IMPORTANT THINGS IN CREATING PLANS as per NBCP Rule 7 & 8
01 Site Requirements (Essential Elements)
02 Development Controls
03 Floor Area Ratios
04 Lot Types
05 Sample Computation
ESSENTIAL SITE ELEMENTS
•
•
•
•
•
ESSENTIAL SITE ELEMENTS
•
•
•
ESSENTIAL SITE ELEMENTS
•
•
•
Guidelines in Developmental Controls
0
50
10
0
15
0
20
0
25
0
30
0
30
0
10
0
40
0
20
0
50 35
0
15
0
25
0
DEVELOPMENT CONTROLS
(Maximum Development Potential of a Lot)
See Sec. 709-B “Guidelines on Building Bulk, Development Controls,
Buidings and Other Accessory Structures within Cemeteries and Memorial
Parks”
1. Allowable Maximum Building Footprint (AMBF)
Two major factors to be considered: PSO and Setbacks
Whichever is stringent between Percentage of Site Occupancy (PSO max) and
Setbacks (minimum)
Guidelines in Developmental Controls
0
50
10
0
15
0
20
0
25
0
30
0
30
0
10
0
40
0
20
0
50 35
0
15
0
25
0
DEVELOPMENT CONTROLS
(Maximum Development Potential of a Lot)
See Sec. 709-B “Guidelines on Building Bulk, Development Controls,
Buidings and Other Accessory Structures within Cemeteries and Memorial
Parks”
2. Percentage of Site Occupancy (PSO)
If setback prevails, compute for the actual PSO,
PSO =
𝐴𝑙𝑙𝑜𝑤𝑎𝑏𝑙𝑒 𝑀𝑎𝑥𝑖𝑚𝑢𝑚 𝐵𝑢𝑖𝑙𝑑𝑖𝑛𝑔 𝐹𝑜𝑜𝑡𝑝𝑟𝑖𝑛𝑡 (𝐴𝑀𝐵𝐹)
𝑇𝑜𝑡𝑎𝑙 𝐿𝑜𝑡 𝐴𝑟𝑒𝑎 (𝑇𝐿𝐴)
Guidelines in Developmental Controls
0
50
10
0
15
0
20
0
25
0
30
0
30
0
10
0
40
0
20
0
50 35
0
15
0
25
0
DEVELOPMENT CONTROLS
(Maximum Development Potential of a Lot)
3. Total Open Space within the Lot (TOSL) – Section 803.3.b
• Factors to be considered:
• Maximum Allowable Impervious Surface Areas (ISA) – paved open spaces (pccp,
slab on grade, tiled)
• Minimum Allowable Unpaved Surface Areas (USA) – unpaved open spaces (green
areas, exposed soil, and gardens, landscaping)
• TOSL = Maximum ISA + Minimum USA
• PSO + TOSL = 100 %
Guidelines in Developmental Controls
0
50
10
0
15
0
20
0
25
0
30
0
30
0
10
0
40
0
20
0
50 35
0
15
0
25
0
DEVELOPMENT CONTROLS
(Maximum Development Potential of a Lot)
4. Maximum Allowable Construction Area (MACA)
MACA = PSO + ISA
5. Floor to Lot Area Ratio (FLAR) : See Table VII.G.1
- An initial determinant of the volume of the building
- FLAR = GFA/TLA
6. Building Height Limit (BHL)
- Maximum height of the building that can be built on a site.
Guidelines in Developmental Controls
0
50
10
0
15
0
20
0
25
0
30
0
30
0
10
0
40
0
20
0
50 35
0
15
0
25
0
DEVELOPMENT CONTROLS
(Maximum Development Potential of a Lot)
7. Gross Floor Area (GFA) –
total floor space within the perimeter of the permanent external building walls
(inclusive of main and auxiliary buildings) such as office areas, residential areas,
corridors, lobbies and mezzanine level/s.
The GFA shall also include building projections which may serve as floors or
platforms that are directly connected to/integrated with areas within the
building/structure, e.g., balconies
(Refer to Section 1004 of Rule X of this IRR) and the GFA excludes the following:
(a) Covered areas used for parking and driveways, services and utilities;
(b) Vertical penetrations in parking floors where no residential or office units are present; And
(c) Uncovered areas for helipads, air-conditioning cooling towers or air-conditioning condensing unit (ACCU) balconies,
overhead water tanks, roof decks, laundry areas and cages, wading or swimming pools, whirlpools or jacuzzis, terraces, gardens,
courtsor plazas, balconies exceeding 10.00 sq. meters, fire escape structures and the like.
GFA = TLA x FLAR
Guidelines in Developmental Controls
0
50
10
0
15
0
20
0
25
0
30
0
30
0
10
0
40
0
20
0
50 35
0
15
0
25
0
DEVELOPMENT CONTROLS
(Maximum Development Potential of a Lot)
8. Total Gross Floor Area (TGFA) –
The total floor space within the main and auxiliary buildings primarily consisting of
the GFA and all other enclosed support areas together with all other usable horizontal
areas/surfaces above and below established grade level that are all physically attached
to the building/s which shall consists of the following:
(a) Covered areas used for parking and driveways, services and utilities. The TGFA specifically excludes
provisions for courts above grade level;
(b) Vertical penetrations in parking floors where no residential or office units are present;
(c) Uncovered areas for helipads, air-conditioning cooling towers or ACCU balconies, overhead water tanks,
roof decks, laundry areas and cages, wading or swimming pools, whirlpool or jacuzzis, terraces, gardens, courts
or plazas, balconies exceeding 10.00 sq. meters, fire escape structures and the like; and
(d) Other building projections which may additionally function as floors or platforms if properly reinforced,
e.g., the top surfaces of roof extensions/eaves, sun-breakers, large roofed or cantilevered areas such as porte
cocheres, canopies and the like.
Guidelines in Developmental Controls
0
50
10
0
15
0
20
0
25
0
30
0
30
0
10
0
40
0
20
0
50 35
0
15
0
25
0
DEVELOPMENT CONTROLS
(Maximum Development Potential of a Lot)
8. Total Gross Floor Area (TGFA) –
TGFA1 = BHL x % of LOT (Table VII.1)
TGFA2 = GFA x Multiplier (Table VII.G.2)
TGFA3 = GFA + Non-GFA - IS
•
•
•
•
•
•
SAMPLE COMPUTATION
0
50
100
150
200
250
300
300
100 400
200
50 350
150 250

More Related Content

Similar to CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx

General Development Control Regulations (GDCR).pptx
General Development Control Regulations (GDCR).pptxGeneral Development Control Regulations (GDCR).pptx
General Development Control Regulations (GDCR).pptxKRUTIDESAI17
 
Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012Candice Osborne
 
Item # 4 & 5 - Powerpoint Residential Design Standards (RDS) Amendments
Item # 4 & 5 - Powerpoint Residential Design Standards (RDS) AmendmentsItem # 4 & 5 - Powerpoint Residential Design Standards (RDS) Amendments
Item # 4 & 5 - Powerpoint Residential Design Standards (RDS) Amendmentsahcitycouncil
 
Development control rules and regulation
Development control rules and regulationDevelopment control rules and regulation
Development control rules and regulationMANINANDANSAHU
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogdenahcitycouncil
 
Presentation on Bangladesh National Building Code 2020 PART 3
Presentation on Bangladesh National Building Code  2020 PART 3Presentation on Bangladesh National Building Code  2020 PART 3
Presentation on Bangladesh National Building Code 2020 PART 3MuktadirAbedin1
 
What You Need to Know about DC’s New Zoning Regulations for Downtown
What You Need to Know about DC’s New Zoning Regulations for Downtown What You Need to Know about DC’s New Zoning Regulations for Downtown
What You Need to Know about DC’s New Zoning Regulations for Downtown Rachael Hesling
 
AH Council Meeting 11/9/15 - Item #7 - MF-D Amendments
AH Council Meeting 11/9/15 - Item #7 - MF-D AmendmentsAH Council Meeting 11/9/15 - Item #7 - MF-D Amendments
AH Council Meeting 11/9/15 - Item #7 - MF-D AmendmentsMarian Vargas Mendoza
 
090727 Final HMU Options
090727  Final HMU Options090727  Final HMU Options
090727 Final HMU OptionsCity of Manvel
 
KPBR.pptx
KPBR.pptxKPBR.pptx
KPBR.pptxMedhaH
 
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdfMCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdfshaheryarkhance
 
Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadwayahcitycouncil
 
Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadwayahcitycouncil
 
Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadwayahcitycouncil
 
Proposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton ZoningProposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton ZoningAdam Cohen
 

Similar to CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx (20)

General Development Control Regulations (GDCR).pptx
General Development Control Regulations (GDCR).pptxGeneral Development Control Regulations (GDCR).pptx
General Development Control Regulations (GDCR).pptx
 
PUNE BYE LAWS
PUNE BYE LAWSPUNE BYE LAWS
PUNE BYE LAWS
 
Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012
 
Item # 4 & 5 - Powerpoint Residential Design Standards (RDS) Amendments
Item # 4 & 5 - Powerpoint Residential Design Standards (RDS) AmendmentsItem # 4 & 5 - Powerpoint Residential Design Standards (RDS) Amendments
Item # 4 & 5 - Powerpoint Residential Design Standards (RDS) Amendments
 
Building bye-laws-of-amritsar
Building bye-laws-of-amritsarBuilding bye-laws-of-amritsar
Building bye-laws-of-amritsar
 
Development control rules and regulation
Development control rules and regulationDevelopment control rules and regulation
Development control rules and regulation
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
 
AH CCM 5.11.20
AH CCM 5.11.20AH CCM 5.11.20
AH CCM 5.11.20
 
BE Cost Plan
BE Cost Plan BE Cost Plan
BE Cost Plan
 
building rules.pptx
building rules.pptxbuilding rules.pptx
building rules.pptx
 
Presentation on Bangladesh National Building Code 2020 PART 3
Presentation on Bangladesh National Building Code  2020 PART 3Presentation on Bangladesh National Building Code  2020 PART 3
Presentation on Bangladesh National Building Code 2020 PART 3
 
What You Need to Know about DC’s New Zoning Regulations for Downtown
What You Need to Know about DC’s New Zoning Regulations for Downtown What You Need to Know about DC’s New Zoning Regulations for Downtown
What You Need to Know about DC’s New Zoning Regulations for Downtown
 
AH Council Meeting 11/9/15 - Item #7 - MF-D Amendments
AH Council Meeting 11/9/15 - Item #7 - MF-D AmendmentsAH Council Meeting 11/9/15 - Item #7 - MF-D Amendments
AH Council Meeting 11/9/15 - Item #7 - MF-D Amendments
 
090727 Final HMU Options
090727  Final HMU Options090727  Final HMU Options
090727 Final HMU Options
 
KPBR.pptx
KPBR.pptxKPBR.pptx
KPBR.pptx
 
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdfMCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
 
Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadway
 
Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadway
 
Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadway
 
Proposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton ZoningProposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton Zoning
 

Recently uploaded

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 

Recently uploaded (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 

CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx

  • 2. IMPORTANT THINGS IN CREATING PLANS as per NBCP Rule 7 & 8 01 Site Requirements (Essential Elements) 02 Development Controls 03 Floor Area Ratios 04 Lot Types 05 Sample Computation
  • 6. Guidelines in Developmental Controls 0 50 10 0 15 0 20 0 25 0 30 0 30 0 10 0 40 0 20 0 50 35 0 15 0 25 0 DEVELOPMENT CONTROLS (Maximum Development Potential of a Lot) See Sec. 709-B “Guidelines on Building Bulk, Development Controls, Buidings and Other Accessory Structures within Cemeteries and Memorial Parks” 1. Allowable Maximum Building Footprint (AMBF) Two major factors to be considered: PSO and Setbacks Whichever is stringent between Percentage of Site Occupancy (PSO max) and Setbacks (minimum)
  • 7. Guidelines in Developmental Controls 0 50 10 0 15 0 20 0 25 0 30 0 30 0 10 0 40 0 20 0 50 35 0 15 0 25 0 DEVELOPMENT CONTROLS (Maximum Development Potential of a Lot) See Sec. 709-B “Guidelines on Building Bulk, Development Controls, Buidings and Other Accessory Structures within Cemeteries and Memorial Parks” 2. Percentage of Site Occupancy (PSO) If setback prevails, compute for the actual PSO, PSO = 𝐴𝑙𝑙𝑜𝑤𝑎𝑏𝑙𝑒 𝑀𝑎𝑥𝑖𝑚𝑢𝑚 𝐵𝑢𝑖𝑙𝑑𝑖𝑛𝑔 𝐹𝑜𝑜𝑡𝑝𝑟𝑖𝑛𝑡 (𝐴𝑀𝐵𝐹) 𝑇𝑜𝑡𝑎𝑙 𝐿𝑜𝑡 𝐴𝑟𝑒𝑎 (𝑇𝐿𝐴)
  • 8. Guidelines in Developmental Controls 0 50 10 0 15 0 20 0 25 0 30 0 30 0 10 0 40 0 20 0 50 35 0 15 0 25 0 DEVELOPMENT CONTROLS (Maximum Development Potential of a Lot) 3. Total Open Space within the Lot (TOSL) – Section 803.3.b • Factors to be considered: • Maximum Allowable Impervious Surface Areas (ISA) – paved open spaces (pccp, slab on grade, tiled) • Minimum Allowable Unpaved Surface Areas (USA) – unpaved open spaces (green areas, exposed soil, and gardens, landscaping) • TOSL = Maximum ISA + Minimum USA • PSO + TOSL = 100 %
  • 9. Guidelines in Developmental Controls 0 50 10 0 15 0 20 0 25 0 30 0 30 0 10 0 40 0 20 0 50 35 0 15 0 25 0 DEVELOPMENT CONTROLS (Maximum Development Potential of a Lot) 4. Maximum Allowable Construction Area (MACA) MACA = PSO + ISA 5. Floor to Lot Area Ratio (FLAR) : See Table VII.G.1 - An initial determinant of the volume of the building - FLAR = GFA/TLA 6. Building Height Limit (BHL) - Maximum height of the building that can be built on a site.
  • 10. Guidelines in Developmental Controls 0 50 10 0 15 0 20 0 25 0 30 0 30 0 10 0 40 0 20 0 50 35 0 15 0 25 0 DEVELOPMENT CONTROLS (Maximum Development Potential of a Lot) 7. Gross Floor Area (GFA) – total floor space within the perimeter of the permanent external building walls (inclusive of main and auxiliary buildings) such as office areas, residential areas, corridors, lobbies and mezzanine level/s. The GFA shall also include building projections which may serve as floors or platforms that are directly connected to/integrated with areas within the building/structure, e.g., balconies (Refer to Section 1004 of Rule X of this IRR) and the GFA excludes the following: (a) Covered areas used for parking and driveways, services and utilities; (b) Vertical penetrations in parking floors where no residential or office units are present; And (c) Uncovered areas for helipads, air-conditioning cooling towers or air-conditioning condensing unit (ACCU) balconies, overhead water tanks, roof decks, laundry areas and cages, wading or swimming pools, whirlpools or jacuzzis, terraces, gardens, courtsor plazas, balconies exceeding 10.00 sq. meters, fire escape structures and the like. GFA = TLA x FLAR
  • 11. Guidelines in Developmental Controls 0 50 10 0 15 0 20 0 25 0 30 0 30 0 10 0 40 0 20 0 50 35 0 15 0 25 0 DEVELOPMENT CONTROLS (Maximum Development Potential of a Lot) 8. Total Gross Floor Area (TGFA) – The total floor space within the main and auxiliary buildings primarily consisting of the GFA and all other enclosed support areas together with all other usable horizontal areas/surfaces above and below established grade level that are all physically attached to the building/s which shall consists of the following: (a) Covered areas used for parking and driveways, services and utilities. The TGFA specifically excludes provisions for courts above grade level; (b) Vertical penetrations in parking floors where no residential or office units are present; (c) Uncovered areas for helipads, air-conditioning cooling towers or ACCU balconies, overhead water tanks, roof decks, laundry areas and cages, wading or swimming pools, whirlpool or jacuzzis, terraces, gardens, courts or plazas, balconies exceeding 10.00 sq. meters, fire escape structures and the like; and (d) Other building projections which may additionally function as floors or platforms if properly reinforced, e.g., the top surfaces of roof extensions/eaves, sun-breakers, large roofed or cantilevered areas such as porte cocheres, canopies and the like.
  • 12. Guidelines in Developmental Controls 0 50 10 0 15 0 20 0 25 0 30 0 30 0 10 0 40 0 20 0 50 35 0 15 0 25 0 DEVELOPMENT CONTROLS (Maximum Development Potential of a Lot) 8. Total Gross Floor Area (TGFA) – TGFA1 = BHL x % of LOT (Table VII.1) TGFA2 = GFA x Multiplier (Table VII.G.2) TGFA3 = GFA + Non-GFA - IS