SlideShare a Scribd company logo
Project for the Construction of 3 Blocks Hostel
Presented By:
Altooba Iqbal (RMBA Fall 12-068)
Hassan Salman (RMBA Fall 12-022)
Sajjad Ahmad (RMBA Fall 12-027)
Zia-ur-Rehman (RMBA Fall 12-019)
Zonaira Arif (RMBA Fall 12-009)
Shahid Nadeem (RMBA Fall 12-025)
M.Hammad Khan (RMBA Fall 12-044)
Presented To: Dr. Asif Nawaz
Introduction
 3 blocks girls hostel (IB&M UET)
 Near SSC
 Area(3112.5 sq.ft),200 students hostilities
 10 rooms,5washroom,1 kitchen, 1 Mess Hall on each floor
 Material Cost(Rs.1,33,05,510),Employees benefits (Rs.28,35,000)
 Total time 1 year 4 month and 2 days
Purpose of Construction of Hostel
 There is no hostel for IB&M students
 To provide flawless, safe, rigid and tolerant construction
 Desires to complete the project within the approved budget
and time
 To provide the final product as per the expectations of the
IB&M UET Lahore and students
Initiation
Develop Project Charter
 Contract
 Enterprise organization factors
 Organization process factor
Project Team
 Overall group work as project Managers
 Cooperator (Sir Asif Nawaz)
Cont.….
 Identify Stakeholders
 UET
 Students
 Our group members
 Labour
 Suppliers
 Cafes in UET
 Our university teachers
 Other hostels in UET and outside the university
 Register Stakeholder
 Stakeholder Management Strategy
Project Plan
 Hostel nature
 Location
 Map
 Number of Labors
 Digging of foundation with 15 skilled person
 Bricks work in foundation up to road level with 8 masons and 15
labors
 Filling of earth with silly sand only with 15 labors
 10 masons and 10 labors inside the rooms for plastering the wall
 5 persons for painting
 5 persons for wood work
Employee Plan
Employee Plan Shown in Table
Material
 Cement
 Steel reinforcements
 Sand
 Bricks
 Stone Ballast
 Wood
 Glass Windows
 Electrical equipment
 Plumbing equipment
 Paint
 PVC piping etc.
Vendor Selection Process & Criteria
 Selection Process
 Tender Through news paper regarding RFQ
Selection Criteria
 Low cost
 Quality of the materials
 Timely delivery
 Reputation in the market
Project Budget & Sponsorship
Sponsored by IB&M UET Lahore
Budget approved PRs. 1,75,00,000
Risk Assessments
 Political Environment of Pakistan
 Unstable market conditions
 Laws and regulations of the Pakistan concerning
construction
 Shortage of materials
 Over costing of the project
 Project not to be completed within the time frame
Scope Management
Project Requirement
 Project Cost
o(Rs.1, 33, 05,510)Employee benefits(RS.28,35,000)
 Project time frame
o1 year 4 months and 2calendar days
 Project scope
Work Breakdown structure
Work break down structure shown in word file
Project Time Management
Start date 1-Dec-2014
End date 2-April-2016
Description Time
Initiation 1 Month
Planning 2 Months
Execution 1 year and 2 days
Monitoring and control Whole the time period monitoring and
controlling
Closing 1 month
Milestone
Milestone shown in word file
Starting and Ending activity time
Activity time Shown in word file
Critical path Method
Project Cost Management
Project Cost shown in Attachment
Cost Statement by Expert
Floor Area Cost (RS.)
Ground Floor 3112.5 sq.ft 46,68,600
Floor Area Cost (RS.) Description
1st Same 42,01,740
10% cost less than ground floor because
foundation earth filling add D.P.C
Floor Area Cost (RS.) Description
2nd Same 44,35,170
5% cost exceed than 1st floor as due to
increase in labor charges due to height
Project Risk Management
Project Risk Management shown in word file
Project Communication Management
Communication with the client (IB&M)
 Through monthly meetings
Communication with the consultant
 Through mail
Communication with the project team
 Face to face on daily basis
Communication with the supplier
 Through documentation
Conclusion
Construction of a girls Hostel(Shahid Nadeem IB&M UET Lahore)
Construction of a girls Hostel(Shahid Nadeem IB&M UET Lahore)

More Related Content

What's hot

Construction Project management
Construction Project management Construction Project management
Construction Project management
Anupama holla
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
tltiede
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
NAVNEET KUMAR JHA
 
Construction Management Introduction ppt
Construction Management  Introduction pptConstruction Management  Introduction ppt
Construction Management Introduction ppt
RajeshPV12
 
Project Management Report
Project Management ReportProject Management Report
Project Management Report
SANKET SENAPATI
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
Sandeep Kumar
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
COEPD HR
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
Clement Seong
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
Satish Yadavalli
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
Rajat Nainwal
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.
Ashutosh Mishra
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
Ho Yen Liang
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
Kaustubh Gupta
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery MethodsStacy Abernathy
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
NAVNEET KUMAR JHA
 
Attributes of Project Manager
Attributes of Project ManagerAttributes of Project Manager
Attributes of Project Manager
Khurram Shakeel
 
Project Management
Project ManagementProject Management
Project Management
ajithsrc
 

What's hot (20)

Construction Project management
Construction Project management Construction Project management
Construction Project management
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Construction Management Introduction ppt
Construction Management  Introduction pptConstruction Management  Introduction ppt
Construction Management Introduction ppt
 
Project Management Report
Project Management ReportProject Management Report
Project Management Report
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Bar chart
Bar chartBar chart
Bar chart
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Attributes of Project Manager
Attributes of Project ManagerAttributes of Project Manager
Attributes of Project Manager
 
Project Management
Project ManagementProject Management
Project Management
 

Viewers also liked

Shahid Nadeem IB&M UET (Business Plan)
Shahid Nadeem IB&M UET (Business Plan)Shahid Nadeem IB&M UET (Business Plan)
Shahid Nadeem IB&M UET (Business Plan)
Shahid Nadeem
 
Business Plan(Shahid Nadeem IB&M UET)
Business Plan(Shahid Nadeem IB&M UET)Business Plan(Shahid Nadeem IB&M UET)
Business Plan(Shahid Nadeem IB&M UET)Shahid Nadeem
 
DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5
anvesh reddy
 
Article
ArticleArticle
Article
Shahid Nadeem
 
Friends of St. Joseph Hostel Appreciates the work of It's Our Mission: Period!
Friends of St. Joseph Hostel Appreciates the work of  It's Our Mission: Period!Friends of St. Joseph Hostel Appreciates the work of  It's Our Mission: Period!
Friends of St. Joseph Hostel Appreciates the work of It's Our Mission: Period!
donnaterpstra
 
Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)rexcris
 
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
Mahammad2251
 
The Ultimate Hostel Guide: Hostels 101
The Ultimate Hostel Guide: Hostels 101The Ultimate Hostel Guide: Hostels 101
The Ultimate Hostel Guide: Hostels 101
WeHostels
 
Design and Analysis of Ladies Hostel using STAAD PRO
Design and Analysis of Ladies Hostel using STAAD PRODesign and Analysis of Ladies Hostel using STAAD PRO
Design and Analysis of Ladies Hostel using STAAD PRO
Mohamed Athif Sultan
 

Viewers also liked (9)

Shahid Nadeem IB&M UET (Business Plan)
Shahid Nadeem IB&M UET (Business Plan)Shahid Nadeem IB&M UET (Business Plan)
Shahid Nadeem IB&M UET (Business Plan)
 
Business Plan(Shahid Nadeem IB&M UET)
Business Plan(Shahid Nadeem IB&M UET)Business Plan(Shahid Nadeem IB&M UET)
Business Plan(Shahid Nadeem IB&M UET)
 
DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5
 
Article
ArticleArticle
Article
 
Friends of St. Joseph Hostel Appreciates the work of It's Our Mission: Period!
Friends of St. Joseph Hostel Appreciates the work of  It's Our Mission: Period!Friends of St. Joseph Hostel Appreciates the work of  It's Our Mission: Period!
Friends of St. Joseph Hostel Appreciates the work of It's Our Mission: Period!
 
Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)
 
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
 
The Ultimate Hostel Guide: Hostels 101
The Ultimate Hostel Guide: Hostels 101The Ultimate Hostel Guide: Hostels 101
The Ultimate Hostel Guide: Hostels 101
 
Design and Analysis of Ladies Hostel using STAAD PRO
Design and Analysis of Ladies Hostel using STAAD PRODesign and Analysis of Ladies Hostel using STAAD PRO
Design and Analysis of Ladies Hostel using STAAD PRO
 

Similar to Construction of a girls Hostel(Shahid Nadeem IB&M UET Lahore)

Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
Syafiq Zariful
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2itsmylifesl
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI
SANKET SENAPATI
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
Sharon Yu Jung Lim
 
A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...
A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...
A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...
IAEME Publication
 
Running Head Construction Project ProposalIntroductionTifwil .docx
Running Head Construction Project ProposalIntroductionTifwil .docxRunning Head Construction Project ProposalIntroductionTifwil .docx
Running Head Construction Project ProposalIntroductionTifwil .docx
joellemurphey
 
Topic 1.ppt
Topic 1.pptTopic 1.ppt
Topic 1.ppt
AlanDSH74
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Reportarmada7000
 
To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...
Peachy Essay
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Ziyad Zaidi
 
Final Project.pptx
Final Project.pptxFinal Project.pptx
Final Project.pptx
SinghHarpreet9
 
Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIAbrony mc
 
AssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docxAssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docx
ssuser562afc1
 
Set up a business faculty
Set up a business facultySet up a business faculty
Set up a business faculty
Imran Sajol
 
construction quality improvement- Presentation
construction quality improvement- Presentationconstruction quality improvement- Presentation
construction quality improvement- Presentation
Manjunatha L.R
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
suzzanekan
 
Project brief
Project brief Project brief
Project brief Haziq1511
 

Similar to Construction of a girls Hostel(Shahid Nadeem IB&M UET Lahore) (20)

Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
 
A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...
A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...
A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING E...
 
Running Head Construction Project ProposalIntroductionTifwil .docx
Running Head Construction Project ProposalIntroductionTifwil .docxRunning Head Construction Project ProposalIntroductionTifwil .docx
Running Head Construction Project ProposalIntroductionTifwil .docx
 
Topic 1.ppt
Topic 1.pptTopic 1.ppt
Topic 1.ppt
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Report
 
RESUMEftraNEW2
RESUMEftraNEW2RESUMEftraNEW2
RESUMEftraNEW2
 
To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docx
 
Final Project.pptx
Final Project.pptxFinal Project.pptx
Final Project.pptx
 
CV MUCHLIS.SREGAR
CV  MUCHLIS.SREGARCV  MUCHLIS.SREGAR
CV MUCHLIS.SREGAR
 
Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIA
 
Vikas CV
Vikas CVVikas CV
Vikas CV
 
AssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docxAssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docx
 
Set up a business faculty
Set up a business facultySet up a business faculty
Set up a business faculty
 
construction quality improvement- Presentation
construction quality improvement- Presentationconstruction quality improvement- Presentation
construction quality improvement- Presentation
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
Project brief
Project brief Project brief
Project brief
 

Recently uploaded

Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 
Protected Workmen required today for growth
Protected Workmen required today for growthProtected Workmen required today for growth
Protected Workmen required today for growth
rivaraj2711
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
tdt5v4b
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
EUS+ Management & Consulting Excellence
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 

Recently uploaded (16)

Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 
Protected Workmen required today for growth
Protected Workmen required today for growthProtected Workmen required today for growth
Protected Workmen required today for growth
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 

Construction of a girls Hostel(Shahid Nadeem IB&M UET Lahore)

  • 1.
  • 2. Project for the Construction of 3 Blocks Hostel Presented By: Altooba Iqbal (RMBA Fall 12-068) Hassan Salman (RMBA Fall 12-022) Sajjad Ahmad (RMBA Fall 12-027) Zia-ur-Rehman (RMBA Fall 12-019) Zonaira Arif (RMBA Fall 12-009) Shahid Nadeem (RMBA Fall 12-025) M.Hammad Khan (RMBA Fall 12-044) Presented To: Dr. Asif Nawaz
  • 3. Introduction  3 blocks girls hostel (IB&M UET)  Near SSC  Area(3112.5 sq.ft),200 students hostilities  10 rooms,5washroom,1 kitchen, 1 Mess Hall on each floor  Material Cost(Rs.1,33,05,510),Employees benefits (Rs.28,35,000)  Total time 1 year 4 month and 2 days
  • 4. Purpose of Construction of Hostel  There is no hostel for IB&M students  To provide flawless, safe, rigid and tolerant construction  Desires to complete the project within the approved budget and time  To provide the final product as per the expectations of the IB&M UET Lahore and students
  • 5. Initiation Develop Project Charter  Contract  Enterprise organization factors  Organization process factor Project Team  Overall group work as project Managers  Cooperator (Sir Asif Nawaz)
  • 6. Cont.….  Identify Stakeholders  UET  Students  Our group members  Labour  Suppliers  Cafes in UET  Our university teachers  Other hostels in UET and outside the university  Register Stakeholder  Stakeholder Management Strategy
  • 7. Project Plan  Hostel nature  Location  Map  Number of Labors  Digging of foundation with 15 skilled person  Bricks work in foundation up to road level with 8 masons and 15 labors  Filling of earth with silly sand only with 15 labors  10 masons and 10 labors inside the rooms for plastering the wall  5 persons for painting  5 persons for wood work
  • 9. Material  Cement  Steel reinforcements  Sand  Bricks  Stone Ballast  Wood  Glass Windows  Electrical equipment  Plumbing equipment  Paint  PVC piping etc.
  • 10. Vendor Selection Process & Criteria  Selection Process  Tender Through news paper regarding RFQ Selection Criteria  Low cost  Quality of the materials  Timely delivery  Reputation in the market
  • 11. Project Budget & Sponsorship Sponsored by IB&M UET Lahore Budget approved PRs. 1,75,00,000 Risk Assessments  Political Environment of Pakistan  Unstable market conditions  Laws and regulations of the Pakistan concerning construction  Shortage of materials  Over costing of the project  Project not to be completed within the time frame
  • 12. Scope Management Project Requirement  Project Cost o(Rs.1, 33, 05,510)Employee benefits(RS.28,35,000)  Project time frame o1 year 4 months and 2calendar days  Project scope
  • 13. Work Breakdown structure Work break down structure shown in word file
  • 14. Project Time Management Start date 1-Dec-2014 End date 2-April-2016 Description Time Initiation 1 Month Planning 2 Months Execution 1 year and 2 days Monitoring and control Whole the time period monitoring and controlling Closing 1 month
  • 16. Starting and Ending activity time Activity time Shown in word file
  • 18. Project Cost Management Project Cost shown in Attachment
  • 19. Cost Statement by Expert Floor Area Cost (RS.) Ground Floor 3112.5 sq.ft 46,68,600 Floor Area Cost (RS.) Description 1st Same 42,01,740 10% cost less than ground floor because foundation earth filling add D.P.C Floor Area Cost (RS.) Description 2nd Same 44,35,170 5% cost exceed than 1st floor as due to increase in labor charges due to height
  • 20. Project Risk Management Project Risk Management shown in word file