
Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...
Quickly Deploy Microsoft Private Cloud and SQL Server 2012 Data Warehouse on ...
 
Oracle Database Consolidation with FlexPod on Cisco UCS
Oracle Database Consolidation with FlexPod on Cisco UCSOracle Database Consolidation with FlexPod on Cisco UCS
Oracle Database Consolidation with FlexPod on Cisco UCS
 
Storage Management with vRealize Operations
Storage Management with vRealize OperationsStorage Management with vRealize Operations
Storage Management with vRealize Operations
 
Giri Uppuganti
Giri UppugantiGiri Uppuganti
Giri Uppuganti
 
Joint NetApp and Cisco Solutions for SAP: FlexPod and HANA
Joint NetApp and Cisco Solutions for SAP: FlexPod and HANAJoint NetApp and Cisco Solutions for SAP: FlexPod and HANA
Joint NetApp and Cisco Solutions for SAP: FlexPod and HANA
 
22by7 and DellEMC Tech Day July 20 2017 - Isilon
22by7 and DellEMC Tech Day July 20 2017 - Isilon22by7 and DellEMC Tech Day July 20 2017 - Isilon
22by7 and DellEMC Tech Day July 20 2017 - Isilon
 

Similar to CV it infrastructure - shahnawaz ali

WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15William Lord
 
Franco arteseros resume
Franco arteseros resumeFranco arteseros resume
Franco arteseros resume
Franco Arteseros
 
dhiraj_dhall (1) (1)
dhiraj_dhall (1) (1)dhiraj_dhall (1) (1)
dhiraj_dhall (1) (1)dhiraj dhall
 
Resume_Achhar_Kalia
Resume_Achhar_KaliaResume_Achhar_Kalia
Resume_Achhar_KaliaAchhar Kalia
 
Spry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementSpry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementStephen Spry
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
Stephen Miller
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
Stephen Miller
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
Stephen Miller
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
Stephen Miller
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
Stephen Miller
 
RapidScale Product Training
RapidScale Product TrainingRapidScale Product Training
RapidScale Product Training
RapidScale
 
System Administrator_Sivaiah
System Administrator_SivaiahSystem Administrator_Sivaiah
System Administrator_SivaiahSivaiah Yakkanti
 
Rama kumar nadipalli
Rama kumar nadipalliRama kumar nadipalli
Rama kumar nadipalli
Rama Kumar
 
Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger Berlin
 

Similar to CV it infrastructure - shahnawaz ali (20)

WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15
 
Franco arteseros resume
Franco arteseros resumeFranco arteseros resume
Franco arteseros resume
 
resumeLF_201503
resumeLF_201503resumeLF_201503
resumeLF_201503
 
MOHAN RAJESH
MOHAN RAJESHMOHAN RAJESH
MOHAN RAJESH
 
Harikishan Thakar
Harikishan ThakarHarikishan Thakar
Harikishan Thakar
 
Resume_updated
Resume_updatedResume_updated
Resume_updated
 
dhiraj_dhall (1) (1)
dhiraj_dhall (1) (1)dhiraj_dhall (1) (1)
dhiraj_dhall (1) (1)
 
Resume_Achhar_Kalia
Resume_Achhar_KaliaResume_Achhar_Kalia
Resume_Achhar_Kalia
 
Spry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementSpry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-Management
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
 
RapidScale Product Training
RapidScale Product TrainingRapidScale Product Training
RapidScale Product Training
 
System Administrator_Sivaiah
System Administrator_SivaiahSystem Administrator_Sivaiah
System Administrator_Sivaiah
 
Rama kumar nadipalli
Rama kumar nadipalliRama kumar nadipalli
Rama kumar nadipalli
 
Vikas_C_R_Summary_081116
Vikas_C_R_Summary_081116Vikas_C_R_Summary_081116
Vikas_C_R_Summary_081116
 
Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15
 
Osama Abou Shady CV
Osama Abou Shady CVOsama Abou Shady CV
Osama Abou Shady CV
 

Recently uploaded

Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Generating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using SmithyGenerating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using Smithy
g2nightmarescribd
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 

Recently uploaded (20)

Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Generating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using SmithyGenerating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using Smithy
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 

CV it infrastructure - shahnawaz ali

  • 1. 1 | P a g e Confidential 1 +91 9661110852 Shahnawaz-ali@outlook.com alimcse2k3 Shahnawaz Ali Career Summary Versatile, results-driven IT management expert with 12+ years of extensive and diversified international exposure with a successful career, creating vision and delivering most efficient support for current operations and future needs. I have worked for companies involved in Marine, Shipping, Airport, Banking, IT/Telecom, FMCG & Steel. Exceptional at Strategic Performance Management (Datacenter planning, Server / Virtualization & Cloud (IaaS), Microsoft, BCP/DRS, Storage Solutions (SAN), Networking, Security. Worked extensively with Sr. Manager, Project Consultants and Audit Members in the areas of: Project Development ICT Technical Evaluation Datacenter Planning and Management Server, Network & Security Planning Disaster Recovery and Business Continuity Plan Highly skilled at managing business practices that strive toward zero breakdowns in process, communication and the technical aspects of IT support methodology. Core Competencies - Azure Cloud & Office 365 - Windows Server Infrastructure - VMware / Hyper-V virtualization - SAN Infrastructure Management - Office 365, MFA & AirWatch - Network & Security Infrastructure - Oracle/SQL ERP & Database - Enterprise Backup Management - Antivirus/Spam/Archive - Technical Documentation - Disaster Recovery & BCP - Relationship Management - Vendor Management - Team Management - Incident Management - Change Management
  • 2. 2 | P a g e Confidential 2 Selected Achievements • Successfully deployed Cloud Migration on Microsoft Azure for the Group. • IBM Power8 (Server & Storage) and VMware Virtualization for SEWA Datacenter Project. • IBM PureFlex Converged Infrastructure (Server & Storage) and VMware Virtualization for Qatar International Bank for new Datacenter Project for DC & DR locations. • Successfully deployed Cloud Migration (IaaS) on Microsoft Azure for Qatar International Bank. • Successfully deployed Office 365, AirWatch & RSA for Qatar International Bank. • Successfully Project design & deployed Microsoft Infrastructure (Server, Virtualization, Storage & Core Banking Database) for Afghan United Bank. • ICT Tender Evaluation Committee member for Abu Dhabi International Airport MTB Project. • Successfully designed and deployed Bio-metric solution for access control and Attendance. • Successfully designed and deployed DataCore Solution for Hyper Converged System. • Successfully designed and deployed Active & Passive Network & Security for Data Centers. • Successfully designed & deployed Server Virtualization on VMware for Data Centers. • Successfully designed & develop DR/BCP project on VMware SRM 5.5. • Successfully designed and deployed the Microsoft Technology Solution for numerous companies. • Successfully designed & deployed Antivirus Server/Clients (Symantec, McAfee and TrendMicro). • Successfully designed and deployed the Storage Solution on IBM / HP for numerous companies. • Develop presentations for senior management for IT Infrastructure projects. • Conducted gap analyses to identify IT resources availability issues. • Developed and initiated IT auditing, and ISO 9001-2008 best-practices procedures. Technical Responsibilities ▪ Business practices that strive toward zero breakdowns & SLA towards 98.99%. ▪ Suggest & build solutions to next generation IT transformation for different Tier Datacenters. ▪ Worked with Pre-sales teams to build solutions in response to RFPs, BOQ, Defend solutions. ▪ Develop & deploy Solution for Cloud (IaaS) on Microsoft Azure. ▪ Design & Deployed Microsoft Technology Solution (ADS, DNS, DHCP, Exchange Server). ▪ Design, Deployed VMware vSphere 6.0 in HA, FT, DRS and VM vMotion & Storage vMotion. ▪ Design, Deployed VMware Site Recovery Manager (SRM) with RPO and RTO. ▪ Design, Configure new Server Farm with Windows Server 2008/2012 R2 in multiple roles. ▪ Design, Configure multisite Exchange Server 2010 in (DAG) Database-Clustering with multiple Roles Servers (Edge, HUB, CAS, Mailbox) at DC and DR Sites. ▪ Develop & deploy Servers/Nodes on IBM PureFlex/ Power8, HP c7000 & Dell m1000 Chassis. ▪ Deploy and configure SAN solutions on IBM V7000, DS8800 & EMC VMAX upto 40 PB storage. ▪ Design, Install & Configure WAN with Cisco 3900, 2900 Routers & Juniper M960 Router. ▪ Design, Install & Configure LAN with Cisco 6500/ 4500 / 3750/ 2950 & HP E5412/E2910. ▪ Design, Install & Configure Security with Palo Alto 850, FortiGate 500D Firewall in HA.
  • 3. 3 | P a g e Confidential 3 Career Path IT Infrastructure Development & Support Lead August 2017– till now Shipping & Marine Management • Evaluate, Capacity, Architecture planning for Azure Migration Project. • Migrate on-premises Virtual Machines to Microsoft Azure Cloud (IaaS) using ASR. • Prepare Azure ASR for Disaster Recovery Solution on Microsoft Azure (IaaS). • Migrate Azure Subscription VMs to another Region subscriptions using Move tool. • Plan and build new Office365 Subscription for Email, BI and Office Suite with Skype for Business. • Manage current On-premises Virtualization on VMware vSphere 6.5 for Remote location Offices. • Office 365 with MFA & AirWatch for Mobile Device management for the Group. • Exchange Server 2010 in (DAG) cluster & Windows Server 2008 R2 (ADS,DNS,DHCP,DFS). • Manage on-premises Datacenters between MU and MC replication and HP SAN. • Responsible for the IT Infrastructure Service Delivery at Global level on ServiceNow. • Develop IT staff for operational Service Desk support and manage Layer3 escalations. Project Lead - IT Infrastructure Infobhan Systems & Services, Qatar June 2017– July 2017 (Client: Qatar Steel) www.qatarsteel.com.qa (2 months contract-based) Azure, DataCore, Windows Server 2008/2012 & Exchange Server 2010, VMware 6.0, Hyper-V 2012, Barracuda ArchiveOne /Load balancer, Forcepoint, FireEye project for 2 months. Project Manager July 2016 – May 2017 Sourcing Solution Technology, UAE (Client: Sharjah Electricity Water Authority) www.sewa.gov.ae (11 months contract) Design, Develop & Deployment: • Capacity planning & evaluation for provisioning Datacenter. • Develop migration for IBM Server, SAN and Virtualization. • Prepare Azure ASR for Disaster Recovery Solution on Microsoft Azure (IaaS). • Microsoft Exchange Online & AirWatch for SaaS Email & Security for MDM. • Datacenter Virtualization on VMware 6.0 and migration Physical Server to virtual (P2V). • Active Directory migration from Windows Server 2008 R2 to Windows Server 2012 R2. • Microsoft SQL Server Always ON for block level database redundancy across DC. • Enterprise Backup management on Veritas Net Backup for Server, Database & Cloud. • PaloAlto Firewall for Network Security & F5 Load Balancers. • Deployment of Tivoli Storage Manager for Server & Virtualization. • Deployed Trend Micro Deep Security Antivirus for Server, Clients, Cloud Security. • Develop IT staff for operational Service Desk support and manage Layer3 escalations. •
  • 4. 4 | P a g e Confidential 4 System Architect – IT Infrastructure Jan 2015 to March 2015 Crystal Solution, Doha, Qatar (Client: Qatar International Islamic Bank) www.qiib.com.qa (3 months contract) • Datacenter evaluation, planning for Disaster risk benchmarking. • Migrate on-premises Virtual Machines to Microsoft Azure Cloud (IaaS) using ASR. • Office 365 for Email, AirWatch for MDM & RSA two factor authentication. • Server Virtualization on VMware vSphere 5.5 • IBM PureFlex Converged Infrastructure Blade (x240) & (p260) and V7000. • Windows Server 2012 R2, Microsoft Exchange Server 2010, ADS & System Center 2012. • Storage (SAN) on IBM storewize V7000 & DS 8800 for DC & DR Sites. • Backup management on IBM Tivoli Storage Manager. • Array based replication on IBM Storage to DR Site for VM and database. • Disaster Recovery for Critical Servers on & VMware Site Recovery Manager 5.5 IT Project Manager Nov 2013 to Oct 2014 Arowana Consulting, Abu Dhabi, UAE (Client: Abu Dhabi Int’ Airport MTB Project www.adac.ae/english/mtp • Develop specifications for Airport IT infrastructure and DataCenters. • Translate business objectives into RFI, RFQ, SOW and evaluate vendor proposals, materials submittal and conduct vendor performance reviews and PoC.. • Contributed to Project Management Plan & owned the execution of same. • Design, plan & own the test bed infrastructure for Data Center Virtualization. • Capacity Planning and Technical Tender Evaluation of IT Infrastructure for deployment at Airport Terminal, including but not limited to, Storage (SAN), Server infrastructure & Virtualization. • Capacity Planning and Technical Evaluation for Active network and passive infrastructure cabling. • Evaluate Storage Vendors (IBM XIV, EMC VMAX, HP 3PAR) for capacity & architecture for large volume data & video seeding deployments (40PB & 60PB storage). • Submits timely status reports to PMO & Committee according to the project communication plan. • Conducts an IT Infrastructure assessment of vendor quality, expertise, and costs when selecting a vendor.
  • 5. 5 | P a g e Confidential 5 Section Head Network & Infrastructure Mar 2011 to Feb 2013 Oman Drydock Company S.A.O.C, Oman www.omandrydock.com Functional Responsibilities: Design, deploy & manage IT infrastructure • Validate BOQ, evaluate vendor proposals negotiate contracts, conduct vendor performance, reviews pre & post tender assignment. • Suggest & build solutions to next generation IT transformation on premise Datacenter. • Dell M1000e enclosure with multiple blade server for Virtual infrastructure on VMware. • Exchange Server 2010 in (DAG) cluster & Windows Server 2008 R2 (ADS,DNS,DHCP,DFS). • Server Virtualization on VMware vSphere 4.1 and VMware Site Recovery Manager (SRM). • HP EVA 6400 SAN of 10 TB storage connected through Brocade SAN switches. • ServiceDesk management on Symantec ServiceDesk 7.0 for 6000 end-users. • FortiGate Firewall for Network Security & Barracuda Application Load Balancers. • RFID Bio-metric installation & Maintenance to record attendance for building access and payroll. • Design Cisco Core, Distribution & Access Switching for large Scale production environment. • Design Cisco Router, Cisco ASA Firewalls & MPLS/ ILL for HO and remote. • Design Fiber backbone in & out connectivity for Datacenter, Dark Fiber to outer-ring & Copper. • Management of IT staff development, Training & Helpdesk tickets for operational support. Sr. IT Infrastructure Engineer Aug 2010 to Dec 2010 Afghan United Bank, Kabul, Afghanistan www.afghanunitedbank.com • Create technical documentation, architecture design, change management, operations handbooks. • Design, deploy & manage IT infrastructure ✓Windows Server 2008 R2 Hyper-V for Server Virtualization. ✓Microsoft Exchange 2007 in clusters for failover between Kabul & Dubai. ✓DC, Active Directory & File Server, Antivirus Server on Windows Server 2008 R2. ✓AIX Server & Oracle Database on IBM Blade Server. ✓Migrate Microsoft ISA Server 2006 to Microsoft Treat Management Gateway (TMG) 2010 • Technical support to Flexcube & SQL Database to Core Banking Solution. • Disaster Recovery planning to support the business continuity plan. Technical Consultant May 2009 to May 2010 iNetlink Technologies, Dubai & Afghanistan • Create technical documentation, architecture design, change management, operations. • Design & commission Cisco Nexus Switching for corporate LAN and WAN. • Rollout Windows Server 2003/2008 on Hyper-V Server Virtualization. • Disaster Recovery planning to support the business continuity plan. • Deploy Windows 2003/2008 on HP & Dell Blades, configured on Raid-1 & 5 • Deploy Windows Server 2008 R2 clusters in multiple roles (ADS, DNS, DHCP, File/Print Servers)
  • 6. 6 | P a g e Confidential 6 Network Engineer Dec 2006 – Feb 2009 Almarai Company, Jeddah, Saudi Arabia www.almarai.com • Inventory / license management and timely procurement. • Configuration management of Cisco 2500/2600/2800 routers & 2950/3550/3560GL switches. • Proactive monitoring & configuration management of server clusters comprising of Windows Server 2003, Exchange 2003… • Coordinate all network/link activities with Saudi Telecom (STC); our WAN network provider. • Setup a Change Management Process and tracked adherence to limit operational impact. • Setup KABA access control system for building Door and Entry for all staff and Visitors. Network Administrator May 2006 - Dec 2006 TajOnline India Pvt. Ltd, Mumbai, India Network Administrator June 2004 - Dec 2005 Sify. Ltd, Mumbai, India Academic Credentials Master’s in Business Administration (M.B.A) June 2010 – June 2012 Manav Bharti University, India (UAE Attested degree) Bachelor of Arts (B.A) Sep 2001 – Sep 2004 Magadh University, India Certification Credentials ❖ PRINCE2 (Project Management) ❖ ITIL V3 (IT Infrastructure Management) ❖ Microsoft Certified Solutions Expert: Productivity :2018 ❖ Microsoft Certified Solutions Expert: Cloud Platform and Infrastructure :2018 ❖ Microsoft Azure Specialist (Microsoft Cloud Infrastructure) ❖ Microsoft Windows Server 2012 Hyper-V and System Center Specialist ❖ DataCore Certified Implementation Engineer ❖ VCP 5.5 (VMware Certified Professional- Cloud) ❖ VCP 4.1 (VMware Certified Professional- Datacenter-V) ❖ MCTS (Microsoft Certified Technology Specialist) ❖ MCSE (Microsoft Certified Systems Engineer) ❖ MCSA (Microsoft Certified Systems Administrator) ❖ CCNA (Cisco Certified Network Associate)
  • 7. 7 | P a g e Confidential 7 Trainings Attended ➢ DataCore (DCIE) Training, Mumbai, India ➢ Certified Auditor (ISO 9001-2008 & OHSAS 18001), ABS Group, UAE ➢ Windows Server 2012 Hyper-V and System Center Specialist, New Horizons, Dubai, UAE ➢ PRINCE2 & ITIL V3, (ProjectingIT), New Delhi, India ➢ Microsoft Azure (Cloud), Koenig Solutions, Delhi, India ➢ VMware vCenter Site Recovery Manager 6.0, Koenig Solutions, Bangalore, India ➢ VCP 4.1 (VMware Certified Professional), VTP, Pune, India ➢ EMC ISM Storage Workshop, Dubai, UAE ➢ Best Employee of the Year, Oman Drydock Company, Oman Personal Details Father Name Kalim Ahmad Date of Birth 01st March 1985 Marital Status Married Languages Known Arabic, English, Hindi & Urdu Nationality Indian Religion Islam Passport Details J5024362, valid till 23/12/2020 Driving License Valid – U.A.E & INDIA