Forecourt Complex Concept Design Report
Introduction
The Forecourt Complex is two (2) complexes that house the two (2) Multi-Storey Car
Parks including their Administrative Office Buildings. The two (2) Car Parks are almost
identically mirrored at North-South direction and are symmetrical about the centre line of
the Passenger Terminal Building. The Forecourt Complex has relative levels corresponding
to the ground floor level of the PTB which defined as Level 0.000 (R) = 7.800.
Each Multi-Storey Car park building will be structured mainly with a reinforced concrete
moment resisting frames consists of cast-in-situ columns, beams and slabs and will be
supported by tied-strip footings. The Ramps roofing systems shall be structural steel frames
with prefabricated roofing panels and insulations. Car Park Shades structures shall be
tapered built-up steel T-Beams supported on pipe struts with purlins and prefabricated
roofing panels. Any walls attached within the structures will be disregarded in the analyses
owing to their very minimal restraining effects on the Forecourt complex.
Adjacent to the Multi-Storey Car Park buildings are the Administrative Office Buildings.
Each Office building, though aesthetically connected to each Car Park building, will be
structurally isolated to contain the effects of seismic movements and thermal expansion of
structural frames. Accordingly, two (2) movement joints, one along each lateral direction
but with a covered floor area of application not exceeding 3600 m², shall be applied also on
each of the Car park buildings owing to the design assumptions requirement that induced
seismic lateral displacements would have to be contained enough in any applied lateral
directions, in addition to the presumed thermal expansion stresses brought upon by
difference in temperatures and the estimated ground settlements. Similarly, each Ramp
shall have a minimum two (2) transverse isolation joints, with isolated longitudinal length
not exceeding 60 m, to restrain any lateral longitudinal movements.
The facades of the Car Park Buildings are open facades with no concrete up-stands or
perimeter walls along the slab edges. The structural slabs will have a trowelled finish of
high quality able to receive suitable abrasion resistant moisture proof concrete protective
coating and indication stripes directly.
Outline Specification
The Forecourt Complex structural frames will be supported by rectangular and square
reinforced concrete strip foundations embedded 2.50 m. (min) from undisturbed or
compacted ground surface. The lateral size of the pad foundations will vary from 2.50 m. -
5.0 m, with depth range of 0.85 m. (min) to 1.70 m (max). Ground Beams will connect all
the structural frames on each building in the Forecourt Complex. Each structural column
will be tied together with a ground beam, the size of which is approximately 0.60 x 0.75 m.
Columns that form the structural framing system on the Forecourt Complex will be
reinforced concrete square columns with sizes of 0.70 m x 0.70 m (min) to 0.90 m x 0.90 m
(max).
Ground slabs at the Car park lowest level will be 0.20 m thick reinforced concrete slabs
panels with isolation and thermal joints applied at both directions to contain the effects of
slabs expansion stresses.
Beams that frame the Forecourt Complex structural system will be reinforced concrete
beams with width range of 0.40 - 0.70 m., and a depth range of 0.75 - 1.00 m.
The structural floors will be framed by reinforced concrete slabs with thickness range of
0.30 m - 0.50 m (max). Each floor slab system will be restrained at edges to stiffen the
whole structural system.
A reinforced concrete parapet shall be applied along exterior edges of the Car Parks and
Ramps that serves as safety barrier to contain any accidental impact loadings.
To restrain the forces brought upon by seismic, thermal, uneven base settlements and
applied moving loads, the Ramps shall be considered as isolated structures restraining
independently such applied stresses; with sufficient flexibility against any lateral and
vertical movements with respect to the overall behavior of the interfaces of structural
systems on the Forecourt Complex.
Block Walls in the Administrative Office Buildings shall be insulated walls.
Structural Concepts
The Forecourt Complex Structural Systems are conceptualized based from the structural
systems behavioural aspects of responses on the applications of applied loadings on the
structures. It is assumed that the application of Framed Reinforced Concrete Structural
System on the Forecourt Complex shall sustain enough the needed flexible resistances of
the structures against the applied loadings coupled with sidesways and plumb
displacements. Owing to the lesser degree of behavioural applications of the presumed
lateral loadings that are ascertained to act on the Structural Systems - since the ratio of the
total exposed building height and applied lateral displacements is considered minimal, the
assumptive need for a structural shear walls to lessen the amount of applications of the
estimated displacements is therefore eliminated. Accordingly, since the required bearing
pressure constraints for equilibrium to contain the applied combined stresses on the
Structural Systems supports points have been assumed not going beyond the nominal
parameters of the allowable independent bases of resistance then an application of mat
foundation as base of supports is disregarded; instead spread pad footings will constitute
the bases of supports for the Structural Systems. Similarly, due to the symmetries of the
floor modules continuities a large imbalance stresses are not foreseen - a lesser degree of
rotations and tensile developments at supports base points are therefore sustainable enough
with strip foundations.
To render the Forecourt Complex Structural Systems points of restrains adequately feasible
enough to contain the magnitudes of the applied displacements in any course of actions
brought upon by the imparted joints and assumptive points stresses resulted from the
applications of the applied seismic, thermal and uneven ground settlements stresses, each
Car Park building will be isolated quadrupled with movement joints; with distributed
covered floor area of isolation application not exceeding 3600 m² and with an isolated
length not exceeding 60 meters and with due considerations on the effects of induced
seismic torsional moments that shall perceive to act on each isolated unit of the building if
the unity ratio of mass and rigidity coincidence could not achieve owing to movement
joints asymmetrical locations. Movement joints load transfer and interface points shall be
capable enough to restrain any lateral and vertical displacements stresses in any direction in
addition to the induced reactions due to combined ultimate stresses. Accordingly, each
Ramps Structural Systems shall also be isolated from the Car Park Structural Systems, with
at least two (2) transverse movement joints and with an isolated longitudinal lengths not
exceeding 60 meter in length. Similarly, the Administrative Office building structure
adjacent to the Car Park shall also be isolated from the Car Park Structural Systems with
the provision of movement joints capable enough to sustain any induced lateral and vertical
displacements stresses. Owing to aesthetic requirements the movement joints shall be
applied with due consideration on the elimination on the needs of additional column and
foundation supports along the joints of isolation lines. It is therefore concluded that without
the application of such movement joints the Forecourt Complex Structural Systems would
need to have much greater amount of resistances against induced lateral and vertical
displacements stresses, which would require the system to have bigger member sizes with
added reinforcements to restrain such displacement stresses, in addition to the application
of much bigger bases of supports such as raft foundation to contain the wide-coverage
uneven ground strata settlements.
To restrain the side sways and plumbs strain effects of seismic movements and uneven
ground settlements stresses including any instability and imbalance stresses, in addition to
the isolation joints, all the Structural Systems Reinforced Concrete Columns shall be tied
together with a grade beams adequately enough to resist any compression, tension and
torsion stresses brought upon by such induced stresses. If the Structural Columns are opted
not to be tied with ground beams then bigger sizes of Structural Columns are foreseen in
addition to the application of Mat Foundation in lieu of Strip Footings as support bases and
instability and imbalance controller at the most critical structural systems joints.
Accordingly, Structural Steel Columns are chosen not quite feasible to be used on the
Forecourt Complex Structural Systems due to the following technical engineering aspects:
firstly - ductility demand - the elastoplastic response of the structural system on seismic
forces; is the ratio of the inelastic movement of the structure to the elastic movement which
requires the structural system, in addition to the seismic additional detailing requirements
on its complex connections, to be rigid or braced enough to attain such demand for
ductility, of which bigger sizes of steel columns are foreseen for rigid frames and lateral
braces for braced frames which would affect the aesthetic requirements on the Forecourt
Complex, and secondly - deflection considerations - owing to effects of moving loads
including impact stress though minimal in applications, will brought upon on the structural
systems nominal cyclic long term deflections which would require the system to have
bigger member sizes with added complex seismic detailing connections and adequate
braces to lessen the magnitude on buckling and slenderness requirements, in addition to the
corrosion and fireproofing protection systems that also would affect the aesthetical aspects
of the Forecourt Complex. Similarly, Precast or Prestressed Concrete Structural System is
disregarded due to its design requirements on complex establishment of overall seismic in-
plane force paths, complex applications on its connections including large amount of
needed movement tolerances to restrain the induced seismic stresses and displacements,
provision of overall vertical tension ties which would require the establishment and
application of seismic effective ground and base interface connections.
Reinforced Concrete Beams and Slabs shall frame the Forecourt Complex Structural
Flooring Systems. Owing to the induced lateral and vertical displacements stresses in
addition to the combined applied ultimate stresses, it is assumed that the applied Flooring
Systems shall have conceivable rigidity - enough to contribute to the overall restraining
stiffness of the whole Structural Frame Systems in terms of joints, interfaces and
correlational assumptive robustness behavioral aspects. Accordingly, composite slab
systems is not considered owing to elastoplastic response requirement on the structural
system, applied deflection considerations, additional seismic detailing requirements on
complex connections, and corrosion and fireproofing requirements. Similarly, flat slab
structural systems is not considered as the best feasible floor framing option due to, in
addition to its economic disadvantage comparison implications, the establishment of
complex concentrated edge points connections requirement along the lines of movement
joints - concentrated stress transfer at isolation lines support points.
Though there are some walls on the sets of buildings on the Forecourt Complex such as
external perimeter walls and safety barrier walls on the Car Parks external edges, such
walls are considered incapable to contribute on the overall strain stiffness of the Forecourt
Complex Structural Systems and hence structurally disregarded relevant to the overall
assumptive behavioral functions and capacities of the structural system against induced
stresses brought upon by applied service and ultimate loadings on the buildings and ramps.
Roofing System and Car Shades structural systems shall be of steel structures and built-up
tapered roof beams with prefabricated insulated aluminum roofing panels - lightweight
enough to lessen the needed restraining stresses on its bases which shall be absorbed by the
supporting slabs on the Car Park decks. Accordingly, owing to wind and seismic induced
forces including thermal stresses, the Car Park Roofing Systems shall have supports joints
flexible enough to contain any transverse and longitudinal lateral displacements brought
upon by such applied movements on the roof framing systems. However, even though the
Car Shades Roofing systems, with built-up beams and rolled steel purlins roofed with
prefabricated roofing panels but without insulation, are similarly lightweight enough will
have their bases fix to the slabs due to the large assumptive concentrated induced surface
point loads and flexural stresses acting on their single struts base supports points brought
upon by the cantilevered actions of the whole framing systems. Accordingly, the Car
Shades roofing systems shall have transverse movement joints at every 60 meter maximum
longitudinal distance capable to restrain any lateral transverse and longitudinal side sways
displacements brought upon by transient seismic and wind loadings coupled with combined
ultimate permanent applied stresses on the car shades structures. The effects of material
corrosions due to environment and utilization factors on members strains sustainable
competence on the Car Park roofing system and car shades structural steel frames shall be
taken into account in the whole assumptive behavioral restraining capacities applications,
of which the minimum thickness of any aspects of rolled sections will be 8 mm and 10 mm
for built-up sections.
To guard against the decaying effects of material strain corrosions and hence to prevent the
impairment and dissipation of energy restrains on affected members reinforcements, all
foundations and grade beams of the sets of buildings in the Forecourt Complex will be
waterproofed and dampproofed in accordance with their applied levels of embedment
corrosion exposures to soil water and chemical seepages proportionate to the estimated
mean sea level. Waterproofed membrane materials shall be technically sophisticated
enough to contain any water and chemical exfiltration and infiltration seepages in addition
to its shredding adequacy - tensile and compressible capacity to restrain any surface applied
stresses on the members. Accordingly, all building decks directly expose to environmental
climate factors shall be waterproofed with due consideration on the amount of periodic
accumulated rainfall and any water pondings on the affected building decks.
Interfaces
Interfaces between adjacent buildings in the Forecourt Complex shall be by movement and
slip joints with adequate flexibility to restrain any induced lateral and vertical
displacements brought upon by applied seismic and thermal stresses including any
calculated deformations due to uneven ground settlements. Such movement and slip joints
shall be capable enough to provide the needed aesthetical floor continuities between
isolated floor edges with sophisticated expansion/contraction material properly installed on
the joints. Effects of building configurations on affected adjacent buildings will be taken
into consideration on the magnitude of application on such movement and slip joints to
restrain any induced tearing, crushing and battering stresses due to seismic oscillation
rotational forces.
Architectural interfaces with the structural frame systems shall take into considerations all
aesthetical finishes material installations and applications with respect to the effects of
frames deflections, sways and expansions due to applied loads. Architectural finishing
materials including roof waterproofing shall be in accordance with manufacturer's
instructions and installed with enough flexibility to retain its designed levels, forms and
line of axes with the use of sophisticated hinges and fixers against any movements on the
frame systems. Aesthetical floor tiling systems including its mortar shall withstand, in
addition to the designed applied floor loadings, any imbalance loadings brought upon by
the structural frame systems movements.
Mechanical interfaces with the structural frame systems shall be by hangers, inserts and
other applicable methods of interfaces but such interfaces shall not impair the design
strength capacities of affected members of the frame systems. With due considerations on
the members tension and compression sides and the effective concrete compression
strength, inserts near the supports and for pipes passing through slabs shall be installed
above the beams neutral axis and within the zone of half of the maximum shear distance
from the face of supports. Accordingly, inserts near to mid-portions of beams shall be
installed below the beams neutral axis and within half of the beam middle length.
Electrical interfaces shall
Information Technology interfaces will be
Civil interfaces with the structural systems
PAGE
NUMPAGES
Normal
Normal
Default Paragraph Font
Default Paragraph Font
Table Normal
Table Normal
No List
No List
ÿBody Text,Body Text Char1,Body Text Char Char,Body Text Char Char3 Char
Char,Body Text Char Char Char Char Char Char,Body Text Char3 Char Char Char Char
Char Char,Body Text Char1 Char Char Char1 Char Char Char Char,Body Text Char2 Char
Char,Body Text Char
ÿBody Text,Body Text Char1,Body Text Char Char,Body Text Char Char3 Char
Char,Body Text Char Char Char Char Char Char,Body Text Char3 Char Char Char Char
Char Char,Body Text Char1 Char Char Char1 Char Char Char Char,Body Text Char2 Char
Char,Body Text Char
êBody Text Char1 Char,Body Text Char Char Char,Body Text Char Char3 Char Char
Char,Body Text Char Char Char Char Char Char Char,Body Text Char3 Char Char Char
Char Char Char Char,Body Text Char1 Char Char Char1 Char Char Char Char Char
êBody Text Char1 Char,Body Text Char Char Char,Body Text Char Char3 Char Char
Char,Body Text Char Char Char Char Char Char Char,Body Text Char3 Char Char Char
Char Char Char Char,Body Text Char1 Char Char Char1 Char Char Char Char Char
4Body Text Char Char Char2,Body Text Char1 Char1 Char
4Body Text Char Char Char2,Body Text Char1 Char1 Char
Header
Header
Footer
Footer
Page Number
Page Number
*€urn:schemas-microsoft-com:office:smarttags
*€urn:schemas-microsoft-com:office:smarttags €PlaceName
*€urn:schemas-microsoft-com:office:smarttags €PlaceType
Unknownÿ!
Times New Roman
Times New Roman
Symbol
Symbol
÷The Multi Storey Car park Building (MSCP) comprise of two (2) building structures
namely the North Car park and the South Car park each four (4) storeys high situated at the
front corners of the Passenger Terminal Building at the arrival concourse
÷The Multi Storey Car park Building (MSCP) comprise of two (2) building structures
namely the North Car park and the South Car park each four (4) storeys high situated at the
front corners of the Passenger Terminal Building at the arrival concourse
Eduardo Pare
Eduardo Pare
Eduardo Pare
Eduardo Pare
The Multi Storey Car park Building (MSCP) comprise of two (2) building structures
namely the North Car park and the South Car park each four (4) storeys high situated at the
front corners of the Passenger Terminal Building at the arrival concourse
Eduardo Pare
Normal.dot
Eduardo Pare
Microsoft Office Word
The Multi Storey Car park Building (MSCP) comprise of two (2) building structures
namely the North Car park and the South Car park each four (4) storeys high situated at the
front corners of the Passenger Terminal Building at the arrival concourse
Root Entry
1Table
1Table
WordDocument
WordDocument
SummaryInformation
SummaryInformation
DocumentSummaryInformation
DocumentSummaryInformation
CompObj
CompObj
Microsoft Office Word Document
MSWordDoc
Word.Document.8
Root Entry
Root Entry
1Table
1Table
WordDocument
WordDocument
SummaryInformation
SummaryInformation
the South Car park each four (4) storeys high situated at the front corners of the Passenger
Terminal Building at the arrival concourse
DocumentSummaryInformation
DocumentSummaryInformation
CompObj
CompObj
Microsoft Office Word Document
MSWordDoc
Word.Document.8
The Multi Storey Car park Building (MSCP) comprise of two (2) building structures
namely the North Car park and
1Table
1Table
WordDocument
WordDocument
SummaryInformation
SummaryInformation
the South Car park each four (4) storeys high situated at the front corners of the Passenger
Terminal Building at the arrival concourse
DocumentSummaryInformation
DocumentSummaryInformation
CompObj
CompObj
Microsoft Office Word Document
MSWordDoc
Word.Document.8
The Multi Storey Car park Building (MSCP) comprise of two (2) building structures
namely the North Car park and

More Related Content

What's hot

Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)Dimple Poddar
 
Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...
Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...
Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...Ursachi Răzvan
 
High rise building study & report
High rise building study & reportHigh rise building study & report
High rise building study & reportMithu hossain
 
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...Jamal Ali
 
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...IRJET Journal
 
Large span structures
Large span structuresLarge span structures
Large span structuresaduiti
 
Performance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without BracingsPerformance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without BracingsIJERA Editor
 
Lecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering Iaşi
Lecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering IaşiLecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering Iaşi
Lecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering IaşiUrsachi Răzvan
 
Vector active systems
Vector active systemsVector active systems
Vector active systemsDanishPathan7
 
6 portal frames
6 portal frames6 portal frames
6 portal framesPrabhu mk
 
Topology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsTopology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsIAEME Publication
 
Lecture 8 s.s.iii Steel Structures
Lecture 8  s.s.iii Steel Structures Lecture 8  s.s.iii Steel Structures
Lecture 8 s.s.iii Steel Structures Ursachi Răzvan
 
Cable systems - form active structure system
Cable systems - form active structure systemCable systems - form active structure system
Cable systems - form active structure systemArchistudent Portal
 
Dynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systemsDynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systemseSAT Journals
 
Designing for long spans 2
Designing for long spans 2Designing for long spans 2
Designing for long spans 2SADEQ ALSALAMI
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsDP NITHIN
 

What's hot (20)

Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
Portal frames (LINK TO DOWNLOAD IS IN DESCRIPTION)
 
Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...
Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...
Lecture 11 s.s.iii Design of Steel Structures - Faculty of Civil Engineering ...
 
Graduation project presentation
Graduation project presentationGraduation project presentation
Graduation project presentation
 
kkr 2
kkr 2kkr 2
kkr 2
 
High rise building study & report
High rise building study & reportHigh rise building study & report
High rise building study & report
 
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
 
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
 
Large span structures
Large span structuresLarge span structures
Large span structures
 
Performance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without BracingsPerformance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without Bracings
 
Lecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering Iaşi
Lecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering IaşiLecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering Iaşi
Lecture 6 s.s.iii Design of Steel Structures - Faculty of Civil Engineering Iaşi
 
Vector active systems
Vector active systemsVector active systems
Vector active systems
 
6 portal frames
6 portal frames6 portal frames
6 portal frames
 
Topology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsTopology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildings
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
Lecture 8 s.s.iii Steel Structures
Lecture 8  s.s.iii Steel Structures Lecture 8  s.s.iii Steel Structures
Lecture 8 s.s.iii Steel Structures
 
Cable systems - form active structure system
Cable systems - form active structure systemCable systems - form active structure system
Cable systems - form active structure system
 
Bracing connections
Bracing connectionsBracing connections
Bracing connections
 
Dynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systemsDynamic analysis of steel tube structure with bracing systems
Dynamic analysis of steel tube structure with bracing systems
 
Designing for long spans 2
Designing for long spans 2Designing for long spans 2
Designing for long spans 2
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 

Viewers also liked

EDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE IIEDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE IIEduardo H. Pare
 
Orig uap docs 200 208 from Uap
Orig uap docs 200 208 from UapOrig uap docs 200 208 from Uap
Orig uap docs 200 208 from UapLouise Tiengco
 
Support the UAP Performance Team
Support the UAP Performance Team Support the UAP Performance Team
Support the UAP Performance Team Rey Gabitan
 
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVTEDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVTEduardo H. Pare
 
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...Eduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1Eduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE_RASCO1
EDUARDO H. PARE WORK CERTIFICATE_RASCO1EDUARDO H. PARE WORK CERTIFICATE_RASCO1
EDUARDO H. PARE WORK CERTIFICATE_RASCO1Eduardo H. Pare
 
Ra 9053 landscape architecture law
Ra 9053 landscape architecture lawRa 9053 landscape architecture law
Ra 9053 landscape architecture lawjbonvier
 
Spp 201-pre-design services
Spp 201-pre-design servicesSpp 201-pre-design services
Spp 201-pre-design servicesMelvin Patawaran
 
Project Specifications and Building Code
Project Specifications and Building CodeProject Specifications and Building Code
Project Specifications and Building Codetboyko
 
APEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUALAPEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUALJennilyn Tagupa
 
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...Eduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAREDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAREduardo H. Pare
 
Project Specifications
Project SpecificationsProject Specifications
Project SpecificationsEric Anderson
 
Specifications 101
Specifications 101Specifications 101
Specifications 101Andrej_M
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil constructiondiasawada12345
 

Viewers also liked (20)

Matrix207
Matrix207Matrix207
Matrix207
 
Uap Document
Uap DocumentUap Document
Uap Document
 
EDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE IIEDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE II
 
Orig uap docs 200 208 from Uap
Orig uap docs 200 208 from UapOrig uap docs 200 208 from Uap
Orig uap docs 200 208 from Uap
 
Support the UAP Performance Team
Support the UAP Performance Team Support the UAP Performance Team
Support the UAP Performance Team
 
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVTEDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
 
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
 
EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1
 
EDUARDO H. PARE WORK CERTIFICATE_RASCO1
EDUARDO H. PARE WORK CERTIFICATE_RASCO1EDUARDO H. PARE WORK CERTIFICATE_RASCO1
EDUARDO H. PARE WORK CERTIFICATE_RASCO1
 
Ra 9053 landscape architecture law
Ra 9053 landscape architecture lawRa 9053 landscape architecture law
Ra 9053 landscape architecture law
 
uap doc 207-208
uap doc 207-208uap doc 207-208
uap doc 207-208
 
Spp 201-pre-design services
Spp 201-pre-design servicesSpp 201-pre-design services
Spp 201-pre-design services
 
Project Specifications and Building Code
Project Specifications and Building CodeProject Specifications and Building Code
Project Specifications and Building Code
 
APEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUALAPEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUAL
 
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
 
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAREDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
 
Project Specifications
Project SpecificationsProject Specifications
Project Specifications
 
Specifications 101
Specifications 101Specifications 101
Specifications 101
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil construction
 
SPECIFICATIONS
SPECIFICATIONSSPECIFICATIONS
SPECIFICATIONS
 

Similar to Forecourt Complex Concept Design Report Summary

EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORTEDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORTEduardo H. Pare
 
Structural systems and aerodynamic in multi stoery buildings
Structural systems and aerodynamic in multi stoery buildingsStructural systems and aerodynamic in multi stoery buildings
Structural systems and aerodynamic in multi stoery buildingsManoj Kumar
 
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...IRJET Journal
 
CCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Concrete
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...IAEME Publication
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...IAEME Publication
 
Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...
Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...
Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...IOSRJMCE
 
Eatrhquake response of reinforced cocrete multi storey building with base iso...
Eatrhquake response of reinforced cocrete multi storey building with base iso...Eatrhquake response of reinforced cocrete multi storey building with base iso...
Eatrhquake response of reinforced cocrete multi storey building with base iso...eSAT Journals
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxChandanLawrence
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteParag Pal
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Earthquake Performance of RCC Frame Structure using different Types of Bracin...
Earthquake Performance of RCC Frame Structure using different Types of Bracin...Earthquake Performance of RCC Frame Structure using different Types of Bracin...
Earthquake Performance of RCC Frame Structure using different Types of Bracin...IRJET Journal
 
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...IRJET Journal
 
IRJET- Comparative Study of Multi-Storey Building with Coupled Shear Wall...
IRJET-  	  Comparative Study of Multi-Storey Building with Coupled Shear Wall...IRJET-  	  Comparative Study of Multi-Storey Building with Coupled Shear Wall...
IRJET- Comparative Study of Multi-Storey Building with Coupled Shear Wall...IRJET Journal
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parkingManoj Navneeth
 
Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...
Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...
Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...Dr.Youssef Hammida
 

Similar to Forecourt Complex Concept Design Report Summary (20)

EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORTEDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
 
Structural systems and aerodynamic in multi stoery buildings
Structural systems and aerodynamic in multi stoery buildingsStructural systems and aerodynamic in multi stoery buildings
Structural systems and aerodynamic in multi stoery buildings
 
Acm Unit 1
Acm Unit 1Acm Unit 1
Acm Unit 1
 
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
 
CCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab Brochure
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...
Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...
Evaluation of the Seismic Response Parameters for Infilled Reinforced Concret...
 
Guida ARBED edifici alti
Guida ARBED edifici altiGuida ARBED edifici alti
Guida ARBED edifici alti
 
Eatrhquake response of reinforced cocrete multi storey building with base iso...
Eatrhquake response of reinforced cocrete multi storey building with base iso...Eatrhquake response of reinforced cocrete multi storey building with base iso...
Eatrhquake response of reinforced cocrete multi storey building with base iso...
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptx
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Earthquake Performance of RCC Frame Structure using different Types of Bracin...
Earthquake Performance of RCC Frame Structure using different Types of Bracin...Earthquake Performance of RCC Frame Structure using different Types of Bracin...
Earthquake Performance of RCC Frame Structure using different Types of Bracin...
 
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
 
IRJET- Comparative Study of Multi-Storey Building with Coupled Shear Wall...
IRJET-  	  Comparative Study of Multi-Storey Building with Coupled Shear Wall...IRJET-  	  Comparative Study of Multi-Storey Building with Coupled Shear Wall...
IRJET- Comparative Study of Multi-Storey Building with Coupled Shear Wall...
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parking
 
Post Tensioning
Post TensioningPost Tensioning
Post Tensioning
 
Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...
Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...
Seminar abstract non seismic walls -مقاومة قوى الزلازل بالإطارات فقط واهمال ج...
 
Research non seismic walls
Research  non seismic wallsResearch  non seismic walls
Research non seismic walls
 

More from Eduardo H. Pare

EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdfEDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdfEduardo H. Pare
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021Eduardo H. Pare
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021Eduardo H. Pare
 
RCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILSRCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILSEduardo H. Pare
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018Eduardo H. Pare
 
COMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LISTCOMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LISTEduardo H. Pare
 
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...Eduardo H. Pare
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...Eduardo H. Pare
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...Eduardo H. Pare
 
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLESEDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLESEduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLCEDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLCEduardo H. Pare
 
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFEEDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFEEduardo H. Pare
 
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)Eduardo H. Pare
 
LADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILSLADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILSEduardo H. Pare
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREduardo H. Pare
 
EDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATEEDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATEEduardo H. Pare
 
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATEEDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATEEduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICESEDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICESEduardo H. Pare
 
EDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTSEDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTSEduardo H. Pare
 

More from Eduardo H. Pare (20)

EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdfEDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021
 
RCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILSRCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILS
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018
 
COMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LISTCOMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LIST
 
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
 
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLESEDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
 
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLCEDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
 
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFEEDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
 
BS 8110, PART-3, 1985
BS 8110, PART-3, 1985BS 8110, PART-3, 1985
BS 8110, PART-3, 1985
 
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
 
LADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILSLADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILS
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
EDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATEEDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATE
 
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATEEDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
 
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICESEDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
 
EDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTSEDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTS
 

Recently uploaded

Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...Suhani Kapoor
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 

Forecourt Complex Concept Design Report Summary

  • 1. Forecourt Complex Concept Design Report Introduction The Forecourt Complex is two (2) complexes that house the two (2) Multi-Storey Car Parks including their Administrative Office Buildings. The two (2) Car Parks are almost identically mirrored at North-South direction and are symmetrical about the centre line of the Passenger Terminal Building. The Forecourt Complex has relative levels corresponding to the ground floor level of the PTB which defined as Level 0.000 (R) = 7.800. Each Multi-Storey Car park building will be structured mainly with a reinforced concrete moment resisting frames consists of cast-in-situ columns, beams and slabs and will be supported by tied-strip footings. The Ramps roofing systems shall be structural steel frames with prefabricated roofing panels and insulations. Car Park Shades structures shall be tapered built-up steel T-Beams supported on pipe struts with purlins and prefabricated roofing panels. Any walls attached within the structures will be disregarded in the analyses owing to their very minimal restraining effects on the Forecourt complex. Adjacent to the Multi-Storey Car Park buildings are the Administrative Office Buildings. Each Office building, though aesthetically connected to each Car Park building, will be structurally isolated to contain the effects of seismic movements and thermal expansion of structural frames. Accordingly, two (2) movement joints, one along each lateral direction but with a covered floor area of application not exceeding 3600 m², shall be applied also on each of the Car park buildings owing to the design assumptions requirement that induced seismic lateral displacements would have to be contained enough in any applied lateral directions, in addition to the presumed thermal expansion stresses brought upon by difference in temperatures and the estimated ground settlements. Similarly, each Ramp shall have a minimum two (2) transverse isolation joints, with isolated longitudinal length not exceeding 60 m, to restrain any lateral longitudinal movements. The facades of the Car Park Buildings are open facades with no concrete up-stands or perimeter walls along the slab edges. The structural slabs will have a trowelled finish of high quality able to receive suitable abrasion resistant moisture proof concrete protective coating and indication stripes directly. Outline Specification The Forecourt Complex structural frames will be supported by rectangular and square reinforced concrete strip foundations embedded 2.50 m. (min) from undisturbed or compacted ground surface. The lateral size of the pad foundations will vary from 2.50 m. - 5.0 m, with depth range of 0.85 m. (min) to 1.70 m (max). Ground Beams will connect all the structural frames on each building in the Forecourt Complex. Each structural column will be tied together with a ground beam, the size of which is approximately 0.60 x 0.75 m. Columns that form the structural framing system on the Forecourt Complex will be reinforced concrete square columns with sizes of 0.70 m x 0.70 m (min) to 0.90 m x 0.90 m (max). Ground slabs at the Car park lowest level will be 0.20 m thick reinforced concrete slabs
  • 2. panels with isolation and thermal joints applied at both directions to contain the effects of slabs expansion stresses. Beams that frame the Forecourt Complex structural system will be reinforced concrete beams with width range of 0.40 - 0.70 m., and a depth range of 0.75 - 1.00 m. The structural floors will be framed by reinforced concrete slabs with thickness range of 0.30 m - 0.50 m (max). Each floor slab system will be restrained at edges to stiffen the whole structural system. A reinforced concrete parapet shall be applied along exterior edges of the Car Parks and Ramps that serves as safety barrier to contain any accidental impact loadings. To restrain the forces brought upon by seismic, thermal, uneven base settlements and applied moving loads, the Ramps shall be considered as isolated structures restraining independently such applied stresses; with sufficient flexibility against any lateral and vertical movements with respect to the overall behavior of the interfaces of structural systems on the Forecourt Complex. Block Walls in the Administrative Office Buildings shall be insulated walls. Structural Concepts The Forecourt Complex Structural Systems are conceptualized based from the structural systems behavioural aspects of responses on the applications of applied loadings on the structures. It is assumed that the application of Framed Reinforced Concrete Structural System on the Forecourt Complex shall sustain enough the needed flexible resistances of the structures against the applied loadings coupled with sidesways and plumb displacements. Owing to the lesser degree of behavioural applications of the presumed lateral loadings that are ascertained to act on the Structural Systems - since the ratio of the total exposed building height and applied lateral displacements is considered minimal, the assumptive need for a structural shear walls to lessen the amount of applications of the estimated displacements is therefore eliminated. Accordingly, since the required bearing pressure constraints for equilibrium to contain the applied combined stresses on the Structural Systems supports points have been assumed not going beyond the nominal parameters of the allowable independent bases of resistance then an application of mat foundation as base of supports is disregarded; instead spread pad footings will constitute the bases of supports for the Structural Systems. Similarly, due to the symmetries of the floor modules continuities a large imbalance stresses are not foreseen - a lesser degree of rotations and tensile developments at supports base points are therefore sustainable enough with strip foundations. To render the Forecourt Complex Structural Systems points of restrains adequately feasible enough to contain the magnitudes of the applied displacements in any course of actions brought upon by the imparted joints and assumptive points stresses resulted from the applications of the applied seismic, thermal and uneven ground settlements stresses, each Car Park building will be isolated quadrupled with movement joints; with distributed covered floor area of isolation application not exceeding 3600 m² and with an isolated length not exceeding 60 meters and with due considerations on the effects of induced seismic torsional moments that shall perceive to act on each isolated unit of the building if the unity ratio of mass and rigidity coincidence could not achieve owing to movement joints asymmetrical locations. Movement joints load transfer and interface points shall be
  • 3. capable enough to restrain any lateral and vertical displacements stresses in any direction in addition to the induced reactions due to combined ultimate stresses. Accordingly, each Ramps Structural Systems shall also be isolated from the Car Park Structural Systems, with at least two (2) transverse movement joints and with an isolated longitudinal lengths not exceeding 60 meter in length. Similarly, the Administrative Office building structure adjacent to the Car Park shall also be isolated from the Car Park Structural Systems with the provision of movement joints capable enough to sustain any induced lateral and vertical displacements stresses. Owing to aesthetic requirements the movement joints shall be applied with due consideration on the elimination on the needs of additional column and foundation supports along the joints of isolation lines. It is therefore concluded that without the application of such movement joints the Forecourt Complex Structural Systems would need to have much greater amount of resistances against induced lateral and vertical displacements stresses, which would require the system to have bigger member sizes with added reinforcements to restrain such displacement stresses, in addition to the application of much bigger bases of supports such as raft foundation to contain the wide-coverage uneven ground strata settlements. To restrain the side sways and plumbs strain effects of seismic movements and uneven ground settlements stresses including any instability and imbalance stresses, in addition to the isolation joints, all the Structural Systems Reinforced Concrete Columns shall be tied together with a grade beams adequately enough to resist any compression, tension and torsion stresses brought upon by such induced stresses. If the Structural Columns are opted not to be tied with ground beams then bigger sizes of Structural Columns are foreseen in addition to the application of Mat Foundation in lieu of Strip Footings as support bases and instability and imbalance controller at the most critical structural systems joints. Accordingly, Structural Steel Columns are chosen not quite feasible to be used on the Forecourt Complex Structural Systems due to the following technical engineering aspects: firstly - ductility demand - the elastoplastic response of the structural system on seismic forces; is the ratio of the inelastic movement of the structure to the elastic movement which requires the structural system, in addition to the seismic additional detailing requirements on its complex connections, to be rigid or braced enough to attain such demand for ductility, of which bigger sizes of steel columns are foreseen for rigid frames and lateral braces for braced frames which would affect the aesthetic requirements on the Forecourt Complex, and secondly - deflection considerations - owing to effects of moving loads including impact stress though minimal in applications, will brought upon on the structural systems nominal cyclic long term deflections which would require the system to have bigger member sizes with added complex seismic detailing connections and adequate braces to lessen the magnitude on buckling and slenderness requirements, in addition to the corrosion and fireproofing protection systems that also would affect the aesthetical aspects of the Forecourt Complex. Similarly, Precast or Prestressed Concrete Structural System is disregarded due to its design requirements on complex establishment of overall seismic in- plane force paths, complex applications on its connections including large amount of needed movement tolerances to restrain the induced seismic stresses and displacements, provision of overall vertical tension ties which would require the establishment and application of seismic effective ground and base interface connections. Reinforced Concrete Beams and Slabs shall frame the Forecourt Complex Structural Flooring Systems. Owing to the induced lateral and vertical displacements stresses in
  • 4. addition to the combined applied ultimate stresses, it is assumed that the applied Flooring Systems shall have conceivable rigidity - enough to contribute to the overall restraining stiffness of the whole Structural Frame Systems in terms of joints, interfaces and correlational assumptive robustness behavioral aspects. Accordingly, composite slab systems is not considered owing to elastoplastic response requirement on the structural system, applied deflection considerations, additional seismic detailing requirements on complex connections, and corrosion and fireproofing requirements. Similarly, flat slab structural systems is not considered as the best feasible floor framing option due to, in addition to its economic disadvantage comparison implications, the establishment of complex concentrated edge points connections requirement along the lines of movement joints - concentrated stress transfer at isolation lines support points. Though there are some walls on the sets of buildings on the Forecourt Complex such as external perimeter walls and safety barrier walls on the Car Parks external edges, such walls are considered incapable to contribute on the overall strain stiffness of the Forecourt Complex Structural Systems and hence structurally disregarded relevant to the overall assumptive behavioral functions and capacities of the structural system against induced stresses brought upon by applied service and ultimate loadings on the buildings and ramps. Roofing System and Car Shades structural systems shall be of steel structures and built-up tapered roof beams with prefabricated insulated aluminum roofing panels - lightweight enough to lessen the needed restraining stresses on its bases which shall be absorbed by the supporting slabs on the Car Park decks. Accordingly, owing to wind and seismic induced forces including thermal stresses, the Car Park Roofing Systems shall have supports joints flexible enough to contain any transverse and longitudinal lateral displacements brought upon by such applied movements on the roof framing systems. However, even though the Car Shades Roofing systems, with built-up beams and rolled steel purlins roofed with prefabricated roofing panels but without insulation, are similarly lightweight enough will have their bases fix to the slabs due to the large assumptive concentrated induced surface point loads and flexural stresses acting on their single struts base supports points brought upon by the cantilevered actions of the whole framing systems. Accordingly, the Car Shades roofing systems shall have transverse movement joints at every 60 meter maximum longitudinal distance capable to restrain any lateral transverse and longitudinal side sways displacements brought upon by transient seismic and wind loadings coupled with combined ultimate permanent applied stresses on the car shades structures. The effects of material corrosions due to environment and utilization factors on members strains sustainable competence on the Car Park roofing system and car shades structural steel frames shall be taken into account in the whole assumptive behavioral restraining capacities applications, of which the minimum thickness of any aspects of rolled sections will be 8 mm and 10 mm for built-up sections. To guard against the decaying effects of material strain corrosions and hence to prevent the impairment and dissipation of energy restrains on affected members reinforcements, all foundations and grade beams of the sets of buildings in the Forecourt Complex will be waterproofed and dampproofed in accordance with their applied levels of embedment corrosion exposures to soil water and chemical seepages proportionate to the estimated mean sea level. Waterproofed membrane materials shall be technically sophisticated enough to contain any water and chemical exfiltration and infiltration seepages in addition to its shredding adequacy - tensile and compressible capacity to restrain any surface applied
  • 5. stresses on the members. Accordingly, all building decks directly expose to environmental climate factors shall be waterproofed with due consideration on the amount of periodic accumulated rainfall and any water pondings on the affected building decks. Interfaces Interfaces between adjacent buildings in the Forecourt Complex shall be by movement and slip joints with adequate flexibility to restrain any induced lateral and vertical displacements brought upon by applied seismic and thermal stresses including any calculated deformations due to uneven ground settlements. Such movement and slip joints shall be capable enough to provide the needed aesthetical floor continuities between isolated floor edges with sophisticated expansion/contraction material properly installed on the joints. Effects of building configurations on affected adjacent buildings will be taken into consideration on the magnitude of application on such movement and slip joints to restrain any induced tearing, crushing and battering stresses due to seismic oscillation rotational forces. Architectural interfaces with the structural frame systems shall take into considerations all aesthetical finishes material installations and applications with respect to the effects of frames deflections, sways and expansions due to applied loads. Architectural finishing materials including roof waterproofing shall be in accordance with manufacturer's instructions and installed with enough flexibility to retain its designed levels, forms and line of axes with the use of sophisticated hinges and fixers against any movements on the frame systems. Aesthetical floor tiling systems including its mortar shall withstand, in addition to the designed applied floor loadings, any imbalance loadings brought upon by the structural frame systems movements. Mechanical interfaces with the structural frame systems shall be by hangers, inserts and other applicable methods of interfaces but such interfaces shall not impair the design strength capacities of affected members of the frame systems. With due considerations on the members tension and compression sides and the effective concrete compression strength, inserts near the supports and for pipes passing through slabs shall be installed above the beams neutral axis and within the zone of half of the maximum shear distance from the face of supports. Accordingly, inserts near to mid-portions of beams shall be installed below the beams neutral axis and within half of the beam middle length. Electrical interfaces shall Information Technology interfaces will be Civil interfaces with the structural systems
  • 6.
  • 7. PAGE NUMPAGES Normal Normal Default Paragraph Font Default Paragraph Font Table Normal Table Normal No List No List ÿBody Text,Body Text Char1,Body Text Char Char,Body Text Char Char3 Char Char,Body Text Char Char Char Char Char Char,Body Text Char3 Char Char Char Char Char Char,Body Text Char1 Char Char Char1 Char Char Char Char,Body Text Char2 Char Char,Body Text Char ÿBody Text,Body Text Char1,Body Text Char Char,Body Text Char Char3 Char Char,Body Text Char Char Char Char Char Char,Body Text Char3 Char Char Char Char Char Char,Body Text Char1 Char Char Char1 Char Char Char Char,Body Text Char2 Char Char,Body Text Char êBody Text Char1 Char,Body Text Char Char Char,Body Text Char Char3 Char Char Char,Body Text Char Char Char Char Char Char Char,Body Text Char3 Char Char Char Char Char Char Char,Body Text Char1 Char Char Char1 Char Char Char Char Char êBody Text Char1 Char,Body Text Char Char Char,Body Text Char Char3 Char Char Char,Body Text Char Char Char Char Char Char Char,Body Text Char3 Char Char Char Char Char Char Char,Body Text Char1 Char Char Char1 Char Char Char Char Char 4Body Text Char Char Char2,Body Text Char1 Char1 Char 4Body Text Char Char Char2,Body Text Char1 Char1 Char Header Header Footer Footer
  • 8. Page Number Page Number *€urn:schemas-microsoft-com:office:smarttags *€urn:schemas-microsoft-com:office:smarttags €PlaceName *€urn:schemas-microsoft-com:office:smarttags €PlaceType Unknownÿ! Times New Roman Times New Roman Symbol Symbol ÷The Multi Storey Car park Building (MSCP) comprise of two (2) building structures namely the North Car park and the South Car park each four (4) storeys high situated at the front corners of the Passenger Terminal Building at the arrival concourse ÷The Multi Storey Car park Building (MSCP) comprise of two (2) building structures namely the North Car park and the South Car park each four (4) storeys high situated at the front corners of the Passenger Terminal Building at the arrival concourse Eduardo Pare Eduardo Pare Eduardo Pare Eduardo Pare The Multi Storey Car park Building (MSCP) comprise of two (2) building structures namely the North Car park and the South Car park each four (4) storeys high situated at the front corners of the Passenger Terminal Building at the arrival concourse Eduardo Pare Normal.dot Eduardo Pare Microsoft Office Word The Multi Storey Car park Building (MSCP) comprise of two (2) building structures namely the North Car park and the South Car park each four (4) storeys high situated at the front corners of the Passenger Terminal Building at the arrival concourse Root Entry 1Table 1Table WordDocument WordDocument SummaryInformation SummaryInformation DocumentSummaryInformation DocumentSummaryInformation CompObj CompObj Microsoft Office Word Document MSWordDoc Word.Document.8 Root Entry Root Entry
  • 9. 1Table 1Table WordDocument WordDocument SummaryInformation SummaryInformation the South Car park each four (4) storeys high situated at the front corners of the Passenger Terminal Building at the arrival concourse DocumentSummaryInformation DocumentSummaryInformation CompObj CompObj Microsoft Office Word Document MSWordDoc Word.Document.8 The Multi Storey Car park Building (MSCP) comprise of two (2) building structures namely the North Car park and
  • 10. 1Table 1Table WordDocument WordDocument SummaryInformation SummaryInformation the South Car park each four (4) storeys high situated at the front corners of the Passenger Terminal Building at the arrival concourse DocumentSummaryInformation DocumentSummaryInformation CompObj CompObj Microsoft Office Word Document MSWordDoc Word.Document.8 The Multi Storey Car park Building (MSCP) comprise of two (2) building structures namely the North Car park and