T. Sai Ram has over 4 years of experience as a field service engineer for gas turbines. He has skills in inspections, maintenance, and commissioning of steam and gas turbines. Some of his projects include commissioning turbines at various cement and power plants. He holds a Bachelor's degree in Mechanical Engineering and is proficient in AutoCAD, Windows, and programming languages like C and Java.
I am a Diploma in Mechanical Engineer with 25 years of experience in Oil & Gas,Power Plant(Combined cycle & Thermal),Steel,Cement,Material Handling. Returned from Abu-Dhabi(Combined cycle power project) under HYUNDAI Engg & Constrn.
I had overseas experience in Saudi Arabia,U.A.E,China.
I have 25 years hands – on experience in Construction, Operation, maintenance, commissioning, Overhauling, Fault diagnosis & trouble shooting of large capacity of All Rotating & Static Equipments, Install, align, dismantling, examine and re-assembling, adjust and repair or replace of defective parts of mechanical equipment, such as Boiler,Turbine,Large Gear & centrifugal pumps, Compressors, Turbochargers, Heat exchangers, HFO & lub oil separators, all types of Valves, and other general mechanical maintenance works. I will do independently , as well as team work.
I would like to discuss further suitability to my position at an interview stage to work in your esteemed organization.
I am Rajapaul from India. I have 10 years experience as a Mechanical Technician in oil & gas field. I have good experience on Pr - commissioning,commissioning, maintaining rotating equipment and static equipment.Herewith i have attached my resume for your reference.
Thanks & Regards,
Rajapaul.P
+91-9600435455(India)
+965-66775329 (Kuwait)
BABOOLAL VISHWAKARMA
E-Mail: baboolalvishwakarma@rocketmail.com
vishwakarmabl@ymail.com, vishwakarmabl@yahoo.com Contact: +91 94258 85234
Senior level assignments in:
Power Plants Operations Project Management Installation & Commissioning Operations & Maintenance
CAREER ABSTRACT
A skilled professional with 34 years of enriched experience; presently working with Maihar Cement, Sarla Nagar, M.P as General Manager Thermal Power Plant
Adroit in managing, directing, planning & coordinating plant operations, including maximizing plant profits & minimizing expenses.
A strategic planner with expertise in planning, executing and spearheading coal based Power Plant construction projects involving Contract & Site Administration & Resource Planning.
Proficient in monitoring thermal power plant performance, investigating & correcting abnormal conditions & directing operations and maintenance activities of the power plant.
Ensured that aims, goals and objectives were accomplished in accordance with outlined priorities, time limitations, and funding conditions.
Strong skills in project planning, monitoring progress, ensuring control & maintaining project requirements.
Excellent communication, analytical & interpersonal skills with the ability to work in a dynamic environment.
EMPLOYMENT DETAILS
Since Sep’83 Maihar Cement, Sarla Nagar, M.P
Growth Path
Sep’83–Nov’88 Engineer (Power Plant)
Dec’88–Jan’91 Industrial Engineer
Jan’91–Dec’92 Design Engineer
Jan’93 – Jan’95 Engineering Consultants
Jan’95 –Jan’97 DCS &boiler management, Operation Manager
Since Feb’97 Manager Thermal Power Plant (Power Generation Engineering)
Domain Skills
Handling operations at 5 MW, 15.7 MW & 15.7 MW capacities.
Designing plant layout for the power plant department & performing building improvements.
Developing boiler & turbine operation / maintenance improvement plan.
Overseeing mechanical systems, power plant, making complete safety package for work & hydraulic double stack lift.
Redesigning dairy open style conveyor, training 10 engineers on Automation.
Incorporating EPA & OSHA regulations into safety procedures, creating
Supervising power plant activities for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational goals.
Handling the installation, commissioning & operations of construction mechanical workshop.
Handling the installation & commissioning of DM water plant, filtration & chlorination plants.
Implementing systems & procedures to reduce rejection levels and ensure compliance with the industrial quality standards.
Anchoring on-site erection & commissioning activities and ensuring completion of project within the time & cost parameters and effective resource utilisation to maximise the output.
Monitoring the progress, controlling quality & cost control & undertaking the quantity survey.
Supervising project activities and handling the complete project management cycle entailing requirement gathering and final execution of projects.
Accomplishments
Efficiently handled operations at the following:
- 5 MW unit (Turbine and Boiler): supplied by Westing House (USA)
- 15.7 MW unit: commissioned in March 1997. Turbine is supplied by of Shin Nippo Machinery co. Ltd. Japan and FBC (CFBC) Boiler
- 15.7 MW unit: commissioned in January 2006.
Effectively supervised over 500 college, maintained security accounts and budgets & interviewed, hired, field trained & conducted performance appraisals.
Played a major role in making a 25 page monthly report.
INDUSTRIALTRAINING
Oct’75 –Mar’78 with Orient Paper Mills District, Shahdol
COMMENCED CAREER
Ma’78 –Sep’83 with Orient Paper Mills Ltd., location as Boiler Operator
SCHOLASTICS
Master Program in Mechanical Engineering fro
To build a career with the skills and insight that could assist a dynamic and prestigious organization and to show my best performance that will definitely match with my skill and job description
1. T. Sai Ram
Mobile:+91 9032963866/9100111511/09000988506
E-Mail:sai07.turaga@gmail.com
Middle LevelAssignments in:
Service Operations, inspections & Erection & Commissioning of GAS TURBINE and Combined power plantwith an organization
of high repute
PROFILE SUMMARY
A competent professional with an experience of 4 years as a Field Service Engineer for Gas Turbine.
Skilled in handling major inspections, combustion inspection & Hot gas path inspections of Gas turbines.
Experience on Taking alignment reading and aligning machine with corrections needed
Carrying out inspections and adjustments of clearances for thrust & journal bearings, oil seals, checking of
buckets & vanes clearances of turbine & compressor rotor
Hands on experience on taking inspection readings on Axial compressors, Variable inlet guide vanes, &
turbine clearances
Hands on experience in inspecting with the backlash & float of the Auxiliary gear box & load gear box
Coordinating with maintenance and planning departments in carrying out inspections with the condition
of lube oil filters, hydraulic filters, trip oil filters / replacing, pulling out the lube oil coolers and
inspecting with respective to its tubes, etc.,
Performed jobs on Steam turbine & auxiliaries - Installation of gland steam condenser, MOT, duplex
filters, generator air coolers, HP heater, LP heater, AOP, MOP, EOP & JOP.
Skilled in Pre-commissioning (Lube oil pipe lines flushing) activities of steam & gas turbine
Preparation of bar chart, Gantt chart, major Inspection report & MOM documents
Skilledin handlingerection&commissioningactivitiesinvolving resource planning, in-process inspection, team
building and co-ordination with internal / external departments
Talentforproactively identifying& resolvingproblems,rampingupproject activities with no time deliverables
and maximizing productivity
Conversant with enhancing operational efficiency by making use of leading edge manufacturing technologies
including business reviews
Proficient in managing maintenance as an activity for reducing downtime and enhancing operational
effectiveness
An effective communicator with strong analytical, problem solving and organisational abilities
CORE COMPETENCIES
Handling the installation and commissioning of turbines and conducting tests & inspections to ensure
operational effectiveness of plant & utilities
Performing detailed engineering review and studying engineering drawings, layouts, diagrams, technical
specifications, cost estimates for erection & commissioning of the plant
Carryingoutoverhaulingworkofequipment,modifications,andmajorrepairstoimproveequipmentefficiency by fault
finding
Conductinginstallation,performance trials&systemlayouts,checkingmain&auxiliarymachineryandpreparing
documents for the same
Formulating maintenance schedules & strategies and conducting periodic checks to ensure effective
performance of various equipment
Initiating proactive steps towards effective maintenance such as predictive & reliability centred maintenance
2. EMPLOYMENT DETAILS .
Now currently working since dec’2014 in M/s.Turbo Engineers & consultants Pvt. Ltd., as a Field Service
Engineer for Gas Turbine
Worked in M/s.Rotodyne Engineering Services Pvt. Ltd., Hyderabad in Erection and commissioning of
steam & gas Turbine, from may’2012 to dec’2014
PROJECTS HANDLED
Highlights:
Played a vital role in performing erection &commissioning of the following:
o 2X40MW Steam Turbine of BHEL at M/s.Wonder Cement, Rajasthan
o Gas Turbine (Frame V) of BHEL at M/s.Maruti Suzuki, Manaswar, Delhi
o 135MW Solar Turbine of SIMENS at Pokhran Raj. of M/s.Reliance Project
Successfullyattended overhauling of Gas Turbine Frame V 20MW BHEL at M/s.Maruti Suzuki, Manaswar Delhi
Holds the distinction of carrying out pre-commissioning activities of 2X 45MW Steam Turbine of BHEL at
M/s.ActionIspat Steel Plant Ltd., Orissa
Overhauling TDBFP Control Values & Turbine Auxiliaries of 600MW at M/s.Vedanta Sterlite Group, Orissa
O Cleaning and inspecting the condition of steam condensers for LP (A) & LP (B)
O Lapping and inspection for the discs of valves
O cleaning and inspecting the condition of MOT, DOT & seal oil tank etc.,
Skilfullyhandled generatortopbarreplacement,re-winding,assemblyandcommissioning of 210MW Generator
of BHEL at M/s.Damodar Valley Corporation, Mejia, Calcutta
O Threading out and threading in the rotor
Successfully completed overhaul of Alstom, PG 5361(PA)/MS5001P Gas Turbine frame - V at M/s.National
Fertilizer Ltd. Madhya Pradesh
Successfully attended and solved the problem of high vibrations on Load Gear Box Graffenstaden 2937, of
GTG at M/s.National fertilizer Ltd.
Successfully completed Major Overhaul of Thomassen International bv, Netherland PG5371(PA)/MS5001P Gas
Turbine frame V at M/s. NFL.
Overseeing
0 Installation of new IGV set, setting angle drilling thereby locking
o Bucketing (re-blading) on gas turbine rotor
o Installation of new set of shrouds
Repairing of oil & steam glands, labyrinth seals, assembly of new diaphragms, centring and alignment of
compressor
Carryingout inspectionandadjustmentof clearancesforthrust&journal bearings,oil glands,checkingof bucket
and vane clearances of rotor, centring and alignment of rotors and couplings, locking after centring and
alignment of turbine, gear box and generator
IGV actuator link disengage applied mechanical lock
Accountable for Rotor positioning check, casing bottom support jacking, combustion piping / cooling and
extractionpipingremovalinstallation, hot gas path components removal, casing bolt removal and installation,
critical lifting plans preparation, and heavy lifting
Responsible for casing half shell opening and closing clearances recording, rotor lifting beam preparation and
rotor lifting, bearing inspection and replacement, lift oil piping pressure testing and load coupling alignment
ACADEMIC PROJECTS
Title: Transmission of Gearbox
Organisation: K.L.R. Drillers
Team Size: 5 members
Duration: 2 weeks
Title: Design & Manufacturing of Vertical Boiler
Organisation: Zenith Thermal Equipment
3. Team Size: 4 members
Duration: 2 ½ months
Role: Team lead
Designed, fabricated and commissioned Reverse jacketed type oil fired boiler, small capacity of boiler with
pressure of 10.5bar &steam outlet is of 50kg/hr at 100deg.centig. and feed water temperature
EDUCATION
BachelorsofTechnology in Mechanical Engineering from Guru Nanak Engineering College, afflicted under JNTU
Hyderabad in 2012 with 69%
DiplomaPolytechnicinMechanicalEngineeringfromTRRPolytechnic College, State Board of Technical Education in
2008 with 60 %
10th
from Sri Krishnaveni Talent School, Board of Secondary Education in 2005 with 73.04%
EXTRACURRICULAR ACTIVITIES/ ACCOLADES
Actively participated in:
o Techno-fest held in college and received first prize for the project
o College Fests
o Essay Writing Competitions & Cultural Event in High School
o Intra-school Competitions
Served as a Vice-President for organizing Annual Day Function during college
Successfully delivered a seminar on Robots and Robotic Handling Materials at JNTU,Kukatpally, Hyd.
IT SKILLS
Languages : C, Java
Operating System : Windows XP/7, 10
AutoCAD : 2D & 3D
PERSONAL DETAILS
Date of Birth: 05th
July 1990
Passport details : M1142833
Date of Issue: 19/08/2004
Date of Expiry: 18/08/2024
Address: H.No. 2-6-485/22, Plot No. 68, Jayapuri Colony, Nagole,L.B. Nagar, Hyderabad-500035
Languages Known: English, Telugu, and Hindi