Ahmad El-Sayed
Address: Doha, Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com
Language Arabic - Fluent, English- Excellent, French- Fluent
Birthday November 22, 1963
Nationality Lebanese
Material Status Married
LinkedIn linkedin.com/in/ahmad-el-sayed-16a54b47
Sponsorship Qatar BuildingCompany - NOCAvailable
QualificationProfile
Project Manager offering 23 years in Roads and Infrastructure Having a Master Degree from ESA
University- Paris France – Architect. 1992. ( http://www.esa-paris.fr/?lang=fr )
Professional Experience
Project Manager
2006 – Present.
Qatar Building Company.
Projects:
Constructionof (LIS-02) IDRISS(IA13/14C 40 M) PWA. QR 980 Million
Designand Builtfor Msherieband Education City (Major Stations) QR 5 Billion.
Constructionof Al NASSIRIYAarea Sewerage NetworkPhase -3 PWA QR 198 Million.
ConstructionofPS25Twin1200 mm PumpingMains.PWA QR 174 Million.
Qatar Power Transmission system GTC124 / GTC 142 D/GTC 117. QR 268 Million.
Doha Expressway D-RING ROAD (Package 4).PWA QR 376 Million.
Ahmad El-Sayed
Address: Doha, Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com
Project Manager
Construction of (LIS-02) IDRISS (IA 13/14 C 40 M) PWA. Consultant: KEO October 2015 – Present
- Responsible forcosting,estimatingandplanningprojects.
- PreparingProjectInitiationdocumentation.
- Responsible forensuringbestvalue isobtainedforthe projectincludingsupplierbase,use of
internal andexternal resources(Stakeholders).
- MaintainingandcompletingProjectKeyPerformance Indicators.
- Writingdetailedandsummarizedprojectprogressreports.
- Identifying,costingandprocessinganycontractvariations.
- Trackingactivitiesagainstthe detailedprojectplans.
- Updatingprojectplansto include agreedchanges.
- Producingaccurate financial reports.
- Monitoringactual expenditure figuresagainstprojectbudgets.
- OrganizingandfacilitatingProjectSteering /OperatingCommitteesmeeting.
Project Manager Qatar BuildingCompany (Samsung-OHL-QBCJV)
Design and Built for MsheriebandEducation City (Major Stations)
Qatar Railways Company June 2013- October2015
- Developandmaintaincost/schedule,analyze,appraise,andforecast,schedulingcost,
estimating,andmanagementinformationfunction.
- Reviewcontractdraftsforadequacyof cost andscope definitionandprojectcontrols
managementrequirements.
- Produce weeklyandmonthlyreports,presentationandproductionanalysistothe clientand
home office.
- Fosterstrongprofessional relationshipwithclientsaswell aswiththe core groupto enhance the
productivityandachievementsof projectgoals.
- Identifyandprovide innovationssolutionstocostengineeringandplanning/scheduling
problems.
- Manage subcontractorcontracts, paymentandchange orders.
- Ensure the operationstrictadherence tothe establishedprojectlaboragreement.
- Lead overall control managementof the project.
Ahmad El-Sayed
Address: Doha, Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com
Project Manager
- Constructionof Al NASSIRIYASewerage Network Phase -3.PWA. Consultant: Atkins.
CP 745/3
Qatar BuildingCompany April 2012- June 2013
- MicroTunnelingWork400DIA – 5 KM.
- Sewerage Network.- 42KM.
- PrecastManholes.
- House connection.
- Responsible forentireprojectworks,costcontrol,execution&supervisionall trades.
- Coordinationandmanagementof thecompanyactivities:
- Contracts&relationswithauthorities.
- Managingthe teamresponsiblefortheexecutionof civilworks.
- Reviewing&approvalof structural,concretedrawings&calculations.
- Control &fulfillmentof theworkwithinthespecification.
Project Manager
- ConstructionofPS25Twin1200 mm PumpingMains/CP678/3 PWA. Consultant: ASCO
Qatar BuildingCompany December2011-March2012
- Responsible forcosting,estimatingandplanningprojects.
- PreparingProjectInitiationdocumentation.
- Responsible forensuringbestvalue isobtainedforthe projectincludingsupplierbase,use of
internal andexternal resources(Stakeholders).
- MaintainingandcompletingProjectKeyPerformance Indicators.
- Writingdetailedandsummarizedprojectprogressreports.
- Identifying,costingandprocessinganycontractvariations.
- Trackingactivitiesagainstthe detailedprojectplans.
- Updatingprojectplansto include agreedchanges.
- Producingaccurate financial reports.
- Monitoringactual expenditure figuresagainstprojectbudgets.
- OrganizingandfacilitatingProjectSteering/OperatingCommitteesmeetings
Ahmad El-Sayed
Address: Doha, Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com
ProjectManager
GTC124 / GTC142 D/GTC117. KAHRAMA Consultant:EnergoprojektFichtnerConsortium
Qatar BuildingCompany August2008-November2011.
- Trenchexcavation,backfillingandreinstatementoverthe doublefeeder1 & 2 220KV cable
- Responsible forcosting,estimatingandplanningprojects.
- PreparingProjectInitiationdocumentation.
- Responsible forensuringbestvalue isobtainedforthe projectincludingsupplierbase,use of
internal andexternal resources(Stakeholders).
- MaintainingandcompletingProjectKeyPerformance Indicators.
- Writingdetailedandsummarizedprojectprogressreports.
- Identifying,costingandprocessinganycontractvariations.
- Trackingactivitiesagainstthe detailedprojectplans.
- Updatingprojectplansto include agreedchanges.
- Producingaccurate financial reports.
- Monitoringactual expenditure figuresagainstprojectbudgets.
- OrganizingandfacilitatingProjectSteering/OperatingCommitteesmeetings
Project Manager
Doha Expressway D-RING ROAD (Package 4). PWA. Consultant: Italconsult.
Qatar Building Company June 2006- July 2008
- Responsible forall aspectsof the highwayplanningworks,costcontrol,executionand
supervision of all trades.
- Responsible forcosting,estimatingandplanningprojects.
- PreparingProjectInitiationdocumentation.
- Responsible forensuringbestvalue isobtainedfor the projectincludingsupplierbase,use of
internal andexternal resources(Stakeholders).
- Identifying,costingandprocessinganycontractvariations.
- Trackingactivitiesagainstthe detailedprojectplans.
- Updatingprojectplansto include agreedchanges.
Ahmad El-Sayed
Address: Doha, Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com
Project Manager (Muscat-Oman) 2001 – 2006
Arabian Projects and Transport Company
- Constructionof Internal RoadsinQuala,ZatKhail,A AaridWilayatALHamra- MRME/WR
- Constructionof Internal RoadsatWilayatMusana
- Construction of Internal RoadsatWilayatSuwaiq- WilayatKhaboura
- Managing the teamresponsibleforthe executionof the civil works.
- Reviewandapproval of structural andconcrete drawingsandcalculations.
- Compliance of the workwiththe specification.
- InspectionandQualityassurance managementof the civil works.
- Coordinationforthe civil andelectro-mechanical works.
Earlier Career
1995 – 2001 ConstructionEngineer/SocietyAyoub - Montana sur Ville - BeirutLebanon
1995 ProjectArchitect/CabinetSaint Etienne – Paris-France
1993 – 1995 Architect/ CabinetMelhemParis – Paris-France
Education
1992 ESA University- ParisFrance –MasterDegree Architect.
( http://www.esa-paris.fr/?lang=fr)
Technical Acumen
AutoCAD;Corel drawProgram; Adobe PhotoshopProgram; VisioProgram; MicrosoftProject
Primavera(P3&P3e & P6); PrimaveraExpedition;lobbytrack
Professional Development
- Chapter8 – TrafficsafetyMeasuresandSignsfor Road Worksand TemporarySituations.
(Feb2012).
- DevelopingEffective Interpersonal&CommunicationSkills.(May 2011).
- ProfessionalBusinessWritingSkills.(May2011).
- EPC ProjectManagement.(Feb2011).
- C201 – ConstructionEstimating&Valuations.(Oct2010).
- C203 –Valuations&Commercial Control. (Oct 2010).
- MBA in Engineering&ConstructionProjectManagement.(March2010).

AHMAD ELSAYED

  • 1.
    Ahmad El-Sayed Address: Doha,Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com Language Arabic - Fluent, English- Excellent, French- Fluent Birthday November 22, 1963 Nationality Lebanese Material Status Married LinkedIn linkedin.com/in/ahmad-el-sayed-16a54b47 Sponsorship Qatar BuildingCompany - NOCAvailable QualificationProfile Project Manager offering 23 years in Roads and Infrastructure Having a Master Degree from ESA University- Paris France – Architect. 1992. ( http://www.esa-paris.fr/?lang=fr ) Professional Experience Project Manager 2006 – Present. Qatar Building Company. Projects: Constructionof (LIS-02) IDRISS(IA13/14C 40 M) PWA. QR 980 Million Designand Builtfor Msherieband Education City (Major Stations) QR 5 Billion. Constructionof Al NASSIRIYAarea Sewerage NetworkPhase -3 PWA QR 198 Million. ConstructionofPS25Twin1200 mm PumpingMains.PWA QR 174 Million. Qatar Power Transmission system GTC124 / GTC 142 D/GTC 117. QR 268 Million. Doha Expressway D-RING ROAD (Package 4).PWA QR 376 Million.
  • 2.
    Ahmad El-Sayed Address: Doha,Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com Project Manager Construction of (LIS-02) IDRISS (IA 13/14 C 40 M) PWA. Consultant: KEO October 2015 – Present - Responsible forcosting,estimatingandplanningprojects. - PreparingProjectInitiationdocumentation. - Responsible forensuringbestvalue isobtainedforthe projectincludingsupplierbase,use of internal andexternal resources(Stakeholders). - MaintainingandcompletingProjectKeyPerformance Indicators. - Writingdetailedandsummarizedprojectprogressreports. - Identifying,costingandprocessinganycontractvariations. - Trackingactivitiesagainstthe detailedprojectplans. - Updatingprojectplansto include agreedchanges. - Producingaccurate financial reports. - Monitoringactual expenditure figuresagainstprojectbudgets. - OrganizingandfacilitatingProjectSteering /OperatingCommitteesmeeting. Project Manager Qatar BuildingCompany (Samsung-OHL-QBCJV) Design and Built for MsheriebandEducation City (Major Stations) Qatar Railways Company June 2013- October2015 - Developandmaintaincost/schedule,analyze,appraise,andforecast,schedulingcost, estimating,andmanagementinformationfunction. - Reviewcontractdraftsforadequacyof cost andscope definitionandprojectcontrols managementrequirements. - Produce weeklyandmonthlyreports,presentationandproductionanalysistothe clientand home office. - Fosterstrongprofessional relationshipwithclientsaswell aswiththe core groupto enhance the productivityandachievementsof projectgoals. - Identifyandprovide innovationssolutionstocostengineeringandplanning/scheduling problems. - Manage subcontractorcontracts, paymentandchange orders. - Ensure the operationstrictadherence tothe establishedprojectlaboragreement. - Lead overall control managementof the project.
  • 3.
    Ahmad El-Sayed Address: Doha,Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com Project Manager - Constructionof Al NASSIRIYASewerage Network Phase -3.PWA. Consultant: Atkins. CP 745/3 Qatar BuildingCompany April 2012- June 2013 - MicroTunnelingWork400DIA – 5 KM. - Sewerage Network.- 42KM. - PrecastManholes. - House connection. - Responsible forentireprojectworks,costcontrol,execution&supervisionall trades. - Coordinationandmanagementof thecompanyactivities: - Contracts&relationswithauthorities. - Managingthe teamresponsiblefortheexecutionof civilworks. - Reviewing&approvalof structural,concretedrawings&calculations. - Control &fulfillmentof theworkwithinthespecification. Project Manager - ConstructionofPS25Twin1200 mm PumpingMains/CP678/3 PWA. Consultant: ASCO Qatar BuildingCompany December2011-March2012 - Responsible forcosting,estimatingandplanningprojects. - PreparingProjectInitiationdocumentation. - Responsible forensuringbestvalue isobtainedforthe projectincludingsupplierbase,use of internal andexternal resources(Stakeholders). - MaintainingandcompletingProjectKeyPerformance Indicators. - Writingdetailedandsummarizedprojectprogressreports. - Identifying,costingandprocessinganycontractvariations. - Trackingactivitiesagainstthe detailedprojectplans. - Updatingprojectplansto include agreedchanges. - Producingaccurate financial reports. - Monitoringactual expenditure figuresagainstprojectbudgets. - OrganizingandfacilitatingProjectSteering/OperatingCommitteesmeetings
  • 4.
    Ahmad El-Sayed Address: Doha,Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com ProjectManager GTC124 / GTC142 D/GTC117. KAHRAMA Consultant:EnergoprojektFichtnerConsortium Qatar BuildingCompany August2008-November2011. - Trenchexcavation,backfillingandreinstatementoverthe doublefeeder1 & 2 220KV cable - Responsible forcosting,estimatingandplanningprojects. - PreparingProjectInitiationdocumentation. - Responsible forensuringbestvalue isobtainedforthe projectincludingsupplierbase,use of internal andexternal resources(Stakeholders). - MaintainingandcompletingProjectKeyPerformance Indicators. - Writingdetailedandsummarizedprojectprogressreports. - Identifying,costingandprocessinganycontractvariations. - Trackingactivitiesagainstthe detailedprojectplans. - Updatingprojectplansto include agreedchanges. - Producingaccurate financial reports. - Monitoringactual expenditure figuresagainstprojectbudgets. - OrganizingandfacilitatingProjectSteering/OperatingCommitteesmeetings Project Manager Doha Expressway D-RING ROAD (Package 4). PWA. Consultant: Italconsult. Qatar Building Company June 2006- July 2008 - Responsible forall aspectsof the highwayplanningworks,costcontrol,executionand supervision of all trades. - Responsible forcosting,estimatingandplanningprojects. - PreparingProjectInitiationdocumentation. - Responsible forensuringbestvalue isobtainedfor the projectincludingsupplierbase,use of internal andexternal resources(Stakeholders). - Identifying,costingandprocessinganycontractvariations. - Trackingactivitiesagainstthe detailedprojectplans. - Updatingprojectplansto include agreedchanges.
  • 5.
    Ahmad El-Sayed Address: Doha,Qatar Phone: +974.5587-9845 Email: ahmadelsayyed@hotmail.com Project Manager (Muscat-Oman) 2001 – 2006 Arabian Projects and Transport Company - Constructionof Internal RoadsinQuala,ZatKhail,A AaridWilayatALHamra- MRME/WR - Constructionof Internal RoadsatWilayatMusana - Construction of Internal RoadsatWilayatSuwaiq- WilayatKhaboura - Managing the teamresponsibleforthe executionof the civil works. - Reviewandapproval of structural andconcrete drawingsandcalculations. - Compliance of the workwiththe specification. - InspectionandQualityassurance managementof the civil works. - Coordinationforthe civil andelectro-mechanical works. Earlier Career 1995 – 2001 ConstructionEngineer/SocietyAyoub - Montana sur Ville - BeirutLebanon 1995 ProjectArchitect/CabinetSaint Etienne – Paris-France 1993 – 1995 Architect/ CabinetMelhemParis – Paris-France Education 1992 ESA University- ParisFrance –MasterDegree Architect. ( http://www.esa-paris.fr/?lang=fr) Technical Acumen AutoCAD;Corel drawProgram; Adobe PhotoshopProgram; VisioProgram; MicrosoftProject Primavera(P3&P3e & P6); PrimaveraExpedition;lobbytrack Professional Development - Chapter8 – TrafficsafetyMeasuresandSignsfor Road Worksand TemporarySituations. (Feb2012). - DevelopingEffective Interpersonal&CommunicationSkills.(May 2011). - ProfessionalBusinessWritingSkills.(May2011). - EPC ProjectManagement.(Feb2011). - C201 – ConstructionEstimating&Valuations.(Oct2010). - C203 –Valuations&Commercial Control. (Oct 2010). - MBA in Engineering&ConstructionProjectManagement.(March2010).