This resume summarizes the career experience of Teguh Iman Djoko Trilaksono, an Indonesian engineer specializing in MEEP (mechanical, electrical, electronic, and plumbing) works for building construction projects in Indonesia. Over the past 20 years, he has worked on numerous high-rise, hotel, and villa projects in roles including MEEP coordinator, designer, consultant, and construction management.
Unleash the motivational power of incentive compensation.
CRMIT Solutions provides a complete set of services, from transition through go live, to post go-live. This also includes modelling, design, administration and analysis of incentive compensation programs ranging from hundreds to thousands of direct or indirect sales professionals.
Unleash the motivational power of incentive compensation.
CRMIT Solutions provides a complete set of services, from transition through go live, to post go-live. This also includes modelling, design, administration and analysis of incentive compensation programs ranging from hundreds to thousands of direct or indirect sales professionals.
1. HIGH RISE BUILDING, HOTEL & VILA CONSTRUCTION INDONESIA PROJECTS
MEEP WORKS
Name : Teguh Iman Djoko Trilaksono, Eng
Temporary Address : Jl. Laksamana XV/ No.6, R e n o n
Province : B a l i
City : Denpasar
Post Code : 80239
Contact Number : 081 338 304 308
2. CURRICULUM VITAE
Resume of Mr. TEGUH IMAN DJOKO TRILAKSONO
PERSONAL DETAILS
Gender : Male
Place, Date of birth : May 21st
1967
Marital Status : Married
Nick Name : Sony
Nationality : INDONESIA
Ethnicity : J a v a
Religion : Muslim
Work Authorization Status : Authorized to work in Indonesia and Outboard
Country of Residence : Indonesia
Residential Status : Rent
No. of Children : 1(daughter)
Own Vehicle : Motorbike
Drive license : A and C
Bank Account : Bank BRI Branch Bali
Present Address Jl. Laksamana XV.No: 6, Babakan Sari, Renon
Postal Code: 80239
Province : B a l i
City : Denpasar
Contact Number : 081 338 304 308
Origin Address in Java : Jl. Balai kota, Gg. Garuda-8 / No: 11A,
Pasuruan – East Java, Post Code: 67125
Height : 166 cm
Weight : 87 kgs
E_mail : tegsoe@yahoo.com
CAREER INTERESTS
EXPECTED SALLARY Negotiable
EXECUTIVE SUMMARY / SELF DESCRIPTION
Over 10 years dynamic and improve of engineering & leadership team and
responsibility of achievement of implementations and finishing the project
PROFESSIONAL QUALIFICATIONS
Professional Qualifications as MEEP Works designing as following:
ELECTRICAL works: Lighting, GPO, Wiring, Feeder Load Schedule, Single Line
Diagram. ELECTRONIC Works: Installations of Telp, MATV, Data, CCTV, SS and
FA. PLUMBING Works: HSVA Installations Clean Water & Hot Water Installations,
Sewage Water & Waste Water and Storm Water Installations; Swimming Pool and
SPA Installations, Pump Room setting MECHANICAL Works and Engineering
Filling.
( page 1 of 8 )
3. SUMMARY OF SKILLS
Languages Reading Writing Speaking Listening
English Good Good Good Good
EDUCATION
Industrial Engineering Faculty – Engineering Dept
INSTITUTE TECHNOLOGY NATIONAL MALANG – EAST JAVA
COMPUTER SKILLS:
Microsoft Office :( Excel & Words), and AutoCAD 2010
WORKING EXPERIENCE’s
Position : MEEP Coordinator
Company/ Project : Jumeirah Dubai-Bali Resort
Period : Feb 2013 – Sept 2015
Job Duties/ Achievements
1. Managing Main Contractor and Sub Cont MEEP Works
2. Liaison to Architect Consultant/ Ground Kent AUS
3. Liaison to Interior Consultant/ Denniston Mexico
4. Liaison to Structure Consultant/ Davysukamta
5. Liaison to MEP Consultant/ Arnan APC
6. Liaison to Lighting Consultant/ Litac
7. Liaison to Construction Management/ Konkordia
8. Arrangement and supervising MEP Works
9. Checking and control MEEP Design & Construction
10. Check and correction MEEP Shop Drawing
11. Check and control MEEP Progress & Reports
12. Trouble Shoot and Engineering Works
------------------------------------------------------------------------------
Position : MEEP Designer & Consultant
Company : Condominium Park Regis Hotel Project
6th
Floor 176Rooms, Kuta Denpasar - Bali
Period : January 2012 – February, 2013
Job Duties/ Achievements:
1. Designing Electrical System: LVMDP, SLD, SDB, PP and Wiring
Panel, Electrical Schedule
2. Electronic System: Telephone, Data Internet Working, F.A,
CCTV, MATV Installations, Sound System
3. Plumbing Works: CW+HW System, SW+WW System and
Swimming Pool System and Installations
4. Calculation Power Demand Water Demand
5. Hydrant and Sprinkler Installations
6. Setting wiring electrical Power Panel
7. Counting and Analyzing Power Consumption & Demand Power
8. Installation Waste water and Sewage water Treatment Plan
9. Grounding Installations and Lightening Protector
10. JTM Medium Voltage Incoming Power and JTR Low Voltage
11. Managing Main Contractor MEP Works
12. Processes application PLN Connections
13. Running Test All MEP Installation
( Page 2 of 8 )
4. Position : MEEP Construction Management
Company : Sky Garden, In spiral, Luna2 Studio
Kuta Seminyak, Denpasar - Bali
Period : September 2011 – March, 2012
Job Duties/ Achievements:
1. Designing Electrical System, Electronic System,
2. CW+HW System, SW+WW System and S. Pool System
3. Calculation Power Demand Water Demand
4. Mechanical Set Up, Submersible Pump, Booster Pump,
Electric Hydrant Pump, Diesel Hydrant Pump, Jockey Pump
5. Trouble shooting electrical installations
6. Rerouting electrical installations
7. Power Consumption and Max. Demand Load Analyzing
8. Sewage Treatment Plan
9. M/E Plumbing Installations Works,
10. Mechanical, Electrical, Electronic and Plumbing
Installations
11. Low Voltage and Medium Voltage Incoming Power
designing
12. Managing sub-contractor and main contractor MEP Works
13. Completion design MEP Installation Works
14. Liaison with PLN Power Electricity apply
_______________________________________________________
Position : MEEP Designer & Team Leader
Company : PT Pure-D French & PT Sandheva French
Denpasar-Bali
Period : Feb 2010 to August 2011
Job Duties/ Achievements:
1. Designing ALL MEP Installations & ALL MEP Works
2. Engineering Works
3. Calculating MEP BOQ
4. Organizing and Managing Main MEP Contractor and MEP
Sub Contractor
5. Making Action Plan & Materials Request
6. Making Project Progress
7. Checking and Control all MEP Installations
8. Supervising Plumbing Works and Testing:
CW+HW Installations and SW+WW Installations
9. Supervising Electrical Works and Testing:
Lighting and Switches + GPO installations, Lightning
Protector
10. Supervising VAC/ Air Conditions Installations: IAC+OAC
11. Supervising Electronic Works and Testing:
Telp, Data, MATV, CCTV
12. Supervising HSFA Installations and Testing
13. Establishment Daily/weekly/Monthly Reports,
14. Making Shop Drawing and paper works
15. Organizing and coordinating with Civil Works
( Page 3 of 8 )
5. 16. Controlling and Corrections of MEP Installations
17. Daily MEP Works reports to Project Manager and Director
18. Coordinating Engineering Works
19. Coordinating with PLN and PDAM
20. Coordinating with Architect and Civil Works
21. Arrange and managing MEP Personnel
22. Preliminary Survey project location: Power Supply, Water
Supply, Drainage Installations
_________________________________________________________________
Position : MEEP Construction Management
Company : Panoramadua – SFM Company
Azzure Point Suites Project MEEP CM
Denpasar-Bali
Period : Mart 2008 to Mart 2009
Job Duties/ Achievements:
1. Controlling and Corrections of MEP Schedule
2. Organizing MEP Main Contractor and Sub Contractor MEP
3. Engineering works of MEP Installations
4. Approving of all MEP Materials and Equipment’s
5. Supervising implementations Installations AC, EAD, FAG,
RW, SW, WW, CW, HW; HSFA
6. Electrical Works
7. Electronic Works
8. Supervise for MEP Installations Testing
9. Check & Correction Shop Drawing
10. Team Works with Civil Works
11. Controlling and Corrections of MEP Works of Monthly
Reports & Project Progress
_________________________________________________________________
Position : MEEP Supervisor & MEEP Site Engineer
Company : PT ESM GENERAL CONTRACTOR
Denpasar – Bali
Period : February 2007 to January 2008
Job Duties/ Achievements:
1. Establish and Supervising Action Plan
2. Organizing all Electrician and Plumber
3. Preparations and submission to Approval of materials
request and shop drawing
4. Supervising Implementations MEEP Works
5. Supervising MEEP Installations Test
6. Organizing and Supervising Over time works
7. Team Works engineering to Architect & Civil Works
8. Establishing Daily Reports of MEP Works
9. Establishing VO & Add & Deductions MEEP Works
10. Counting of Variation Orders of MEEP Works as BOQ to
re-designing MEEP Works
( Page 4 of 8 )
6. Position : General Manager
Company : Batavia Furniture CV
Own Company, Denpasar- Bali
Period : March 2004 to Sept 2006
Job Duties/ Achievements:
1. Establishment of managements
2. Set up man power
3. Establishment works planning
4. Establishing materials request
5. Budgeting of all activities
6. Sales and Marketing
7. Sea Forwarding Doc’s handling
8. Doc’s Handling
9. Packing and Stuffing supervising
_________________________________________________________________
Position : Manager & Designer Pool & SPA
Period : March 2001 to December 2004
Company : Tropical Specialist Pool and Spa
Branch Office Ubud - Bali
Job Duties/ Achievements:
1. Designing of plumbing installations of Pool and Spa,
materials and equipments
2. Designing of Filtrations System of Pool and Spa,
materials and equipments
3. Engineering Activities of implementations project
4. Trouble shooting and problem solving on site
5. Supervising Progress Pool and Spa Project
6. Supports of Technical and System Pool Spa
7. Product support of Pool and SPA
8. Handling of pool spa project customers
9. Accounting cash flow by MYOB
10. Administrations Office reports
11. Supervising of finishing furniture activities
12. Establishing Sea cargo Doc's
_________________________________________________________________
Position : General Maintenance Manager
Company : Wind Vilas, Legian – Kuta, Bali
Period : May 1999 to December 2001
Job Duties/ Achievements:
1. Checking and Controlling all Installations:
Electrical and electronic installations, AC, Plumbing
Installation and Sanitary Pool
2. Trouble shooting and repairing of Plumbing Electrical
Installation
3. Water Treatments of Pool Sanitary
4. Maintenance Hot Water of Solar Hart System
5. Budgeting of Electrical and Plumbing Installation
6. Set up all pumps pressure
7. Jointing and supervising electrical installtn repairs
8. Arrange sub contractor to repairs of all Inslltn
Bonding pool and treatments
( Page 5 of 8 )
7. Position : Supervisory and Surveyor
Primary & Secondary Networks
Company SIEMENS
Project Planning and Implementations
Telecommunications Project Office
South Eastern of Indonesia
Period : January 1997 to January 1999
Job Duties/ Achievements:
1. Macro and Micro Demand Survey, include for Street
Overview, Bali, Lombok, South Sulawesi until Toraja
Land
2. Eng. Data Processing and Demand Forecasting
3. Supervising Civil Works:
Ducting Instltn, MH, Man Hole and HH, Hand Hole for
Primary Cable Instltn CCC, Cross Cone Cabinet
from/to MDF, Main Distribution Frame Chamber in
STO
4. Supervising pulling secondary and primary cable
5. Supervising activities and jointing primary and
secondary cable installations
6. Supervising Jointing in MDF,CCC, Man Hole
7. Supervising Cut Over secondary cable installations
8. Inspections and Acceptance Test for Installations and
Materials Equipments
9. Test and Commissioning Project
_________________________________________________________________
Position : EDP Computation
Company : Deep well GOVERNMENT CONTRACTOR
Kupang, NTT – Eastern of Indonesia
Period : July 1994 to August 1995
Job Duties/ Achievements:
1. Issued Daily Administrations Cash Office and Cash flow
Project Site
2. Supervising equipment’s and materials in-out project
3. Team Works geology and deep well test
4. Team works w/. Topography Survey
5. Geology Survey to find water resources
6. Geological reports
7. Deep well test
8. Plumbing installations deep well to irrigations
9. Making Progress reports
10. Moving and set up deep well equipments
( Page 6 of 8 )
8. Position : Operational Manager
Heavy Equipemnts
Company : CONSULTANT and CONTRACTOR
High Way and Bridge Project’s
Atambua, NTT, South Eastern Indonesia
Period : May 1993 to June 1994
Job Duties/ Achievements:
1. Establishing Maintenance Schedule of Heavy Equipment
2. Maintenance budgeting of Heavy Equipment
3. Supervising mobilizations of Heavy Equipments
4. Controlling and Supervising Heavy Equipment on site
5. Monitoring and Reports Equipments Activities
6. Head Technician Coordinating on site
7. Assembling of Stone crusher Installation
8. Setting blade of Grader Equipment
_________________________________________________________________
Position : Sales and Marketing Executive
And Export Documents Handling
Company : SAMUDERA INDONESIA GROUP
International Air Forwarder
Period : January 1992 to February 1993
Job Duties/ Achievements:
1. Handling PEB, B/L, Airway Bill, L/C Doc’s
2. Handling COO Form A, Form B, Form K
3. Establishing of Packing List and Invoice
4. Supervising packing activities and stuffing
5. Making sales plan and quotations rate
6. Custom clearance
7. Communications and handling International and
Domestic Agent’s, Factories, Consignee, Shippers and
Buyers
_________________________________________________________________
Position : SPV Centralize AC Inst./ Chiller System
Company : Bali Padma Hotel
Legian – Kuta, Bali
Period : August 1990 to Nov 1991
Job Duties/ Achievements:
1. Controlling supply & return installations & circulations
2. Controlling of Chiller: supply & return cooling air
3. Adjustment and control water pressure pumps
4. Supervising and control air circulations of AHU, Air
Handling Unit to Cooling Tower
5. Supervising of maintenance and repairing AC
6. Engineering supports and Team Work of Civil,
Mechanical, Electrical Works
7. Team Works and Trouble Shooting Electrical and
Plumbing Installation
_________________________________________________________________
( Page 7 of 8 )
9. For further please reach me on: 081 338 304 308 any times
Best regards,
Teguh Iman Djoko Trilaksono, Eng
( Page 8 of 8 )