Cargo Fuel Oil Sale Contract
Contract No. Date:
1. – Parties
Seller:
Economic code:
1.1. Buyer:
Address:
2. Validity:
This Contract is effective from the date of signature of this contract till one week. After
which seller will accept no obligations to buyer.
3 . Quantity
00,000 MT Metric Tons +/- 10 percent operational tolerance at seller option.
4- Quality
As per seller’s normal export quality for CST 280 & 380/ <3.5% sulfur fuel oil
5- Delivery Date & Term:
Note:
CST 380 = FOB - Bandar abbas port.
CST 280 = FOB- Mahshar port.
6 - Title and risk
Delivery shall be deemed completed and title and risk shall past to buyer as
such petroleum product passes the flanges connecting to buyer's storage
facility. Seller's delivery house with tank at which point seller responsibility shall
seas and buyer shall assume all risk of loss, damage, detraction, to petroleum
product so delivered.
7- Delivery-lifting period-FOB
For delivery-lifting, three days ITT time shall be advise by seller to buyer before
shipment. This advise three days by seller to buyer, shall be final and binding
upon bout parties. Meanwhile, buyer is obliged to receive nominate cargo
during the agreed time as mentioned above. In case of any delay, buyer shall
be responsible for the relevant cost accordingly.
8 - Price
Average of five days after completion of loading-(B/L date and two days
before and two days after) at load port with following formula In USD per MT
FOB calculated based on the average effective quotations.
Mean of high and low quotations for HSFO 180 CST under the heading “FOB
Persian Gulf” (so called Arab Gulf in Platts) minus a fixed amount of CST 380
…… AND CST 280 …USD/MT.
In calculating the final price arithmetic rules for rounding to two decimal points
shall be applied as follows:
a. If the third decimal point is four or any number less than four then such
third and/or more decimal shall be ignored.
b. If the third decimal point is five or any number higher than five then one
digit shall be added to the second decimal point and the rest will be
ignored.
9 - Payment
Buyer shall pay 100% value of total cargo in advance before loading, or ( A-
Letter of Guaranty through one of ………..State Banks(ie
……………………………………………Banks or B-Managerial Cheque in
………. with a maturity of one month from the date of B/L) provisional invoices
based on Platts Scan Market will be issue. The balance of payment will be
settled after firm final invoices issue by seller after completion loading of cargo
at load port.
The payments should be done through a bank, which is announced to buyer by
seller after signing the contract
Seller will issue the relevant invoice in USD and will instruct the buyer to pay
the full invoice value in USD/AED(based on mutual agreement between seller
and buyer but no less than exchange conversion rate of 3.67 in case OF WILL
BE USED FOR CONVERTING USD TO AED (UAE dirham).
In calculating the total lifting value, arithmetic rule for rounding the invoice value
to the nearest dollar, shall be applied as follows:
 If the decimal figure (cents) is any amount up to 49 cents, then such cent(s)
shall be ignored.
 If the decimal figure (cents) is 50 to 99 cents, then one dollar shall be added
to the invoice value and such cents to be ignored.
USD to Rials:
The invoice amount in AED(rate 3.67) conversion rate on the seller option if
deem requested as published daily through Mellat and saderat exchange office
and available on www.Mellatexchange.com All commissions and sundry banking
charges including conversion fee (if any), for converting US Dollar to Rials, shall
be for the account of Buyer.
For payment later than the contractual payment date, interest at 30 percent on
daily bases per day shall be applied for invoice value on maturity up to the
actual payment date. All costs and charges, including conversion costs, if any,
will be for the account of buyer.
In calculating the total lifting value, arithmetic rule for rounding the invoice value
to the nearest unit currency, shall be applied as follows:
c. If the decimal figures are any amount up to 49, then such decimal figures
shall be ignored.
d. If the decimal figures are 50 to 99, then one unit currency shall be added
to the invoice value and such de3cimal figure to be ignored.
10. Dues and Charges
At all load and discharge port dues and cost what so ever as well as freight of
the shipping performing all costs are for the buyers account.
11 - DETERMINATION OF QUANTITY/QUALITY
The quantity and quality of the product shall be determined at load port by inspectors
appointed by seller and acceptable to buyer with the costs shared equally. certificates
of quantity and quality in respect of the product issued, witnessed or countersigned by
such inspectors shall be conclusive and will be final and binding on both parties with
no guarantee, condition, warranty or undertaking ( whether express or implied ) that
the product will remain of such quality and/or condition thereafter. Seller shall have no
liability for any deterioration in the condition and/or quality of the product after
shipment for any reason what so ever.
Quantity shall be determined by Seller port authorities. The quality shall be as
per actual shore tanks or mother vessel at khark Island. Resulted at storage
facilities.
However, buyer may appoint one of the independent inspectors as approved
by Seller, to witness ITT operations at its entirely own cost.
13 - Measurement
The quantity of Fuel Oil shall be determined by Seller’s personnel, using seller’s
equipment according to Seller’s official methods (shore tanks gauges or, if such
is not available, by barge calibrated meter or, if such is not available, by barge
calibrated meter or, if such is not available, by barge or truck, volume
measurement figure)
 Buyer may be present or represented by a property accredited agent at all
measurements. If the buyer or Buyer’s representative declines such
invitation to present for before and after measurements, seller’s or
supplier’s determination of quantity shall prevail and be binding. All
measurements shall be adjusted to metric tons at 60 degrees Fahrenheit
temperature.
14- Confidentiality
Seller and Buyer to the contract undertake to treat the contents of the contract
as strictly confidential and shall not be revealed to the third party without written
consent.
.
15 – ASSIGNMENT
Neither party may, without the prior written consent of the other, assign this Contract
or any of its right or obligations hereunder to any third party.
16 – ENTIRE CONTRACT / MODIFICATION
This Contract constitutes the entire agreement between the Seller and the Buyer
concerning the subject matter hereof and supersedes all previous documents,
undertakings and agreement, whether verbal, written or otherwise, between the
parties concerning the subject matter hereof. This Contract shall not be amended or
modified unless in writing and signed by the duly authorized representatives of both
parties.
17 – WAIVER
Any delay or failure of either party to insist upon strict adherence to any terms of
this Contract on any occasion shall not be construed to be a waiver of any right
thereafter to insist upon strict adherence to that term or any other terms of this
Contract. Any waiver of rights by a party under this Contract shall only be valid if
made in writing.
18– GOVERNING LAW AND COURT
All disputes and claims arising from or relating to the present contract including its
conclusion, validity, termination or breach, an its interpretation or application, shall be
submitted with through negotiations and ultimately settled through competent courts of
the Singapore on the basis of English commerce law
19 – FORCE MAJEURE
19.1 In the event of delivery of all or part of the Commodity under this Contract being
obstructed and/ or delayed due to or resulting from a cause or causes beyond the
control of the Seller and Buyer, such as war hostility, military operation of
character, civil commotions, sabotage, quarantine restriction, acts of government,
local and other regulatory authorities, fire, floods, explosion, epidemics, blockades,
revolutions, insurrection, mobilization, strikes, lockouts, riots and act of God, the
Seller and Buyer shall be relieved from the responsibility for performance of this
Contract upon the giving of notice to the other parties of the occurrence of such
event.
19.2 The party asserting the presence a force majeure event under clause 18.1 shall,
during the duration of such force majeure event, use its best efforts to resume the
performance of its obligations under this Contract with the least possible delay and
such party shall always advise the other parties of the detailed progress of
resuming, the prospect of settlement of such an event and of the resumption of the
performance of its obligations under this Contract.
19.3 Should the delay caused by a force majeure event under clause 18.1 last for more
than one (1) month, the parties will attempt to agree on measures to be taken to
allow the Agreement to continue. Should such an agreement not be reached within
thirty (30) days from the date one (1) month after the occurrence of such force
majeure event, either the Buyer or the Seller shall be entitled to terminate this
Contract with no penalty by giving notice to the other party.
20 - DEMURRAGE /DISPATCH
Lay time at load port is 42 hours. Lay time shall commence at when the vessel is all
fast alongside berth or 6 hours from when the notice of readiness in tendered.
Demurrage shall be payable by the seller – buyer at a rate of 35000USD per day
port.
Seller Buyer
“

More Related Content

What's hot

The Future of Shipping
The Future of ShippingThe Future of Shipping
The Future of Shipping
Prizztech
 
Ship Ballast Water Management.ppt
Ship Ballast Water Management.pptShip Ballast Water Management.ppt
Ship Ballast Water Management.ppt
gksaha2007
 
Forensic examination of stamp, seal and other mechanical impressions
Forensic examination of stamp, seal and other mechanical impressionsForensic examination of stamp, seal and other mechanical impressions
Forensic examination of stamp, seal and other mechanical impressions
kiran malik
 
What does a shipbroker actually do?
What does a shipbroker actually do?What does a shipbroker actually do?
What does a shipbroker actually do?
M3 Marine Group
 
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - WorkshopPROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
Fernando Remolina, PMP
 
Autonomous shipping
Autonomous shippingAutonomous shipping
Autonomous shipping
Dr. Stylianos Kampakis
 
1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering
Olanrewaju O Sulaiman
 
2 classification societies
2 classification societies2 classification societies
2 classification societies
Olanrewaju O Sulaiman
 
Garbage management marpol 2012 training
Garbage management marpol 2012 trainingGarbage management marpol 2012 training
Garbage management marpol 2012 training
geminiansailor
 
Solas Presentation.pptx
Solas Presentation.pptxSolas Presentation.pptx
Solas Presentation.pptx
ErichViray
 
Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...
Admin-marinerscircle
 
Unit 2_serial number restoration.pptx
Unit 2_serial number restoration.pptxUnit 2_serial number restoration.pptx
Unit 2_serial number restoration.pptx
Suchita Rawat
 
SHIP PROPULSION SEMINAR report
SHIP PROPULSION SEMINAR reportSHIP PROPULSION SEMINAR report
SHIP PROPULSION SEMINAR report
DNSPTL4569
 
Forensic engineering
Forensic engineeringForensic engineering
Forensic engineering
Don Caeiro
 
Introduction to forensic medicine
Introduction to forensic medicineIntroduction to forensic medicine
Introduction to forensic medicine
Saleh Alorainy
 
Loading inspection report
Loading inspection reportLoading inspection report
Types of Glass and it's Forensic Analysis
Types of Glass and it's Forensic AnalysisTypes of Glass and it's Forensic Analysis
Types of Glass and it's Forensic Analysis
AdritaDam1
 
Multi hull vessels
Multi hull vesselsMulti hull vessels
Multi hull vessels
Nitin Sharma
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
Mohammud Hanif Dewan M.Phil.
 
Cryogenic Applications and Importance of Cryogenic Vessels
Cryogenic Applications and Importance of Cryogenic VesselsCryogenic Applications and Importance of Cryogenic Vessels
Cryogenic Applications and Importance of Cryogenic Vessels
inoxindia123
 

What's hot (20)

The Future of Shipping
The Future of ShippingThe Future of Shipping
The Future of Shipping
 
Ship Ballast Water Management.ppt
Ship Ballast Water Management.pptShip Ballast Water Management.ppt
Ship Ballast Water Management.ppt
 
Forensic examination of stamp, seal and other mechanical impressions
Forensic examination of stamp, seal and other mechanical impressionsForensic examination of stamp, seal and other mechanical impressions
Forensic examination of stamp, seal and other mechanical impressions
 
What does a shipbroker actually do?
What does a shipbroker actually do?What does a shipbroker actually do?
What does a shipbroker actually do?
 
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - WorkshopPROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
 
Autonomous shipping
Autonomous shippingAutonomous shipping
Autonomous shipping
 
1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering
 
2 classification societies
2 classification societies2 classification societies
2 classification societies
 
Garbage management marpol 2012 training
Garbage management marpol 2012 trainingGarbage management marpol 2012 training
Garbage management marpol 2012 training
 
Solas Presentation.pptx
Solas Presentation.pptxSolas Presentation.pptx
Solas Presentation.pptx
 
Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...
 
Unit 2_serial number restoration.pptx
Unit 2_serial number restoration.pptxUnit 2_serial number restoration.pptx
Unit 2_serial number restoration.pptx
 
SHIP PROPULSION SEMINAR report
SHIP PROPULSION SEMINAR reportSHIP PROPULSION SEMINAR report
SHIP PROPULSION SEMINAR report
 
Forensic engineering
Forensic engineeringForensic engineering
Forensic engineering
 
Introduction to forensic medicine
Introduction to forensic medicineIntroduction to forensic medicine
Introduction to forensic medicine
 
Loading inspection report
Loading inspection reportLoading inspection report
Loading inspection report
 
Types of Glass and it's Forensic Analysis
Types of Glass and it's Forensic AnalysisTypes of Glass and it's Forensic Analysis
Types of Glass and it's Forensic Analysis
 
Multi hull vessels
Multi hull vesselsMulti hull vessels
Multi hull vessels
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
 
Cryogenic Applications and Importance of Cryogenic Vessels
Cryogenic Applications and Importance of Cryogenic VesselsCryogenic Applications and Importance of Cryogenic Vessels
Cryogenic Applications and Importance of Cryogenic Vessels
 

Viewers also liked

Jewellery design
Jewellery designJewellery design
Jewellery design
misshivi_xo
 
Красавица осень
Красавица осеньКрасавица осень
Красавица осень
lusigurye
 
Costume &amp; props 1
Costume &amp; props 1Costume &amp; props 1
Costume &amp; props 1
1516twbsasmediagroup8
 
Presentasjon skitunnel september 2015
Presentasjon skitunnel september 2015Presentasjon skitunnel september 2015
Presentasjon skitunnel september 2015
holmestrandskitunnel
 
Maryon_P_Strugstad_Thesis
Maryon_P_Strugstad_ThesisMaryon_P_Strugstad_Thesis
Maryon_P_Strugstad_Thesis
Maryon Paulsen Strugstad
 
Evaluation Q6
Evaluation Q6Evaluation Q6
Evaluation Q6
1516twbsasmediagroup8
 
MohitBilakhia
MohitBilakhiaMohitBilakhia
MohitBilakhia
Mohit Bilakhia
 
Fonts
FontsFonts
Horror
HorrorHorror
Horror
misshivi_xo
 
Costume, props and make up research assignment 46
Costume, props and make up research assignment 46Costume, props and make up research assignment 46
Costume, props and make up research assignment 46
1516twbsasmediagroup8
 
Assignment 1 SubGenres
Assignment 1 SubGenres Assignment 1 SubGenres
Assignment 1 SubGenres
1516twbsasmediagroup8
 
Stravvaganza
StravvaganzaStravvaganza
Stravvaganza
misshivi_xo
 
Photoshoot plan
Photoshoot planPhotoshoot plan
Photoshoot plan
samipayling1
 
Evaluation q1
Evaluation q1Evaluation q1
Evaluation q1
samipayling1
 
Screenshots
ScreenshotsScreenshots
Screenshots
samipayling1
 
1. comunicación visual 1
1. comunicación visual 11. comunicación visual 1
1. comunicación visual 1
Patricia GH
 
Audience research 1
Audience research 1Audience research 1
Audience research 1
samipayling1
 

Viewers also liked (17)

Jewellery design
Jewellery designJewellery design
Jewellery design
 
Красавица осень
Красавица осеньКрасавица осень
Красавица осень
 
Costume &amp; props 1
Costume &amp; props 1Costume &amp; props 1
Costume &amp; props 1
 
Presentasjon skitunnel september 2015
Presentasjon skitunnel september 2015Presentasjon skitunnel september 2015
Presentasjon skitunnel september 2015
 
Maryon_P_Strugstad_Thesis
Maryon_P_Strugstad_ThesisMaryon_P_Strugstad_Thesis
Maryon_P_Strugstad_Thesis
 
Evaluation Q6
Evaluation Q6Evaluation Q6
Evaluation Q6
 
MohitBilakhia
MohitBilakhiaMohitBilakhia
MohitBilakhia
 
Fonts
FontsFonts
Fonts
 
Horror
HorrorHorror
Horror
 
Costume, props and make up research assignment 46
Costume, props and make up research assignment 46Costume, props and make up research assignment 46
Costume, props and make up research assignment 46
 
Assignment 1 SubGenres
Assignment 1 SubGenres Assignment 1 SubGenres
Assignment 1 SubGenres
 
Stravvaganza
StravvaganzaStravvaganza
Stravvaganza
 
Photoshoot plan
Photoshoot planPhotoshoot plan
Photoshoot plan
 
Evaluation q1
Evaluation q1Evaluation q1
Evaluation q1
 
Screenshots
ScreenshotsScreenshots
Screenshots
 
1. comunicación visual 1
1. comunicación visual 11. comunicación visual 1
1. comunicación visual 1
 
Audience research 1
Audience research 1Audience research 1
Audience research 1
 

Similar to CONTRACT.docx fuel oil 1394

fco gold bars
fco gold bars fco gold bars
fco gold bars
chimbojames
 
Fundingkart's Mandated BG SBLC DOA V2
Fundingkart's Mandated BG SBLC DOA V2Fundingkart's Mandated BG SBLC DOA V2
Fundingkart's Mandated BG SBLC DOA V2
Raaj Khanna
 
David purchase doa
David purchase doaDavid purchase doa
David purchase doa
DavidVerney5
 
Fundingkart's Mandated BG SBLC DOA V1
Fundingkart's Mandated BG SBLC DOA V1 Fundingkart's Mandated BG SBLC DOA V1
Fundingkart's Mandated BG SBLC DOA V1
Raaj Khanna
 
Blank sales agreement
Blank sales agreementBlank sales agreement
Blank sales agreement
ieyra Athirah
 
Lease instrument application
Lease instrument applicationLease instrument application
Lease instrument application
jose Anaya
 
Tlm lease deed of agreement
Tlm lease deed of agreementTlm lease deed of agreement
Tlm lease deed of agreement
joelcoker
 
Agency agreement hnt ma xshipping
Agency agreement hnt ma xshippingAgency agreement hnt ma xshipping
Agency agreement hnt ma xshipping
chinh
 
International sale contract
International sale contract International sale contract
International sale contract
T.H. Y.P
 
Purchase contract
Purchase contractPurchase contract
Purchase contract
Medhat Saad Eldin
 
Leased Instrument Application R (1)
Leased Instrument Application R (1)Leased Instrument Application R (1)
Leased Instrument Application R (1)
jose Anaya
 
INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...
INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...
INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...
GLC
 
Car-Sales-Agreement-Kenya-1.docx Car sales document
Car-Sales-Agreement-Kenya-1.docx Car sales documentCar-Sales-Agreement-Kenya-1.docx Car sales document
Car-Sales-Agreement-Kenya-1.docx Car sales document
ahimbisibwelamed
 
Lease BG/SBLC HSBC London Price (6+2)
Lease BG/SBLC HSBC London Price (6+2)Lease BG/SBLC HSBC London Price (6+2)
Lease BG/SBLC HSBC London Price (6+2)
SGT K. K. Group
 
SUB-SALE SPA.pdf
SUB-SALE SPA.pdfSUB-SALE SPA.pdf
SUB-SALE SPA.pdf
mrRayz
 
ACCOUNTING AGREEMENT
ACCOUNTING AGREEMENTACCOUNTING AGREEMENT
ACCOUNTING AGREEMENT
Kanoon Ke Rakhwale India
 
agency agreement.docx
agency agreement.docxagency agreement.docx
agency agreement.docx
MohammedAbdullah372750
 
IMPORTER AGREEMENT
IMPORTER AGREEMENTIMPORTER AGREEMENT
IMPORTER AGREEMENT
Kanoon Ke Rakhwale India
 
Incoterms 2020 changes the transfer of risk of goods
Incoterms 2020 changes the transfer of risk of goodsIncoterms 2020 changes the transfer of risk of goods
Incoterms 2020 changes the transfer of risk of goods
M S Siddiqui
 
New lease bg price 6+2 (1)
New lease bg price   6+2 (1)New lease bg price   6+2 (1)
New lease bg price 6+2 (1)
Alnord Narine
 

Similar to CONTRACT.docx fuel oil 1394 (20)

fco gold bars
fco gold bars fco gold bars
fco gold bars
 
Fundingkart's Mandated BG SBLC DOA V2
Fundingkart's Mandated BG SBLC DOA V2Fundingkart's Mandated BG SBLC DOA V2
Fundingkart's Mandated BG SBLC DOA V2
 
David purchase doa
David purchase doaDavid purchase doa
David purchase doa
 
Fundingkart's Mandated BG SBLC DOA V1
Fundingkart's Mandated BG SBLC DOA V1 Fundingkart's Mandated BG SBLC DOA V1
Fundingkart's Mandated BG SBLC DOA V1
 
Blank sales agreement
Blank sales agreementBlank sales agreement
Blank sales agreement
 
Lease instrument application
Lease instrument applicationLease instrument application
Lease instrument application
 
Tlm lease deed of agreement
Tlm lease deed of agreementTlm lease deed of agreement
Tlm lease deed of agreement
 
Agency agreement hnt ma xshipping
Agency agreement hnt ma xshippingAgency agreement hnt ma xshipping
Agency agreement hnt ma xshipping
 
International sale contract
International sale contract International sale contract
International sale contract
 
Purchase contract
Purchase contractPurchase contract
Purchase contract
 
Leased Instrument Application R (1)
Leased Instrument Application R (1)Leased Instrument Application R (1)
Leased Instrument Application R (1)
 
INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...
INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...
INTERNATIONAL STANDARD OF GENERAL TERMS AND CONDITIONS OF SALE SAMPLE (Purcha...
 
Car-Sales-Agreement-Kenya-1.docx Car sales document
Car-Sales-Agreement-Kenya-1.docx Car sales documentCar-Sales-Agreement-Kenya-1.docx Car sales document
Car-Sales-Agreement-Kenya-1.docx Car sales document
 
Lease BG/SBLC HSBC London Price (6+2)
Lease BG/SBLC HSBC London Price (6+2)Lease BG/SBLC HSBC London Price (6+2)
Lease BG/SBLC HSBC London Price (6+2)
 
SUB-SALE SPA.pdf
SUB-SALE SPA.pdfSUB-SALE SPA.pdf
SUB-SALE SPA.pdf
 
ACCOUNTING AGREEMENT
ACCOUNTING AGREEMENTACCOUNTING AGREEMENT
ACCOUNTING AGREEMENT
 
agency agreement.docx
agency agreement.docxagency agreement.docx
agency agreement.docx
 
IMPORTER AGREEMENT
IMPORTER AGREEMENTIMPORTER AGREEMENT
IMPORTER AGREEMENT
 
Incoterms 2020 changes the transfer of risk of goods
Incoterms 2020 changes the transfer of risk of goodsIncoterms 2020 changes the transfer of risk of goods
Incoterms 2020 changes the transfer of risk of goods
 
New lease bg price 6+2 (1)
New lease bg price   6+2 (1)New lease bg price   6+2 (1)
New lease bg price 6+2 (1)
 

CONTRACT.docx fuel oil 1394

  • 1. Cargo Fuel Oil Sale Contract Contract No. Date: 1. – Parties Seller: Economic code: 1.1. Buyer: Address: 2. Validity: This Contract is effective from the date of signature of this contract till one week. After which seller will accept no obligations to buyer. 3 . Quantity 00,000 MT Metric Tons +/- 10 percent operational tolerance at seller option. 4- Quality As per seller’s normal export quality for CST 280 & 380/ <3.5% sulfur fuel oil 5- Delivery Date & Term: Note: CST 380 = FOB - Bandar abbas port. CST 280 = FOB- Mahshar port. 6 - Title and risk Delivery shall be deemed completed and title and risk shall past to buyer as such petroleum product passes the flanges connecting to buyer's storage
  • 2. facility. Seller's delivery house with tank at which point seller responsibility shall seas and buyer shall assume all risk of loss, damage, detraction, to petroleum product so delivered. 7- Delivery-lifting period-FOB For delivery-lifting, three days ITT time shall be advise by seller to buyer before shipment. This advise three days by seller to buyer, shall be final and binding upon bout parties. Meanwhile, buyer is obliged to receive nominate cargo during the agreed time as mentioned above. In case of any delay, buyer shall be responsible for the relevant cost accordingly. 8 - Price Average of five days after completion of loading-(B/L date and two days before and two days after) at load port with following formula In USD per MT FOB calculated based on the average effective quotations. Mean of high and low quotations for HSFO 180 CST under the heading “FOB Persian Gulf” (so called Arab Gulf in Platts) minus a fixed amount of CST 380 …… AND CST 280 …USD/MT. In calculating the final price arithmetic rules for rounding to two decimal points shall be applied as follows: a. If the third decimal point is four or any number less than four then such third and/or more decimal shall be ignored. b. If the third decimal point is five or any number higher than five then one digit shall be added to the second decimal point and the rest will be ignored.
  • 3. 9 - Payment Buyer shall pay 100% value of total cargo in advance before loading, or ( A- Letter of Guaranty through one of ………..State Banks(ie ……………………………………………Banks or B-Managerial Cheque in ………. with a maturity of one month from the date of B/L) provisional invoices based on Platts Scan Market will be issue. The balance of payment will be settled after firm final invoices issue by seller after completion loading of cargo at load port. The payments should be done through a bank, which is announced to buyer by seller after signing the contract Seller will issue the relevant invoice in USD and will instruct the buyer to pay the full invoice value in USD/AED(based on mutual agreement between seller and buyer but no less than exchange conversion rate of 3.67 in case OF WILL BE USED FOR CONVERTING USD TO AED (UAE dirham). In calculating the total lifting value, arithmetic rule for rounding the invoice value to the nearest dollar, shall be applied as follows:  If the decimal figure (cents) is any amount up to 49 cents, then such cent(s) shall be ignored.  If the decimal figure (cents) is 50 to 99 cents, then one dollar shall be added to the invoice value and such cents to be ignored. USD to Rials: The invoice amount in AED(rate 3.67) conversion rate on the seller option if deem requested as published daily through Mellat and saderat exchange office and available on www.Mellatexchange.com All commissions and sundry banking charges including conversion fee (if any), for converting US Dollar to Rials, shall be for the account of Buyer.
  • 4. For payment later than the contractual payment date, interest at 30 percent on daily bases per day shall be applied for invoice value on maturity up to the actual payment date. All costs and charges, including conversion costs, if any, will be for the account of buyer. In calculating the total lifting value, arithmetic rule for rounding the invoice value to the nearest unit currency, shall be applied as follows: c. If the decimal figures are any amount up to 49, then such decimal figures shall be ignored. d. If the decimal figures are 50 to 99, then one unit currency shall be added to the invoice value and such de3cimal figure to be ignored. 10. Dues and Charges At all load and discharge port dues and cost what so ever as well as freight of the shipping performing all costs are for the buyers account. 11 - DETERMINATION OF QUANTITY/QUALITY The quantity and quality of the product shall be determined at load port by inspectors appointed by seller and acceptable to buyer with the costs shared equally. certificates of quantity and quality in respect of the product issued, witnessed or countersigned by such inspectors shall be conclusive and will be final and binding on both parties with no guarantee, condition, warranty or undertaking ( whether express or implied ) that the product will remain of such quality and/or condition thereafter. Seller shall have no liability for any deterioration in the condition and/or quality of the product after shipment for any reason what so ever. Quantity shall be determined by Seller port authorities. The quality shall be as per actual shore tanks or mother vessel at khark Island. Resulted at storage facilities.
  • 5. However, buyer may appoint one of the independent inspectors as approved by Seller, to witness ITT operations at its entirely own cost. 13 - Measurement The quantity of Fuel Oil shall be determined by Seller’s personnel, using seller’s equipment according to Seller’s official methods (shore tanks gauges or, if such is not available, by barge calibrated meter or, if such is not available, by barge calibrated meter or, if such is not available, by barge or truck, volume measurement figure)  Buyer may be present or represented by a property accredited agent at all measurements. If the buyer or Buyer’s representative declines such invitation to present for before and after measurements, seller’s or supplier’s determination of quantity shall prevail and be binding. All measurements shall be adjusted to metric tons at 60 degrees Fahrenheit temperature. 14- Confidentiality Seller and Buyer to the contract undertake to treat the contents of the contract as strictly confidential and shall not be revealed to the third party without written consent. . 15 – ASSIGNMENT Neither party may, without the prior written consent of the other, assign this Contract or any of its right or obligations hereunder to any third party.
  • 6. 16 – ENTIRE CONTRACT / MODIFICATION This Contract constitutes the entire agreement between the Seller and the Buyer concerning the subject matter hereof and supersedes all previous documents, undertakings and agreement, whether verbal, written or otherwise, between the parties concerning the subject matter hereof. This Contract shall not be amended or modified unless in writing and signed by the duly authorized representatives of both parties. 17 – WAIVER Any delay or failure of either party to insist upon strict adherence to any terms of this Contract on any occasion shall not be construed to be a waiver of any right thereafter to insist upon strict adherence to that term or any other terms of this Contract. Any waiver of rights by a party under this Contract shall only be valid if made in writing. 18– GOVERNING LAW AND COURT All disputes and claims arising from or relating to the present contract including its conclusion, validity, termination or breach, an its interpretation or application, shall be submitted with through negotiations and ultimately settled through competent courts of the Singapore on the basis of English commerce law 19 – FORCE MAJEURE
  • 7. 19.1 In the event of delivery of all or part of the Commodity under this Contract being obstructed and/ or delayed due to or resulting from a cause or causes beyond the control of the Seller and Buyer, such as war hostility, military operation of character, civil commotions, sabotage, quarantine restriction, acts of government, local and other regulatory authorities, fire, floods, explosion, epidemics, blockades, revolutions, insurrection, mobilization, strikes, lockouts, riots and act of God, the Seller and Buyer shall be relieved from the responsibility for performance of this Contract upon the giving of notice to the other parties of the occurrence of such event. 19.2 The party asserting the presence a force majeure event under clause 18.1 shall, during the duration of such force majeure event, use its best efforts to resume the performance of its obligations under this Contract with the least possible delay and such party shall always advise the other parties of the detailed progress of resuming, the prospect of settlement of such an event and of the resumption of the performance of its obligations under this Contract. 19.3 Should the delay caused by a force majeure event under clause 18.1 last for more than one (1) month, the parties will attempt to agree on measures to be taken to allow the Agreement to continue. Should such an agreement not be reached within thirty (30) days from the date one (1) month after the occurrence of such force majeure event, either the Buyer or the Seller shall be entitled to terminate this Contract with no penalty by giving notice to the other party. 20 - DEMURRAGE /DISPATCH Lay time at load port is 42 hours. Lay time shall commence at when the vessel is all fast alongside berth or 6 hours from when the notice of readiness in tendered. Demurrage shall be payable by the seller – buyer at a rate of 35000USD per day port. Seller Buyer “