The document describes a Complaint Management System (CMS) that will be created using VB programming to maintain a database for generator complaints from both home appliances and commercial customers. The CMS will also track customer interactions with the company's help line and allow viewing of customer profiles. It will allow users to enroll, delete, and edit customers and complaints. The CMS will segregate complaints by nature and region and provide reporting and a complete history for each customer to allow for detailed analysis. The requirements analysis, design, implementation and control, testing, and evaluation and feedback stages of the software development life cycle are outlined.
The smart complaint system is our mini project based on the fact that people should more utilize technology in their day to day life for solving their problems.
Online shopping project synopsis uploaded in this document.
You can download project in https://www.studentprojectguide.com/php/online-shopping-system/
Hostel Management System monitors and records a variety of information covering Hostel Attendance, Disciplinary Logs, as well as Room charge Status.Hostel management software
Hostel software module includes many features like fee collection, room allotment, room management as categorization of rooms, daily attendance register of hostel and hostel reports.Hostel management system module includes many reports like room allotment register, room left report, charge due reports and receipts, room transfer register and room status report
The smart complaint system is our mini project based on the fact that people should more utilize technology in their day to day life for solving their problems.
Online shopping project synopsis uploaded in this document.
You can download project in https://www.studentprojectguide.com/php/online-shopping-system/
Hostel Management System monitors and records a variety of information covering Hostel Attendance, Disciplinary Logs, as well as Room charge Status.Hostel management software
Hostel software module includes many features like fee collection, room allotment, room management as categorization of rooms, daily attendance register of hostel and hostel reports.Hostel management system module includes many reports like room allotment register, room left report, charge due reports and receipts, room transfer register and room status report
Use Case, Activity, Sequence, Class Diagram of Blood Bank Management System.
Poster Design of Blood Bank Management System.
By- CSE Students of East West University
• Hotels are the place where you stay, eat meals and utilize their other services.
• As computer has merged with man as single entity so a computerized application can be developed that can handle Hotel Management System (HMS).
• Various activities takes place in hotel like:-
• Hotel needs to maintain the record of guests and reserve rooms beforehand.
• Customers should be able to know the availability of the rooms on a particular date.
• They should be able to reserve the available rooms according to their need in advance.
• To make their stay comfortable, they are provided with food and other services.
• The record of the food taken by each customer and the services availed by the customer should be kept.
Use Case, Activity, Sequence, Class Diagram of Blood Bank Management System.
Poster Design of Blood Bank Management System.
By- CSE Students of East West University
• Hotels are the place where you stay, eat meals and utilize their other services.
• As computer has merged with man as single entity so a computerized application can be developed that can handle Hotel Management System (HMS).
• Various activities takes place in hotel like:-
• Hotel needs to maintain the record of guests and reserve rooms beforehand.
• Customers should be able to know the availability of the rooms on a particular date.
• They should be able to reserve the available rooms according to their need in advance.
• To make their stay comfortable, they are provided with food and other services.
• The record of the food taken by each customer and the services availed by the customer should be kept.
Among the manufacturing industries, the electronics industry occupies a key position in modern science and technology. It plays vital role in the field of Atomic Energy, Communication, Defense, Education, Entertainment and Space Technology. Until 1970’s the electronics industry was the most protected of all the Indian industries. At that point of time country’s electronics policy strongly favored self-reliance and technology and capital imports were strongly discouraged. This resulted in the electronics industry being highly under developed till the late 1980’s. The industry was considered very inefficient producing outdated and low quality models at a very high cost. Policy reforms were initiated in the early 1990’s with the liberalization of trade and industry sectors. With the change in the policy regimes after liberalization, the industry experienced restructuring.
This presentation consist of report which is in a form of slides. it consist of introduction of Company, scope of project, tools used, and little bit of introduction of each topics.
This is my report that i did for my industrial placement or what one would call internship. It has some detailed information that can help anyone in the field of IT.
It has all sorts of topics like networks, systems administration and many others.
"A study of digital marketing services" -summer internship projectMarketerBoard
Introduction
To begin with, as a part of the curriculum a summer internship programme was to be conducted for a period of two months. Given a choice one was allowed to choose the field in which he/she was interested. As my interest and curiosity was in online or digital marketing I choose to work with a startup company named Return on web. Return on web is three year old Pune based online marketing & web development firm focused on providing you business-centric strategic solutions to the companies. I choose the startup company because with start I can explore myself and why digital marketing? Because it is booming industry, the growth of digital marketing is tremendous and expected to grow more.
Due to this summer internship, I learnt every aspect of digital marketing include (business development process, content writing, social media). The company asks me to do their competitive research and told to found return on web USP. And research of our target segments digital habits. With the help of the research we got a flow of what are the major criteria’s we need to have. One had to identify various sectors in the market that actually have a need of digital marketing services. And then your task is to approach them before your competitors.
Digital marketing startup companies follow a standard process of approaching clients. There are certain steps which cannot be altered or skipped. These are followed in sequences and executed after evaluating the process again and again. In digital marketing your team should be strong enough to deliver what your client expecting, as under digital marketing everyone work is interconnected and with a team only one campaign can get ready.
An extensive literature review is done on the concepts and theories related to web advertising. A review of Research papers, articles is undertaken to take note of and acknowledge work that has been done in the field of web advertising as such. The Researcher has collected secondary data from reputed Journals and Magazines, Newspapers, articles, Internet websites and Archives. The Researcher has visited
Libraries in Pune and out of Pune, to collect literature.The researcher has identified seven research papers along with thirteen articles published in renowned journals on various topics such as Web ad, Web based ad market, E-commerce impact, trends of online marketing, consumer attitude to Web ad and sales/marketing strategy
It was an amazing experience working virtually and on field. I came to many new terminologies of digital marketing, corporate world etc. The project contain the task which has been done by me during my internship as well as what I have learnt from it.
My internship final presentation. This presentation was to share my experiences on internship, adaptation to the company culture, working in a professional environment, challenges i faced and what i achieved from my internship.
A CASE Lab Report - Project File on "ATM - Banking System"joyousbharat
A CASE Lab Report - Project File on "ATM - Banking System"
The software to be designed will control a simulated automated teller machine
(ATM) having a magnetic stripe reader for reading an ATM card, a keyboard and
display for interaction with the customer, a slot for depositing envelopes, a
dispenser for cash (in multiples of $20), a printer for printing customer receipts, and
a key-operated switch to allow an operator to start or stop the machine. The ATM
will communicate with the bank's computer over an appropriate communication
link. (The software on the latter is not part of the requirements for this problem.)
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PRO.docxclarebernice
CIS 321 Case Study ‘Equipment Check-Out System’MILESTONE 3 – PROCESS MODELING- Part I
______________________________________________________________________________________________________
Synopsis
The requirements analysis phase answers the question, "What does the user need and want from a new system?" The requirements analysis phase is critical to the success of any new information system! In this milestone we need to identify what information systems requirements need to be defined from the system users’ perspectives.
The Data flow diagram (DFD) has gained popularity as a technique for expressing system requirements for two reasons:
• It facilitates development, which often leads to building systems that better
satisfy user needs
• Data flow diagrams and narratives are easy for users to understand.
In this milestone you will first uncover external agents, processes and data flows that define the requirements for the proposed system and document that information. You will use that to build the Context Data Flow Diagrams.
Objectives
After completing this milestone, you should be able to:
• Understand and perform the techniques for requirements discovery.
• Determine external agents (external entities) and their relationship with the
System, identify data flows.
• Construct the Context DFD using VISIO.
Prerequisites
Before starting this milestone, the following topics should be covered:
• The problem analysis phase — Chapters 3 and 5
• PIECES framework — Chapters 3 and 5
• Problem analysis techniques — Chapter 6
• Process modeling techniques — Chapter 9
Assignment
Now that we have studied the current system and analyzed some of its problems and opportunities, plus gained approval to proceed, we can now start to identify the business requirements for the system and model them. In this assignment we will use our results of the previous Milestone and transcripts of an interview with the Equipment Depot staff. The results of this activity will identify the system requirements for the proposed system.
Exhibit 3.1 is a copy of the transcript of the interview. Refer to the transcript, sample forms, and results from Milestones 1 and 2 for the information necessary to complete the activities.
Activities
1. Identify External entities and relationship with system
2. Identify data flows
3. Prepare Context level Data FlowDiagram
Deliverable format and software to be used are according to your instructor’s specifications. Deliverables should be neatly packaged in a binder, separated with a tab divider labeled “Milestone 3”.
References
• Transcripts of Interview - Exhibit 3.1 (see below)
Deliverables:
Context level DFD:
Due: __/__/__
Time: _______
ADVANCED OPTIONFor the advanced option, compile the process description to note processes’ input and output.
Due: __/__/__
Time: _______
Milestone’s Poin ...
Systems Development Life Cycle(SDLC) is the step by step process whi.pdfaniyathikitchen
Systems Development Life Cycle(SDLC) is the step by step process which we are following to
complete software project that includes development and testing.
There are 6 different phases available in SDLC.
1.Requirements
2.Analysis
3.System Design
4.System Implementation / Coding
5.System Testing and Integration
6.Release or System maintenance
1.Requirements:
This is the first phase in SDLC,once the project has been confirmed between client and company
will provide directly requirements to the company BA team.
Defining the problems,adjectives such as resources and personal costs.
Studying the ability of providing alternative solutions after meeting with clients,suppliers,c
consultants and employees.
After analyzing this you have a three choices i.e. develop a new system,improve the current
system/project or leave a system.
2.System Analysis:
End users requirements should be determined and documented,what their expectations are there
for the system,and how it will perform.
It was very important to maintain strong communication level with the clients to make sure you
have a clear vision of a product.
3.System Design:
In this phase defines the elements of a system,the components,the security levels and the
modules,architecture and different interfaces.
In this design phase high level and low level designers will design system process.
4.System Implementation / Coding :
In this phase development team will involving to write the actual coding functional modules.
In this phase system is ready to be deployed and installed customer premises.
Training will be given end users depends upon the project
5.System testing and Integration testing
During this phase testing team involved to ensures customer satisfaction and it will no required
coding knowledge.
Testing team performed real users it was systematic process in testing and done the integration
testing and automation testing if required.
6.Release and system maintenance:
During this phase technical team will be involving delay the application into production
environment.
Technical team and testing team will be involving to provide support to client while using
application production.
In the above question is that critical activity may include the coding of the application as per
client requirement is very difficult and gathering the requirements from the client also very
effecient task in SDLC process.
My position include coding of a project and in that project client need the minimum 3 months of
time for deploying the application into the production then our manager and team lead will
mainly focus on the developer in the project.
If we develop project then the testing team will find the errors and then that errors we will again
rectify and where that bugs are impacting we will find.
B.
In project we are following the agile methodology.this will includes the following
Customer satisfaction by rapid delivery of useful software
Welcome changing requirements,e Ben late in development
Working software is .
A Project to Automate Inventory Management in a Fast Food, Cas.docxransayo
A Project to Automate Inventory Management in a Fast Food, Case of Big Square
BY:
Lawrence Smith
Systems Analysis, Design and Integration(IT425-1604B-02)
Doctor Reddy Urimindi
Colorado Technical University
November 28th 2016
Table of Contents
Chapter One: System Overview3
1.1 Introduction3
1.2 Users and Stakeholders3
1.3 Project Initiator or sponsor3
Chapter One Section 2: Requirements Specification4
2.1 System Goals and Objectives4
2.2 Requirements Gathering4
2.3 Functional Requirements4
2.4 Non- Functional Requirements5
2.5 Project Scope6
Chapter One: System Overview1.1 Introduction
This project is intended to develop a real time Enterprise Resource Planning system with capabilities to monitor inventory levels in the company. Through the system, Big Square Company, who are the clients for the system, will be able to track their current inventory levels as soon a sale is made. The system will enable the management monitor inventory levels in all their branches countrywide. As an addition to managing inventory, Big Square Company will also be able to perform analysis and determine future order dates from their suppliers. This could be attained by creating reorder levels for inventory and subsequent notification to suppliers. Having collected and generated data, the system will be able to generate reports for decision making process by the management of the company. The analysis of the data collected could provide insight on which decisions will have a positive impact on the growth of the company. For example, the data could inform the management which type of food that customers consume more and thus they should stock more of the commodity. They can also be able to determine and relate the effect of seasons to the consumption of the food. 1.2 Users and Stakeholders
The system has a set of users, classified based on their responsibilities in the company. The first user is the store keeper. This is the user with the most basic role of entering new stock as it is received and managing the inventory. This user has limited capabilities based on his/her job description and is attached to one branch. The storekeeper role might have more than one person based on the number of stores that Big Square Company has.
The second user is the general store manager. This user is at management level since he/she handles inventory for more than one branch. This manager approves reorders for more than one store.
The final user of the system is the management team. This user’s role could be by one or more people depending on the management structure. The manager has all the privileges that the other two users have. The manager can be able to see and analyze reports concerning the business. 1.3 Project Initiator or sponsor
The project is initiated and sponsored by Big Square, a fast food company located in Chicago. The company has other branches in other parts of the country. Chapter One Section.
Bus Information Live Monitoring System software is a globally deployable, integrated, workflow based end-to-end system starting from searching bus routes to gathering entering details of the BUS. This is a complete application for Students as well as Transportation Staff. Vendors provide the information like, available routes, timings, etc. Students will have facility to view all the BUS details under college transportation. There is also scope to measure the user satisfaction regarding the BUS selection.
4. REQUIREMENT ANALYSIS
This system (CMS) will be based on VB programming, which will be specifically
created to maintain data base for the generator (Home Appliance & Commercial
Both) complaints and other concerns. The CMS will be used as Customer
Relationship Management System (CRMS) because it will also describe
customers interactions with company’s help line. In addition customer’s profile
can be view at any point.
The CMS will be helpful for the following concerns
a) User will be able to enrolled new customer, delete and edit as well. The said
process will be same for complaints
b) Customer can be search out in the system at any point with few desired
codes
c) Complaint will be segregated at its defined nature and also be sent in
accordance with the defined regions.
d) CMS will provide complete history of the customer for detail analysis
e) Multiple Reports can be exported from the system (excel sheet xlms)
5. REQUIREMENT ANALYSIS
Following requirements will be discussed in details while exploring
specification requirements, functional requirements
1. Login Credentials
2. Dashboard
i. Customer Enrolled
ii. New Complaint
iii. Search Menu for Required History
iv. Reports
6. DESIGN
This stage will explore the basic structure of the system. Some time
this stage strongly recommend by the client and the given instructions
must be followed.
If your client is new then you may have chance to catch client’s trust
by giving out your suggestions regarding system’s design
“Don’t forget to keep the theme you are working on”
7. TESTING
It must be ensured that the required design is either implemented
with required functions. For this concern software is tested by quality
engineers after evaluating every stage of the desired software
8. EVALUATION & FEEDBACK
Once it is ensured that the required software is designed in
accordance with the required functional requirements. Software
output or result is evaluated as per defined process.
In case of any changes required, the details instructions will be
forwarded to the concerns.
A details document is created for end user. This department is also
responsible for providing trainings to client.