SlideShare a Scribd company logo
1 of 30
Download to read offline
Simulations
Project
Glass Systems| Brij Consulting, LLC
| Jean A. Marshall
Part I: City Scale
SIMULATIONS
MDIA
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 1
LIFT & LIFE
Certified
Project Goals
 Ultimate goal of project.
 Relationship to other projects.
 High-level timing goals.
6/16/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 2
The modulation of scale can not be
superficial since it will become a dynamic
agile arrangement
V1 MULTI-AGENCY
Description
 Within the Glass project the stage after
remote assimilation is partnering
 The need to partner early to simulate the
building process successfully with
instancing in the solid-state assimilations
Currently the general trend characterizing the
management of supply relationships in SCM is the shift
from an arm’s length to a partnership approach
(Ellram, 1991; Lamming, 1993), wherein Supply Chain
firms cooperate. “Supply Chain Cooperation,” Page 261
SCM is Supply Chain Management
Vector Recommendation: The All-Trig Vector or the New Form Vector (Gate)
New Form
6/18/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 3
New Form
All Trig
Multi-form Investment
See Slide 12, 14
V1 MULTI-AGENCY
Both Production and Simulation Strategies are
improved by Glass systems
 The best system of BIM Building Information
Modeling may be won over from glass
We will constructively work
on the simulation purpose
of this model first.
Glass and Green in
our papers are not
on a meta basis
Glass Fabrications are
what makes building
and manufacturing
similar.
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 4
CALCULATE LIFT
MODEL SIMULATION LIFT BY INSTANCE
BRIJ CONSULTING, LLC JEAN MARSHALL 6/18/2023 5
L1
L2
L3
L1
L2
L3
Ω1
STRABO DIVISION
85752
63.20580488
1356.71083
2713.42166
2721.9
0.996885139
GATE
0.332295046
MAX YIELD
LIFT and LIFE Certifications
keep Cloud-Star Portal
accessible for Simulations
See Slide 13
V1 MULTI-AGENCY
Phase 1 T3&T4
Componentize
• The Fundamental
Approach to Green is
to Componentize
existing Technologies
– Products will run on a
consortium of green
until the green wall is
built.
Phase 2 T1&T2
Solid State
• Solid State is a Glass
synthetic value of the
Green Approach.
– Products will be built
locally, and windows
enhanced to permit
various build scenarios.
Phase 3 Fin & Br
Remote
• The minitiarization of
scientific assets
provides mobility and
remote building.
– The Streamline
Warehouse, branching
and portals begin to
assist cloud fluency.
Growth Strategy
6
How will we scale in the future?
BRIJ CONSULTING, LLC JEAN MARSHALL
Pre-facts are determined through LIFT simulations
L1
L2
L3
The Pre-Facts of LIFT Simulations
help to keep the project on-
target with series requirements
and other positions
specifications that need to be
performed ahead of milestones.
This is especially true in agile
mode due to rapid build-out.
There is a type of Fail-safe
requiring a new instance
captivation for tracking.
V1 MULTI-AGENCY
A New affluency in Lens
commutations
Other benefits include
Glass System Windows and Portal arrangements
Green Energy passivity
Better Health Maintenance
Multiple lens fields and dimensional
scale attribution within the ring star
Variegated Lens Ring Assimilation
Variegated
like ring facets
BRIJ CONSULTING, LLC JEAN MARSHALL 7
Slide 15, see more on topic…
Test Analysis
 P Factors
– Strengths
• We would suggest the use of the
standard P-Factor did not
compromise our test because
when substituted we gained back
the golden ratio within an
acceptable limit
Here we substituted
standard p (black) and
derived the golden ratio
(green)
Yield
Parameters
Push Test
• The P-Factor in its digital form was
also a digital contender.
6/20/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 8
885 Table
885 Table
P
p
V1 MULTI-AGENCY
Supply Chain to Gate
The Big Push at the Gate delivery of
the vector completion finishes off
all of the metric remainders
demonstrating the compilation was
successful from beginning to end.
We determined the correctly
scaled vector from the Ring Test.
6/20/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 9
See Schedule, Slide 11, for more details
BIG
Push
885 Table
V1 MULTI-AGENCY
Ring Test
Appendix IV
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 10
 New technology recommended.
– Digital Standards built advanced to Ark
 Standards being adopted.
– Ark Sciences advance
 Standards specifically being ignored.
– Meta Standards subsist
 Simulations advance agile designs
– Miniaturization may require digital P
Technology
The Mountain of the House of the LORD
…3Then He will judge between many peoples and arbitrate for strong nations far and wide.
Then they will beat their swords into plowshares and their spears into pruning hooks. Nation
will no longer take up the sword against nation, nor will they train anymore for war. 4And each
man will sit under his own vine and under his own fig tree, with no one to frighten him. For the
mouth of the LORD of Hosts has spoken
BRIJ CONSULTING, LLC JEAN MARSHALL 11
ScheduleReview high-level schedule and details.
Lift
885 Table
V1 MULTI-AGENCY
4. The simulation analysis
4.1. The base-line model
Our base-line model refers to the real cases of
IDs characterized by the specific form of cooperation
that seeks to balance the utilization of the production
capacity of suppliers while minimizing
unsatisfied customer demand. These IDs have an
organizational structure dominated by small,
locally owned firms without the presence of a leading
actor, such as a vertically integrated firm, a
large, externally owned and headquartered firm,
or a government institution (Markusen, 1996).
This kind of ID is usually called Marshallian ID
in the literature (Becattini, 1990; Markusen,
1996). Cooperation in these IDs has produced real
benefits when the competitive scenario is characterized
by a reasonably stable and not particularly
sophisticated final customer demand (Carbonara,
2002; Pilotti, 1999; Unioncamere, 1995).
Our multi-agent system model has been used to
simulate real cases so as to test the base-line
model. For this purpose, we have measured the
benefits obtained in the base-line model and compared
them with those obtained in the absence of
cooperation (NoCoop_case).
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 12
Mdpi.com
 P has modulated the scale
 F has wall frequency
 Load increases with synergy
 Prevalence of Ring Lens
strategy will only improve
the outcome of instances
 X has the primary object of
the threaded relationship
Economies of Scale
exist within operations
of non-glass or what is
considered “classic”
industry. Modulating
Scale is then a goal of
competent standards
such as Y and X are on
an equivalent basis.
Competing Instances Analysis See Slides 13, 3
STRABO graph
Glass has
scalability and
plait capability
built into it. It is
also GREEN.
BRIJ CONSULTING, LLC JEAN MARSHALL
13
Portal Resources
LIFT and LIFE Certifications
are necessary to utilize portal
resources
Yield
Parameters
LIFT Comparative
Facts
Yield Parameters:
Instance Facts
adjusted to avoid
exceeding Yield
Ω1
LIFE Certification is Omega guaranteed
885 Table
Ω1
LIFT and LIFE Facts
Certifications
Certifications are necessary for all Portal
Arrangements including Prototyping,
Production Book, Engineering of Utilities.
Production and Simulation works.
LIFT Certifications are engineering tested.
LIFE Certifications are equity interfaced.
Authentication of the Morning Star
Oversight is essential for system
Performance mechanics.
LIFT & LIFE
α,Ω1
BENCHMARK
No loss to benchmark
All Trig
V1 MULTI-AGENCY
 We will highlight the Phases and
Interoperability of Projects
 Discuss requirements, benefits, and
issues of using new procedures.
6/22/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 14
See Slide 3
 Phase 1 T3&T4
Componentize
V2 INTEROPERABILITY
L1
See Slide 17
Each Phase will have its own
commutative properties
New Form
Metric Moving Phase Changes
Sum by Phase and System Task
Detail of Moving Average Changes
BRIJ CONSULTING, LLC JEAN MARSHALL 6/20/2023 15
See App I
Impacts of Model Development
 High-level overview of progress against schedule.
– On-track in what areas
– Behind in what areas
– Ahead in what areas
 Unexpected delays or issues.
 Synthesis, Miniaturization, and Remote Delivery
– Require a highly developed angular acuity.
– Remote Building requires a positional aspect
that has both reach and angular acuity.
6/22/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 16
V3 LENS EVOLUTION
Lens Status
Slide 19, Dig-P4;
885 Table
App IV, Ark-P4
5.78
7.76
Lens Acuity=
Lens and Window
relationships are a matter
of process associations
Events Compilation
Assists the compiled
form with metric
parameter, slide 17
New Form
7.07966
BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 17
 Ring Test for digital/miniaturization
– Digital Standards built advanced to Ark
 Reconcile Phases with Instances
– Ark Sciences advance
 Simulate to advance agile designs
 Varying States require variegated lens
– Discuss requirements for VRD on x products (planning of
instances)
– Use of compiled events produce objectives of new lens, etc..
To Do
Instances divide the load
and bifurcate the margin.
These are important clues in
finding simulation events. In
the affluent cloud they will
not be divided but in the
instances of forms and mix
this is a challenge.
764.6 x 2=
1529.3
- 1526.9=
2.8
-3.85 establishes unitary conversion
Events
Compilation
30.8
26.2
18.8 75.8
+3.6
Phase Compilation
-See digital ring slide 20
.00482391 x 2=
0.00964782-.00963409 = .00001373
Critical Path
Goal: Fabrication
at the Construction Site
.963409 -.960734214 = .002674786
411 = ROI, slide 22
BRIJ CONSULTING, LLC JEAN MARSHALL 6/20/2023 18
 Detail by Phase and System Task  Detail of Phase and System Features
Related Documents
• Perform with each advancing stage
Marketing Plan
• Perform to forecast each LIFE cycle
Phase Budget
• Events preceding the LIFT requirement
Pre-Evident
• Results Assimilated and Variegated
Post-Actuated
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 19
When is it necessary to recertify LIFT and LIFE
requirements? When the stratifications shift
significantly to change the relevant range. These
views will be explored in upcoming papers
Digital Ring Test
BRIJ CONSULTING, LLC JEAN MARSHALL 6/18/2023 20
P
App IV, see Ark-P4
Agreed to the Yield Parameters
Variegated Lens Assimilation
Simulation Vectors
Part of preparation for each phase is
identification of the intricate requirements
for lens and table arrangements as well as
adequate windows and portals and other
system requirements. The table has to be
ready for miniaturization of scientific assets
where the “M” sits or approximately. This
is from “our” point of view and partners
may have a different set of requirements.
This is also why simulations are group or
multi-agency events.
BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 21
Componentization
Solid State (SSE)
Remote Partnering
Local Glass Industry
M
The Almighty
answered Her: “My
Dove, do not fear, for I
will assist thee and
guide thee, directing
thee in all things
necessary for the
service of my only-
begotten Son.”
Componentization Solid State (SSE) Remote/Branch
Digital to Ark Builds
Actual work results will change the
simulation outcome and the dates,
so that lens arrangements in the
supply chain need to be consistently
tested for changes and reported.
12 Vector, 4 Strata
The Splice Vector approach uses
both digital splice and ark splice
factors
BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 22
Componentization
Solid State (SSE)
Remote Partnering
Local Glass Industry Legacy Glass Industry Architectural Glass Industry
Componentization and the
development of models for solid
state development will help to settle
issues of synergy between
compositional layers
M
City Scale Remote Scale Confluent
7.07966 x 1000 – 4.11 ROI
885 Table See Slide 23
Simulation Strategy
Summary
 The compilations here will be finished in our next paper to show
how the various forms will produce new and active facts for the
cases presented to the model for each phase. As products advance
new requirements are found.
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 23
z
Each Phase will have its own
commutative properties
Lens and Window
relationships are a matter
of process associations
1392.744 x 2 = 2784
Documents
V3 LENS EVOLUTION
V2 INTEROPERABILITY
V1 MULTI-AGENCY
Actual work results will change the
simulation outcome and the dates, so
that lens, windows, tooling
arrangements in the supply chain need
to be consistently tested for changes
and reported.
• Correcting the Agile
composition of the work-
flow and life cycle
• Associating the Supply Chain
in the Simulation to assess
timing, scope and expediting
delivery
• Supplying new tooling to the
job
LIFE and LIFT Assessments
See App II
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 24
Appendix I
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL
25
Appendix II
Unit
burden
See Slide 3
T h i s P a p e r i n D e s i g n S e r i e s
Devising a Test Strategy to find
Markers for the Moments in the
Captivation of the Project that
define the wall migration, the
uplift, the distinct change in the
arrays that point to the position
of the project from
componentization to solid state
and other chores that make a
simulation modeling strategy a
great venture for investors and
stakeholders to the project, to
take hold of the imminent
domain.
SSE
Ring Test Background
Appendix III
Reasons for Simulation of Phase Mechanics
BRIJ CONSULTING, LLC JEAN MARSHALL
6/15/2023 26
Appendix IV
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 27
6/19/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 28
Next Paper in Design Ser ies
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green Wall
and the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance mined
and delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
Three parts of the
Simulations project
explore cloud depth,
cloud reach and cloud
layers
SIMULATIONS
Part I: City Scale
Part II: Remote Scale
The New Earth
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 29
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
Simulations
Project
Glass Systems| Brij Consulting, LLC
| Jean A. Marshall
Part II: Remote Scale
SIMULATIONS
6/20/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 30

More Related Content

Similar to Simulations in Ark Design Mode.pdf

Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Comments for Simulations Part II.pdf
Comments for Simulations Part II.pdfComments for Simulations Part II.pdf
Comments for Simulations Part II.pdfJeanMarshall8
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfBrij Consulting, LLC
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfBrij Consulting, LLC
 
Portal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part IIPortal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part IIBrij Consulting, LLC
 
BLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNING
BLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNINGBLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNING
BLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNINGIRJET Journal
 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfBrij Consulting, LLC
 
Portal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIPortal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIBrij Consulting, LLC
 
Scope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfScope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
The Glass Build, Mechanics and Assembly v1 Adjusting the Build
The Glass Build, Mechanics and Assembly v1 Adjusting the BuildThe Glass Build, Mechanics and Assembly v1 Adjusting the Build
The Glass Build, Mechanics and Assembly v1 Adjusting the BuildBrij Consulting, LLC
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdfJeanMarshall8
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Victor Chang: Cloud computing business framework
Victor Chang: Cloud computing business frameworkVictor Chang: Cloud computing business framework
Victor Chang: Cloud computing business frameworkCBOD ANR project U-PSUD
 
HOUSE PRICE ESTIMATION USING DATA SCIENCE AND ML
HOUSE PRICE ESTIMATION USING DATA SCIENCE AND MLHOUSE PRICE ESTIMATION USING DATA SCIENCE AND ML
HOUSE PRICE ESTIMATION USING DATA SCIENCE AND MLIRJET Journal
 

Similar to Simulations in Ark Design Mode.pdf (20)

Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Comments for Simulations Part II.pdf
Comments for Simulations Part II.pdfComments for Simulations Part II.pdf
Comments for Simulations Part II.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdf
 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdf
 
Portal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part IIPortal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part II
 
BLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNING
BLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNINGBLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNING
BLOCKISH SCAM EXPOSURE USING AUTOMATION LEARNING
 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdf
 
Portal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIPortal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part III
 
Scope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfScope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
The Glass Build, Mechanics and Assembly v1 Adjusting the Build
The Glass Build, Mechanics and Assembly v1 Adjusting the BuildThe Glass Build, Mechanics and Assembly v1 Adjusting the Build
The Glass Build, Mechanics and Assembly v1 Adjusting the Build
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Victor Chang: Cloud computing business framework
Victor Chang: Cloud computing business frameworkVictor Chang: Cloud computing business framework
Victor Chang: Cloud computing business framework
 
HOUSE PRICE ESTIMATION USING DATA SCIENCE AND ML
HOUSE PRICE ESTIMATION USING DATA SCIENCE AND MLHOUSE PRICE ESTIMATION USING DATA SCIENCE AND ML
HOUSE PRICE ESTIMATION USING DATA SCIENCE AND ML
 

Recently uploaded

Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...bleessingsbender
 
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEJIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEkajalroy875762
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdfciolook1
 
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptxBoundify
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...ssuserf63bd7
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxtmthompson1
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Klinik kandungan
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxseemajojo02
 
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDEGURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDEkajalroy875762
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docxManagerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docxssuserf63bd7
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 

Recently uploaded (20)

Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
 
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEJIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
 
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptx
 
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDEGURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docxManagerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 

Simulations in Ark Design Mode.pdf

  • 1. Simulations Project Glass Systems| Brij Consulting, LLC | Jean A. Marshall Part I: City Scale SIMULATIONS MDIA 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 1 LIFT & LIFE Certified
  • 2. Project Goals  Ultimate goal of project.  Relationship to other projects.  High-level timing goals. 6/16/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 2 The modulation of scale can not be superficial since it will become a dynamic agile arrangement V1 MULTI-AGENCY
  • 3. Description  Within the Glass project the stage after remote assimilation is partnering  The need to partner early to simulate the building process successfully with instancing in the solid-state assimilations Currently the general trend characterizing the management of supply relationships in SCM is the shift from an arm’s length to a partnership approach (Ellram, 1991; Lamming, 1993), wherein Supply Chain firms cooperate. “Supply Chain Cooperation,” Page 261 SCM is Supply Chain Management Vector Recommendation: The All-Trig Vector or the New Form Vector (Gate) New Form 6/18/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 3 New Form All Trig Multi-form Investment See Slide 12, 14 V1 MULTI-AGENCY
  • 4. Both Production and Simulation Strategies are improved by Glass systems  The best system of BIM Building Information Modeling may be won over from glass We will constructively work on the simulation purpose of this model first. Glass and Green in our papers are not on a meta basis Glass Fabrications are what makes building and manufacturing similar. 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 4
  • 5. CALCULATE LIFT MODEL SIMULATION LIFT BY INSTANCE BRIJ CONSULTING, LLC JEAN MARSHALL 6/18/2023 5 L1 L2 L3 L1 L2 L3 Ω1 STRABO DIVISION 85752 63.20580488 1356.71083 2713.42166 2721.9 0.996885139 GATE 0.332295046 MAX YIELD LIFT and LIFE Certifications keep Cloud-Star Portal accessible for Simulations See Slide 13 V1 MULTI-AGENCY
  • 6. Phase 1 T3&T4 Componentize • The Fundamental Approach to Green is to Componentize existing Technologies – Products will run on a consortium of green until the green wall is built. Phase 2 T1&T2 Solid State • Solid State is a Glass synthetic value of the Green Approach. – Products will be built locally, and windows enhanced to permit various build scenarios. Phase 3 Fin & Br Remote • The minitiarization of scientific assets provides mobility and remote building. – The Streamline Warehouse, branching and portals begin to assist cloud fluency. Growth Strategy 6 How will we scale in the future? BRIJ CONSULTING, LLC JEAN MARSHALL Pre-facts are determined through LIFT simulations L1 L2 L3 The Pre-Facts of LIFT Simulations help to keep the project on- target with series requirements and other positions specifications that need to be performed ahead of milestones. This is especially true in agile mode due to rapid build-out. There is a type of Fail-safe requiring a new instance captivation for tracking. V1 MULTI-AGENCY
  • 7. A New affluency in Lens commutations Other benefits include Glass System Windows and Portal arrangements Green Energy passivity Better Health Maintenance Multiple lens fields and dimensional scale attribution within the ring star Variegated Lens Ring Assimilation Variegated like ring facets BRIJ CONSULTING, LLC JEAN MARSHALL 7 Slide 15, see more on topic…
  • 8. Test Analysis  P Factors – Strengths • We would suggest the use of the standard P-Factor did not compromise our test because when substituted we gained back the golden ratio within an acceptable limit Here we substituted standard p (black) and derived the golden ratio (green) Yield Parameters Push Test • The P-Factor in its digital form was also a digital contender. 6/20/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 8 885 Table 885 Table P p V1 MULTI-AGENCY
  • 9. Supply Chain to Gate The Big Push at the Gate delivery of the vector completion finishes off all of the metric remainders demonstrating the compilation was successful from beginning to end. We determined the correctly scaled vector from the Ring Test. 6/20/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 9 See Schedule, Slide 11, for more details BIG Push 885 Table V1 MULTI-AGENCY Ring Test Appendix IV
  • 10. 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 10  New technology recommended. – Digital Standards built advanced to Ark  Standards being adopted. – Ark Sciences advance  Standards specifically being ignored. – Meta Standards subsist  Simulations advance agile designs – Miniaturization may require digital P Technology The Mountain of the House of the LORD …3Then He will judge between many peoples and arbitrate for strong nations far and wide. Then they will beat their swords into plowshares and their spears into pruning hooks. Nation will no longer take up the sword against nation, nor will they train anymore for war. 4And each man will sit under his own vine and under his own fig tree, with no one to frighten him. For the mouth of the LORD of Hosts has spoken
  • 11. BRIJ CONSULTING, LLC JEAN MARSHALL 11 ScheduleReview high-level schedule and details. Lift 885 Table V1 MULTI-AGENCY
  • 12. 4. The simulation analysis 4.1. The base-line model Our base-line model refers to the real cases of IDs characterized by the specific form of cooperation that seeks to balance the utilization of the production capacity of suppliers while minimizing unsatisfied customer demand. These IDs have an organizational structure dominated by small, locally owned firms without the presence of a leading actor, such as a vertically integrated firm, a large, externally owned and headquartered firm, or a government institution (Markusen, 1996). This kind of ID is usually called Marshallian ID in the literature (Becattini, 1990; Markusen, 1996). Cooperation in these IDs has produced real benefits when the competitive scenario is characterized by a reasonably stable and not particularly sophisticated final customer demand (Carbonara, 2002; Pilotti, 1999; Unioncamere, 1995). Our multi-agent system model has been used to simulate real cases so as to test the base-line model. For this purpose, we have measured the benefits obtained in the base-line model and compared them with those obtained in the absence of cooperation (NoCoop_case). 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 12 Mdpi.com  P has modulated the scale  F has wall frequency  Load increases with synergy  Prevalence of Ring Lens strategy will only improve the outcome of instances  X has the primary object of the threaded relationship Economies of Scale exist within operations of non-glass or what is considered “classic” industry. Modulating Scale is then a goal of competent standards such as Y and X are on an equivalent basis. Competing Instances Analysis See Slides 13, 3 STRABO graph Glass has scalability and plait capability built into it. It is also GREEN.
  • 13. BRIJ CONSULTING, LLC JEAN MARSHALL 13 Portal Resources LIFT and LIFE Certifications are necessary to utilize portal resources Yield Parameters LIFT Comparative Facts Yield Parameters: Instance Facts adjusted to avoid exceeding Yield Ω1 LIFE Certification is Omega guaranteed 885 Table Ω1 LIFT and LIFE Facts Certifications Certifications are necessary for all Portal Arrangements including Prototyping, Production Book, Engineering of Utilities. Production and Simulation works. LIFT Certifications are engineering tested. LIFE Certifications are equity interfaced. Authentication of the Morning Star Oversight is essential for system Performance mechanics. LIFT & LIFE α,Ω1 BENCHMARK No loss to benchmark All Trig V1 MULTI-AGENCY
  • 14.  We will highlight the Phases and Interoperability of Projects  Discuss requirements, benefits, and issues of using new procedures. 6/22/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 14 See Slide 3  Phase 1 T3&T4 Componentize V2 INTEROPERABILITY L1 See Slide 17 Each Phase will have its own commutative properties New Form
  • 15. Metric Moving Phase Changes Sum by Phase and System Task Detail of Moving Average Changes BRIJ CONSULTING, LLC JEAN MARSHALL 6/20/2023 15 See App I
  • 16. Impacts of Model Development  High-level overview of progress against schedule. – On-track in what areas – Behind in what areas – Ahead in what areas  Unexpected delays or issues.  Synthesis, Miniaturization, and Remote Delivery – Require a highly developed angular acuity. – Remote Building requires a positional aspect that has both reach and angular acuity. 6/22/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 16 V3 LENS EVOLUTION Lens Status Slide 19, Dig-P4; 885 Table App IV, Ark-P4 5.78 7.76 Lens Acuity= Lens and Window relationships are a matter of process associations Events Compilation Assists the compiled form with metric parameter, slide 17 New Form 7.07966
  • 17. BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 17  Ring Test for digital/miniaturization – Digital Standards built advanced to Ark  Reconcile Phases with Instances – Ark Sciences advance  Simulate to advance agile designs  Varying States require variegated lens – Discuss requirements for VRD on x products (planning of instances) – Use of compiled events produce objectives of new lens, etc.. To Do Instances divide the load and bifurcate the margin. These are important clues in finding simulation events. In the affluent cloud they will not be divided but in the instances of forms and mix this is a challenge. 764.6 x 2= 1529.3 - 1526.9= 2.8 -3.85 establishes unitary conversion Events Compilation 30.8 26.2 18.8 75.8 +3.6 Phase Compilation -See digital ring slide 20 .00482391 x 2= 0.00964782-.00963409 = .00001373 Critical Path Goal: Fabrication at the Construction Site .963409 -.960734214 = .002674786 411 = ROI, slide 22
  • 18. BRIJ CONSULTING, LLC JEAN MARSHALL 6/20/2023 18  Detail by Phase and System Task  Detail of Phase and System Features
  • 19. Related Documents • Perform with each advancing stage Marketing Plan • Perform to forecast each LIFE cycle Phase Budget • Events preceding the LIFT requirement Pre-Evident • Results Assimilated and Variegated Post-Actuated 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 19 When is it necessary to recertify LIFT and LIFE requirements? When the stratifications shift significantly to change the relevant range. These views will be explored in upcoming papers
  • 20. Digital Ring Test BRIJ CONSULTING, LLC JEAN MARSHALL 6/18/2023 20 P App IV, see Ark-P4 Agreed to the Yield Parameters Variegated Lens Assimilation
  • 21. Simulation Vectors Part of preparation for each phase is identification of the intricate requirements for lens and table arrangements as well as adequate windows and portals and other system requirements. The table has to be ready for miniaturization of scientific assets where the “M” sits or approximately. This is from “our” point of view and partners may have a different set of requirements. This is also why simulations are group or multi-agency events. BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 21 Componentization Solid State (SSE) Remote Partnering Local Glass Industry M The Almighty answered Her: “My Dove, do not fear, for I will assist thee and guide thee, directing thee in all things necessary for the service of my only- begotten Son.” Componentization Solid State (SSE) Remote/Branch Digital to Ark Builds Actual work results will change the simulation outcome and the dates, so that lens arrangements in the supply chain need to be consistently tested for changes and reported.
  • 22. 12 Vector, 4 Strata The Splice Vector approach uses both digital splice and ark splice factors BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 22 Componentization Solid State (SSE) Remote Partnering Local Glass Industry Legacy Glass Industry Architectural Glass Industry Componentization and the development of models for solid state development will help to settle issues of synergy between compositional layers M City Scale Remote Scale Confluent 7.07966 x 1000 – 4.11 ROI 885 Table See Slide 23 Simulation Strategy
  • 23. Summary  The compilations here will be finished in our next paper to show how the various forms will produce new and active facts for the cases presented to the model for each phase. As products advance new requirements are found. BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 23 z Each Phase will have its own commutative properties Lens and Window relationships are a matter of process associations 1392.744 x 2 = 2784 Documents V3 LENS EVOLUTION V2 INTEROPERABILITY V1 MULTI-AGENCY Actual work results will change the simulation outcome and the dates, so that lens, windows, tooling arrangements in the supply chain need to be consistently tested for changes and reported. • Correcting the Agile composition of the work- flow and life cycle • Associating the Supply Chain in the Simulation to assess timing, scope and expediting delivery • Supplying new tooling to the job LIFE and LIFT Assessments See App II
  • 24. 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 24 Appendix I
  • 25. 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 25 Appendix II Unit burden See Slide 3
  • 26. T h i s P a p e r i n D e s i g n S e r i e s Devising a Test Strategy to find Markers for the Moments in the Captivation of the Project that define the wall migration, the uplift, the distinct change in the arrays that point to the position of the project from componentization to solid state and other chores that make a simulation modeling strategy a great venture for investors and stakeholders to the project, to take hold of the imminent domain. SSE Ring Test Background Appendix III Reasons for Simulation of Phase Mechanics BRIJ CONSULTING, LLC JEAN MARSHALL 6/15/2023 26
  • 28. 6/19/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 28 Next Paper in Design Ser ies 1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope determination of Glass and STRABO serialization for Agile 2. Glass Impact: Streaming the Engineering of Components, Solid State Assemblage, Table Design Outcomes 3. Cascading in Green: The theories and concepts related to the Green Wall and the starting compositing of green energy and wall migrations. 4. SSE: The Remote End: How Solid-State Engineering is Performance mined and delivered remotely 5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency 6. Simulations in Diminishing Scale: The use of Ring and Lens SSE CASCADE IMPACT SCOPE CLOUD-STAR Brij Consulting, LLC | SlideShare Part I: City Scale Part II: Remote Scale Part III: Confluent Scale Three parts of the Simulations project explore cloud depth, cloud reach and cloud layers SIMULATIONS Part I: City Scale Part II: Remote Scale The New Earth
  • 29. 1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property reconcilement for Conveyance 2. Crossover Conveyance: Beginning with Remote Signature, threading the advancing fingerprint with a glass path and integral site management, moving into SIMULATIONS in Real Time 3. Converge- The Remote Build: Tasks to consider the process of converging to the Remote Build Site and what considerations are given to producing a remote service or build out of a productive requirement, introducing sandbox theory. Phase I only considers the Kitchen Tech. Phase II is involved in whole home Media and Tech in Glass. Phase III develops the land and its attributes. This is three separate papers. 6/15/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 29 1. Studying T&MM: the requirement for certification of mobility for competent conveyances 2. Portal Projects: the evidence, timing and intelligent use of portals 3. Calling it Green: Components of Green Energy, short review: Calling it Green requires new uses of potential and ^studies in wave glass and graphical relationships can raise up a green energy fluency that will lead to energy self-sufficiency 4. Dimensions in Multivariant Fabrications: Determining Forms and Contents of Green Energy and Blue Wave Cascade; relating elements to current science and future requirements 5. Wave and Lens Assimilation: The means to compile and to build in Glass Systems is described. The use of secant math. 6. Math Solutions for Wave and Lens Assimilations: See also Commentary for Math Solutions 7. Supply Side Portfolio: Timing and Model of Glass and Green events to fulfill path… Does the Tan Line help? 8. Partners in T Pluribus Unum: Measuring with Diacritical Marks 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process 13. Branch- Sound and Image Construction: Characterizing the branch capability of new applications, appliances and mode[ls] of operations 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) Motion Projects-8 Remote Theory-5 Ark Model-13 Digital-20 Go to https://www.slideshare.net/Marshallja/presentations https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for- wave-and-lens-assimilationpdf Roadmap: #47 & #48 & #49 Dimensional Building in Ark Design Glass Cars and New Product Roadmap Calendar Cartography Building with Glass #50 New Remote Theory Ark Model Motion Projects Building
  • 30. Simulations Project Glass Systems| Brij Consulting, LLC | Jean A. Marshall Part II: Remote Scale SIMULATIONS 6/20/2023 BRIJ CONSULTING, LLC JEAN MARSHALL 30