Duong Xuan Sang has over 13 years of experience as a senior structural engineer and civil design engineer. He received a Bachelor's degree in Civil Engineering from Hanoi Water Resources University in 2003. His expertise includes designing structures for hydropower projects, conducting dam safety assessments, site supervision, and project management. Some of the key projects he has worked on include the AMATA Long Thanh Hi-Teach Industrial Park Project in Vietnam and the Dak Mi 4 Hydropower Project. He is proficient in engineering design software such as AutoCAD, SAP2000, and Microsoft Office.
Working as a translator/interpreter for MWH International Consulting Co. for over 6 years in Vietnam Provincial Roads Improvement Project (VPRIP), a project which is funded in part by ADB (over 90 sub-project roads),
Duties: Doing interpretation on the site and translation with various of reports and related documents of the project components;
o Engineering & Construction: (Transport, irrigation, drainage, infrastructure…etc.)
o Economy: (PPTA, Benefit Monitoring Evaluation, Traffic Count…etc.)
o Environment: (Initial Environment Evaluation, Environmental Impact Evaluation, Secure of Environment Standard…etc.)
o Resettlement (Land Acquisition, Compensation, Ethnic Minority Development…etc.)
Working as a translator/interpreter for MWH International Consulting Co. for over 6 years in Vietnam Provincial Roads Improvement Project (VPRIP), a project which is funded in part by ADB (over 90 sub-project roads),
Duties: Doing interpretation on the site and translation with various of reports and related documents of the project components;
o Engineering & Construction: (Transport, irrigation, drainage, infrastructure…etc.)
o Economy: (PPTA, Benefit Monitoring Evaluation, Traffic Count…etc.)
o Environment: (Initial Environment Evaluation, Environmental Impact Evaluation, Secure of Environment Standard…etc.)
o Resettlement (Land Acquisition, Compensation, Ethnic Minority Development…etc.)
A short selection of a few key projects I have been involved in. Please contact me if you'd like to know more about these projects or other types of projects that aren't explicitly highlighted here.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
Honest Reviews of Tim Han LMA Course Program.pptxtimhan337
Personal development courses are widely available today, with each one promising life-changing outcomes. Tim Han’s Life Mastery Achievers (LMA) Course has drawn a lot of interest. In addition to offering my frank assessment of Success Insider’s LMA Course, this piece examines the course’s effects via a variety of Tim Han LMA course reviews and Success Insider comments.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Cv (Duong Xuan Sang - 2016)
1. Duong Xuan Sang / 1
Curriculum Vitae (CV)
1. General:
Position Position: Senior Structural Engineer / Civil Design Engineer
Name of Staff member: DUONG XUAN SANG
Name of the Firm: TEAM Consulting Engineering and Management Co., Ltd.
Date of Birth: January 01st
,1978 Nationality: Vietnamese
Country of Citizenship/Residence: Vietnam
2. Education: Bachelor’s degree of Civil Engineer, Good, 1998-2003, Hanoi Water Resources
University
3. Certificates: - Professional Certification of Civil design Engineer, License KS-08-07762-A
Issued by Construction Department of HoChiMinh City, Vietnam.
- Practising Certification of Supervisor construction, License GS1-08-14270-A
Issued by Construction Department of HoChiMinh City, Vietnam.
Website: www.constructiondpt.hochiminhcity.gov.vn/
4. Key Qualifications: Comprehensive understanding of engineering and design principles.
Understanding of computer –assisted design software such as Autocad, Sap2000,
Fenas, Geoslope, Microsoft office.
Experience in design structure and supervision of hydropower project. Extensive
knowledge in the structural and
Experience of relevant structural US standard.
Self-motivated with a positive and friendly attitude
5. Employment Record relevant to the assignment:
Period Employing organization and your title/
position. Contact information for references
Country Summary of activities performed relevant to the Assignment
< More than 13 years professional experience since 2003 >
- May,
2016
Upto now
- Nov,
2005 to
Apr, 2016
- Jul, 2003
to Oct,
2005.
- Team Consulting Engineering and
Management Co., Ltd.
- Power Engineering Consulting Joint Stock
Company 2 (PECC2).
Senior Structural Engineer /Civil design
Engineer
- Power Engineering Consulting Joint Stock
Company 4 (PECC4).
Structural Engineer /Civil Design Engineer
Thailand
Vietnam
Vietnam
- Respossible for Project Coordination and management on
Designing civil Structural works.
- Responsible for Management on Civil design works and
Site Supervision.
- Responsible for Designing Structure and Site construction
supervisor.
For reference: Dr. Pornsak Project Director. Pornss @team.co.th
Mr. Nguyen Quoc Long Manager of Human Resources Dept. long.nq@pecc2.com
6. Membership in Professional Associations and Publications: None
7. Language Skills: Speaking Reading Writing
English : good good good
Vietnamese: native native native
8. Adequacy for the Assignment:
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks:
1) AMATA Long Thanh Hi-Teach Industrial Park Project, Long Thanh District, Dongnai Province, Vietnam
Capacity : 410 ha
Period : May. 2016 – up to Now
Client/Finance : Amata Nakorn Thailand / ODA Loan
Types of Service : Basic Desin , Detail Design and Bidding document.
Position : Project Coordination
Responsible for Management on Civil structural works and Coordination between Consulting Engineering Design, Client and Site
Contractors.
2. Duong Xuan Sang / 2
2) Dak Mi 3 Hydropower Project, Vietnam
Capacity : 54MW
Period : Feb. 2016 – Apr.2016 (3 months)
Client/Finance : IDCO(Vietnam Urban & Industrial Zone Development Investigation Corp.) / Domestic Loan
Types of Service : Designing Working drawing.
Position : Engineer incharge of Designing powerhouse’s Utilities
Responsible for Preparation Utilies working drawing.
3) Thac Mo Extension Hydropower Project, Vietnam
Capacity : 75MW
Period : Jul. 2014 - Jan. 2016 (19 months)
Client/Finance : EVN (Viet Nam Electricity) / Japanese ODA Loan
Types of Service : Construction Supervision
Position : Civil design Engineer and Structural Engineer
Responsible for :
+ Designed Structure of Construction drawing for Powerhouse, Intake and Dam.
+ Reviewed, Checked over Working Drawing; construction method statement and Monthly Statement for Approval.
+ Engineer in charge of safety site construction.
+ Site inspection.
4) Dak Mi 4c Hydropower Project, Vietnam
Capacity : 18MW
Period : Apr. 2014 - Jun. 2014 (4 months)
Client/Finance : IDCO / Domestic Fund
Types of Service : Dam Safety Assessment .
Position : Deputy Project Manager.
Responsible for Stability calculation of Main Dam, Spillway; calculation for Dam’s crest elevation, Hydraulic regulation Reservoir
flood ; Making reported Appendices and Management on civil design.
5) Dak Mi 4b Hydropower Project, Vietnam
Capacity : 42MW
Period : Dec. 2013 - Mar. 2014 (4 months)
Client/Finance : IDCO / Domestic Fund
Types of Service : Dam Safety Assessment .
Position : Deputy Project Manager.
Responsible for Stability calculation of Main Dam, Spillway, Calculation for Dam’s crest elevation, Calculated hydraulic regulation
Reservoir flood , Making reported Appendices and Management on civil design.
6) Dak Mi 4a Hydropower Project, Vietnam
Capacity : 148MW
Period : Jun. 2013 - Nov. 2013 (6 months)
Client/Finance : IDCO / Domestic Fund
Types of Service : Dam Safety Assessment .
Position : Deputy Project Manager.
Responsible for stability calculation of Main Dam, Spillway, Calculation for Dam’s crest elevation, Calculated hydraulic regulation
Reservoir flood , Making reported Appendices and Management on civil design.
7) Dak Mi 3 Hydropower Project, Vietnam
Capacity : 54MW
Period : May. 2012 - May. 2013 (12 months)
Client/Finance : IDCO(Vietnam Urban & Industrial Zone Development Investigation Corp.) / Domestic Loan
Types of Service : Detailed design.
Position : Engineer incharge of civil structural works
Responsible for designing Structure of Intake, Bridge and making reported Appendices.
8) Quang Tri Hydropower Project, Vietnam
Capacity : 64MW
Period : Feb. 2011 - Aug. 2011 (7 months)
Client/Finance : Quang Tri Hydropower Joint Stock Company / Domestic Fund
Types of Service : Dam Safety Assessment .
Position : Deputy Project Manager.
Responsible for Stability calculaton of Main Dam, Spillway, Calculation for Dam’s crest elevation, Calculated hydraulic regulation
Reservoir flood , Making reported Appendices and Management on civil design.
3. Duong Xuan Sang / 3
9) Tuyen Quang Hydropower Project, Vietnam
Capacity : 342MW
Period : Feb. 2011 - Aug. 2011 (7 months)
Client/Finance : EVN / Domestic Fund
Types of Service : Dam Safety Assessment .
Position : Engineer incharge of civil Design .
Responsible for calculating stability of Dams, Spillway and making reported Appendices.
10) Thac Ba Hydropower Project, Vietnam
Capacity : 120MW
Period : Dec. 2010 - Jan. 2011 (2 months)
Client/Finance : Thac Ba Hydropower Joint Stock Company / Domestic Fund
Types of Service : Dam Safety Assessment .
Position : Civil design Engineer.
Responsible for calculating stability and making reported Appendice of Auxiliary Dams.
11) Dong Nai 4 Hydropower Project, Vietnam
Capacity : 340MW
Period : Jun. 2007 - Oct. 2007 (5 months)
Client/Finance : EVN (Vietnam Electricity) / Domestic Loan
Types of Service : Detailed design .
Position : Structural Engineer.
Responsible for designing RCC Dam and Powerhouse.
12) Dong Nai 3 Hydropower Project, Vietnam
Capacity : 180MW
Period : Dec. 2006 - May. 2007 (6 months)
Client/Finance : EVN (Vietnam Electricity) / Domestic Loan
Types of Service : Detailed design .
Position : Structural Engineer.
Responsible for designing RCC Dam.
13) Dak Mi 4 Hydropower Project, Vietnam
Capacity : 196MW
Period : Oct. 2006 - Nov. 2010 (49 months)
Client/Finance : IDCO(Vietnam Urban & Industrial Zone Development Investigation Corp.) / Domestic Loan
Types of Service : Teachnical design, Detailed design, Bidding Document, Construction Drawing and, Working Drawing and Site
supervisor works.
Position : Civil design /Structural Engineer.
Responsible for designing Structural works of Dams, Spillway, Bridge, Channel, Intake, Powerhouse and Tailrace.
14) Dak’r Tih Hydropower Project, Vietnam
Capacity : 144MW
Period : Jul. 2006 - Jun. 2009 (36 months)
Client/Finance : CC1 (Construction Corporation No.1) / Domestic Loan
Types of Service : Preparation Bidding Document, Detailed design, Construction Drawing and Working Drawing
Position : Civil design Engineer/Structural Engineer.
Responsible for designing Structural of Bridge, Intake, Powerhouse, Tailrace and Connecting Channel.
15) Krong Hnang Hydropower Project, Vietnam
Capacity : 64MW
Period : May. 2004 - Oct. 2005 (17 months)
Client/Finance : EVN (Vietnam Electricity) / Domestic Loan
Types of Service : Technical design & Detailed design.
Position : Civil design Engineer & Structural Engineer.
Responsible for designing Structure of Powerhouse and Penstock.
16) Dai Ninh Hydropower Project, Vietnam
Capacity : 300MW
Period : Now. 2005 - Jun. 2006 (8 months)
Client/Finance : EVN (Vietnam Electricity) / Japanese ODA Loan
Types of Service : Site construction supervision
Position : Site assistant Structural Engineer
4. Duong Xuan Sang / 4
Responsible for designing Construction Drawing of Powerhouse and Site supervision.
17) Buon Tua Shra Hydropower Project, Vietnam
Capacity : 86MW
Period : Feb. 2004 - May. 2005 (15 months)
Client/Finance : EVN (Vietnam Electricity) / Domestic Loan
Types of Service : Technical design & Detailed design.
Position : Civil design Engineer
Responsible for designing structure of Intake bridge and Spillway.
18) Upgrade of Song Hinh Hydropower Project Vietnam.
Capacity : 66MW
Period : Jul. 2003 - Jan. 2004 (7 months)
Client/Finance : Vinh Son-Song Hinh Hydropower Project Management Board / Domestic Fund
Types of Service : Site Construction Supervision
Position : Site inspection of Dams.
Responsible for Inspection of Dams.
Responsible for management of all review activities.
No. Project Name, Country Period Client/Finance Types of Service Position
1.
AMATA Long Thanh
Hi-Teach Industrial Park
Project, Vietnam
(Capacity: 410 ha)
May. 2016 upto now
Amata Nakorn Thailand /
ODA Loan
Basic Design, Detail
Design and Bidding
Document
Project
coordination
2.
Dak Mi 3 Hydropower
Project, Vietnam
(Capacity: 54MW)
Feb. 2016 – Apr. 2016
(3 months)
IDCO(Vietnam Urban &
Industrial Zone
Development
Investment Corp.)/
Domestic Loan
Working drawing Design
Engineer
Incharge of
Civil design
3.
Thac Mo Extension
Hydropower Project, Vietnam
(Capacity: 75MW)
Jul. 2014 - Jan. 2016
(19 months)
EVN / Japanese
ODA Loan
Site construction
Supervision
Civil design /
Structural
Engineer
and Site
Supervisor
4.
Dak Mi 4c Hydropower
Project, Vietnam
(Capacity: 18MW)
Apr. 2014 - Jun. 2014
(4 months)
IDCO / Domestic Fund Dam Safety Assessment
Deputy
Project
Manager
5.
Dak Mi 4b Hydropower
Project, Vietnam
(Capacity: 42MW)
Dec. 2013 - Mar. 2014
(4 months)
IDCO / Domestic Fund Dam Safety Assessment
Deputy
Project
Manager
6.
Dak Mi 4a Hydropower
Project, Vietnam
(Capacity: 148MW)
Jun. 2013 - Nov. 2013
(6 months) IDCO / Domestic Fund Dam Safety Assessment
Deputy
Project
Manager
7.
Quang Tri Hydropower
Project, Viet Nam
(Capacity: 64MW)
Feb. 2011 - Aug. 2011
(7 months)
Quang Tri Hydropower JSC
/ Domestic Fund
Dam Safety Assessment
Deputy
Project
Manager
8.
Đak Mi 3 Hydropower
Project, Vietnam
(Capacity: 54MW)
May. 2012 - May.
2013 (12 months)
IDCO / Domestic Loan Detailed design
Civil design
Engineer /
Structural
Engineer
9.
Tuyen Quang Hydropower
Project, Vietnam
(Capacity: 342MW)
Feb. 2011 - Aug. 2011
(7 months) EVN / Domestic Fund Dam Safety Assessment
Engineer
Incharge of
Civil design
10.
Thac Ba Hydropower Project,
Vietnam
(Capacity: 120MW)
Dec. 2010 - Jan. 2011
(2 months)
Thac Ba Hydropower JSC /
Domestic Fund
Dam Safety Assessment
Civil design
Engineer
11.
Dong Nai 4 Hydropower
Project, Viet Nam
(Capacity: 340MW)
Jun. 2007 - Oct. 2007
(5 months)
EVN / Domestic Loan Detail design
Structural
Engineer
12.
Dong Nai 3 Hydropower
Project, Vietnam
(Capacity: 180MW)
Dec. 2006 - May.
2007 (6 months)
EVN / Domestic Loan Detailed design
Structural
Engineer
13.
Dak Mi 4 Hydropower
Project, Vietnam
(Capacity: 196MW)
Oct. 2006 - Nov. 2010
(50 months)
IDCO / Domestic Loan
Bidding Document,
Detailed design,
Construction Drawing
and, Working Drawing
and Site supervisor works
Civil design
Engineer/
Structural
Engineer and
5. Duong Xuan Sang / 5
No. Project Name, Country Period Client/Finance Types of Service Position
14.
Dak’r Tih Hydropower
Project, Vietnam
(Capacity: 144MW)
Jul. 2006 - Jun. 2009
(36 months)
CC1 (Construction
Corporation No.1) /
Domestic Loan
Bidding Document,
Detailed design,
Construction Drawing
and, Working Drawing
and Site supervisor works
Civil design
Engineer/
Structural
Engineer and
15.
Dai Ninh Hydropower
Project, Vietnam
(Capacity: 300MW)
Now. 2005 - Jun. 2006
(8 months)
EVN / Japanese
ODA Loan
Site construction
Supervision
Assistant
Structural
Engineer
and Site
supervisor
16.
Krong Hnang Hydropower
Project, Vietnam
(Capacity: 64MW)
May. 2004 - Oct. 2005
(18 months)
EVN / Domestic Loan
Technical design &
Detailed design
Civil design /
Structural
Engineer
17.
Buon Tua Shra Hydropower
Project, Vietnam
(Capacity: 86MW)
Feb. 2004 - Apr. 2005
(15 months)
EVN (Vietnam Electricity) /
Domestic Loan
Technical design &
Detailed design
Civil design
Engineer
18.
Upgrade of Song Hinh
Hydropower Project, Vietnam
(Capacity: 66MW)
Jul. 2003 - Jan. 2004
(7 months)
Vinh Son-Song Hinh
Hydropower Project
Management Board /
Domestic Fund
Site construction
Supervision
Site
inspection of
Dams
9. Certification:
I, the undersigned, certify to the best of my knowledge and belief that:
(i) this CV correctly describes my qualifications and my experience;
(ii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in the
Schedule provided team mobilization takes place within the validity of this proposal or any agreed extension thereof;
(iii) I am committed to undertake the assignment within the validity of Proposal;
I understand that any misstatement described herein may lead to my disqualification or dismissal, if engaged.
Bangkok: Aug.10th
, 2016
Signature of Staff member
Duong Xuan Sang