SlideShare a Scribd company logo
CANDIDATE REPORT
Name Yang wenchao
Applied Position
Birth Date 21/07/1978
Gender Male
Marital statutes Married
Nationality China
Language Skill skilful English
Mobile phone 13820381144
Email yangmotor@163.com
Address TEDA southern sea road 23# 2-3-401 (300457
)
RECOMMENDATION
- Strongly requirements in studying and improving himself,
long experience working in formal company make my
career quality very good, good communication skill, be
good at coordination, be able to descript issue
precisely.
- Has almost 10 years working experience in field
mechanical engineering with active and efficient
performance, including big equipment workshop overhaul
2 years, field equipment maintenance and modification
about 12 years
- Experienced MA547 gas turbine new installation project
partly
- Experienced MA389 Wusu station unit 2 casing repair
- Experienced MA552 Zaoyang station new installation
project
- Experienced MA672 Linxian station new installation
project
- Experienced MA446 Shandan and Ha mi AERO swap project
- Experienced MA389 Yan dun compressor damage overhaul
project(on going)
- Experienced the 2006 COPC Mingzhu shut down
modification and WHP-C whole Hook-up period. Has
clearly understood of offshore work and process.
-
EDUCATION
09/1994 – 07/1998 Civil Aviation University of China
Turbine engine
Bachelor
Training record & certificate
06/2005 Ingersoll-land air compressor, maintenance certificate
08/2005 HVAC, maintenance certificate
09/2006 rigging, rigging certificate
02/2007 Helicopter landing official, HLO certificate
07/2007 CAT engine 3400 and3500, maintenance certificate
07/2007 launch and receiver, operating certificate
05/2008 Hydraulic of crane, maintenance certificate
05/2006 Business English of Cambridge---primary (self-study),
level B certificate
12/2006 Business English of Cambridge---vantage(self-study),
level C certificate
EXPERIENCE
2014.7.1 To now ,Elliott turbo machinery service(Tianjin)company Limited,Field
service engineer,report to Yi bangguo
27/7/2014-30/7/2014 MTO China coal Mengda steam turbine drive compressor
installation on-job training
21/8/2014-26/8/2014 Xinjiang guang hui turbine drive compressor 60MB7I overhaul
Achievement:technical service and translation at same time
27/8/2014-8/9/2014 Wison Nan jing 15M6I compressor Overhaul on-job training。
15/9/2014-27/10/2014 MTO Mengda turbine drive compressor installation on-job
training, 46M61+32M5/31+2SQV-7, 56M10-8+2SNV-8
Achievement:Help identify special tools and complete bearing
inspection
4/11/2014-14/11/2014 Lu an-180 project steam turbine drive compressor installation。
Chock block adjustment and main skids sets
17/11/2014-24/11/2014 Jing bian Yan chang coal chemical company YR steam turbine
commissioning and start up
Achievement: Figure out the steam ejector not installed.
25/11/2014-4/12/2014 Star energy company MTO plant turbine drive compressor
installation and commissioning, oil flushing, on job training.
15/12/2014-04/05/2015 Zhangjia gang yangzi river PDH project 88MD-3+Motor,
78M6I+Gear+Motor, 78M3I+Gear+Motor,compressors commissioning
and start up。
Achievement:XV2039,2040surge valves trouble shooting; Dry
Gas seal console low pressure trouble shooting;Dry gas seal
booster trouble shooting。
2015.5.29 - 6.23 Bangladesh 2DYRIII steam turbine commissioning and start up。
2015.6.27 -7.8 Shan dong yang Mei turbine drive compressor Overhaul
2015.8.23-8.29 Indonesia DYR turbine overhaul investigation
2015.9.24-10.5 CNPC & Chevron Chuandongbei project CYR PEIII, steam turbine
commissioning 。
2015.11.14-11.18 R12T0038, china coal yunlin new energy co ltd turbine bearing
inspection and replacement
Achievement:finish work within 2 days and figure out lube oil
system clean issue.
2015.12.21-12.23 R13T0058/60/61, Nanjing huntsman new energy company,
compressor and turbine installation service
2016.1.1-1.17 Saudi Arabia, Petro-Kemya, DYR & BYR steam turbine
commissioning and start up
Achievement: figure out lube system piping issue.
2016.2.20-3.7 Elliott Japan work shop Level 1 training
2016.4.3-4.12 Zhang jiagang Yangzi river petrol chemical co .ltd, VFD
updates coordination
2016.4.12-5.2 CNPC & Chevron Chuandongbei project CYR PEIII steam turbine
commissioning and start up
2015.5.13- 5.30 Lu an-180 project steam turbine installation service
2016.5.30- 6.4 CNPC & Chevron Chuan dong bei project CYR PEIII turbine drive
pump commissioning and start up
Achievement: start up units successfully when steam
temperature is lower than design.
2016.6.5-6.7 Nanjing huntsman new energy company, unpacking service
2016.6.13-6.18 Project manager training in Tianjin
2016-6-19 to 6-24 Shang hai GE Bently navada 3500 vibration system training
2016-6-25 to 10-28 Sabic overhaul project planners and coordinator
2016-9-3 to 9-10 Jing bian Yulin new energy company Dry gas seal replacement
Achievement: replaced 6 set Dry gas seal within 5 days, assist
start up successfully, replace a governor for a small steam
turbine
2016.9.22-9.24 Lan zhou ethylene steam turbine trip leveller trouble shooting.
Achievement: figure out the trouble is because of installation
issue, and fixed. Then assist start up
2016.10.31-11.14 FREP turbine steam drive compressor overhaul tools and spare
parts prepare
Achievement:Submit new and old productive plans materials
list and spare parts
2016.12.2-now Qinghai Yanhu Meiye DMTO plant turbine drive compressor
Dry gas seal failure troubleshooting,overhaul.
09/2011—06/2014 RRESI,CSB ,As a Mechanical FSR, Report to :Liu bingxun
21/09/2011 Bore scope on-job training, Yin chuan.
Achievements: After that training, I did bore scope
myself many times, and direct burner 8# replacement on
March 12, 2012;
Coordinate customer relationship well, independently
download data as a Mechanical FSR without control
engineer conduct on Feb 10
th
, 2012, even the software is
changed.
28/09/2011---25/10/2011 SJ 3
rd
line,MA547 new installation project on job
training.
Achievements:work out new method about oil flush, shrink
the flushing time, can be used when project is hurry.
29/12/2011---07/03/2012 WEEP Line 2,MA389 Wu su Unit2 Casing repair. Take part
in all disassembly steps, counting materials and spare
parts, assembly special tools, during casing disassembly,
mark all material according to drawings, seal and packing
components, coordinate loading and assist rising the
packing list.
Achievements: independently coordinate multi work group
offloading packing boxes without crane assist,save much
time for the project;further more,arrange time proper
replace seal kit for seal gas booster and replace one
alternator for MCC during that project.
11/2011—07/11/2012 WEEP line 2,MA552 Zao yang station new installation
(suspending).
Achievements: independently coordinate multi work group,
control cost during project, save cost much. Such as
Cullum supplied material components miss shipment, steel
structure components wrong size, I managed to eliminate
the relevant cost, and achieved 0 costs on those issues.
Even some of parts supplied by RR not arrive at site; I
try to make it not influent project proceeding, keep good
occupation on RR. On July 10 store materials tools and
seal up work site, make full documentation for other
colleagues; make no person stay for work site, save cost
for company.
21/07/2012—07/29/2012 Hanas work shop engine combustors replacement。
Achievements: Complete all 8 combustors replacement by
only 4 persons within 5days. Save time and keep
production available.
08/01/2012—08/09/2012 WEEP line 2,MA552 Nanchang station GG lube oil pump
coupling upgrade.
Achievements: Identified wrong supply spare parts in time
and make a detail report to company, provide reference
for other work site.
08/31/2012—12/03/2012 SJ 3
rd
line,MA672 Lin xian station installation and
commissioning.
Achievements: Independently coordinate multi work group,
organize people, tools, materials, arrange work process
properly, control cost during project, save cost much.
Achieve first fire from unit offloading only 102 days,
praised by customer.
04/08/2013—04/11/2013 Hanas workshop engine pre-middle life inspection.
04/14/2013—05/25/2013 WEEP MA446 Shan dan No.3 unit and Ha mi No3.unit aero
swap.
Achievements:Safely and smoothly complete all work and
start up unit successfully on first time.
05/252013—07/04/2013 WEEP line 2,MA389 Yan dun No.3 unit abnormal overhaul.
Achievements:After precisely calculation, daringly used
100T jack and a special tool with a long time patient
moved out the damaged bundle, avoid the whole unit
sliding cost and heavy goods transporting cost, and save
both maintenance time for company and production time for
customer.
07/29/2013—08/02/2013 Hanas work shop TRENT 60 engine overhaul, engine remove
and packing.
09/13/2013—09/22/2013 MA552 Nan chang Punch make up.
10/09/2013—10/31/2013 MA552 Zao yang station installation and commissioning,
restart works since 2012 July suspend. Checked PT
bearings, installed 63PGD2, and match tubing for 63PGD2,
80PGS,63PGJSS. Main lube oil system flushing and GG lube
oil system flushing, take oil sample to test。Suspend
again due to power supply problem.
01/2005–09/2011 COPC
ConocoPhillips China Inc. (COPC) is a subsidiary of
ConocoPhillips, undertaking oil and gas exploration and
production operations in China. In Bohai Bay, COPC is
cooperating with China National Offshore Oil Corporation
(CNOOC) in the development of China's largest offshore
discovery - Peng Lai (PL) 19-3. The project includes two
phases of development. Production from the first phase
began in December 2002. Production from the second phase
utilizing a floating, production, storage and offloading
(FPSO) vessel is expected to begin in late 2008。
12/2006–09/2011 COPC19-3 WHP-C mechanic
Report to:OIM
Responsibility:
 Platform equipment management,parameters monitoring
and record。
 Platform equipment PM BM and CM
 Platform equipment and materials recording
Achievements
 On-crank water washes products with pictures
interpretation and training it to new technician。
 Taken out broken pieces of nozzle inside engine。
 Help onshore MM group to investigate and build up
spare parts for platform equipment。
 Compile water maker operating and maintenance
procedures
 Compile seawater lift pump replacing procedures,
reducing working duration to 1/4 of original
 Compile crane Hydraulic oil cooler replacing
procedures ,reducing working duration from
original 3 days to 6 hours
 review and update mechanic PMs
 advise technical drawings to fabricate expensive
filter elements locally
 Translate centrifuge diesel treatment unit O&M
Manual,train the offshore technicians.Modified the
process inside the skid and solved the belt slip
symptom.
 Give several basic training to SAP group about
offshore equipment and process.
 Modified the illogical material sock items。
01/2006–12/2006 COPC19-3 FPSO Miungzhu mechanic
Report to:Maintenance supervisor
Responsibility:
 FPSO equipment management,parameters monitoring and
record。
 FPSO equipment PM BM and CM
Achievements
 Translate solar turbine training manual chapter 1to
chapter 10, make elder workers understand the
equipment quite a lot。
 Translate easy laser alignment manual and training
to colleagues
 Training engine room process to colleagues and make
them understand how to switch the equipment when
emergency without shutdown。
06/2005–01/2006 COPC19-3 WHP-A operator
Report to:OIM
Responsibility:
 Monitoring well production parameter,accounting oil
production
 CCR remote monitoring,download senor data everyday
 Star and shut in well,start and stop ESP, ESP trend
monitoring
 Life boat、stand-by generator、fire pump PM
 Sanitary unit PM
Achievements
 Compile production operating procedures
 Help to crane maintenance and avoid a big hazard by
noticing running status to the temporary crane
operator.
01/2005–06/2005 COPC19-3 FPSO Miungzhu operator trainee
Report to:production supervisor
Responsibility:
 Monitoring Solar engine, R&R engine,heating media
system,steam boiler,inert gas generator,crude oil
system,produced water system,chemical system,
water injection system,fuel gas system
 CCR remote monitoring
Achievements
 Compile the routine job to brief procedure and train
the new operators on site。
08/2002-12/2004 Bohai Oil engineering company (BOEC)
BOEC is a subordinate of CNOOC,major business are
offshore equipment reparation ,crane reparation 、ESP
tech support、I&E tech support、slop water treatment、
ship equipment、physical chemistry cleaning、machining、
equipment running monitoring、engineering project design
etc.
08/2002-03/2003 BOEC offshore repairing division technology team pump director
Responsibility:Pumps in general contract overhaul and
relevant auxiliary system repair, temporary small repair
projects.
Responsible for repair procedure adoption, components
organize and repair, take part in whole repair process,
disassembly, clean up, measurement, spare parts replace,
shaft repair, the rotor dynamic balance, assembly, and
return to offshore customer installation and
commissioning.
 “Changtsing”FPSO afloat tube yearly repairing and
maintenance;
 SZ36-1oil field(9 platforms total)oil transfer
pump overhaul,thermal oil circulate pump overhaul,
open-type emptying pump、closed-type emptying pump
overhaul;sum contract-- pump polling;
 SZ36-1oil field Air compressor polling
 Natural gas compressor fault repair
Achievements:
 Compile SZ36-1 offloading pump (10 grades
centrifuge ) overhaul process,
 Compile SZ36-1 offloading pump (5 grades centrifuge )
overhaul process
03/2003~07/2003 BOEC offshore repairing division diesel oil engine director :
Responsibility:
Diesel engine in general contract periodic maintenance
and corrective maintenance,temporary small repair
projects
Responsible for repair procedure adoption, components
organize and repair, components localize and upgrade.
Achievements:
 Adapt the diesel engine PM procedure of CB and QK
oil field 。
 Filed the technical files ,change the original 7
levels structures to 3 levels and delete redundant
files make the whole package shrink from 2GB to 84
MB, easy for anyone to look up or record
07/2003-12/2003 BOEC repairing and maintenance division hydraulic lift director
Responsibility:
Offshore cranes in general contract periodic maintenance
and corrective maintenance,temporary small repair
projects
Responsible for repair procedure adoption, components
organize and repair, components localize and upgrade.
 SZ36-1oil field(9 platforms total)hydraulic lift
yearly repairing and maintenance;
 QK17-2 oil field hydraulic lift yearly repairing and
maintenance;
 “Changtsing”FPSO crane fault repair(5 dun crane
exchange hydraulic cylinder seal elements,15 dun
crane exchange balance valve)
 SZ36-1oil field platform B exchange hoisting cable
of boat hoisting engine
Achievements:
 Filed the technical files ,change the original
structures to 3 levels and delete redundant files
make the whole package easy for anyone to look up or
record
Project experiences:
Project Name You Yi FPSO refurbish
Project profile:repair equipment and update units on
FPSO“You Yi”to make the facility compatible to BZ28-
1oil field production, 1.98 billion RMB, project last for
1.5 year
Responsibility:
“YouYi ”FPSO repairing project equipment
director concentrate on:
 Worked with Solar personnel to do turbine exchange
and PLC control plus
 Worked with Ness personnel to do thermal oil boiler
repairing and control system plus
 Worked with Ness personnel to do steam oil boiler
repairing and burner plus
 Worked with Sinoda personnel to do inert gases
producer repairing and control system plus
 some other work of ship equipment
Achievements:
 All tasks re-perform rate O
 All tasks complete 14 days ahead of project with
only once over time work about 4 hours。
 Precisely record the collaborate contractor working,
and attend the business negotiation, reduce the
onsite service cost from 350,000$ to about 15000$ 。
Attached are some site work pictures:
CV 杨文超英文版
CV 杨文超英文版
CV 杨文超英文版

More Related Content

What's hot

Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout Javier Siles
 
CV MUHAMMAD ZAHID with Skp
CV MUHAMMAD ZAHID with SkpCV MUHAMMAD ZAHID with Skp
CV MUHAMMAD ZAHID with SkpMuhammad Zahid
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalprashant rai
 
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...JAGADEESAN MANICKA
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
aqeel ahmed
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16Vishwesh Patel
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
aqeel ahmed
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay ParanjapeAbhay Paranjape
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAzhar Zahoor
 

What's hot (20)

DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout
 
CV MUHAMMAD ZAHID with Skp
CV MUHAMMAD ZAHID with SkpCV MUHAMMAD ZAHID with Skp
CV MUHAMMAD ZAHID with Skp
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
Madan 0816
Madan 0816Madan 0816
Madan 0816
 
cv2_15
cv2_15cv2_15
cv2_15
 
UWANDU KENNETH CV
UWANDU KENNETH CVUWANDU KENNETH CV
UWANDU KENNETH CV
 
Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1
 
Sudhakar Debarki
Sudhakar DebarkiSudhakar Debarki
Sudhakar Debarki
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
rajpanday
rajpandayrajpanday
rajpanday
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
Puneet_Singh
Puneet_SinghPuneet_Singh
Puneet_Singh
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisor
 

Viewers also liked

Prospek ukm dalam perdagangan bebas
Prospek ukm dalam perdagangan bebasProspek ukm dalam perdagangan bebas
Prospek ukm dalam perdagangan bebas
achmadseno15
 
Iniciacion a la lectura
Iniciacion a la lecturaIniciacion a la lectura
Iniciacion a la lectura
macarena mendoza
 
The speed barrier
The speed barrier  The speed barrier
The speed barrier
Daniel Alapat
 
CERTIFICATES~.1 & III
CERTIFICATES~.1 & IIICERTIFICATES~.1 & III
CERTIFICATES~.1 & IIIAndrew Leroy
 
DhakaInsider1
DhakaInsider1DhakaInsider1
DhakaInsider1Ali Ehsan
 
מוסף החינוך של מעגלים 2017
מוסף החינוך של מעגלים 2017מוסף החינוך של מעגלים 2017
מוסף החינוך של מעגלים 2017
maagalim
 

Viewers also liked (7)

Prospek ukm dalam perdagangan bebas
Prospek ukm dalam perdagangan bebasProspek ukm dalam perdagangan bebas
Prospek ukm dalam perdagangan bebas
 
DiplomeDuBaccalaureatGeneral
DiplomeDuBaccalaureatGeneralDiplomeDuBaccalaureatGeneral
DiplomeDuBaccalaureatGeneral
 
Iniciacion a la lectura
Iniciacion a la lecturaIniciacion a la lectura
Iniciacion a la lectura
 
The speed barrier
The speed barrier  The speed barrier
The speed barrier
 
CERTIFICATES~.1 & III
CERTIFICATES~.1 & IIICERTIFICATES~.1 & III
CERTIFICATES~.1 & III
 
DhakaInsider1
DhakaInsider1DhakaInsider1
DhakaInsider1
 
מוסף החינוך של מעגלים 2017
מוסף החינוך של מעגלים 2017מוסף החינוך של מעגלים 2017
מוסף החינוך של מעגלים 2017
 

Similar to CV 杨文超英文版

KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)Kee M
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIMohd Yunus
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan Railways
Muhammad Usman
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1Prasad naik
 
Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.Sajid Jahangir
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plant
Amit Kumar
 

Similar to CV 杨文超英文版 (20)

SENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - CopySENTHIL.BIODATA.1 - Copy
SENTHIL.BIODATA.1 - Copy
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
 
Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.
 
UPDATED CV
UPDATED CVUPDATED CV
UPDATED CV
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
CV_Madhukar Kashyap
CV_Madhukar KashyapCV_Madhukar Kashyap
CV_Madhukar Kashyap
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Ong-Art CV 170208
Ong-Art CV 170208Ong-Art CV 170208
Ong-Art CV 170208
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan Railways
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
Suntharesar Shummugham Resume
Suntharesar Shummugham ResumeSuntharesar Shummugham Resume
Suntharesar Shummugham Resume
 
Iqbal cv...final
Iqbal cv...finalIqbal cv...final
Iqbal cv...final
 
CV_Saddam Hussain_mecheng
CV_Saddam Hussain_mechengCV_Saddam Hussain_mecheng
CV_Saddam Hussain_mecheng
 
my_resume-1
my_resume-1my_resume-1
my_resume-1
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
nasrulla resume
nasrulla resumenasrulla resume
nasrulla resume
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
 
Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.Muhammad Sajid Khan CVS.
Muhammad Sajid Khan CVS.
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plant
 

CV 杨文超英文版

  • 1. CANDIDATE REPORT Name Yang wenchao Applied Position Birth Date 21/07/1978 Gender Male Marital statutes Married Nationality China Language Skill skilful English Mobile phone 13820381144 Email yangmotor@163.com Address TEDA southern sea road 23# 2-3-401 (300457 ) RECOMMENDATION - Strongly requirements in studying and improving himself, long experience working in formal company make my career quality very good, good communication skill, be good at coordination, be able to descript issue precisely. - Has almost 10 years working experience in field mechanical engineering with active and efficient performance, including big equipment workshop overhaul 2 years, field equipment maintenance and modification about 12 years - Experienced MA547 gas turbine new installation project partly - Experienced MA389 Wusu station unit 2 casing repair - Experienced MA552 Zaoyang station new installation project - Experienced MA672 Linxian station new installation project - Experienced MA446 Shandan and Ha mi AERO swap project - Experienced MA389 Yan dun compressor damage overhaul project(on going) - Experienced the 2006 COPC Mingzhu shut down modification and WHP-C whole Hook-up period. Has clearly understood of offshore work and process.
  • 2. - EDUCATION 09/1994 – 07/1998 Civil Aviation University of China Turbine engine Bachelor Training record & certificate 06/2005 Ingersoll-land air compressor, maintenance certificate 08/2005 HVAC, maintenance certificate 09/2006 rigging, rigging certificate 02/2007 Helicopter landing official, HLO certificate 07/2007 CAT engine 3400 and3500, maintenance certificate 07/2007 launch and receiver, operating certificate 05/2008 Hydraulic of crane, maintenance certificate 05/2006 Business English of Cambridge---primary (self-study), level B certificate 12/2006 Business English of Cambridge---vantage(self-study), level C certificate EXPERIENCE 2014.7.1 To now ,Elliott turbo machinery service(Tianjin)company Limited,Field service engineer,report to Yi bangguo 27/7/2014-30/7/2014 MTO China coal Mengda steam turbine drive compressor installation on-job training 21/8/2014-26/8/2014 Xinjiang guang hui turbine drive compressor 60MB7I overhaul Achievement:technical service and translation at same time 27/8/2014-8/9/2014 Wison Nan jing 15M6I compressor Overhaul on-job training。 15/9/2014-27/10/2014 MTO Mengda turbine drive compressor installation on-job training, 46M61+32M5/31+2SQV-7, 56M10-8+2SNV-8 Achievement:Help identify special tools and complete bearing inspection 4/11/2014-14/11/2014 Lu an-180 project steam turbine drive compressor installation。 Chock block adjustment and main skids sets 17/11/2014-24/11/2014 Jing bian Yan chang coal chemical company YR steam turbine commissioning and start up Achievement: Figure out the steam ejector not installed. 25/11/2014-4/12/2014 Star energy company MTO plant turbine drive compressor installation and commissioning, oil flushing, on job training. 15/12/2014-04/05/2015 Zhangjia gang yangzi river PDH project 88MD-3+Motor, 78M6I+Gear+Motor, 78M3I+Gear+Motor,compressors commissioning and start up。
  • 3. Achievement:XV2039,2040surge valves trouble shooting; Dry Gas seal console low pressure trouble shooting;Dry gas seal booster trouble shooting。 2015.5.29 - 6.23 Bangladesh 2DYRIII steam turbine commissioning and start up。 2015.6.27 -7.8 Shan dong yang Mei turbine drive compressor Overhaul 2015.8.23-8.29 Indonesia DYR turbine overhaul investigation 2015.9.24-10.5 CNPC & Chevron Chuandongbei project CYR PEIII, steam turbine commissioning 。 2015.11.14-11.18 R12T0038, china coal yunlin new energy co ltd turbine bearing inspection and replacement Achievement:finish work within 2 days and figure out lube oil system clean issue. 2015.12.21-12.23 R13T0058/60/61, Nanjing huntsman new energy company, compressor and turbine installation service 2016.1.1-1.17 Saudi Arabia, Petro-Kemya, DYR & BYR steam turbine commissioning and start up Achievement: figure out lube system piping issue. 2016.2.20-3.7 Elliott Japan work shop Level 1 training 2016.4.3-4.12 Zhang jiagang Yangzi river petrol chemical co .ltd, VFD updates coordination 2016.4.12-5.2 CNPC & Chevron Chuandongbei project CYR PEIII steam turbine commissioning and start up 2015.5.13- 5.30 Lu an-180 project steam turbine installation service 2016.5.30- 6.4 CNPC & Chevron Chuan dong bei project CYR PEIII turbine drive pump commissioning and start up Achievement: start up units successfully when steam temperature is lower than design. 2016.6.5-6.7 Nanjing huntsman new energy company, unpacking service 2016.6.13-6.18 Project manager training in Tianjin 2016-6-19 to 6-24 Shang hai GE Bently navada 3500 vibration system training 2016-6-25 to 10-28 Sabic overhaul project planners and coordinator 2016-9-3 to 9-10 Jing bian Yulin new energy company Dry gas seal replacement Achievement: replaced 6 set Dry gas seal within 5 days, assist start up successfully, replace a governor for a small steam turbine 2016.9.22-9.24 Lan zhou ethylene steam turbine trip leveller trouble shooting. Achievement: figure out the trouble is because of installation issue, and fixed. Then assist start up 2016.10.31-11.14 FREP turbine steam drive compressor overhaul tools and spare parts prepare Achievement:Submit new and old productive plans materials list and spare parts
  • 4. 2016.12.2-now Qinghai Yanhu Meiye DMTO plant turbine drive compressor Dry gas seal failure troubleshooting,overhaul. 09/2011—06/2014 RRESI,CSB ,As a Mechanical FSR, Report to :Liu bingxun 21/09/2011 Bore scope on-job training, Yin chuan. Achievements: After that training, I did bore scope myself many times, and direct burner 8# replacement on March 12, 2012; Coordinate customer relationship well, independently download data as a Mechanical FSR without control engineer conduct on Feb 10 th , 2012, even the software is changed. 28/09/2011---25/10/2011 SJ 3 rd line,MA547 new installation project on job training. Achievements:work out new method about oil flush, shrink the flushing time, can be used when project is hurry. 29/12/2011---07/03/2012 WEEP Line 2,MA389 Wu su Unit2 Casing repair. Take part in all disassembly steps, counting materials and spare parts, assembly special tools, during casing disassembly, mark all material according to drawings, seal and packing components, coordinate loading and assist rising the packing list. Achievements: independently coordinate multi work group offloading packing boxes without crane assist,save much time for the project;further more,arrange time proper replace seal kit for seal gas booster and replace one alternator for MCC during that project. 11/2011—07/11/2012 WEEP line 2,MA552 Zao yang station new installation (suspending). Achievements: independently coordinate multi work group, control cost during project, save cost much. Such as Cullum supplied material components miss shipment, steel structure components wrong size, I managed to eliminate the relevant cost, and achieved 0 costs on those issues. Even some of parts supplied by RR not arrive at site; I try to make it not influent project proceeding, keep good occupation on RR. On July 10 store materials tools and seal up work site, make full documentation for other colleagues; make no person stay for work site, save cost for company. 21/07/2012—07/29/2012 Hanas work shop engine combustors replacement。
  • 5. Achievements: Complete all 8 combustors replacement by only 4 persons within 5days. Save time and keep production available. 08/01/2012—08/09/2012 WEEP line 2,MA552 Nanchang station GG lube oil pump coupling upgrade. Achievements: Identified wrong supply spare parts in time and make a detail report to company, provide reference for other work site. 08/31/2012—12/03/2012 SJ 3 rd line,MA672 Lin xian station installation and commissioning. Achievements: Independently coordinate multi work group, organize people, tools, materials, arrange work process properly, control cost during project, save cost much. Achieve first fire from unit offloading only 102 days, praised by customer. 04/08/2013—04/11/2013 Hanas workshop engine pre-middle life inspection. 04/14/2013—05/25/2013 WEEP MA446 Shan dan No.3 unit and Ha mi No3.unit aero swap. Achievements:Safely and smoothly complete all work and start up unit successfully on first time. 05/252013—07/04/2013 WEEP line 2,MA389 Yan dun No.3 unit abnormal overhaul. Achievements:After precisely calculation, daringly used 100T jack and a special tool with a long time patient moved out the damaged bundle, avoid the whole unit sliding cost and heavy goods transporting cost, and save both maintenance time for company and production time for customer. 07/29/2013—08/02/2013 Hanas work shop TRENT 60 engine overhaul, engine remove and packing. 09/13/2013—09/22/2013 MA552 Nan chang Punch make up. 10/09/2013—10/31/2013 MA552 Zao yang station installation and commissioning, restart works since 2012 July suspend. Checked PT bearings, installed 63PGD2, and match tubing for 63PGD2, 80PGS,63PGJSS. Main lube oil system flushing and GG lube oil system flushing, take oil sample to test。Suspend again due to power supply problem. 01/2005–09/2011 COPC ConocoPhillips China Inc. (COPC) is a subsidiary of ConocoPhillips, undertaking oil and gas exploration and production operations in China. In Bohai Bay, COPC is
  • 6. cooperating with China National Offshore Oil Corporation (CNOOC) in the development of China's largest offshore discovery - Peng Lai (PL) 19-3. The project includes two phases of development. Production from the first phase began in December 2002. Production from the second phase utilizing a floating, production, storage and offloading (FPSO) vessel is expected to begin in late 2008。 12/2006–09/2011 COPC19-3 WHP-C mechanic Report to:OIM Responsibility:  Platform equipment management,parameters monitoring and record。  Platform equipment PM BM and CM  Platform equipment and materials recording Achievements  On-crank water washes products with pictures interpretation and training it to new technician。  Taken out broken pieces of nozzle inside engine。  Help onshore MM group to investigate and build up spare parts for platform equipment。  Compile water maker operating and maintenance procedures  Compile seawater lift pump replacing procedures, reducing working duration to 1/4 of original  Compile crane Hydraulic oil cooler replacing procedures ,reducing working duration from original 3 days to 6 hours  review and update mechanic PMs  advise technical drawings to fabricate expensive filter elements locally  Translate centrifuge diesel treatment unit O&M Manual,train the offshore technicians.Modified the process inside the skid and solved the belt slip symptom.  Give several basic training to SAP group about offshore equipment and process.  Modified the illogical material sock items。
  • 7. 01/2006–12/2006 COPC19-3 FPSO Miungzhu mechanic Report to:Maintenance supervisor Responsibility:  FPSO equipment management,parameters monitoring and record。  FPSO equipment PM BM and CM Achievements  Translate solar turbine training manual chapter 1to chapter 10, make elder workers understand the equipment quite a lot。  Translate easy laser alignment manual and training to colleagues  Training engine room process to colleagues and make them understand how to switch the equipment when emergency without shutdown。 06/2005–01/2006 COPC19-3 WHP-A operator Report to:OIM Responsibility:  Monitoring well production parameter,accounting oil production  CCR remote monitoring,download senor data everyday  Star and shut in well,start and stop ESP, ESP trend monitoring  Life boat、stand-by generator、fire pump PM  Sanitary unit PM Achievements  Compile production operating procedures  Help to crane maintenance and avoid a big hazard by noticing running status to the temporary crane operator. 01/2005–06/2005 COPC19-3 FPSO Miungzhu operator trainee Report to:production supervisor Responsibility:  Monitoring Solar engine, R&R engine,heating media system,steam boiler,inert gas generator,crude oil system,produced water system,chemical system, water injection system,fuel gas system  CCR remote monitoring Achievements
  • 8.  Compile the routine job to brief procedure and train the new operators on site。 08/2002-12/2004 Bohai Oil engineering company (BOEC) BOEC is a subordinate of CNOOC,major business are offshore equipment reparation ,crane reparation 、ESP tech support、I&E tech support、slop water treatment、 ship equipment、physical chemistry cleaning、machining、 equipment running monitoring、engineering project design etc. 08/2002-03/2003 BOEC offshore repairing division technology team pump director Responsibility:Pumps in general contract overhaul and relevant auxiliary system repair, temporary small repair projects. Responsible for repair procedure adoption, components organize and repair, take part in whole repair process, disassembly, clean up, measurement, spare parts replace, shaft repair, the rotor dynamic balance, assembly, and return to offshore customer installation and commissioning.  “Changtsing”FPSO afloat tube yearly repairing and maintenance;  SZ36-1oil field(9 platforms total)oil transfer pump overhaul,thermal oil circulate pump overhaul, open-type emptying pump、closed-type emptying pump overhaul;sum contract-- pump polling;  SZ36-1oil field Air compressor polling  Natural gas compressor fault repair Achievements:  Compile SZ36-1 offloading pump (10 grades centrifuge ) overhaul process,  Compile SZ36-1 offloading pump (5 grades centrifuge ) overhaul process 03/2003~07/2003 BOEC offshore repairing division diesel oil engine director : Responsibility: Diesel engine in general contract periodic maintenance and corrective maintenance,temporary small repair projects Responsible for repair procedure adoption, components organize and repair, components localize and upgrade. Achievements:
  • 9.  Adapt the diesel engine PM procedure of CB and QK oil field 。  Filed the technical files ,change the original 7 levels structures to 3 levels and delete redundant files make the whole package shrink from 2GB to 84 MB, easy for anyone to look up or record 07/2003-12/2003 BOEC repairing and maintenance division hydraulic lift director Responsibility: Offshore cranes in general contract periodic maintenance and corrective maintenance,temporary small repair projects Responsible for repair procedure adoption, components organize and repair, components localize and upgrade.  SZ36-1oil field(9 platforms total)hydraulic lift yearly repairing and maintenance;  QK17-2 oil field hydraulic lift yearly repairing and maintenance;  “Changtsing”FPSO crane fault repair(5 dun crane exchange hydraulic cylinder seal elements,15 dun crane exchange balance valve)  SZ36-1oil field platform B exchange hoisting cable of boat hoisting engine Achievements:  Filed the technical files ,change the original structures to 3 levels and delete redundant files make the whole package easy for anyone to look up or record Project experiences: Project Name You Yi FPSO refurbish Project profile:repair equipment and update units on FPSO“You Yi”to make the facility compatible to BZ28- 1oil field production, 1.98 billion RMB, project last for 1.5 year Responsibility: “YouYi ”FPSO repairing project equipment director concentrate on:  Worked with Solar personnel to do turbine exchange and PLC control plus
  • 10.  Worked with Ness personnel to do thermal oil boiler repairing and control system plus  Worked with Ness personnel to do steam oil boiler repairing and burner plus  Worked with Sinoda personnel to do inert gases producer repairing and control system plus  some other work of ship equipment Achievements:  All tasks re-perform rate O  All tasks complete 14 days ahead of project with only once over time work about 4 hours。  Precisely record the collaborate contractor working, and attend the business negotiation, reduce the onsite service cost from 350,000$ to about 15000$ 。 Attached are some site work pictures:
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.