The benefits of using Consult Group’s RPO service include:
• Higher number of quality candidates identified quicker
• Reduced time to recruit staff
• Reduced recruitment costs
• Removal of the administrative burdens of recruitment
• Improved retention of staff
• Mitigation of operational risks
• Accessing the best available technology
HR impacts the bottom line. But how do you prove it?
Discover the outcomes organisations like yours have achieved with talent measurement and the latest innovations in best practice assessments.
Professional Overview: Lynn Hunsaker - ClearActionClearAction
Pictorial resume / bio of Lynn Hunsaker, Customer Experience Transformation Strategist at ClearAction, CEO at Marketing Operations Partners, and co-founder of Marketing Future Forum.
See http://ClearActionCX.com
http://MOpartners.com
HR impacts the bottom line. But how do you prove it?
Discover the outcomes organisations like yours have achieved with talent measurement and the latest innovations in best practice assessments.
Professional Overview: Lynn Hunsaker - ClearActionClearAction
Pictorial resume / bio of Lynn Hunsaker, Customer Experience Transformation Strategist at ClearAction, CEO at Marketing Operations Partners, and co-founder of Marketing Future Forum.
See http://ClearActionCX.com
http://MOpartners.com
Focus HR management efforts on maximizing personnel transactions and service effectiveness including reduction in personnel spending thus increasing HR team’s service orientation and response time to business needs
Recruitment process outsourcing case studies of true business impact.
Does it really matter how you hire? As long as you fill the chair, that’s all that matters – right? Wrong. Building an innovative talent solution can have far-reaching impact throughout your organization. Translating that impact to meaningful data and information that you can share with your executives can be powerful.
In this presentation you'll find pointers on:
1. How to identify the information needed to add value to the executive team and strategic vision of your organization.
2. How to connect business challenges to your talent strategy and show results.
3. How to evolve your strategy from “butts in seats” to a talent solution with measurable business impact.
Hr professionals guide to business transformationMaven
Change management and specifically large-scale organisational change or business transformation initiatives are dominating the activities of many organisations. In the most recent Trends in Business Transformation survey 84% of European managers viewed transformation as the norm and were involved in a new business transformation programme on average every 6 months.
Recruiting experts, John Hess and Tim Oyer with Advanced RPO, discuss the difference between contract recruiting, recruiting agencies, and RPOs. Access the webinar on the RPO Association website at: https://resources.rpoassociation.org/how-rpo-stacks-up-against-agencies-and-contract-recruiters
Total quality management, now a well known idea, is a philosophy of management for
continuously improving the quality of products and processes. The idea is that the
quality of products and processes is the responsibility of everyone who is involved
with the development and/or use of the products or services. TQM involves
management, workforce, suppliers, and even customers, in order to meet or exceed
customer expectations.
HRM Innovation in Reinventing Performance Management and CompensationCharles Cotter, PhD
Human resources Management (HRM) Innovation in Reinventing Performance Management and Compensation - global trends and changes that are driving business success
Strategic importance of hiring with recruitment & employmentacreatynigeria
Recruitment Outsourcing Firms in Nigeria invest their resources, time and energy into sourcing, selecting and hiring the best talent to the client Company. RPO companies have the right models and structures in place to adapt to any situation.
Focus HR management efforts on maximizing personnel transactions and service effectiveness including reduction in personnel spending thus increasing HR team’s service orientation and response time to business needs
Recruitment process outsourcing case studies of true business impact.
Does it really matter how you hire? As long as you fill the chair, that’s all that matters – right? Wrong. Building an innovative talent solution can have far-reaching impact throughout your organization. Translating that impact to meaningful data and information that you can share with your executives can be powerful.
In this presentation you'll find pointers on:
1. How to identify the information needed to add value to the executive team and strategic vision of your organization.
2. How to connect business challenges to your talent strategy and show results.
3. How to evolve your strategy from “butts in seats” to a talent solution with measurable business impact.
Hr professionals guide to business transformationMaven
Change management and specifically large-scale organisational change or business transformation initiatives are dominating the activities of many organisations. In the most recent Trends in Business Transformation survey 84% of European managers viewed transformation as the norm and were involved in a new business transformation programme on average every 6 months.
Recruiting experts, John Hess and Tim Oyer with Advanced RPO, discuss the difference between contract recruiting, recruiting agencies, and RPOs. Access the webinar on the RPO Association website at: https://resources.rpoassociation.org/how-rpo-stacks-up-against-agencies-and-contract-recruiters
Total quality management, now a well known idea, is a philosophy of management for
continuously improving the quality of products and processes. The idea is that the
quality of products and processes is the responsibility of everyone who is involved
with the development and/or use of the products or services. TQM involves
management, workforce, suppliers, and even customers, in order to meet or exceed
customer expectations.
HRM Innovation in Reinventing Performance Management and CompensationCharles Cotter, PhD
Human resources Management (HRM) Innovation in Reinventing Performance Management and Compensation - global trends and changes that are driving business success
Strategic importance of hiring with recruitment & employmentacreatynigeria
Recruitment Outsourcing Firms in Nigeria invest their resources, time and energy into sourcing, selecting and hiring the best talent to the client Company. RPO companies have the right models and structures in place to adapt to any situation.
Collinson Grant has been helping clients with all aspects of HR for more than 40 years. We provide a fully outsourced human resources function that manages people more effectively at lower cost.
You can select which tasks you want to outsource fully and those you wish to retain in-house. Typically, we reduce the costs of running an HR function by 20%. Outsourcing also puts a wider range of specialist resources at your disposal.
Our clients include some of the UK's largest care home operators, the country's largest provider of off-street parking, and a distribution business with a turnover of more than £1.4bn. We also work for owner-managed businesses and charities with fewer than 100 employees.
This document describes how we do it.
Webinar- Recruitment Process OutsourcingG&A Partners
Recruitment Process Outsourcing (RPO) is a form of business where an employer transfers all or part of its recruitment processes to an external provider. This webinar is intended for recruiters, hiring managers, business owners and executives.
In this webinar you will:
Understand the meaning of Recruitment Process Outsourcing
Become familiar with the multiple components
Determine how RPO can be utilized in your organization
Recognize that RPO is not just one process but a series of processes that can be used as needed
Learn the benefits that RPO can have on your organization
Identify how to build alignment between recruitment efforts and corporate strategy
Seek next steps to improve recruiting and be creative in a competitive, employee-driven market
Recruitment companies romania, recruitment agencies romania, recruitment and temporary employment romania, recruitment agency romania, head hunting romania, direct search romania, personal recruitment romania, recruitment company romania, executive search romania
Recruitment Process Outsourcing WebinarG&A Partners
Host: Jose Laurel - Director of Recruitment Services G&A Partners
Recruitment Process Outsourcing (RPO) is a form of business where an employer transfers all or part of its recruitment processes to an external provider. This webinar is intended for recruiters, hiring managers, business owners and executives.
Understand the meaning of Recruitment Process Outsourcing. Become familiar with the multiple components
Determine how an RPO can be utilized in their organizations. Recognize that RPO is not just one process but a series of processes that can be used as needed
Answer the questions, do we have a recruiting process that works, or do we need to explore RPO options. Learn the benefits that an RPO can have on their organization.
Identify how to build alignment between recruitment efforts and corporate strategy. Seek next steps to improve recruiting and be creative in a competitive employee driven market
Recruitment companies romania, recruitment agencies romania, recruitment and temporary employment romania, recruitment agency romania, head hunting romania, direct search romania, personal recruitment romania, recruitment company romania, executive search romania
Partnering with an RPO provider can transform your recruitment process, leading to faster, more effective hiring, and ultimately, better business outcomes. Ready to elevate your hiring strategy? Reach out to an RPO expert today!
We kindly Request you to give us an opportunity to serve you and we assure you of our sincere effort to meet out your expectations with utmost care and responsibility.
Consult Group - Recruitment & Human Capital Services - Brochure (Mandarin Chi...OLIVER DRAPER
Consult Group provides a variety of recruitment, talent management and outplacement services for companies invested in Asia Pacific. We recruit at middle, senior, and executive levels of management and specialize in a range of industry sectors and occupations. We pride ourselves on enabling our clients to maximize their commercial endeavors by attracting and securing the most capable of individuals. Consult Group has a reputation for being able to deliver on the most difficult of assignments and frequently succeeds where others have failed. In addition, we deliver talent management services that allow our clients to maximize the potential of their human capital.
Consult Group - Recruitment & Human Capital Services - Brochure (Mandarin Chi...
Consult Group - Recruitment Process Outsourcing - Brochure
1. Consultants in Search & Selection
Our aim is not to be the largest consultancy in Asia, our aim is simply to be the best.
Recruitment process
Outsourcing (RpO)
2. Introduction
Recruitment Process Outsourcing (RPO) offers executives a potential competitive
advantage in the marketplace as it provides organisations with the ability to rapidly acquire
the best people, reduce operational costs and risks, and gain access to consultancy
expertise to develop their HR strategies.
Consult Group’s approach to RPO combines a comprehensive transformation
of the recruitment function of an organisation with a collaborative approach to
delivering the service so you don’t lose control. We evaluate and modify the
recruitment process to deliver a higher quality outcome. Core to the success
of our service is our commitment to transfer skills and share best practices
with our clients.
Adopting an RPO strategy though Consult Group translates into tangible and
measurable benefits for our clients.
The benefits of using Consult Group’s RPO service include:
• Higher number of quality candidates identified quicker
• Reduced time to recruit staff
• Reduced recruitment costs
• Removal of the administrative burdens of recruitment
• Improved retention of staff
• Mitigation of operational risks
• Accessing the best available technology
• Greater management buy-in to the recruitment process
In summary, Consult Group’s RPO service provides our clients with
the power to rapidly acquire high performing staff, optimise their workforce,
and reduce operational costs and risks, whilst accessing excellent technology
and recruitment expertise.
With global competition increasing, it is essential for high performing businesses
to build a competitive organisational capability.
Competition for the best talent and knowledge is increasing, not declining.
For that reason, RPO is a vital component within the HR strategies of today’s
leading companies.
1
3. Central to the concept of RpO is the examination
and enhancement of recruitment processes.
In delivering a RPO service, Consult Group takes ownership for all or a discrete
part of your recruitment process. We take full responsibility for enhancing the
output. RPO is however more than simply changing who is operating the
recruitment function and it delivers significant benefit when compared to a
traditional managed service, master vendor, or preferred or sole supplier
relationships offered by many recruitment companies.
Consult Group’s RPO service involves a comprehensive re-engineering of
recruitment and resourcing within an organisation.
Before you make the assumption that outsourcing
your recruitment is not for you, just stop and think.
Any company that uses agencies is outsourcing their recruitment. There’s nothing
new about the concept – it just hasn’t been labelled outsourcing.
Recruitment is a prime HR area for outsourcing. On the one hand it involves a
great number of low value administrative activities. On the other, it is an
increasingly complex function that requires specialist knowledge and expertise
to capitalise on the vastly expanded sources of candidates.
2
4. So how does our Recruitment process
Outsourcing work?
The First Steps
Recruitment is a complex process in most organizations and we do not
pretend to have all the answers. Nor can we add value to every business.
Our first step to developing a long-term relationship with a prospective client is
to undertake a Recruitment Process Audit. During this process, we would:
• meet with key decision makers in the recruitment process and gain an
understanding of your current recruitment methodologies
• benchmark these against global best practices
• evaluate current expenditure against potential costs and likely benefits
of an outsourced recruitment service
If based on this research exercise, we truly believe that we can add value, we will
submit a proposal detailing the likely benefits of RPO to our prospective client.
In the event that either the prospective client or we believe that outsourcing all
or an element of the recruitment function will not add value, there is no cost
implication to the client. Further, we sign a confidentiality clause in which we
undertake not to utilize this information to our client’s detriment.
3
5. An On-site Team
Following the award of a contract, we will deploy either an individual consultant
or a team of experienced recruitment specialists, who have undergone intensive
training in our unique approach to recruitment, in your offices.
Generally, where we deploy a team this would comprise:
• Client Relationship Manager (CRM), who would be responsible for
the engagement at a strategic level. The CRM would be supported by
regional consultants
• Client Service Managers (CSM’s), who would drive the recruitment
process in each major location. They would also be responsible for quality
management and adherence to a Service Level Agreement that would
govern all aspects of the relationship
• On-site Consultants, who deliver against the specific client requirements.
In the event that the volumes of recruitment did not warrant additional
consultants, the CSM would be responsible for delivery. The delivery team is
scaleable, dependent on recruitment volumes and geographic locations
The benefits of having an on-site, specialist recruitment teams are numerous.
These would include:
• A single national and regional contact point
• A team that is fully integrated with your business. As such they understand your
unique culture and are able to identify staff who not only meet the technical and
behavioral requirements of each position, but whose value systems are aligned
with yours
• CRM’s and CSM’s who really understand your business, its staffing needs and
recruitment processes. Relationships are developed and maintained with key
decision makers in the recruitment process
• A team whose recruitment skills are at the cutting edge of global best practices
• A team whose sole focus is your business and ensuring that the right person is
identified first time every time
Our staff are driven by client satisfaction not by commissions. Every staff member’s
performance is measured and managed on an assignment-by-assignment basis.
Our clients play a key role in the selection of staff who will work on their sites.
We provide our clients with a shortlist of CRM’s and CSM’s who have been screened
against our competency models for these positions. Our clients interview these
candidates against a competency model and make the final decisions around who
will service them best.
4
6. A Re-designed Recruitment process
Our team will review your current recruitment processes against our global best
practices benchmarks. In the event that the process can be improved, we will, in
conjunction with HR and Line Managers, re-design the process to align with global
best practice. This will include:
• Implementing competency based recruitment methodologies
• Behavioral event interviewing, which includes candidate measurement metrics
against the relevant competencies
• Competency based reference checking
• Alignment with your business processes
• Integration with your HR Information Systems
Our candidates are presented on the basis of a match against pre-determined
competencies. We do not believe in a perfect candidate. As such, our candidates are
presented realistically and truthfully against the competency model. The decision to
hire, or not, by our client, is ultimately based on whether any deficiencies against the
required competencies represents an “area for development” or a “deal breaker”.
5
7. All Sourcing Methodologies can be Incorporated
in the process
We understand the inherent risks to our client of “putting all the eggs in one basket”.
This is particularly true in situations where a company has used a number of
recruitment agencies in the past.
The difference in our approach is that we are constantly scanning the market for
talent and intellect that would fit your specific business. We develop client specific
databases that are proactively populated with candidates who are likely to meet both
current and future needs.
This process not only speeds up the recruitment cycle, but also reduces costs.
Once it becomes market knowledge that we represent the “gateway” into a client, our
experience has clearly shown that we are regularly approached by top candidates in
the industry sector to gain access to our clients.
In addition our on-site teams are trained in search, advertised recruitment, database
search, networking and in the development of employee referral programmes. They
are supported by teams of research consultants for senior executive and specialized
technical positions where search methodologies are more appropriate. Additionally
we are also experience in managing direct sourcing channels.
The combination of these different approaches to the identification of candidates
results in a far more effective and efficient approach than the traditional approach
which generally tends to be one-dimensional. It has also proved to be far more
effective in identifying the right candidates for a position than the “shotgun” approach
of using 3-4 agencies who do not really understand the strategic recruitment drivers.
Managing agencies is one of the biggest drains on management time – and time
costs money. Consult Group offers a genuinely independent interface between you
and recruitment agencies to save time, control costs and improve service standards.
6
8. Applicant Tracking Systems – Technology Alignment
In today’s economy, operational efficiency is a top priority for all organizations.
We are all looking for ways to improve overall effectiveness while cutting costs while
managing our human resources platform. One common solution is to deploy an
Applicant Tracking System (ATS) to easily standardize activities in the hiring process.
Consult Group considers that the many benefits and operational efficiencies
associated with technology to manage human capital should be an essential
component of any outsourced recruitment solution. In addition to the operational
efficiencies the ability built-in ability of analyse data and produce performance metrics
are invaluable tools.
We can either walk in with a pre-aligned ATS or integrate with a client’s existing
system. Alternatively we can recommend and manage any recruitment technology
for the clients business. We are aligned with the leading ATS providers for fast and
efficient implementation. Systems can be supported locally on-site, or can be cloud
based. We can manage all back up and data security where required.
7
9. Additional Recruitment Tools
In addition, we are able to recommend psychometric profiling tools that measure
the specific competencies or behaviors being sought. Where necessary, we will also
undertake qualification checks with tertiary institutions, credit and criminal record checks.
The entire process is relevant Labour Legislation compliant.
The production of a short-list is only part of the process for our team. They will
facilitate the interview process to its conclusion. To this end they provide guidance
and support to your line managers during the hiring process.
Reference checking is an integral part of our process. Our belief is that a candidates
historic behaviour patterns are likely to be repeated. To this end we undertake
comprehensive reference checks to validate our interview findings.
The thoroughness of the process reduces, significantly, the likelihood of any surprises
once a candidate commences duties and therefore reduces the risk inherent in every
new hire.
8
10. Let us work your agencies for you!
The pressure is on to reduce cost per hire, cut time to hire and increase the
calibre of new talent into your organisation. Agency fees are one of the biggest
drains on companies’ recruitment budgets. Managing agencies is one of the
biggest drains on management time – and time costs money.
Consult Group offers a genuinely independent interface between you and
recruitment agencies to save time, control costs and improve service standards.
Working with us as your single point of contact for all agency
communication will help you to:
• Reduce cold calls by up to 70%
• Reduce time spent on CV vetting by up to 40%
• Reduce time spent on interviews by up to 30%
• Reduce time spent on invoicing by up to 75%
• Reduce administration by up to 90%
Agencies still have a valuable role to play in sourcing niche specialist skills.
But one of the problems is that many organisations have almost as many
agencies as hiring managers.
Consult Group has established numerous preferred supplier arrangements for
clients, helping them to consolidate their agency base, reduce costs and raise
service standards.
9
11. Reporting, Quality Assurance and
performance Standards
Implicit in the management of a Recruitment Process Outsourcing project is regular
feedback to our client in respect of our performance. We would propose a monthly
feedback session, where a report is presented to client management teams. Our
performance is assessed on a monthly basis. Formal quality reviews are also built into
the process.
Typically the benchmarks against which our service would be measured would include:
• Number of vacancies filled in the preceding month
• Time taken to fill each vacancy
• Positions not filled within the agreed time parameters of the Recruitment Process
Outsourcing Agreement, reasons for the positions not being filled and corrective
action being taken
• Demographic breakdown of applicants, short-listed candidates and placed
candidates, by position
• Feedback from QA procedures and post assignment client and candidate feedback
• Performance against other benchmarks as may be determined in the Service Level
Agreement
In addition to the monthly meetings and other client feedback mechanisms, we
implement a rigid quality assurance programme to ensure compliance with processes
and procedures as laid down in the Recruitment Process Outsourcing Agreement.
We also implement a problem escalation process to ensure that any issues or
problems are resolved quickly and effectively. The quality of our service to our clients is
paramount and every possible step is taken to ensure that our on-site staffs exceed
your expectations.
10
12. Governed by a Recruitment process
Outsourcing Agreement
A Recruitment Process Outsourcing Agreement governs the entire arrangement
between our clients and Consult Group. This contract would detail the responsibilities
of both parties, the processes and procedures to be implemented, define the
benchmarks against which the service will be measured, quality standards that will
be achieved, reporting standards and timing, the fee structures and payment terms,
remedies in the event of non-performance and any other issues that are relevant to
the agreement.
Whilst our objective will always be to exceed our client’s expectations, it is critical to
the long-term success of the arrangement that a joint culture is created and the
parties behave in a manner that ensures the spirit of partnership is maintained.
11
13. Case Study
Client: World Leader in Business Software Solutions
Onsite Locations: Beijing, Shanghai, Singapore
Placement Locations: Australia, China, Hong Kong, India, Japan, Korea, Singapore
Candidate Sources: Global (Asia Pacific, United States, Europe)
Product Area: On-site Recruitment and Assessment
Project Purpose: Outsourced recruitment of 306 people across Asia Pacific, delivered via seven onsite
Consult Group recruiters and the utilization of a multitude of candidate sourcing channels
Solution – Key Elements
• Rapid mobilization and commitment of resources to the project. First onsite
consultants being on board within 1 business day of the initial request.
• Consultation with line management to obtain objectives and secure business unit
“buy-in” for the duration of the project. Implementation of “change” by ensuring closer
integration between the business lines and the recruiting function.
• Design of a robust end-to-end recruitment process to comply with unique
employment & monitoring legislation in a variety of Asian countries and delivery of
resourcing requirements to exacting quality standards and deadlines in very buoyant
and sensitive markets.
• Provision of seven on site recruiters, spread across three locations each conducting
end to end recruitment activities and integrating with client human resource
professionals and business unit line managers. Our recruiters were also responsible for
managing external data sourcing companies and third party agency recruiters.
• Design of an integrated multi-channel candidate attraction framework
incorporating: website advertising, independent research/candidate mapping, direct
sourcing, e-recruitment, recruitment fairs, referral programs and the management of
executives search agencies.
• Act as a key point of contact for candidates from initial interest through to arranging
interviews, making verbal offers and rejecting unsuccessful applicants and any other
communication during the process.
• Strong project management to ensure that appropriate candidates were delivered
in line with time-critical on-boarding strategies. Close liaison with line management
throughout the whole recruitment process from position specification through to
candidate on-boarding.
• Design and delivery of an effective competency-based assessment process,
quality monitoring and assessor support.
• Assistance with hiring decisions, verbal and written offer management and follow-up
together with referencing and background checking.
• Supply and maintenance of a legislation-compliant computerized monitoring
system and the production of regular project progress reports.
12
14. Consult Group
Consult Group is a leading human capital solutions provider that specialises in the
Asia Pacific marketplace. We source, select, appraise and recruit talented Human
Capital for a wide variety of clients at middle, senior and executive levels of
management and technical positions, covering a broad range of industry sectors and
diversity of cultures. Consult Group enables our clients to maximize their commercial
endeavours by attracting and securing the most capable of individuals.
We have always placed an emphasis on building long-term client relationships.
Our success in this regard is demonstrated by a high level of repeat business with
existing clients.
To find out more about our Asia Recruitment Solutions and our contact
information, please visit:
www.consultgroup.net
13
15. To find out more about our Asia Recruitment Solutions
and our contact information, please visit us at
www.consultgroup.net