SlideShare a Scribd company logo
FLORIN TULUC
110 Torkildsen Way
Harlow
CM20 1AY
Tel.no.07765200437
Email:florin_tuluc17@yahoo.co.uk
Profile
A site supervisorwithawide range of experience inRail Infrastructure/Civil Engineeringactivities.
Able to work on own initiative and as part of the team. I am both punctual and committed to
work.Dedicated tomaintainhighsafetystandardswhile working. I do take pride in my job, keen
to look at many options to come to the most logical and practical solution.
Experience:
September 2015 – January 2016 BPH Rail
Site Supervisor Project: ChestertonInterchange Station/High Wycombe/ShenfieldStation
Duties:
 To provide a safe place of work that complies with current legislation
 To run the site as directed by the Construction Phase Plan.
 Responsible forsupervisingandco-ordinatingteamsof directlabourand
specialist subcontractors, meeting targets and deadlines the contract.
 To assist with providing information for completion of daily site diary,
allocationsheets,time sheets,recordof labour, progress report sheets,
plant returns, material returns and local site purchase sheets.
 To ensure safe workingpracticesare adhered to, as outlined in method
statements and risk assessments.
 Deliver product to the customer satisfaction.
January 2015 – August 2015 Carmichael UK (Volkerfitzpatrick Rail) - Site Supervisor
Site Supervisor Project: West Anglia Main Line Capacity Increase
Duties:
 Carry out directsupervisiononsite of internal workforce,agencylabour,
sub-contractors and plant, including lifting appliances where certified
 Ensure productivity and workmanship of staff is of an acceptable
standard
Responsible forsupervisingandco-ordinatingteamsof directlabourand
specialist subcontractors, meeting targets and deadlines the contract.
 Ensure all site operations are carried out safely and in accordance with
relevant legislation, carrying out periodic site safety checks. Report on
accidents/near misses as required. Carry out risk assessments as
required
 Assistinthe planning of current on site operations and future projects,
including resource planning and input into rostering
 Ensure all relevant site records and paperwork are maintained as
required by the Project Manager and input into preparation of WPPs,
TBSs, Site reports etc
 Implement and participate in Competency Assessment Programme
November 2014 – January 2015 Morgan Sindall
Site Supervisor Project: Finsbury Park Station – OLE Foundations
Duties:
 To provide a safe place of work that complies with current legislation
 Responsible for supervising and coordinating a team of labours and
specialist contractors
 Deliver the work without environmental incidents
 Deliver the work to the specified quality without defects
 Ensure production and implementation of Project Plans, risk
assessments,methodstatements,site waste management plans are in
line with company procedures
 Deliver product to the customer satisfaction
September 2013 – October 2014 Carmichael UK (Volkerfitzpatrick Rail) Site Supervisor
Site Supervisor Project: Little haven Train Station (sept 2013-May 2014)
West Anglia Main Line Capacity Increase (June 2014-
October 2014)
Duties:
To provide a safe place of work that complies with current legislation
 To run the site as directed by the Construction Phase Plan.
 Responsible forsupervisingandco-ordinatingteamsof directlabourand
specialist subcontractors, meeting targets and deadlines the contract.
 To assist with providing information for completion of daily site diary,
allocationsheets,time sheets,recordof labour, progress report sheets,
plant returns, material returns and local site purchase sheets.
 To ensure safe workingpracticesare adhered to, as outlined in method
statements and risk assessments.
February 2013 – August 2013 BPH Rail
Site Supervisor Project: Wallington Rail Station
Duties:
 To provide a safe place of work that complies with current legislation
 To run the site as directed by the Construction Phase Plan.
 Responsible forsupervisingandco-ordinatingteamsof directlabourand
specialist subcontractors, meeting targets and deadlines the contract.
 To assist with providing information for completion of daily site diary,
allocationsheets,time sheets,recordof labour, progress report sheets,
plant returns, material returns and local site purchase sheets.
 To ensure safe workingpracticesare adhered to, as outlined in method
statements and risk assessments.
 To liaise withthe managementteampassingonrelevantinformation on
regular
July 2012 - February 2013 One Way Recruitment
Shuttering Carpenter Project: London Bridge Train Station
Duties:
 Platforms underpinning
 Maintenance
 Building signal bases
March 2012 – July 2012 BPH Rail
Shuttering Carpenter Project: Hackney Train Station- Arsenal Train Station
Duties:
 Fabricating of formwork for lift shafts and pump rooms
 Read and interpret drawings and specifications;
 Fabricating precast slabs
 Dismantling of formwork and their proper handling for re-use.
August 2011 – February 2012 Chiltern Construction Contractor (Morgan Sindall)
Shuttering Carpenter Project: Cambridge Train Station
Duties:
 Building formwork for bases and foundations for bridge
 Erecting platform hoardings
 Building bases for signal posts
May 2011 – August 2011 ESS Engineering
Shuttering Carpenter Project: High Street Kensington Underground Station
Euston Square Underground Station
Great Portland Street Underground Station
Baker Street Underground Station
Duties:
 Use and care of tools and equipment;
 Read and interpret drawings and specifications;
 Checking of dimensions, alignment and level of formwork;
 Fabricating Shutters for foot bridge bases
 Dismantling of formwork and their proper handling for re-use.
October 2010 – April 2011 BPH Rail
Shuttering Carpenter Project: Southwark Substation
Duties:
 Use and care of tools and equipment;
 Read and interpret drawings and specifications;
 Fabricating and erecting of formwork, precast slabs
 Checking of dimensions, alignment and level of formwork;
 Dismantling of formwork and their proper handling for re-use.
July 2010 - October 2010 Zone contractors (agency)
Shuttering carpenter Project: Broxbourne White Water Canoe Centre
Duties:
 Use and care of tools and equipment;
 Readand interpretdrawingsandspecifications
 Erection of formwork: bases, walls, columns;
 Checking of dimensions, alignment and level of formwork;
 Dismantling of formwork and their proper handling for re-use.
January 2010 – July 2010 Sword contracts ltd
Shuttering carpenter Project: M25; - Rickmansworth bridge
Duties:
 Use and care of tools and equipment;
 Readand interpretdrawingsandspecifications;
 Erection of formwork: walls, columns;
 Checking of dimensions, alignment and level of formwork;
 Dismantling of formwork and their proper handling for re-use.
April 2007 - December 2009 Optoma Project ltd
Shuttering carpenter Projects: Canada Water Regeneration Programme
Dalston Redevelopment
Duties:
 Use and care of tools and equipment;
 Read and interpret drawings and specifications;
o  Erection of formwork: walls, columns, floors and stairs;
  Checking of dimensions, alignment and level of formwork;
o  Dismantling of formwork and their proper handling for re-use.
October 2006– April 2007 JJ Cafferkey & co
Shuttering carpenter Projects: Milton Knees Pinnacle
Duties:
 Constructing, installing and repairing formwork structures and
fixtures
 Ensuring accuracy of formwork
 Use and care of tools and equipment;
 Erectionof formwork:walls,columns,floorsandstairs; liftshafts
March 2006 – October 2006 Byrne Bros Ltd
Shuttering carpenter Project: Dome arena
Duties:
 Erection of formwork: walls, columns, stairs, etc.
 Read and interpret drawings and specifications
 Dismantlingof formworkandtheir proper handling for re-
use.
Training courses:
Various courses including NVQ Level 2 in formwork;, Leading edge ;Fire Marshal;
Personal track safety (PTS)
London Underground (LUCAS, LUA-TLL)
Thames Water Safety Passport; Underground service avoidance /CAT SCAN & Genny
Education and qualifications:
SSTSS; CSCS -Technical, Supervisory & Management
Additional information:
Driving licence
Interests and hobbies:
Physical fitness - gym
References:
Zone Contractors: Mr. Jim Brasil-tel.07825918391-manager
Sword contractors: Mr. Lee Jackson-tel.07500602451-foreman
Optoma Project ltd: Mr. Martin O’Hari- tel: 07926066858-foreman
JJ Cafferkey&co ltd: Mr. Martin Rally-tel: 07590276165-foreman
Chiltern Construction Contractor: Mr. Paul Mcadam – 07976191849 – Site Manager
ESS Engineering: Mr. Amul Sarda – tel: 07971914515 – Manager
PBH Rail: Mr Paul: Howard – tel: 07802738020 - Managing Director
Volkerfitzpatrick: Mr. Clive May – tel:07909755825 –Senior Works Manager
Volkerfitzpatrick: Mr. Iulian Badea – tel:07824474125 – Project manager
Volkerfitzpatrick: Mr. Alex Griffits – tel:07776170542 - Construction Interface Manager
Volkerfitzpatrick: Mr. Adrian Pettigrew – tel:07876875845 Site Engineer
BPH Rail: Mr. Fazer Reid -tel:07872542235 Site Manager

More Related Content

What's hot

Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
Ian Rowell
 
Ian C. Shannon
Ian C. ShannonIan C. Shannon
Ian C. Shannon
ian shannon
 
Resume of Mohammad Kamruzzaman
Resume of Mohammad KamruzzamanResume of Mohammad Kamruzzaman
Resume of Mohammad Kamruzzaman
Mohammad Kamruzzaman
 
cv aggiornato sturlese
cv aggiornato sturlesecv aggiornato sturlese
cv aggiornato sturlese
sturlese rodolfo
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
Joan Willox
 
J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'
Brad Thompson
 
MUGHAL 2
MUGHAL 2MUGHAL 2
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
walid madani
 
CV F 2016
CV  F 2016CV  F 2016
Devin Lockhart Resume
Devin Lockhart ResumeDevin Lockhart Resume
Devin Lockhart Resume
Devin Lockhart
 
P Kennedy CV Nov 2016
P Kennedy CV Nov 2016P Kennedy CV Nov 2016
P Kennedy CV Nov 2016
Philip Kennedy
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
?????? ????? Naveed Asif
 
cv 2016
cv 2016cv 2016
cv 2016
Andrew Corner
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
Erfan Farooqui
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
Ayman Alhaggar
 
Malik@ cv
Malik@  cvMalik@  cv
Malik@ cv
Malik Saleem
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
Moustfa Shalaby
 
A.Awad_CV 1016
A.Awad_CV 1016A.Awad_CV 1016
A.Awad_CV 1016
Ahmed Awad
 
curriculum11-10-2015
curriculum11-10-2015curriculum11-10-2015
curriculum11-10-2015
Patrick Holligan
 
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
konain alam ansari ansari
 

What's hot (20)

Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
Ian C. Shannon
Ian C. ShannonIan C. Shannon
Ian C. Shannon
 
Resume of Mohammad Kamruzzaman
Resume of Mohammad KamruzzamanResume of Mohammad Kamruzzaman
Resume of Mohammad Kamruzzaman
 
cv aggiornato sturlese
cv aggiornato sturlesecv aggiornato sturlese
cv aggiornato sturlese
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'
 
MUGHAL 2
MUGHAL 2MUGHAL 2
MUGHAL 2
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
 
CV F 2016
CV  F 2016CV  F 2016
CV F 2016
 
Devin Lockhart Resume
Devin Lockhart ResumeDevin Lockhart Resume
Devin Lockhart Resume
 
P Kennedy CV Nov 2016
P Kennedy CV Nov 2016P Kennedy CV Nov 2016
P Kennedy CV Nov 2016
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
cv 2016
cv 2016cv 2016
cv 2016
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
Malik@ cv
Malik@  cvMalik@  cv
Malik@ cv
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
A.Awad_CV 1016
A.Awad_CV 1016A.Awad_CV 1016
A.Awad_CV 1016
 
curriculum11-10-2015
curriculum11-10-2015curriculum11-10-2015
curriculum11-10-2015
 
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
 

Similar to CV - Florin Tuluc 2

Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
Steven Miller
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
John Mark S Jandoc
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
Jack Milligan
 
CV_Armand_Maritz_EM
CV_Armand_Maritz_EMCV_Armand_Maritz_EM
CV_Armand_Maritz_EM
Armand Maritz
 
Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell Resume May 2016
Brent Maskell Resume May 2016
Brent Maskell
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Pavel Babincak
 
Curriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstCurriculum Vitea Neil Herbst
Curriculum Vitea Neil Herbst
Neil Herbst
 
abdi cv
abdi cvabdi cv
abdi cv
Boobe handule
 
Bill resume
Bill resumeBill resume
Bill resume
Awili Bill
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
belal alrwadieh
 
CV
CVCV
Cv
CvCv
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
Paul Baffour Asare
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
Connelly Darren
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
Simon Barkley
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
RAO YAGITILA
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
hamdi khalefa
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
savvas salakidis
 
Amey CV 2015
Amey CV 2015Amey CV 2015
Amey CV 2015
Ian Taylor
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
Mohamed Sayed
 

Similar to CV - Florin Tuluc 2 (20)

Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
CV_Armand_Maritz_EM
CV_Armand_Maritz_EMCV_Armand_Maritz_EM
CV_Armand_Maritz_EM
 
Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell Resume May 2016
Brent Maskell Resume May 2016
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
 
Curriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstCurriculum Vitea Neil Herbst
Curriculum Vitea Neil Herbst
 
abdi cv
abdi cvabdi cv
abdi cv
 
Bill resume
Bill resumeBill resume
Bill resume
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
CV
CVCV
CV
 
Cv
CvCv
Cv
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Amey CV 2015
Amey CV 2015Amey CV 2015
Amey CV 2015
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 

CV - Florin Tuluc 2

  • 1. FLORIN TULUC 110 Torkildsen Way Harlow CM20 1AY Tel.no.07765200437 Email:florin_tuluc17@yahoo.co.uk Profile A site supervisorwithawide range of experience inRail Infrastructure/Civil Engineeringactivities. Able to work on own initiative and as part of the team. I am both punctual and committed to work.Dedicated tomaintainhighsafetystandardswhile working. I do take pride in my job, keen to look at many options to come to the most logical and practical solution. Experience: September 2015 – January 2016 BPH Rail Site Supervisor Project: ChestertonInterchange Station/High Wycombe/ShenfieldStation Duties:  To provide a safe place of work that complies with current legislation  To run the site as directed by the Construction Phase Plan.  Responsible forsupervisingandco-ordinatingteamsof directlabourand specialist subcontractors, meeting targets and deadlines the contract.  To assist with providing information for completion of daily site diary, allocationsheets,time sheets,recordof labour, progress report sheets, plant returns, material returns and local site purchase sheets.  To ensure safe workingpracticesare adhered to, as outlined in method statements and risk assessments.  Deliver product to the customer satisfaction. January 2015 – August 2015 Carmichael UK (Volkerfitzpatrick Rail) - Site Supervisor Site Supervisor Project: West Anglia Main Line Capacity Increase Duties:  Carry out directsupervisiononsite of internal workforce,agencylabour, sub-contractors and plant, including lifting appliances where certified  Ensure productivity and workmanship of staff is of an acceptable standard Responsible forsupervisingandco-ordinatingteamsof directlabourand specialist subcontractors, meeting targets and deadlines the contract.  Ensure all site operations are carried out safely and in accordance with relevant legislation, carrying out periodic site safety checks. Report on accidents/near misses as required. Carry out risk assessments as required  Assistinthe planning of current on site operations and future projects, including resource planning and input into rostering  Ensure all relevant site records and paperwork are maintained as required by the Project Manager and input into preparation of WPPs, TBSs, Site reports etc  Implement and participate in Competency Assessment Programme
  • 2. November 2014 – January 2015 Morgan Sindall Site Supervisor Project: Finsbury Park Station – OLE Foundations Duties:  To provide a safe place of work that complies with current legislation  Responsible for supervising and coordinating a team of labours and specialist contractors  Deliver the work without environmental incidents  Deliver the work to the specified quality without defects  Ensure production and implementation of Project Plans, risk assessments,methodstatements,site waste management plans are in line with company procedures  Deliver product to the customer satisfaction September 2013 – October 2014 Carmichael UK (Volkerfitzpatrick Rail) Site Supervisor Site Supervisor Project: Little haven Train Station (sept 2013-May 2014) West Anglia Main Line Capacity Increase (June 2014- October 2014) Duties: To provide a safe place of work that complies with current legislation  To run the site as directed by the Construction Phase Plan.  Responsible forsupervisingandco-ordinatingteamsof directlabourand specialist subcontractors, meeting targets and deadlines the contract.  To assist with providing information for completion of daily site diary, allocationsheets,time sheets,recordof labour, progress report sheets, plant returns, material returns and local site purchase sheets.  To ensure safe workingpracticesare adhered to, as outlined in method statements and risk assessments. February 2013 – August 2013 BPH Rail Site Supervisor Project: Wallington Rail Station Duties:  To provide a safe place of work that complies with current legislation  To run the site as directed by the Construction Phase Plan.  Responsible forsupervisingandco-ordinatingteamsof directlabourand specialist subcontractors, meeting targets and deadlines the contract.  To assist with providing information for completion of daily site diary, allocationsheets,time sheets,recordof labour, progress report sheets, plant returns, material returns and local site purchase sheets.  To ensure safe workingpracticesare adhered to, as outlined in method statements and risk assessments.  To liaise withthe managementteampassingonrelevantinformation on regular July 2012 - February 2013 One Way Recruitment Shuttering Carpenter Project: London Bridge Train Station Duties:  Platforms underpinning  Maintenance  Building signal bases
  • 3. March 2012 – July 2012 BPH Rail Shuttering Carpenter Project: Hackney Train Station- Arsenal Train Station Duties:  Fabricating of formwork for lift shafts and pump rooms  Read and interpret drawings and specifications;  Fabricating precast slabs  Dismantling of formwork and their proper handling for re-use. August 2011 – February 2012 Chiltern Construction Contractor (Morgan Sindall) Shuttering Carpenter Project: Cambridge Train Station Duties:  Building formwork for bases and foundations for bridge  Erecting platform hoardings  Building bases for signal posts May 2011 – August 2011 ESS Engineering Shuttering Carpenter Project: High Street Kensington Underground Station Euston Square Underground Station Great Portland Street Underground Station Baker Street Underground Station Duties:  Use and care of tools and equipment;  Read and interpret drawings and specifications;  Checking of dimensions, alignment and level of formwork;  Fabricating Shutters for foot bridge bases  Dismantling of formwork and their proper handling for re-use. October 2010 – April 2011 BPH Rail Shuttering Carpenter Project: Southwark Substation Duties:  Use and care of tools and equipment;  Read and interpret drawings and specifications;  Fabricating and erecting of formwork, precast slabs  Checking of dimensions, alignment and level of formwork;  Dismantling of formwork and their proper handling for re-use. July 2010 - October 2010 Zone contractors (agency) Shuttering carpenter Project: Broxbourne White Water Canoe Centre Duties:  Use and care of tools and equipment;
  • 4.  Readand interpretdrawingsandspecifications  Erection of formwork: bases, walls, columns;  Checking of dimensions, alignment and level of formwork;  Dismantling of formwork and their proper handling for re-use. January 2010 – July 2010 Sword contracts ltd Shuttering carpenter Project: M25; - Rickmansworth bridge Duties:  Use and care of tools and equipment;  Readand interpretdrawingsandspecifications;  Erection of formwork: walls, columns;  Checking of dimensions, alignment and level of formwork;  Dismantling of formwork and their proper handling for re-use. April 2007 - December 2009 Optoma Project ltd Shuttering carpenter Projects: Canada Water Regeneration Programme Dalston Redevelopment Duties:  Use and care of tools and equipment;  Read and interpret drawings and specifications; o  Erection of formwork: walls, columns, floors and stairs;   Checking of dimensions, alignment and level of formwork; o  Dismantling of formwork and their proper handling for re-use. October 2006– April 2007 JJ Cafferkey & co Shuttering carpenter Projects: Milton Knees Pinnacle Duties:  Constructing, installing and repairing formwork structures and fixtures  Ensuring accuracy of formwork  Use and care of tools and equipment;  Erectionof formwork:walls,columns,floorsandstairs; liftshafts March 2006 – October 2006 Byrne Bros Ltd Shuttering carpenter Project: Dome arena Duties:  Erection of formwork: walls, columns, stairs, etc.  Read and interpret drawings and specifications  Dismantlingof formworkandtheir proper handling for re- use.
  • 5. Training courses: Various courses including NVQ Level 2 in formwork;, Leading edge ;Fire Marshal; Personal track safety (PTS) London Underground (LUCAS, LUA-TLL) Thames Water Safety Passport; Underground service avoidance /CAT SCAN & Genny Education and qualifications: SSTSS; CSCS -Technical, Supervisory & Management Additional information: Driving licence Interests and hobbies: Physical fitness - gym References: Zone Contractors: Mr. Jim Brasil-tel.07825918391-manager Sword contractors: Mr. Lee Jackson-tel.07500602451-foreman Optoma Project ltd: Mr. Martin O’Hari- tel: 07926066858-foreman JJ Cafferkey&co ltd: Mr. Martin Rally-tel: 07590276165-foreman Chiltern Construction Contractor: Mr. Paul Mcadam – 07976191849 – Site Manager ESS Engineering: Mr. Amul Sarda – tel: 07971914515 – Manager PBH Rail: Mr Paul: Howard – tel: 07802738020 - Managing Director Volkerfitzpatrick: Mr. Clive May – tel:07909755825 –Senior Works Manager Volkerfitzpatrick: Mr. Iulian Badea – tel:07824474125 – Project manager Volkerfitzpatrick: Mr. Alex Griffits – tel:07776170542 - Construction Interface Manager Volkerfitzpatrick: Mr. Adrian Pettigrew – tel:07876875845 Site Engineer BPH Rail: Mr. Fazer Reid -tel:07872542235 Site Manager