AGENDA
• Context
• Key factors for successful design projects
• Benefits
– Students
– Industrial Design Leader
• Design course – Looking Forward
2
INVOLVEMENT IN DESIGN COURSES
• McGill & Polytechnique - since 2013
• Team achieved great success
• High quality reports and presentations
• Not only technical…
3Context Key Factors Benefits Forward
EXAMPLE – LNG TERMINAL PROJECT
4
Source: David Chondon, Tinke-Marie De Witte, Kevin Qiu, Gabrielle Trzcinski, CLEAN ENERGY TERMINAL, Final Presentation
Winter2016, CHEE 457 - DESIGN PROJECT
200,000 m3 LNG Carrier pool fire
Loss of life
Damage to Equipment
𝟑𝟓 𝐤𝐖/𝐦 𝟐
𝟏𝟖 𝐤𝐖/𝐦 𝟐
5 𝐤𝐖/𝐦 𝟐
Radiation Radius Effects
5 kW/m2 2.25 km
Permissible Level of
Emergency operations
18 kW/m2 1.85 km
Ignite wood and melt
plastic tubing
35 kW/m2 1.5 km
Damage to Steel piping
and Process Equipment
KEY FACTORS FOR SUCCESS
5
Define
Scope
Give
Feedback
Act as One
Team
Provide
Training
Context Key Factors Benefits Forward
DEFINE SCOPE
• Start with Kick-off Meeting!
– Mandate
– Roles & Expectations
– Methodology
• Bring team to:
– Define Boundary Limits
– Oversee whole Context
6Context Key Factors Benefits Forward
Can you break the problem into pieces ?
EXAMPLE – LNG TERMINAL PROJECT
7
Source: David Chondon, Tinke-Marie De Witte, Kevin Qiu, Gabrielle Trzcinski, CLEAN ENERGY TERMINAL, Final
Presentation Winter2016, CHEE 457 - DESIGN PROJECT, McGill
EXAMPLE – SULPHURIC ACID PROJECT
8Source: Pierre-Étienne Auclair, Mylène Gosselin, Maxime Lavoie, Catherine Marsan, Conception d’une usine d’acide sulfurique,
GCH4160 : Projet de conception et analyse d’impacts, Ecole Polytechnique de Montreal
GIVE FEEDBACK
• Weekly meetings
– Project progress over schedule
– Powerpoint presentation
• Deliverables commented
– Technical Aspects
– Clarity of the information
9
We don’t want to know it, we want to see it (Yvon Deschamps)
Can you add some Wow effects ?
Context Key Factors Benefits Forward
Industry
Control Narratives
It is important to control the liquid level inside the column
to ensure that adequate mass transfer takes place between
the vapor and liquid phases, and to prevent flooding. This is
accomplished by using a feedback control system in loop
204 that regulates the flow of rich amine leaving the
bottom of the absorber (stream 12). Excessively high and
low liquid levels pose an operational risk, and as such are
insured by interlock action. I-3 trips the motor on pumps P-
201 at the bottom of the absorber if the liquid level is
excessively low, which terminates the outflow of liquid.
Conversely, the amine inflow (stream 10) is terminated by I-
4 using a shutoff valve if the liquid level becomes very high.
Source: Nathan Goldstein, Anand Natu, Chantelyn Pineda and K. Praneet Akilla , Carbon Capture Facility Design Final Design
Recommendations for Apatite Inc., Final Presentation Winter2015, CHEE 457 - DESIGN PROJECT, McGill
EXAMPLE - CARBON CAPTURE PROJECT
Industry
Control Narratives
It is important to control the liquid level inside the column
to ensure that adequate mass transfer takes place between
the vapor and liquid phases, and to prevent flooding. This is
accomplished by using a feedback control system in loop
204 that regulates the flow of rich amine leaving the
bottom of the absorber (stream 12). Excessively high and
low liquid levels pose an operational risk, and as such are
insured by interlock action. I-3 trips the motor on pumps P-
201 at the bottom of the absorber if the liquid level is
excessively low, which terminates the outflow of liquid.
Conversely, the amine inflow (stream 10) is terminated by I-
4 using a shutoff valve if the liquid level becomes very high.
Source: Nathan Goldstein, Anand Natu, Chantelyn Pineda and K. Praneet Akilla , Carbon Capture Facility Design Final Design
Recommendations for Apatite Inc., Final Presentation Winter2015, CHEE 457 - DESIGN PROJECT, McGill
EXAMPLE - CARBON CAPTURE PROJECT
Student
Control Narratives
ACT AS ONE TEAM
• Presence whole team at the meetings
• Design leaders involvement
• Guide the development
• Focus on Students Strenghts
• Found project execution bottlenecks
• Motivates & Free students’ Energy!
• Get Best from students
12
Don’t Bring me Problems Bring me Solutions
Share your Problems !
Context Key Factors Benefits Forward
PROVIDE TRAINING
Not all students share the same field experience
Training is typically on:
Basic Controls & Interlocks
Link between HAZOP, P&ID & Interlocks
Read/draw a P&ID
Project Management
Simulation Skills (Aspen Hysys®…)
Hands-on
Project Accelerator
Difficult to integrate more training session during Design Course
13Context Key Factors Benefits Forward
EXAMPLE – P&ID
14Source: David Chondon, Tinke-Marie De Witte, Kevin Qiu, Gabrielle Trzcinski, CLEAN ENERGY TERMINAL, Final Presentation
Winter2016, CHEE 457 - DESIGN PROJECT
1
2
15
What are the benefits for the
industrial Design Leaders?
Benefits for students:
Momentum for their career in a rewarding project
Context Key Factors Benefits Forward
WINS FOR DESIGN LEADERS
• Confront our own limitations
• Develop Management Skills
• Learn new technologies
• Essential relationship industry-university
• Develop high potential individuals
16Context Key Factors Benefits Forward
LOOKING FORWARD…
• Develop specialized workshops
– Practical Topics
Ex: How to create/read P&ID
How to do an Hazop?
– Industrial Design Leaders – Subject Matter Experts
– Hands-on training
– Offered through out bachelor program
• Build strong community around universities
17Context Key Factors Benefits Forward
THANKS TO
18
École Polytechnique de Montreal
McGill University
Pr. Tavares
Pr. Fradette
Pr. Chaouki
Pr. Patience
Pr. Bertrand
Pr. Coulombe
Pr. Yargeau
Pr. Kopyscinski
Pr. Hoesli
A. Al-Haiek
J. Baria
L. Dauphin
N. Ghoul
G. Milot
P.-É. Auclair-
Bédard
M. Gosselin
M. Lavoie
C. Marsan-
Loyer
C. Bourdeau-
Laferrière
V. Harvey
S. Jaffer
H. To
S. Viau
G. El Baghli
K. Laassel
P.D. Mbog
T. Pham Phu
S. Benjelloun
C. Brucel
A. Cimon
S. El Kabriti
N. Goldstein
C. Pineda
A. Natu
P. Kaustubh
A. Gershanov
J. Wilkinson
R. Nanua
D. Chondon
G. Trzcinski
K. Qiu
T.-M. De Witte
R. Chowdhury
A. Colantuoni
S. Marcotte
J. Montagut
R. Osseiran
Partners
P. Renaud P. Crohmal

More Related Content

Viewers also liked

Ecologistes, solidaires et citoyens: notre programme
Ecologistes, solidaires et citoyens: notre programmeEcologistes, solidaires et citoyens: notre programme
Ecologistes, solidaires et citoyens: notre programme
Hélène Frick
 
Etapas de produção de um objeto de aprendizagem
Etapas de produção de um objeto de aprendizagemEtapas de produção de um objeto de aprendizagem
Etapas de produção de um objeto de aprendizagemElton Vinicius Silva
 
Consultoría estratégica social media by insare
Consultoría estratégica social media by insareConsultoría estratégica social media by insare
Consultoría estratégica social media by insare
Insare.Insurance Software
 
Economia politica alimentaria
Economia politica alimentariaEconomia politica alimentaria
Economia politica alimentaria
dianaquiroz03
 
Objetos de aprendizagem
Objetos de aprendizagemObjetos de aprendizagem
Objetos de aprendizagemcursometa
 
Ambientes virtuais interativos
Ambientes virtuais interativosAmbientes virtuais interativos
Ambientes virtuais interativos
EAD Amazon
 
10 Dicas sobre Objetos de Aprendizagem
10 Dicas sobre Objetos de Aprendizagem10 Dicas sobre Objetos de Aprendizagem
10 Dicas sobre Objetos de Aprendizagem
Mupi
 
Transitar com Segurança
Transitar com SegurançaTransitar com Segurança
Transitar com Segurança
Milton R. Almeida
 
10 Integrated Pest Management
10 Integrated Pest Management10 Integrated Pest Management
10 Integrated Pest Managementsherylwil
 
Objetos de aprendizagem slides
Objetos de aprendizagem slidesObjetos de aprendizagem slides
Objetos de aprendizagem slides
Chantell75
 
Objetos de aprendizagem teoria
Objetos de aprendizagem teoriaObjetos de aprendizagem teoria
Objetos de aprendizagem teoriaAlefaella
 
Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...
Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...
Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...Edinei Reis
 

Viewers also liked (14)

Tarpulin logo
Tarpulin  logoTarpulin  logo
Tarpulin logo
 
Ecologistes, solidaires et citoyens: notre programme
Ecologistes, solidaires et citoyens: notre programmeEcologistes, solidaires et citoyens: notre programme
Ecologistes, solidaires et citoyens: notre programme
 
Objetos de aprendizagem
Objetos de aprendizagemObjetos de aprendizagem
Objetos de aprendizagem
 
Etapas de produção de um objeto de aprendizagem
Etapas de produção de um objeto de aprendizagemEtapas de produção de um objeto de aprendizagem
Etapas de produção de um objeto de aprendizagem
 
Consultoría estratégica social media by insare
Consultoría estratégica social media by insareConsultoría estratégica social media by insare
Consultoría estratégica social media by insare
 
Economia politica alimentaria
Economia politica alimentariaEconomia politica alimentaria
Economia politica alimentaria
 
Objetos de aprendizagem
Objetos de aprendizagemObjetos de aprendizagem
Objetos de aprendizagem
 
Ambientes virtuais interativos
Ambientes virtuais interativosAmbientes virtuais interativos
Ambientes virtuais interativos
 
10 Dicas sobre Objetos de Aprendizagem
10 Dicas sobre Objetos de Aprendizagem10 Dicas sobre Objetos de Aprendizagem
10 Dicas sobre Objetos de Aprendizagem
 
Transitar com Segurança
Transitar com SegurançaTransitar com Segurança
Transitar com Segurança
 
10 Integrated Pest Management
10 Integrated Pest Management10 Integrated Pest Management
10 Integrated Pest Management
 
Objetos de aprendizagem slides
Objetos de aprendizagem slidesObjetos de aprendizagem slides
Objetos de aprendizagem slides
 
Objetos de aprendizagem teoria
Objetos de aprendizagem teoriaObjetos de aprendizagem teoria
Objetos de aprendizagem teoria
 
Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...
Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...
Objetos De Aprendizagem - Breve Histórico, características e alguns aspectos ...
 

Similar to Consider Industrial Design Leaders involvement in specialized workshops for Design Project Courses

Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
Society of Petroleum Engineers
 
PetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and TreatmentsPetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and Treatments
PetroSync
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-SlidesICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
Russell Archibald
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...shawncarner
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
Essam Lotffy, PMP®, CCP®
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
Walter Lee
 
Pe986 HPHT Well Control
Pe986 HPHT Well Control Pe986 HPHT Well Control
Pe986 HPHT Well Control
petroEDGE
 
Derek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology AreaDerek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology Area
Sandia National Laboratories: Energy & Climate: Renewables
 
Predicting the future - increasing success
Predicting the future - increasing successPredicting the future - increasing success
Predicting the future - increasing success
Association for Project Management
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling Operation
PetroSync
 
Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...
Michele Lauriero
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
naveen_ncn
 
An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...
FAST-Lab. Factory Automation Systems and Technologies Laboratory, Tampere University of Technology
 
Portfolio Management 2017
Portfolio Management 2017Portfolio Management 2017
Portfolio Management 2017Chris Haller
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Energy Construction Forum
 
Masterclass Unmanned vessels - vice and virtue for shipping industry?
Masterclass Unmanned vessels - vice and virtue for shipping industry?Masterclass Unmanned vessels - vice and virtue for shipping industry?
Masterclass Unmanned vessels - vice and virtue for shipping industry?
Maurice Jansen
 

Similar to Consider Industrial Design Leaders involvement in specialized workshops for Design Project Courses (20)

Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
 
PetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and TreatmentsPetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and Treatments
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
IPLOCA_NEWS_63w
IPLOCA_NEWS_63wIPLOCA_NEWS_63w
IPLOCA_NEWS_63w
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-SlidesICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
 
Pe986 HPHT Well Control
Pe986 HPHT Well Control Pe986 HPHT Well Control
Pe986 HPHT Well Control
 
Derek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology AreaDerek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology Area
 
Predicting the future - increasing success
Predicting the future - increasing successPredicting the future - increasing success
Predicting the future - increasing success
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling Operation
 
Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
 
An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...
 
Portfolio Management 2017
Portfolio Management 2017Portfolio Management 2017
Portfolio Management 2017
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
 
Masterclass Unmanned vessels - vice and virtue for shipping industry?
Masterclass Unmanned vessels - vice and virtue for shipping industry?Masterclass Unmanned vessels - vice and virtue for shipping industry?
Masterclass Unmanned vessels - vice and virtue for shipping industry?
 

More from Sergio Joao

Atelier d'Optimisation de Contrôleurs en simulation Dynamique
Atelier d'Optimisation de Contrôleurs en simulation DynamiqueAtelier d'Optimisation de Contrôleurs en simulation Dynamique
Atelier d'Optimisation de Contrôleurs en simulation Dynamique
Sergio Joao
 
Nitric Acid Production Plant
Nitric Acid Production Plant Nitric Acid Production Plant
Nitric Acid Production Plant
Sergio Joao
 
Ammonia Synthesis - Zero Emission Design Project
Ammonia Synthesis - Zero Emission Design ProjectAmmonia Synthesis - Zero Emission Design Project
Ammonia Synthesis - Zero Emission Design Project
Sergio Joao
 
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Sergio Joao
 
Plant operability optimization_through_dynamic_simulation
Plant operability optimization_through_dynamic_simulationPlant operability optimization_through_dynamic_simulation
Plant operability optimization_through_dynamic_simulation
Sergio Joao
 
Consider Industrial Design Leaders Involvement in Specialized Workshops
Consider Industrial Design Leaders Involvement in Specialized WorkshopsConsider Industrial Design Leaders Involvement in Specialized Workshops
Consider Industrial Design Leaders Involvement in Specialized Workshops
Sergio Joao
 

More from Sergio Joao (6)

Atelier d'Optimisation de Contrôleurs en simulation Dynamique
Atelier d'Optimisation de Contrôleurs en simulation DynamiqueAtelier d'Optimisation de Contrôleurs en simulation Dynamique
Atelier d'Optimisation de Contrôleurs en simulation Dynamique
 
Nitric Acid Production Plant
Nitric Acid Production Plant Nitric Acid Production Plant
Nitric Acid Production Plant
 
Ammonia Synthesis - Zero Emission Design Project
Ammonia Synthesis - Zero Emission Design ProjectAmmonia Synthesis - Zero Emission Design Project
Ammonia Synthesis - Zero Emission Design Project
 
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
 
Plant operability optimization_through_dynamic_simulation
Plant operability optimization_through_dynamic_simulationPlant operability optimization_through_dynamic_simulation
Plant operability optimization_through_dynamic_simulation
 
Consider Industrial Design Leaders Involvement in Specialized Workshops
Consider Industrial Design Leaders Involvement in Specialized WorkshopsConsider Industrial Design Leaders Involvement in Specialized Workshops
Consider Industrial Design Leaders Involvement in Specialized Workshops
 

Recently uploaded

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 

Consider Industrial Design Leaders involvement in specialized workshops for Design Project Courses

  • 1. CONSIDER INDUSTRIAL DESIGN LEADERS INVOLVEMENT IN SPECIALIZED WORKSHOPS Sergio Joao, eng. Steven Sidthiphol, jr. eng. SUCCESSFUL INVOLVEMENT IN DESIGN COURSES 66th Canadian Chemical Engineering Conference October 17th, 2016
  • 2. AGENDA • Context • Key factors for successful design projects • Benefits – Students – Industrial Design Leader • Design course – Looking Forward 2
  • 3. INVOLVEMENT IN DESIGN COURSES • McGill & Polytechnique - since 2013 • Team achieved great success • High quality reports and presentations • Not only technical… 3Context Key Factors Benefits Forward
  • 4. EXAMPLE – LNG TERMINAL PROJECT 4 Source: David Chondon, Tinke-Marie De Witte, Kevin Qiu, Gabrielle Trzcinski, CLEAN ENERGY TERMINAL, Final Presentation Winter2016, CHEE 457 - DESIGN PROJECT 200,000 m3 LNG Carrier pool fire Loss of life Damage to Equipment 𝟑𝟓 𝐤𝐖/𝐦 𝟐 𝟏𝟖 𝐤𝐖/𝐦 𝟐 5 𝐤𝐖/𝐦 𝟐 Radiation Radius Effects 5 kW/m2 2.25 km Permissible Level of Emergency operations 18 kW/m2 1.85 km Ignite wood and melt plastic tubing 35 kW/m2 1.5 km Damage to Steel piping and Process Equipment
  • 5. KEY FACTORS FOR SUCCESS 5 Define Scope Give Feedback Act as One Team Provide Training Context Key Factors Benefits Forward
  • 6. DEFINE SCOPE • Start with Kick-off Meeting! – Mandate – Roles & Expectations – Methodology • Bring team to: – Define Boundary Limits – Oversee whole Context 6Context Key Factors Benefits Forward Can you break the problem into pieces ?
  • 7. EXAMPLE – LNG TERMINAL PROJECT 7 Source: David Chondon, Tinke-Marie De Witte, Kevin Qiu, Gabrielle Trzcinski, CLEAN ENERGY TERMINAL, Final Presentation Winter2016, CHEE 457 - DESIGN PROJECT, McGill
  • 8. EXAMPLE – SULPHURIC ACID PROJECT 8Source: Pierre-Étienne Auclair, Mylène Gosselin, Maxime Lavoie, Catherine Marsan, Conception d’une usine d’acide sulfurique, GCH4160 : Projet de conception et analyse d’impacts, Ecole Polytechnique de Montreal
  • 9. GIVE FEEDBACK • Weekly meetings – Project progress over schedule – Powerpoint presentation • Deliverables commented – Technical Aspects – Clarity of the information 9 We don’t want to know it, we want to see it (Yvon Deschamps) Can you add some Wow effects ? Context Key Factors Benefits Forward
  • 10. Industry Control Narratives It is important to control the liquid level inside the column to ensure that adequate mass transfer takes place between the vapor and liquid phases, and to prevent flooding. This is accomplished by using a feedback control system in loop 204 that regulates the flow of rich amine leaving the bottom of the absorber (stream 12). Excessively high and low liquid levels pose an operational risk, and as such are insured by interlock action. I-3 trips the motor on pumps P- 201 at the bottom of the absorber if the liquid level is excessively low, which terminates the outflow of liquid. Conversely, the amine inflow (stream 10) is terminated by I- 4 using a shutoff valve if the liquid level becomes very high. Source: Nathan Goldstein, Anand Natu, Chantelyn Pineda and K. Praneet Akilla , Carbon Capture Facility Design Final Design Recommendations for Apatite Inc., Final Presentation Winter2015, CHEE 457 - DESIGN PROJECT, McGill EXAMPLE - CARBON CAPTURE PROJECT
  • 11. Industry Control Narratives It is important to control the liquid level inside the column to ensure that adequate mass transfer takes place between the vapor and liquid phases, and to prevent flooding. This is accomplished by using a feedback control system in loop 204 that regulates the flow of rich amine leaving the bottom of the absorber (stream 12). Excessively high and low liquid levels pose an operational risk, and as such are insured by interlock action. I-3 trips the motor on pumps P- 201 at the bottom of the absorber if the liquid level is excessively low, which terminates the outflow of liquid. Conversely, the amine inflow (stream 10) is terminated by I- 4 using a shutoff valve if the liquid level becomes very high. Source: Nathan Goldstein, Anand Natu, Chantelyn Pineda and K. Praneet Akilla , Carbon Capture Facility Design Final Design Recommendations for Apatite Inc., Final Presentation Winter2015, CHEE 457 - DESIGN PROJECT, McGill EXAMPLE - CARBON CAPTURE PROJECT Student Control Narratives
  • 12. ACT AS ONE TEAM • Presence whole team at the meetings • Design leaders involvement • Guide the development • Focus on Students Strenghts • Found project execution bottlenecks • Motivates & Free students’ Energy! • Get Best from students 12 Don’t Bring me Problems Bring me Solutions Share your Problems ! Context Key Factors Benefits Forward
  • 13. PROVIDE TRAINING Not all students share the same field experience Training is typically on: Basic Controls & Interlocks Link between HAZOP, P&ID & Interlocks Read/draw a P&ID Project Management Simulation Skills (Aspen Hysys®…) Hands-on Project Accelerator Difficult to integrate more training session during Design Course 13Context Key Factors Benefits Forward
  • 14. EXAMPLE – P&ID 14Source: David Chondon, Tinke-Marie De Witte, Kevin Qiu, Gabrielle Trzcinski, CLEAN ENERGY TERMINAL, Final Presentation Winter2016, CHEE 457 - DESIGN PROJECT 1 2
  • 15. 15 What are the benefits for the industrial Design Leaders? Benefits for students: Momentum for their career in a rewarding project Context Key Factors Benefits Forward
  • 16. WINS FOR DESIGN LEADERS • Confront our own limitations • Develop Management Skills • Learn new technologies • Essential relationship industry-university • Develop high potential individuals 16Context Key Factors Benefits Forward
  • 17. LOOKING FORWARD… • Develop specialized workshops – Practical Topics Ex: How to create/read P&ID How to do an Hazop? – Industrial Design Leaders – Subject Matter Experts – Hands-on training – Offered through out bachelor program • Build strong community around universities 17Context Key Factors Benefits Forward
  • 18. THANKS TO 18 École Polytechnique de Montreal McGill University Pr. Tavares Pr. Fradette Pr. Chaouki Pr. Patience Pr. Bertrand Pr. Coulombe Pr. Yargeau Pr. Kopyscinski Pr. Hoesli A. Al-Haiek J. Baria L. Dauphin N. Ghoul G. Milot P.-É. Auclair- Bédard M. Gosselin M. Lavoie C. Marsan- Loyer C. Bourdeau- Laferrière V. Harvey S. Jaffer H. To S. Viau G. El Baghli K. Laassel P.D. Mbog T. Pham Phu S. Benjelloun C. Brucel A. Cimon S. El Kabriti N. Goldstein C. Pineda A. Natu P. Kaustubh A. Gershanov J. Wilkinson R. Nanua D. Chondon G. Trzcinski K. Qiu T.-M. De Witte R. Chowdhury A. Colantuoni S. Marcotte J. Montagut R. Osseiran Partners P. Renaud P. Crohmal