HIGH RISE BUILDING, HOTEL & VILA CONSTRUCTION INDONESIA PROJECTS
MEEP WORKS
Name : Teguh Iman Djoko Trilaksono, Eng
Temporary Address : Jl. Laksamana XV/ No.6, R e n o n
Province : B a l i
City : Denpasar
Post Code : 80239
Contact Number : 081 338 304 308
CURRICULUM VITAE
Resume of Mr. TEGUH IMAN DJOKO TRILAKSONO
PERSONAL DETAILS
Gender : Male
Place, Date of birth : May 21st
1967
Marital Status : Married
Nick Name : Sony
Nationality : INDONESIA
Ethnicity : J a v a
Religion : Muslim
Work Authorization Status : Authorized to work in Indonesia and Outboard
Country of Residence : Indonesia
Residential Status : Rent
No. of Children : 1(daughter)
Own Vehicle : Motorbike
Drive license : A and C
Bank Account : Bank BRI Branch Bali
Present Address Jl. Laksamana XV.No: 6, Babakan Sari, Renon
Postal Code: 80239
Province : B a l i
City : Denpasar
Contact Number : 081 338 304 308
Origin Address in Java : Jl. Balai kota, Gg. Garuda-8 / No: 11A,
Pasuruan – East Java, Post Code: 67125
Height : 166 cm
Weight : 87 kgs
E_mail : tegsoe@yahoo.com
CAREER INTERESTS
EXPECTED SALLARY Negotiable
EXECUTIVE SUMMARY / SELF DESCRIPTION
Over 10 years dynamic and improve of engineering & leadership team and
responsibility of achievement of implementations and finishing the project
PROFESSIONAL QUALIFICATIONS
Professional Qualifications as MEEP Works designing as following:
ELECTRICAL works: Lighting, GPO, Wiring, Feeder Load Schedule, Single Line
Diagram. ELECTRONIC Works: Installations of Telp, MATV, Data, CCTV, SS and
FA. PLUMBING Works: HSVA Installations Clean Water & Hot Water Installations,
Sewage Water & Waste Water and Storm Water Installations; Swimming Pool and
SPA Installations, Pump Room setting MECHANICAL Works and Engineering
Filling.
( page 1 of 8 )
SUMMARY OF SKILLS
Languages Reading Writing Speaking Listening
English Good Good Good Good
EDUCATION
Industrial Engineering Faculty – Engineering Dept
INSTITUTE TECHNOLOGY NATIONAL MALANG – EAST JAVA
COMPUTER SKILLS:
Microsoft Office :( Excel & Words), and AutoCAD 2010
WORKING EXPERIENCE’s
Position : MEEP Coordinator
Company/ Project : Jumeirah Dubai-Bali Resort
Period : Feb 2013 – Sept 2015
Job Duties/ Achievements
1. Managing Main Contractor and Sub Cont MEEP Works
2. Liaison to Architect Consultant/ Ground Kent AUS
3. Liaison to Interior Consultant/ Denniston Mexico
4. Liaison to Structure Consultant/ Davysukamta
5. Liaison to MEP Consultant/ Arnan APC
6. Liaison to Lighting Consultant/ Litac
7. Liaison to Construction Management/ Konkordia
8. Arrangement and supervising MEP Works
9. Checking and control MEEP Design & Construction
10. Check and correction MEEP Shop Drawing
11. Check and control MEEP Progress & Reports
12. Trouble Shoot and Engineering Works
------------------------------------------------------------------------------
Position : MEEP Designer & Consultant
Company : Condominium Park Regis Hotel Project
6th
Floor 176Rooms, Kuta Denpasar - Bali
Period : January 2012 – February, 2013
Job Duties/ Achievements:
1. Designing Electrical System: LVMDP, SLD, SDB, PP and Wiring
Panel, Electrical Schedule
2. Electronic System: Telephone, Data Internet Working, F.A,
CCTV, MATV Installations, Sound System
3. Plumbing Works: CW+HW System, SW+WW System and
Swimming Pool System and Installations
4. Calculation Power Demand Water Demand
5. Hydrant and Sprinkler Installations
6. Setting wiring electrical Power Panel
7. Counting and Analyzing Power Consumption & Demand Power
8. Installation Waste water and Sewage water Treatment Plan
9. Grounding Installations and Lightening Protector
10. JTM Medium Voltage Incoming Power and JTR Low Voltage
11. Managing Main Contractor MEP Works
12. Processes application PLN Connections
13. Running Test All MEP Installation
( Page 2 of 8 )
Position : MEEP Construction Management
Company : Sky Garden, In spiral, Luna2 Studio
Kuta Seminyak, Denpasar - Bali
Period : September 2011 – March, 2012
Job Duties/ Achievements:
1. Designing Electrical System, Electronic System,
2. CW+HW System, SW+WW System and S. Pool System
3. Calculation Power Demand Water Demand
4. Mechanical Set Up, Submersible Pump, Booster Pump,
Electric Hydrant Pump, Diesel Hydrant Pump, Jockey Pump
5. Trouble shooting electrical installations
6. Rerouting electrical installations
7. Power Consumption and Max. Demand Load Analyzing
8. Sewage Treatment Plan
9. M/E Plumbing Installations Works,
10. Mechanical, Electrical, Electronic and Plumbing
Installations
11. Low Voltage and Medium Voltage Incoming Power
designing
12. Managing sub-contractor and main contractor MEP Works
13. Completion design MEP Installation Works
14. Liaison with PLN Power Electricity apply
_______________________________________________________
Position : MEEP Designer & Team Leader
Company : PT Pure-D French & PT Sandheva French
Denpasar-Bali
Period : Feb 2010 to August 2011
Job Duties/ Achievements:
1. Designing ALL MEP Installations & ALL MEP Works
2. Engineering Works
3. Calculating MEP BOQ
4. Organizing and Managing Main MEP Contractor and MEP
Sub Contractor
5. Making Action Plan & Materials Request
6. Making Project Progress
7. Checking and Control all MEP Installations
8. Supervising Plumbing Works and Testing:
CW+HW Installations and SW+WW Installations
9. Supervising Electrical Works and Testing:
Lighting and Switches + GPO installations, Lightning
Protector
10. Supervising VAC/ Air Conditions Installations: IAC+OAC
11. Supervising Electronic Works and Testing:
Telp, Data, MATV, CCTV
12. Supervising HSFA Installations and Testing
13. Establishment Daily/weekly/Monthly Reports,
14. Making Shop Drawing and paper works
15. Organizing and coordinating with Civil Works
( Page 3 of 8 )
16. Controlling and Corrections of MEP Installations
17. Daily MEP Works reports to Project Manager and Director
18. Coordinating Engineering Works
19. Coordinating with PLN and PDAM
20. Coordinating with Architect and Civil Works
21. Arrange and managing MEP Personnel
22. Preliminary Survey project location: Power Supply, Water
Supply, Drainage Installations
_________________________________________________________________
Position : MEEP Construction Management
Company : Panoramadua – SFM Company
Azzure Point Suites Project MEEP CM
Denpasar-Bali
Period : Mart 2008 to Mart 2009
Job Duties/ Achievements:
1. Controlling and Corrections of MEP Schedule
2. Organizing MEP Main Contractor and Sub Contractor MEP
3. Engineering works of MEP Installations
4. Approving of all MEP Materials and Equipment’s
5. Supervising implementations Installations AC, EAD, FAG,
RW, SW, WW, CW, HW; HSFA
6. Electrical Works
7. Electronic Works
8. Supervise for MEP Installations Testing
9. Check & Correction Shop Drawing
10. Team Works with Civil Works
11. Controlling and Corrections of MEP Works of Monthly
Reports & Project Progress
_________________________________________________________________
Position : MEEP Supervisor & MEEP Site Engineer
Company : PT ESM GENERAL CONTRACTOR
Denpasar – Bali
Period : February 2007 to January 2008
Job Duties/ Achievements:
1. Establish and Supervising Action Plan
2. Organizing all Electrician and Plumber
3. Preparations and submission to Approval of materials
request and shop drawing
4. Supervising Implementations MEEP Works
5. Supervising MEEP Installations Test
6. Organizing and Supervising Over time works
7. Team Works engineering to Architect & Civil Works
8. Establishing Daily Reports of MEP Works
9. Establishing VO & Add & Deductions MEEP Works
10. Counting of Variation Orders of MEEP Works as BOQ to
re-designing MEEP Works
( Page 4 of 8 )
Position : General Manager
Company : Batavia Furniture CV
Own Company, Denpasar- Bali
Period : March 2004 to Sept 2006
Job Duties/ Achievements:
1. Establishment of managements
2. Set up man power
3. Establishment works planning
4. Establishing materials request
5. Budgeting of all activities
6. Sales and Marketing
7. Sea Forwarding Doc’s handling
8. Doc’s Handling
9. Packing and Stuffing supervising
_________________________________________________________________
Position : Manager & Designer Pool & SPA
Period : March 2001 to December 2004
Company : Tropical Specialist Pool and Spa
Branch Office Ubud - Bali
Job Duties/ Achievements:
1. Designing of plumbing installations of Pool and Spa,
materials and equipments
2. Designing of Filtrations System of Pool and Spa,
materials and equipments
3. Engineering Activities of implementations project
4. Trouble shooting and problem solving on site
5. Supervising Progress Pool and Spa Project
6. Supports of Technical and System Pool Spa
7. Product support of Pool and SPA
8. Handling of pool spa project customers
9. Accounting cash flow by MYOB
10. Administrations Office reports
11. Supervising of finishing furniture activities
12. Establishing Sea cargo Doc's
_________________________________________________________________
Position : General Maintenance Manager
Company : Wind Vilas, Legian – Kuta, Bali
Period : May 1999 to December 2001
Job Duties/ Achievements:
1. Checking and Controlling all Installations:
Electrical and electronic installations, AC, Plumbing
Installation and Sanitary Pool
2. Trouble shooting and repairing of Plumbing Electrical
Installation
3. Water Treatments of Pool Sanitary
4. Maintenance Hot Water of Solar Hart System
5. Budgeting of Electrical and Plumbing Installation
6. Set up all pumps pressure
7. Jointing and supervising electrical installtn repairs
8. Arrange sub contractor to repairs of all Inslltn
Bonding pool and treatments
( Page 5 of 8 )
Position : Supervisory and Surveyor
Primary & Secondary Networks
Company SIEMENS
Project Planning and Implementations
Telecommunications Project Office
South Eastern of Indonesia
Period : January 1997 to January 1999
Job Duties/ Achievements:
1. Macro and Micro Demand Survey, include for Street
Overview, Bali, Lombok, South Sulawesi until Toraja
Land
2. Eng. Data Processing and Demand Forecasting
3. Supervising Civil Works:
Ducting Instltn, MH, Man Hole and HH, Hand Hole for
Primary Cable Instltn CCC, Cross Cone Cabinet
from/to MDF, Main Distribution Frame Chamber in
STO
4. Supervising pulling secondary and primary cable
5. Supervising activities and jointing primary and
secondary cable installations
6. Supervising Jointing in MDF,CCC, Man Hole
7. Supervising Cut Over secondary cable installations
8. Inspections and Acceptance Test for Installations and
Materials Equipments
9. Test and Commissioning Project
_________________________________________________________________
Position : EDP Computation
Company : Deep well GOVERNMENT CONTRACTOR
Kupang, NTT – Eastern of Indonesia
Period : July 1994 to August 1995
Job Duties/ Achievements:
1. Issued Daily Administrations Cash Office and Cash flow
Project Site
2. Supervising equipment’s and materials in-out project
3. Team Works geology and deep well test
4. Team works w/. Topography Survey
5. Geology Survey to find water resources
6. Geological reports
7. Deep well test
8. Plumbing installations deep well to irrigations
9. Making Progress reports
10. Moving and set up deep well equipments
( Page 6 of 8 )
Position : Operational Manager
Heavy Equipemnts
Company : CONSULTANT and CONTRACTOR
High Way and Bridge Project’s
Atambua, NTT, South Eastern Indonesia
Period : May 1993 to June 1994
Job Duties/ Achievements:
1. Establishing Maintenance Schedule of Heavy Equipment
2. Maintenance budgeting of Heavy Equipment
3. Supervising mobilizations of Heavy Equipments
4. Controlling and Supervising Heavy Equipment on site
5. Monitoring and Reports Equipments Activities
6. Head Technician Coordinating on site
7. Assembling of Stone crusher Installation
8. Setting blade of Grader Equipment
_________________________________________________________________
Position : Sales and Marketing Executive
And Export Documents Handling
Company : SAMUDERA INDONESIA GROUP
International Air Forwarder
Period : January 1992 to February 1993
Job Duties/ Achievements:
1. Handling PEB, B/L, Airway Bill, L/C Doc’s
2. Handling COO Form A, Form B, Form K
3. Establishing of Packing List and Invoice
4. Supervising packing activities and stuffing
5. Making sales plan and quotations rate
6. Custom clearance
7. Communications and handling International and
Domestic Agent’s, Factories, Consignee, Shippers and
Buyers
_________________________________________________________________
Position : SPV Centralize AC Inst./ Chiller System
Company : Bali Padma Hotel
Legian – Kuta, Bali
Period : August 1990 to Nov 1991
Job Duties/ Achievements:
1. Controlling supply & return installations & circulations
2. Controlling of Chiller: supply & return cooling air
3. Adjustment and control water pressure pumps
4. Supervising and control air circulations of AHU, Air
Handling Unit to Cooling Tower
5. Supervising of maintenance and repairing AC
6. Engineering supports and Team Work of Civil,
Mechanical, Electrical Works
7. Team Works and Trouble Shooting Electrical and
Plumbing Installation
_________________________________________________________________
( Page 7 of 8 )
For further please reach me on: 081 338 304 308 any times
Best regards,
Teguh Iman Djoko Trilaksono, Eng
( Page 8 of 8 )

More Related Content

What's hot

Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12
charkins
 
COMPANY PROFILE 2015
COMPANY PROFILE 2015COMPANY PROFILE 2015
COMPANY PROFILE 2015VIJAY XAVIER
 
CV of Alamin
CV of AlaminCV of Alamin
CV of AlaminAl Amin
 
New CV Updated-February 20_2016
New CV Updated-February 20_2016New CV Updated-February 20_2016
New CV Updated-February 20_2016Nazareno Natan
 
Cvyapcw 2012(5) (solar & trainer-m & mes)
Cvyapcw 2012(5) (solar & trainer-m & mes)Cvyapcw 2012(5) (solar & trainer-m & mes)
Cvyapcw 2012(5) (solar & trainer-m & mes)
IR YAP CHEE WAH
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resumesadiq rizan
 
SADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaiSADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaisadiq rizan
 
Charles Ytzen Resume Specification
Charles Ytzen Resume SpecificationCharles Ytzen Resume Specification
Charles Ytzen Resume SpecificationCharles Ytzen
 

What's hot (12)

Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12
 
RESUME
RESUMERESUME
RESUME
 
COMPANY PROFILE 2015
COMPANY PROFILE 2015COMPANY PROFILE 2015
COMPANY PROFILE 2015
 
CV of Alamin
CV of AlaminCV of Alamin
CV of Alamin
 
CV. dedy
CV. dedyCV. dedy
CV. dedy
 
New CV Updated-February 20_2016
New CV Updated-February 20_2016New CV Updated-February 20_2016
New CV Updated-February 20_2016
 
Cvyapcw 2012(5) (solar & trainer-m & mes)
Cvyapcw 2012(5) (solar & trainer-m & mes)Cvyapcw 2012(5) (solar & trainer-m & mes)
Cvyapcw 2012(5) (solar & trainer-m & mes)
 
Group Component
Group ComponentGroup Component
Group Component
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
 
Terry RESUME
Terry RESUMETerry RESUME
Terry RESUME
 
SADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaiSADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubai
 
Charles Ytzen Resume Specification
Charles Ytzen Resume SpecificationCharles Ytzen Resume Specification
Charles Ytzen Resume Specification
 

Viewers also liked

Paul Tokpah Resume v3
Paul Tokpah Resume v3Paul Tokpah Resume v3
Paul Tokpah Resume v3Paul Tokpah
 
Paul Loder Resume 2016
Paul Loder Resume 2016Paul Loder Resume 2016
Paul Loder Resume 2016Paul Loder
 
Sexual orientation, policy, and the public workplace
Sexual orientation, policy, and the public workplaceSexual orientation, policy, and the public workplace
Sexual orientation, policy, and the public workplace
taratoot
 
Postgraduate Plan
Postgraduate PlanPostgraduate Plan
Postgraduate Planlizeth89500
 
Dispositivos Móviles
Dispositivos Móviles Dispositivos Móviles
Dispositivos Móviles
Larissa Cruz C
 
Conceptual Problem solution
Conceptual Problem solutionConceptual Problem solution
Conceptual Problem solutionManish sharma
 
Incentive Compensation Management
Incentive Compensation ManagementIncentive Compensation Management
Incentive Compensation Management
CRMIT
 
Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...
Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...
Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...ViPra135
 
Port Huron Writing support 2015-16
Port Huron Writing support 2015-16Port Huron Writing support 2015-16
Port Huron Writing support 2015-16
Jennifer Evans
 
La onu
La onuLa onu
La onu
axelg600
 

Viewers also liked (13)

Paul Tokpah Resume v3
Paul Tokpah Resume v3Paul Tokpah Resume v3
Paul Tokpah Resume v3
 
Hola , soy romina
Hola , soy rominaHola , soy romina
Hola , soy romina
 
Paul Loder Resume 2016
Paul Loder Resume 2016Paul Loder Resume 2016
Paul Loder Resume 2016
 
Sexual orientation, policy, and the public workplace
Sexual orientation, policy, and the public workplaceSexual orientation, policy, and the public workplace
Sexual orientation, policy, and the public workplace
 
Resume #11
Resume #11Resume #11
Resume #11
 
Postgraduate Plan
Postgraduate PlanPostgraduate Plan
Postgraduate Plan
 
Dispositivos Móviles
Dispositivos Móviles Dispositivos Móviles
Dispositivos Móviles
 
Conceptual Problem solution
Conceptual Problem solutionConceptual Problem solution
Conceptual Problem solution
 
Incentive Compensation Management
Incentive Compensation ManagementIncentive Compensation Management
Incentive Compensation Management
 
Other advanced settings for turnitin assignments
Other advanced settings for turnitin assignmentsOther advanced settings for turnitin assignments
Other advanced settings for turnitin assignments
 
Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...
Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...
Vipin_Prajapati_Fully Printed Carbon Nanotube Thin-Film Transistors for Press...
 
Port Huron Writing support 2015-16
Port Huron Writing support 2015-16Port Huron Writing support 2015-16
Port Huron Writing support 2015-16
 
La onu
La onuLa onu
La onu
 

Similar to CVtegsoe-151229

Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)Tuan Vu Dinh
 
Subrat dash.credential
Subrat dash.credentialSubrat dash.credential
Subrat dash.credentialSubrat Dash
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016ZUBER AHAMED
 
RESUME for Data Center Facility Maintenance
RESUME for Data Center Facility MaintenanceRESUME for Data Center Facility Maintenance
RESUME for Data Center Facility Maintenanceselva s
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photoronnie luneta
 

Similar to CVtegsoe-151229 (20)

Resume Dax Roque C.
Resume Dax Roque C.Resume Dax Roque C.
Resume Dax Roque C.
 
vivek-cv
vivek-cvvivek-cv
vivek-cv
 
CV-Gusryan Zari Khamsya
CV-Gusryan Zari KhamsyaCV-Gusryan Zari Khamsya
CV-Gusryan Zari Khamsya
 
Lawrence_Jacobs_CV_2017
Lawrence_Jacobs_CV_2017Lawrence_Jacobs_CV_2017
Lawrence_Jacobs_CV_2017
 
Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Nguyen_Ngoc_Thao CVs-E
Nguyen_Ngoc_Thao CVs-ENguyen_Ngoc_Thao CVs-E
Nguyen_Ngoc_Thao CVs-E
 
ye lwinoo CV
ye lwinoo CVye lwinoo CV
ye lwinoo CV
 
LOHGESH2
LOHGESH2LOHGESH2
LOHGESH2
 
Subrat dash.credential
Subrat dash.credentialSubrat dash.credential
Subrat dash.credential
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016
 
Pari Resume 2015 India
Pari Resume 2015 IndiaPari Resume 2015 India
Pari Resume 2015 India
 
LATEST CV
LATEST CVLATEST CV
LATEST CV
 
RESUME for Data Center Facility Maintenance
RESUME for Data Center Facility MaintenanceRESUME for Data Center Facility Maintenance
RESUME for Data Center Facility Maintenance
 
Makhate CV - Jun 2015
Makhate CV - Jun 2015Makhate CV - Jun 2015
Makhate CV - Jun 2015
 
SULU TOLANI cv
SULU TOLANI cvSULU TOLANI cv
SULU TOLANI cv
 
Sree_CV Aug 2015
Sree_CV Aug 2015Sree_CV Aug 2015
Sree_CV Aug 2015
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
 
English lanuange resume
English lanuange resumeEnglish lanuange resume
English lanuange resume
 
Resume Bhaskar
Resume BhaskarResume Bhaskar
Resume Bhaskar
 

CVtegsoe-151229

  • 1. HIGH RISE BUILDING, HOTEL & VILA CONSTRUCTION INDONESIA PROJECTS MEEP WORKS Name : Teguh Iman Djoko Trilaksono, Eng Temporary Address : Jl. Laksamana XV/ No.6, R e n o n Province : B a l i City : Denpasar Post Code : 80239 Contact Number : 081 338 304 308
  • 2. CURRICULUM VITAE Resume of Mr. TEGUH IMAN DJOKO TRILAKSONO PERSONAL DETAILS Gender : Male Place, Date of birth : May 21st 1967 Marital Status : Married Nick Name : Sony Nationality : INDONESIA Ethnicity : J a v a Religion : Muslim Work Authorization Status : Authorized to work in Indonesia and Outboard Country of Residence : Indonesia Residential Status : Rent No. of Children : 1(daughter) Own Vehicle : Motorbike Drive license : A and C Bank Account : Bank BRI Branch Bali Present Address Jl. Laksamana XV.No: 6, Babakan Sari, Renon Postal Code: 80239 Province : B a l i City : Denpasar Contact Number : 081 338 304 308 Origin Address in Java : Jl. Balai kota, Gg. Garuda-8 / No: 11A, Pasuruan – East Java, Post Code: 67125 Height : 166 cm Weight : 87 kgs E_mail : tegsoe@yahoo.com CAREER INTERESTS EXPECTED SALLARY Negotiable EXECUTIVE SUMMARY / SELF DESCRIPTION Over 10 years dynamic and improve of engineering & leadership team and responsibility of achievement of implementations and finishing the project PROFESSIONAL QUALIFICATIONS Professional Qualifications as MEEP Works designing as following: ELECTRICAL works: Lighting, GPO, Wiring, Feeder Load Schedule, Single Line Diagram. ELECTRONIC Works: Installations of Telp, MATV, Data, CCTV, SS and FA. PLUMBING Works: HSVA Installations Clean Water & Hot Water Installations, Sewage Water & Waste Water and Storm Water Installations; Swimming Pool and SPA Installations, Pump Room setting MECHANICAL Works and Engineering Filling. ( page 1 of 8 )
  • 3. SUMMARY OF SKILLS Languages Reading Writing Speaking Listening English Good Good Good Good EDUCATION Industrial Engineering Faculty – Engineering Dept INSTITUTE TECHNOLOGY NATIONAL MALANG – EAST JAVA COMPUTER SKILLS: Microsoft Office :( Excel & Words), and AutoCAD 2010 WORKING EXPERIENCE’s Position : MEEP Coordinator Company/ Project : Jumeirah Dubai-Bali Resort Period : Feb 2013 – Sept 2015 Job Duties/ Achievements 1. Managing Main Contractor and Sub Cont MEEP Works 2. Liaison to Architect Consultant/ Ground Kent AUS 3. Liaison to Interior Consultant/ Denniston Mexico 4. Liaison to Structure Consultant/ Davysukamta 5. Liaison to MEP Consultant/ Arnan APC 6. Liaison to Lighting Consultant/ Litac 7. Liaison to Construction Management/ Konkordia 8. Arrangement and supervising MEP Works 9. Checking and control MEEP Design & Construction 10. Check and correction MEEP Shop Drawing 11. Check and control MEEP Progress & Reports 12. Trouble Shoot and Engineering Works ------------------------------------------------------------------------------ Position : MEEP Designer & Consultant Company : Condominium Park Regis Hotel Project 6th Floor 176Rooms, Kuta Denpasar - Bali Period : January 2012 – February, 2013 Job Duties/ Achievements: 1. Designing Electrical System: LVMDP, SLD, SDB, PP and Wiring Panel, Electrical Schedule 2. Electronic System: Telephone, Data Internet Working, F.A, CCTV, MATV Installations, Sound System 3. Plumbing Works: CW+HW System, SW+WW System and Swimming Pool System and Installations 4. Calculation Power Demand Water Demand 5. Hydrant and Sprinkler Installations 6. Setting wiring electrical Power Panel 7. Counting and Analyzing Power Consumption & Demand Power 8. Installation Waste water and Sewage water Treatment Plan 9. Grounding Installations and Lightening Protector 10. JTM Medium Voltage Incoming Power and JTR Low Voltage 11. Managing Main Contractor MEP Works 12. Processes application PLN Connections 13. Running Test All MEP Installation ( Page 2 of 8 )
  • 4. Position : MEEP Construction Management Company : Sky Garden, In spiral, Luna2 Studio Kuta Seminyak, Denpasar - Bali Period : September 2011 – March, 2012 Job Duties/ Achievements: 1. Designing Electrical System, Electronic System, 2. CW+HW System, SW+WW System and S. Pool System 3. Calculation Power Demand Water Demand 4. Mechanical Set Up, Submersible Pump, Booster Pump, Electric Hydrant Pump, Diesel Hydrant Pump, Jockey Pump 5. Trouble shooting electrical installations 6. Rerouting electrical installations 7. Power Consumption and Max. Demand Load Analyzing 8. Sewage Treatment Plan 9. M/E Plumbing Installations Works, 10. Mechanical, Electrical, Electronic and Plumbing Installations 11. Low Voltage and Medium Voltage Incoming Power designing 12. Managing sub-contractor and main contractor MEP Works 13. Completion design MEP Installation Works 14. Liaison with PLN Power Electricity apply _______________________________________________________ Position : MEEP Designer & Team Leader Company : PT Pure-D French & PT Sandheva French Denpasar-Bali Period : Feb 2010 to August 2011 Job Duties/ Achievements: 1. Designing ALL MEP Installations & ALL MEP Works 2. Engineering Works 3. Calculating MEP BOQ 4. Organizing and Managing Main MEP Contractor and MEP Sub Contractor 5. Making Action Plan & Materials Request 6. Making Project Progress 7. Checking and Control all MEP Installations 8. Supervising Plumbing Works and Testing: CW+HW Installations and SW+WW Installations 9. Supervising Electrical Works and Testing: Lighting and Switches + GPO installations, Lightning Protector 10. Supervising VAC/ Air Conditions Installations: IAC+OAC 11. Supervising Electronic Works and Testing: Telp, Data, MATV, CCTV 12. Supervising HSFA Installations and Testing 13. Establishment Daily/weekly/Monthly Reports, 14. Making Shop Drawing and paper works 15. Organizing and coordinating with Civil Works ( Page 3 of 8 )
  • 5. 16. Controlling and Corrections of MEP Installations 17. Daily MEP Works reports to Project Manager and Director 18. Coordinating Engineering Works 19. Coordinating with PLN and PDAM 20. Coordinating with Architect and Civil Works 21. Arrange and managing MEP Personnel 22. Preliminary Survey project location: Power Supply, Water Supply, Drainage Installations _________________________________________________________________ Position : MEEP Construction Management Company : Panoramadua – SFM Company Azzure Point Suites Project MEEP CM Denpasar-Bali Period : Mart 2008 to Mart 2009 Job Duties/ Achievements: 1. Controlling and Corrections of MEP Schedule 2. Organizing MEP Main Contractor and Sub Contractor MEP 3. Engineering works of MEP Installations 4. Approving of all MEP Materials and Equipment’s 5. Supervising implementations Installations AC, EAD, FAG, RW, SW, WW, CW, HW; HSFA 6. Electrical Works 7. Electronic Works 8. Supervise for MEP Installations Testing 9. Check & Correction Shop Drawing 10. Team Works with Civil Works 11. Controlling and Corrections of MEP Works of Monthly Reports & Project Progress _________________________________________________________________ Position : MEEP Supervisor & MEEP Site Engineer Company : PT ESM GENERAL CONTRACTOR Denpasar – Bali Period : February 2007 to January 2008 Job Duties/ Achievements: 1. Establish and Supervising Action Plan 2. Organizing all Electrician and Plumber 3. Preparations and submission to Approval of materials request and shop drawing 4. Supervising Implementations MEEP Works 5. Supervising MEEP Installations Test 6. Organizing and Supervising Over time works 7. Team Works engineering to Architect & Civil Works 8. Establishing Daily Reports of MEP Works 9. Establishing VO & Add & Deductions MEEP Works 10. Counting of Variation Orders of MEEP Works as BOQ to re-designing MEEP Works ( Page 4 of 8 )
  • 6. Position : General Manager Company : Batavia Furniture CV Own Company, Denpasar- Bali Period : March 2004 to Sept 2006 Job Duties/ Achievements: 1. Establishment of managements 2. Set up man power 3. Establishment works planning 4. Establishing materials request 5. Budgeting of all activities 6. Sales and Marketing 7. Sea Forwarding Doc’s handling 8. Doc’s Handling 9. Packing and Stuffing supervising _________________________________________________________________ Position : Manager & Designer Pool & SPA Period : March 2001 to December 2004 Company : Tropical Specialist Pool and Spa Branch Office Ubud - Bali Job Duties/ Achievements: 1. Designing of plumbing installations of Pool and Spa, materials and equipments 2. Designing of Filtrations System of Pool and Spa, materials and equipments 3. Engineering Activities of implementations project 4. Trouble shooting and problem solving on site 5. Supervising Progress Pool and Spa Project 6. Supports of Technical and System Pool Spa 7. Product support of Pool and SPA 8. Handling of pool spa project customers 9. Accounting cash flow by MYOB 10. Administrations Office reports 11. Supervising of finishing furniture activities 12. Establishing Sea cargo Doc's _________________________________________________________________ Position : General Maintenance Manager Company : Wind Vilas, Legian – Kuta, Bali Period : May 1999 to December 2001 Job Duties/ Achievements: 1. Checking and Controlling all Installations: Electrical and electronic installations, AC, Plumbing Installation and Sanitary Pool 2. Trouble shooting and repairing of Plumbing Electrical Installation 3. Water Treatments of Pool Sanitary 4. Maintenance Hot Water of Solar Hart System 5. Budgeting of Electrical and Plumbing Installation 6. Set up all pumps pressure 7. Jointing and supervising electrical installtn repairs 8. Arrange sub contractor to repairs of all Inslltn Bonding pool and treatments ( Page 5 of 8 )
  • 7. Position : Supervisory and Surveyor Primary & Secondary Networks Company SIEMENS Project Planning and Implementations Telecommunications Project Office South Eastern of Indonesia Period : January 1997 to January 1999 Job Duties/ Achievements: 1. Macro and Micro Demand Survey, include for Street Overview, Bali, Lombok, South Sulawesi until Toraja Land 2. Eng. Data Processing and Demand Forecasting 3. Supervising Civil Works: Ducting Instltn, MH, Man Hole and HH, Hand Hole for Primary Cable Instltn CCC, Cross Cone Cabinet from/to MDF, Main Distribution Frame Chamber in STO 4. Supervising pulling secondary and primary cable 5. Supervising activities and jointing primary and secondary cable installations 6. Supervising Jointing in MDF,CCC, Man Hole 7. Supervising Cut Over secondary cable installations 8. Inspections and Acceptance Test for Installations and Materials Equipments 9. Test and Commissioning Project _________________________________________________________________ Position : EDP Computation Company : Deep well GOVERNMENT CONTRACTOR Kupang, NTT – Eastern of Indonesia Period : July 1994 to August 1995 Job Duties/ Achievements: 1. Issued Daily Administrations Cash Office and Cash flow Project Site 2. Supervising equipment’s and materials in-out project 3. Team Works geology and deep well test 4. Team works w/. Topography Survey 5. Geology Survey to find water resources 6. Geological reports 7. Deep well test 8. Plumbing installations deep well to irrigations 9. Making Progress reports 10. Moving and set up deep well equipments ( Page 6 of 8 )
  • 8. Position : Operational Manager Heavy Equipemnts Company : CONSULTANT and CONTRACTOR High Way and Bridge Project’s Atambua, NTT, South Eastern Indonesia Period : May 1993 to June 1994 Job Duties/ Achievements: 1. Establishing Maintenance Schedule of Heavy Equipment 2. Maintenance budgeting of Heavy Equipment 3. Supervising mobilizations of Heavy Equipments 4. Controlling and Supervising Heavy Equipment on site 5. Monitoring and Reports Equipments Activities 6. Head Technician Coordinating on site 7. Assembling of Stone crusher Installation 8. Setting blade of Grader Equipment _________________________________________________________________ Position : Sales and Marketing Executive And Export Documents Handling Company : SAMUDERA INDONESIA GROUP International Air Forwarder Period : January 1992 to February 1993 Job Duties/ Achievements: 1. Handling PEB, B/L, Airway Bill, L/C Doc’s 2. Handling COO Form A, Form B, Form K 3. Establishing of Packing List and Invoice 4. Supervising packing activities and stuffing 5. Making sales plan and quotations rate 6. Custom clearance 7. Communications and handling International and Domestic Agent’s, Factories, Consignee, Shippers and Buyers _________________________________________________________________ Position : SPV Centralize AC Inst./ Chiller System Company : Bali Padma Hotel Legian – Kuta, Bali Period : August 1990 to Nov 1991 Job Duties/ Achievements: 1. Controlling supply & return installations & circulations 2. Controlling of Chiller: supply & return cooling air 3. Adjustment and control water pressure pumps 4. Supervising and control air circulations of AHU, Air Handling Unit to Cooling Tower 5. Supervising of maintenance and repairing AC 6. Engineering supports and Team Work of Civil, Mechanical, Electrical Works 7. Team Works and Trouble Shooting Electrical and Plumbing Installation _________________________________________________________________ ( Page 7 of 8 )
  • 9. For further please reach me on: 081 338 304 308 any times Best regards, Teguh Iman Djoko Trilaksono, Eng ( Page 8 of 8 )