Construction Industry is one of the most booming industries in the whole world. This
industry is mainly an urban based one which is concerned with preparation as well as
construction of real estate properties. The repairing of any existing building or making certain
alterations in the same also comes under construction Industry. This industry can be
categorized into three basic categories namely :-
 Heavy Construction: The construction of large projects such as bridge, road, etc
comes under this category.
 General construction: The construction works that involve building of real estate
ones such as residential or commercial real estate assets, etc.
 Construction projects involving specialty trades: Construction works that involve
building up of specialized items namely, electric related works, works on woods, etc.
 Types:
o Industry sectors
o Building construction
o Residential construction
 Pakistan ranked as number 43-44 among the countries of the world in nominal GDP,
26th in GDP with purchasing power parity and number 55 in the world in factory.
 Pakistan's industrial sector accounts for about 24% of GDP. Cotton textile production
and apparel manufacturing are Pakistan's largest industries, accounting for about 66%
of the merchandise exports and almost 40% of the employed labour force. Cotton and
cotton-based products account for 61% of export earnings of Pakistan. The
consumption of cotton increased by 5.7% over the past five years while the economic
growth rate was 7%. By 2010 the spinning capacity increased to 15 million spindles
and textile exports hit $15.5 .billion. Other major industries include cement, fertilizer,
edible oil, sugar, steel, tobacco, chemicals, machinery and food processing.
ShahrukhNiaz
 Challenges:
1. Skilled Labour Shortage:
The construction industry is on a
steady rise and remains heavily
dependent on manual labour, even with
the uptake of construction technology.
However, Australia has an ageing
workforce, and as the construction
industry continues to grow, the industry
is having a hard time recruiting skilled
workers to satisfy the rising
demand.Many young Australians today
do not find construction jobs lucrative
and are opting for other careers. Hence
there is need to improve training
programs and increase construction
apprenticeship opportunities.
2. Rising Cost of Raw Materials:
Contractors bear the risk of cost changes due to fixed
price contracts and speculative home construction. The
cost of land and raw materials can change rapidly. With
rapid change in prices, small construction companies
have less leverage, and are greatly affected by cost
variations between the time the project commences and
when it ends.
3. Slow Invoicing and Payments:
Small construction businesses often have a problem regulating
cash flow because they don’t employ suitable invoicing
systems. A progress payment schedule can help outline what is
expected at different phases of the project and determine when
each phase of the project is considered complete. Without
regular progress payments you can have too many resources
tied up in one job, which can significantly affect cash flow.
ShahrukhNiaz
4. Inadequate Planning:
It is critical that you lay out a comprehensive business plan. It should cover finances,
operations, and marketing your construction business, among other aspects. This will give
you a clear perspective of your cash and manpower and help you not to overestimate or
underestimate your capabilities. You should map out the details of all your project stages to
stay on track.
5. Lack of Safety Training:
Poor safety training is a recurring problem
in the Australian construction industry. As
demand grows in the industry, companies
can cut corners as they try to maximize
profitability. They can reduce their spend on
safety and training which puts them at a risk
of incurring heavy losses due to increased
insurance and litigation costs caused
by building non-compliance.
ShahrukhNiaz
6. Technology Adoption:
Technology has transformed the construction industry and companies that are unable to keep
up risk extinction. It plays a key role not only in the day-to-day operations, but also when
competing for projects. Construction technology includes cloud-based software, mobile,
wearable, IoT technology and estimating technology. Acquiring capital to invest in
technology can be a challenge to small construction companies.
Projectplayers of constructionindustry :
 Owner or client.
 Construction manager.
 General contractor.
 Sub contractor or specially contractors.
 Designer or Architect engineer.
 Insurance companies.
 Banks.
 Suppliers.
 Public.
 Construction labor force.
Owner:
Owner is also called client. Owner is the person who actually arranges money for particular
project. Owner is a real instinct who has to launch idea. Owner may be a person or
Government. He provides funds. He is a funding agency for the project. Scope definition is
also provided by the owner.
ShahrukhNiaz
Constructionmanager(CM):
Construction manager is the person who actually coordinates the construction process on
behalf of the owner. Construction manager is not common in some countries. Usually in other
countries, client assigns construction work to a CM who deals and manages all the things
related to construction.
Generalcontractor(GC):
GC is the person who actually execute the contract. He actually negotiate the contract with
client. He is the key person who is responsible to change dream of owner into physical shape.
Contractor is assigned the whole job. He needs directions from engineers and clients. This
makes a triangle of owner, contractor and engineer. In this triangle, there is a two way traffic.
For example owner can question contractor and engineer and so is contractor and engineer.
Contractor signs an agreement with the owner and holds his position. Following are some
tasks performed by General Contractor.
 Assure the work to be completed on time he specified.
 He must use Tool and plant at the site, which he has specified at the time of contract.
 He must arrange labor force.
Sub contractor:
It is also a project player. It is also known as special contractor. They actually provide
facilities to the General contractor for the sub projects. There is an agreement between these
GC and and subcontractor.Tasks which are performed by Sub contractor are :
 Electric wiring.
 Plumbing.
 Air condition supply.
 Wood work.
 Paint.
 Providing soil for project.
 Steel fixing.
Architect or Engineer:
Architect or engineer is a consultant. On behalf of the owner, engineer will take the
responsibilities of the owner to undertake the smooth execution of the project. He also co
ordinates with contractor.
Designer:
Designer may be an Architect or an Engineer. He design the project on the basis of his
previous experience. Designer must have prequalification. Owner will select a designer
which is expert in his work.
ShahrukhNiaz
Insurance Companies:
 Bid bond facility.
 Performance bond.
 Payment bond.
 By the contractor to the owner.
Bank:
The bank will allow funding on behalf of client. The client uses his bank account to provide
money for the project.
Suppliers:
These are actually the people who provide construction material such as bricks, concrete,
cement, etc.
Public:
Public is also a project player. During making of a project public face difficulty but when it
completes, then we enjoy facilities.
Constructionlabor Force:
 Masons.
 Brick Masons
 Brick Stone Masons.
 Block Masons.
 Cement Masons.
 Carpenters.
 Construction equipment operator.
 Electricians.
 Fixers or Steel fabricator.
 Glazers.
 Painters.
 Plumbers.
ShahrukhNiaz
Global setting:
 A detailed analysis of the prospects for the global construction industry up to 2021,
The pace of expansion in the global construction industry steadied in 2016, standing
at 2.4 percent, but there will be an improvement in the next five years, with growth
averaging 2.8 percent. The pick-up will reflect trends in the wider economy; in 2017-
2021, the world economy is set to expand by close to 3 percent per year on average.
 Despite the uptick, there are a number of key risks on the horizon as well. The most
notable is how Chinese authorities will rein in credit growth and manage the ensuing
economic slowdown, and how investors in advanced economies will respond to the
shift towards monetary policy normalization, particularly in view of the likely pick-up
in inflation, as commodity prices bounce back.
 In real value terms, global construction output reached $8.8 trillion in 2016, up from
$7.9 trillion in 2012. It will stand at $10.1 trillion in 2021. The value of construction
activity in the emerging world surpassed that of advanced economies in 2014, and this
difference will continue to widen. Emerging markets will account for 52.8 percent of
global output by 2021. Asia-Pacific will continue to account for the largest share of
the global construction industry.
 The pace of growth will slow, given the relative sluggishness in China's construction
industry. The emerging markets of Southeast Asia will invest heavily in new
infrastructure projects, supported by private investment.
 The overall outlook of the industry shows that contractors will be busy and those that
understand the shifts will have the best advantage in the market.
LocalSetting:
 The construction industry in Pakistan witnessed 11.31% y/y growth in the current
fiscal year on the back of increased government spending, while the country’s GDP
surpassed projected estimates, rising by approximately 4.14%. Ishaq Dar, Finance
Minister, told local news sources that the country was on track in terms of achieving
its GDP growth targets. Officials had hoped for 4%+ growth in the first fiscal year
(FY14) and are forecasting 5% growth in FY15 and 6% growth in FY16.
 The contribution of individual sectors to overall GDP growth rate was estimated at a
recent National Accounts Committee (NAC) meeting, chaired by Asif Bajwa, Chief
Statistician. The agriculture sector witnessed 2.12% growth (against a projected target
of 3.8%); the industrial sector saw 5.84% growth (against a projected target of 4.8%);
and the service sector grew by 4.29% (against a projected target of 4.26%) for the
current fiscal year (FY14). The construction sector grew by 11.31% in FY14 due to
increased government investments (50% increase), surpassing revised estimates of -
1.68% growth in the previous fiscal year.

More Related Content

What's hot

02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
akashpadole
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
 
Construction contract
Construction contract Construction contract
Construction contract
Rakshith Reddy
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project manager
Jackson Sampson
 
Mivan aluminium formwork
Mivan  aluminium formworkMivan  aluminium formwork
Mivan aluminium formwork
Anup Kude
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
Aditi Shah
 
Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )
shindesuraj82
 
Cost effective materials
Cost effective materialsCost effective materials
Cost effective materialsSarthak Kaura
 
Sustainable Construction
Sustainable ConstructionSustainable Construction
Sustainable Construction
Mohsen, S Ab
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
Anupama holla
 
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Ahmed Fouad, MCIArb, PMP, SP, RMP
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
SOUMYA KHANDELWAL
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
Ar. Mukunda K.S
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
Axay Sharma
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
johnkirth1898
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
Esmael Aragaw
 
118 sustainable construction
118 sustainable construction118 sustainable construction
118 sustainable construction
Dr Fereidoun Dejahang
 
An introduction to the construction team
An introduction to the construction teamAn introduction to the construction team
An introduction to the construction team
Competitive Advantage
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
DavidMcLachlan1
 
Tendering presenation
Tendering presenationTendering presenation
Tendering presenation
JIT KUMAR GUPTA
 

What's hot (20)

02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Construction contract
Construction contract Construction contract
Construction contract
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project manager
 
Mivan aluminium formwork
Mivan  aluminium formworkMivan  aluminium formwork
Mivan aluminium formwork
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )
 
Cost effective materials
Cost effective materialsCost effective materials
Cost effective materials
 
Sustainable Construction
Sustainable ConstructionSustainable Construction
Sustainable Construction
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
118 sustainable construction
118 sustainable construction118 sustainable construction
118 sustainable construction
 
An introduction to the construction team
An introduction to the construction teamAn introduction to the construction team
An introduction to the construction team
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
 
Tendering presenation
Tendering presenationTendering presenation
Tendering presenation
 

Similar to Construction industry

Ideal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building ConstructionIdeal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building Construction
International Journal of Business Marketing and Management (IJBMM)
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
Vijayfan2
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
Vijayfan2
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
Vijayfan2
 
Significant problems in the construction industry etrack crushers.pptx
Significant problems in the construction industry etrack crushers.pptxSignificant problems in the construction industry etrack crushers.pptx
Significant problems in the construction industry etrack crushers.pptx
Etrack Crushers
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaEmpowerhosting
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
atulpkhekade
 
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksakCOTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
2cd
 
Future of work from home by rajeev choudhary
Future of work from home by rajeev choudharyFuture of work from home by rajeev choudhary
Future of work from home by rajeev choudhary
Rajeev Choudhary
 
Icm2000 18
Icm2000 18Icm2000 18
Icm2000 18
HailatYEMulee
 
Future of Construction Industry 2020
Future of Construction Industry 2020Future of Construction Industry 2020
Future of Construction Industry 2020
Lake Global Reach Inc
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
Mohd Zulhairi Mohd Noor
 
Business proposal for Construction industry of UAE
Business proposal for Construction industry of UAEBusiness proposal for Construction industry of UAE
Business proposal for Construction industry of UAE
KratiJain53
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
ahsansaeed78
 
Infrastructure financing guide india netz capital
Infrastructure financing guide india netz capitalInfrastructure financing guide india netz capital
Infrastructure financing guide india netz capital
Atul Khekade
 
A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...
atulpkhekade
 
Construction industry report
Construction industry reportConstruction industry report
Construction industry report
Aflac
 
CSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfCSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdf
DejeneTsegaye6
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
DejeneTsegaye6
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
DejeneTsegaye6
 

Similar to Construction industry (20)

Ideal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building ConstructionIdeal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building Construction
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
Significant problems in the construction industry etrack crushers.pptx
Significant problems in the construction industry etrack crushers.pptxSignificant problems in the construction industry etrack crushers.pptx
Significant problems in the construction industry etrack crushers.pptx
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
 
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksakCOTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
 
Future of work from home by rajeev choudhary
Future of work from home by rajeev choudharyFuture of work from home by rajeev choudhary
Future of work from home by rajeev choudhary
 
Icm2000 18
Icm2000 18Icm2000 18
Icm2000 18
 
Future of Construction Industry 2020
Future of Construction Industry 2020Future of Construction Industry 2020
Future of Construction Industry 2020
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
 
Business proposal for Construction industry of UAE
Business proposal for Construction industry of UAEBusiness proposal for Construction industry of UAE
Business proposal for Construction industry of UAE
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
 
Infrastructure financing guide india netz capital
Infrastructure financing guide india netz capitalInfrastructure financing guide india netz capital
Infrastructure financing guide india netz capital
 
A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...
 
Construction industry report
Construction industry reportConstruction industry report
Construction industry report
 
CSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfCSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdf
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
 

More from Shahrukh Niaz

Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
Shahrukh Niaz
 
Principles of marketing
Principles of marketingPrinciples of marketing
Principles of marketing
Shahrukh Niaz
 
Mass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkongMass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkong
Shahrukh Niaz
 
Paint
PaintPaint
Social stratification
Social stratificationSocial stratification
Social stratification
Shahrukh Niaz
 
Strength evaluation of existing structures
Strength evaluation of existing structuresStrength evaluation of existing structures
Strength evaluation of existing structures
Shahrukh Niaz
 

More from Shahrukh Niaz (6)

Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 
Principles of marketing
Principles of marketingPrinciples of marketing
Principles of marketing
 
Mass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkongMass transit railway (mtr) hongkong
Mass transit railway (mtr) hongkong
 
Paint
PaintPaint
Paint
 
Social stratification
Social stratificationSocial stratification
Social stratification
 
Strength evaluation of existing structures
Strength evaluation of existing structuresStrength evaluation of existing structures
Strength evaluation of existing structures
 

Recently uploaded

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 

Recently uploaded (20)

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 

Construction industry

  • 1. UNIVERSITY COLLEGE OF ENGINEERING AND TECHNOLOGY, SARGODHA CONSTRUCTION MANGEMENT SUBMITTED TO: Engr. Asad Sultan SUBMITTED BY: Shahrukh Niaz ROLL NUMBERS: BCEF16M017 (Assignment) DEPARTMENT OF CIVIL ENGINEERING
  • 2. ShahrukhNiaz Construction Industry Construction Industry is one of the most booming industries in the whole world. This industry is mainly an urban based one which is concerned with preparation as well as construction of real estate properties. The repairing of any existing building or making certain alterations in the same also comes under construction Industry. This industry can be categorized into three basic categories namely :-  Heavy Construction: The construction of large projects such as bridge, road, etc comes under this category.  General construction: The construction works that involve building of real estate ones such as residential or commercial real estate assets, etc.  Construction projects involving specialty trades: Construction works that involve building up of specialized items namely, electric related works, works on woods, etc.  Types: o Industry sectors o Building construction o Residential construction  Pakistan ranked as number 43-44 among the countries of the world in nominal GDP, 26th in GDP with purchasing power parity and number 55 in the world in factory.  Pakistan's industrial sector accounts for about 24% of GDP. Cotton textile production and apparel manufacturing are Pakistan's largest industries, accounting for about 66% of the merchandise exports and almost 40% of the employed labour force. Cotton and cotton-based products account for 61% of export earnings of Pakistan. The consumption of cotton increased by 5.7% over the past five years while the economic growth rate was 7%. By 2010 the spinning capacity increased to 15 million spindles and textile exports hit $15.5 .billion. Other major industries include cement, fertilizer, edible oil, sugar, steel, tobacco, chemicals, machinery and food processing.
  • 3. ShahrukhNiaz  Challenges: 1. Skilled Labour Shortage: The construction industry is on a steady rise and remains heavily dependent on manual labour, even with the uptake of construction technology. However, Australia has an ageing workforce, and as the construction industry continues to grow, the industry is having a hard time recruiting skilled workers to satisfy the rising demand.Many young Australians today do not find construction jobs lucrative and are opting for other careers. Hence there is need to improve training programs and increase construction apprenticeship opportunities. 2. Rising Cost of Raw Materials: Contractors bear the risk of cost changes due to fixed price contracts and speculative home construction. The cost of land and raw materials can change rapidly. With rapid change in prices, small construction companies have less leverage, and are greatly affected by cost variations between the time the project commences and when it ends. 3. Slow Invoicing and Payments: Small construction businesses often have a problem regulating cash flow because they don’t employ suitable invoicing systems. A progress payment schedule can help outline what is expected at different phases of the project and determine when each phase of the project is considered complete. Without regular progress payments you can have too many resources tied up in one job, which can significantly affect cash flow.
  • 4. ShahrukhNiaz 4. Inadequate Planning: It is critical that you lay out a comprehensive business plan. It should cover finances, operations, and marketing your construction business, among other aspects. This will give you a clear perspective of your cash and manpower and help you not to overestimate or underestimate your capabilities. You should map out the details of all your project stages to stay on track. 5. Lack of Safety Training: Poor safety training is a recurring problem in the Australian construction industry. As demand grows in the industry, companies can cut corners as they try to maximize profitability. They can reduce their spend on safety and training which puts them at a risk of incurring heavy losses due to increased insurance and litigation costs caused by building non-compliance.
  • 5. ShahrukhNiaz 6. Technology Adoption: Technology has transformed the construction industry and companies that are unable to keep up risk extinction. It plays a key role not only in the day-to-day operations, but also when competing for projects. Construction technology includes cloud-based software, mobile, wearable, IoT technology and estimating technology. Acquiring capital to invest in technology can be a challenge to small construction companies. Projectplayers of constructionindustry :  Owner or client.  Construction manager.  General contractor.  Sub contractor or specially contractors.  Designer or Architect engineer.  Insurance companies.  Banks.  Suppliers.  Public.  Construction labor force. Owner: Owner is also called client. Owner is the person who actually arranges money for particular project. Owner is a real instinct who has to launch idea. Owner may be a person or Government. He provides funds. He is a funding agency for the project. Scope definition is also provided by the owner.
  • 6. ShahrukhNiaz Constructionmanager(CM): Construction manager is the person who actually coordinates the construction process on behalf of the owner. Construction manager is not common in some countries. Usually in other countries, client assigns construction work to a CM who deals and manages all the things related to construction. Generalcontractor(GC): GC is the person who actually execute the contract. He actually negotiate the contract with client. He is the key person who is responsible to change dream of owner into physical shape. Contractor is assigned the whole job. He needs directions from engineers and clients. This makes a triangle of owner, contractor and engineer. In this triangle, there is a two way traffic. For example owner can question contractor and engineer and so is contractor and engineer. Contractor signs an agreement with the owner and holds his position. Following are some tasks performed by General Contractor.  Assure the work to be completed on time he specified.  He must use Tool and plant at the site, which he has specified at the time of contract.  He must arrange labor force. Sub contractor: It is also a project player. It is also known as special contractor. They actually provide facilities to the General contractor for the sub projects. There is an agreement between these GC and and subcontractor.Tasks which are performed by Sub contractor are :  Electric wiring.  Plumbing.  Air condition supply.  Wood work.  Paint.  Providing soil for project.  Steel fixing. Architect or Engineer: Architect or engineer is a consultant. On behalf of the owner, engineer will take the responsibilities of the owner to undertake the smooth execution of the project. He also co ordinates with contractor. Designer: Designer may be an Architect or an Engineer. He design the project on the basis of his previous experience. Designer must have prequalification. Owner will select a designer which is expert in his work.
  • 7. ShahrukhNiaz Insurance Companies:  Bid bond facility.  Performance bond.  Payment bond.  By the contractor to the owner. Bank: The bank will allow funding on behalf of client. The client uses his bank account to provide money for the project. Suppliers: These are actually the people who provide construction material such as bricks, concrete, cement, etc. Public: Public is also a project player. During making of a project public face difficulty but when it completes, then we enjoy facilities. Constructionlabor Force:  Masons.  Brick Masons  Brick Stone Masons.  Block Masons.  Cement Masons.  Carpenters.  Construction equipment operator.  Electricians.  Fixers or Steel fabricator.  Glazers.  Painters.  Plumbers.
  • 8. ShahrukhNiaz Global setting:  A detailed analysis of the prospects for the global construction industry up to 2021, The pace of expansion in the global construction industry steadied in 2016, standing at 2.4 percent, but there will be an improvement in the next five years, with growth averaging 2.8 percent. The pick-up will reflect trends in the wider economy; in 2017- 2021, the world economy is set to expand by close to 3 percent per year on average.  Despite the uptick, there are a number of key risks on the horizon as well. The most notable is how Chinese authorities will rein in credit growth and manage the ensuing economic slowdown, and how investors in advanced economies will respond to the shift towards monetary policy normalization, particularly in view of the likely pick-up in inflation, as commodity prices bounce back.  In real value terms, global construction output reached $8.8 trillion in 2016, up from $7.9 trillion in 2012. It will stand at $10.1 trillion in 2021. The value of construction activity in the emerging world surpassed that of advanced economies in 2014, and this difference will continue to widen. Emerging markets will account for 52.8 percent of global output by 2021. Asia-Pacific will continue to account for the largest share of the global construction industry.  The pace of growth will slow, given the relative sluggishness in China's construction industry. The emerging markets of Southeast Asia will invest heavily in new infrastructure projects, supported by private investment.  The overall outlook of the industry shows that contractors will be busy and those that understand the shifts will have the best advantage in the market. LocalSetting:  The construction industry in Pakistan witnessed 11.31% y/y growth in the current fiscal year on the back of increased government spending, while the country’s GDP surpassed projected estimates, rising by approximately 4.14%. Ishaq Dar, Finance Minister, told local news sources that the country was on track in terms of achieving its GDP growth targets. Officials had hoped for 4%+ growth in the first fiscal year (FY14) and are forecasting 5% growth in FY15 and 6% growth in FY16.  The contribution of individual sectors to overall GDP growth rate was estimated at a recent National Accounts Committee (NAC) meeting, chaired by Asif Bajwa, Chief Statistician. The agriculture sector witnessed 2.12% growth (against a projected target of 3.8%); the industrial sector saw 5.84% growth (against a projected target of 4.8%); and the service sector grew by 4.29% (against a projected target of 4.26%) for the current fiscal year (FY14). The construction sector grew by 11.31% in FY14 due to increased government investments (50% increase), surpassing revised estimates of - 1.68% growth in the previous fiscal year.