1. Dinh Tuan Vu
Gender: Male.
Date of Birth: 09/07/1991.
Address: No.37, Alley 19, Dong Tac Street, Dong Da District, Ha Noi.
Phone : 016 56 25 88 09
Email : vu54dt1@gmail.com
EDUCATION
2009 – 2014 Engineer in National University of Civil Engineering (NUCE)
Department : Institute of Environment Sciene and Engineering.
Special major : Environment technology
EMPLOYMENT RECORD
07/2013 – 02/2014 Internship at Vietnam AE Investment and Consultant Joint stock company
Position held : Support for water supply and sewerage engineer
02/2014 – 11/2014 Work at Vietnam AE Investment and Consultant Joint stock company
Position held : Water supply and sewerage engineer
11/2014 - Present Work at Sreng Co. Ltd
Position held : Environment engineer
REFERENCES
Sreng Co. Ltd
Site Manager: Mr Kim Nam Seoung. Tel : 0981591885. Email: jihoney3005@naver.com
Vietnam AE Investment and Consultant Joint stock company
Team leader/ Manager : Mr Nguyen Quang Huy. Tel : 04.6680 8561. Email : Huy.nguyen@aevietnam.com
Institue of Environment Sciene and Engineering
Headmaster/ Dean : Assoc. Prof. Dr. Leu Tho Bach. Tel : 04.3628 4352. Email : leuthobach@gmail.com
DETAIL TASK ASSIGN
Being responsible for following task :
- Estimate the quanity for bid
- Draw the Design Drawings.
- Draw the As-built Drawings and make the payment in the end project.
- Supervisior in project site.
Curriculum Vitae
2. - Testing Operation after project comnplete
- Working under the asignment the Team Leader and Deputy Team Leader.
- Supporting the Team Leader and Deputy Team Leader and key engineers in transferring ideas to designing
drawings.
- Supporting key engineers in preparation of Feasibility Study (main report and basic design report).
WORK UNDERTAKEN THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK
ASSIGN
1. Name of the project : Improvement of water quality at Japan Bridge Area Project, Hoi An city, Quang Nam
province.
- Year : 12/2013 to present
- Location : Quang Nam province, Viet Nam.
- Project investor : People’s Committee of Hoi An city (funded by JICA).
- Main project features : Proposed capacity of wastewater treatment plan will be 2,000m3
/day.,
improving wastewate chanel to Waste treatment plan with length of 1.59km.
- Position held : internship.
- Acitivities performed : Support prepare for Fesibility Study.
2. Name of the project : Central region rural water supply and sanitation sector project.
- Name of sub-project: Rural water supply and sanitation for Long Thanh, Khanh Thanh, Vinh
Thanh and Trung Thanh Communes, Yen Thanh District, Nghe An province.
- Year: 02/2014 to present.
- Location: Nghe An province, Viet Nam.
- Project investor: Provincial project management unit of Nghe An provice (funded by ADB ).
- Main project features:
Construction and sustainable management of centralized water supply system: Investment items
of main construction with treatment capacity of 3,500 m3
/day, water supply network with total
length of pipeline is 134.828 m; diameter from D300mm to 25 mm connecting to 5.315 house
holds.
Construction of prioritized small sanitary consstruction, public and household toilets.
Increasing community awareness about sanitation.
Capacity building for rural water and sanitation management.
Capacity building for project management.
- Position held : water supply engineer.
- Activities performed : Support responsible for hydraulic calculation, design of water supply
system, prepare for Fesibility Study.
3. Name of the project : SEVT Die Casting Wastewater treatment Project, Yen Binh Industrial Zone, Thai
Nguyen province.
- Year : 11/2014 to 3/2015
- Location : Thai Nguyen province, Viet Nam.
- Project investor : Samsung C&T.
- Main project features : Install treatment system with capacity of 3,000 m3
/day. With water
treatement system have metal, general and sewer wastewater, and plus deoder system with scrubber.
- Position held : Environmental Engineer.
- Acitivities performed :Take part in design team (11/2014) ; Make final and add-on payment
(4/2015); operation (5/2015).
3. 4. Name of the project : Fine MS Cleanroom Project, Que Vo Industrial Zone, Bac Ninh province.
- Year : 12/2014 to 3/2015
- Location : Bac Ninh province, Viet Nam.
- Project investor : Finne MS company.
- Main project features : Built cleanroom A standard for mobile component with 90m2
square. It
include BFU, AHU.
- Position held : Mechanical l Engineer.
- Acitivities performed :Supervisior in site and repair all problem in site.
5. Name of the project : SEVT 3D GLASS Wastewater treatment Project,Yen Binh Industrial Zone, Thai
Nguyen province.
- Year : 5/2015 to 11/2015
- Location : Thai Nguyen province, Viet Nam.
- Project investor : Samsung Engineering.
- Main project features : Install treament system wwith capacity of 8800 m3/day. With water
treatement system have metal, general and sewer wastewater, and plus deoder system with scrubber
and use disk filter for clean water before exhaust.
- Position held : Environmentl Engineer.
- Acitivities performed :Draw Shop drawings and payment document, statistic all equipment; then
draw As-built Drawings.
6. Name of the project : SEV EXPANSION WWT Project,Yen Phong Industrial Zone, Bac Ninh province.
- Year : 11/2015 to present
- Location : Bac Ninh province, Viet Nam.
- Project investor : Samsung C&T.
- Main project features : Install treament system wwith capacity of 6000 m3/day. With water
treatement system have line, cub and sewer wastewater, and plus deoder system with scrubber and
use disk filter for clean water before exhaust.
- Position held : Environmentl Engineer.
- Acitivities performed :Draw Shop drawings and payment document, statistic all equipment; then
draw As-built Drawings, management the material .
LANGUAGES
Vietnamese Native Language
English Listening : 3/5 Speaking : 3.5/5 Reading : 4/5 Writing : 3.5/5
Japanese Listening : 3/5 Speaking : 3/5 Reading : 3/5 Writing : 3/5
SKILLS
1. Software: MS Word, MS Excel, Autocad, Epanet, Flow Hy, Hwase.
2. Soft skills : Team work spirit, responsibility, enthusiasm.
3. Got A2-2 Japanese Certificate by Japan Foudation Center .
HOBBIES
Reading novel ; watching and playing football, fan of Arsenal.
4. SELF-ASSESSMENT
Four and a half years in National university of Civil Engineering, Institute of Environment Sciene and Engineering
and over two years in Viet Nam AE investment and consultant JSC, SReng Ltd Company, I have been studying and
working with the erudite professors and talented expect, experienced engineers. I have accumulated and widened
my knowledge for the time of studying, partising and working. Besides, i also have the ability to adapt with many
different fields. Despite of the lack of exprecience, I have not only the strong basic knowledge, good logical
thinking but also the responsibility and the ethiasm of working as an engineer. I strongly believe that if I have a
chance to work in a professional environment, i will quickly improve my skill and accomplish entrusted missions.
CERTIFICATION
I, the undersigned, certify that to the best of my knowledge and belief that, this CV correctly describes myself, my
qualifications and my exprience. I understand that any wilful misstatement described herein may lead to my
disqualification or dismissal, if engage.
SIGNATURE
Dinh Tuan Vu