PART I: CITY SCALE: Vector relationships in partnering simulations help to deploy complex lens and window relationships. LIFT and LIFE certifications supply access to Cloud-Star portal arrangements in the Glass system.
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Simulations in Ark Design Mode.pdf
1. Simulations
Project
Glass Systems| Brij Consulting, LLC
| Jean A. Marshall
Part I: City Scale
SIMULATIONS
MDIA
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 1
LIFT & LIFE
Certified
2. Project Goals
Ultimate goal of project.
Relationship to other projects.
High-level timing goals.
6/16/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 2
The modulation of scale can not be
superficial since it will become a dynamic
agile arrangement
V1 MULTI-AGENCY
3. Description
Within the Glass project the stage after
remote assimilation is partnering
The need to partner early to simulate the
building process successfully with
instancing in the solid-state assimilations
Currently the general trend characterizing the
management of supply relationships in SCM is the shift
from an arm’s length to a partnership approach
(Ellram, 1991; Lamming, 1993), wherein Supply Chain
firms cooperate. “Supply Chain Cooperation,” Page 261
SCM is Supply Chain Management
Vector Recommendation: The All-Trig Vector or the New Form Vector (Gate)
New Form
6/18/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 3
New Form
All Trig
Multi-form Investment
See Slide 12, 14
V1 MULTI-AGENCY
4. Both Production and Simulation Strategies are
improved by Glass systems
The best system of BIM Building Information
Modeling may be won over from glass
We will constructively work
on the simulation purpose
of this model first.
Glass and Green in
our papers are not
on a meta basis
Glass Fabrications are
what makes building
and manufacturing
similar.
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 4
5. CALCULATE LIFT
MODEL SIMULATION LIFT BY INSTANCE
BRIJ CONSULTING, LLC JEAN MARSHALL 6/18/2023 5
L1
L2
L3
L1
L2
L3
Ω1
STRABO DIVISION
85752
63.20580488
1356.71083
2713.42166
2721.9
0.996885139
GATE
0.332295046
MAX YIELD
LIFT and LIFE Certifications
keep Cloud-Star Portal
accessible for Simulations
See Slide 13
V1 MULTI-AGENCY
6. Phase 1 T3&T4
Componentize
• The Fundamental
Approach to Green is
to Componentize
existing Technologies
– Products will run on a
consortium of green
until the green wall is
built.
Phase 2 T1&T2
Solid State
• Solid State is a Glass
synthetic value of the
Green Approach.
– Products will be built
locally, and windows
enhanced to permit
various build scenarios.
Phase 3 Fin & Br
Remote
• The minitiarization of
scientific assets
provides mobility and
remote building.
– The Streamline
Warehouse, branching
and portals begin to
assist cloud fluency.
Growth Strategy
6
How will we scale in the future?
BRIJ CONSULTING, LLC JEAN MARSHALL
Pre-facts are determined through LIFT simulations
L1
L2
L3
The Pre-Facts of LIFT Simulations
help to keep the project on-
target with series requirements
and other positions
specifications that need to be
performed ahead of milestones.
This is especially true in agile
mode due to rapid build-out.
There is a type of Fail-safe
requiring a new instance
captivation for tracking.
V1 MULTI-AGENCY
7. A New affluency in Lens
commutations
Other benefits include
Glass System Windows and Portal arrangements
Green Energy passivity
Better Health Maintenance
Multiple lens fields and dimensional
scale attribution within the ring star
Variegated Lens Ring Assimilation
Variegated
like ring facets
BRIJ CONSULTING, LLC JEAN MARSHALL 7
Slide 15, see more on topic…
8. Test Analysis
P Factors
– Strengths
• We would suggest the use of the
standard P-Factor did not
compromise our test because
when substituted we gained back
the golden ratio within an
acceptable limit
Here we substituted
standard p (black) and
derived the golden ratio
(green)
Yield
Parameters
Push Test
• The P-Factor in its digital form was
also a digital contender.
6/20/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 8
885 Table
885 Table
P
p
V1 MULTI-AGENCY
9. Supply Chain to Gate
The Big Push at the Gate delivery of
the vector completion finishes off
all of the metric remainders
demonstrating the compilation was
successful from beginning to end.
We determined the correctly
scaled vector from the Ring Test.
6/20/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 9
See Schedule, Slide 11, for more details
BIG
Push
885 Table
V1 MULTI-AGENCY
Ring Test
Appendix IV
10. 6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 10
New technology recommended.
– Digital Standards built advanced to Ark
Standards being adopted.
– Ark Sciences advance
Standards specifically being ignored.
– Meta Standards subsist
Simulations advance agile designs
– Miniaturization may require digital P
Technology
The Mountain of the House of the LORD
…3Then He will judge between many peoples and arbitrate for strong nations far and wide.
Then they will beat their swords into plowshares and their spears into pruning hooks. Nation
will no longer take up the sword against nation, nor will they train anymore for war. 4And each
man will sit under his own vine and under his own fig tree, with no one to frighten him. For the
mouth of the LORD of Hosts has spoken
11. BRIJ CONSULTING, LLC JEAN MARSHALL 11
ScheduleReview high-level schedule and details.
Lift
885 Table
V1 MULTI-AGENCY
12. 4. The simulation analysis
4.1. The base-line model
Our base-line model refers to the real cases of
IDs characterized by the specific form of cooperation
that seeks to balance the utilization of the production
capacity of suppliers while minimizing
unsatisfied customer demand. These IDs have an
organizational structure dominated by small,
locally owned firms without the presence of a leading
actor, such as a vertically integrated firm, a
large, externally owned and headquartered firm,
or a government institution (Markusen, 1996).
This kind of ID is usually called Marshallian ID
in the literature (Becattini, 1990; Markusen,
1996). Cooperation in these IDs has produced real
benefits when the competitive scenario is characterized
by a reasonably stable and not particularly
sophisticated final customer demand (Carbonara,
2002; Pilotti, 1999; Unioncamere, 1995).
Our multi-agent system model has been used to
simulate real cases so as to test the base-line
model. For this purpose, we have measured the
benefits obtained in the base-line model and compared
them with those obtained in the absence of
cooperation (NoCoop_case).
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 12
Mdpi.com
P has modulated the scale
F has wall frequency
Load increases with synergy
Prevalence of Ring Lens
strategy will only improve
the outcome of instances
X has the primary object of
the threaded relationship
Economies of Scale
exist within operations
of non-glass or what is
considered “classic”
industry. Modulating
Scale is then a goal of
competent standards
such as Y and X are on
an equivalent basis.
Competing Instances Analysis See Slides 13, 3
STRABO graph
Glass has
scalability and
plait capability
built into it. It is
also GREEN.
13. BRIJ CONSULTING, LLC JEAN MARSHALL
13
Portal Resources
LIFT and LIFE Certifications
are necessary to utilize portal
resources
Yield
Parameters
LIFT Comparative
Facts
Yield Parameters:
Instance Facts
adjusted to avoid
exceeding Yield
Ω1
LIFE Certification is Omega guaranteed
885 Table
Ω1
LIFT and LIFE Facts
Certifications
Certifications are necessary for all Portal
Arrangements including Prototyping,
Production Book, Engineering of Utilities.
Production and Simulation works.
LIFT Certifications are engineering tested.
LIFE Certifications are equity interfaced.
Authentication of the Morning Star
Oversight is essential for system
Performance mechanics.
LIFT & LIFE
α,Ω1
BENCHMARK
No loss to benchmark
All Trig
V1 MULTI-AGENCY
14. We will highlight the Phases and
Interoperability of Projects
Discuss requirements, benefits, and
issues of using new procedures.
6/22/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 14
See Slide 3
Phase 1 T3&T4
Componentize
V2 INTEROPERABILITY
L1
See Slide 17
Each Phase will have its own
commutative properties
New Form
15. Metric Moving Phase Changes
Sum by Phase and System Task
Detail of Moving Average Changes
BRIJ CONSULTING, LLC JEAN MARSHALL 6/20/2023 15
See App I
16. Impacts of Model Development
High-level overview of progress against schedule.
– On-track in what areas
– Behind in what areas
– Ahead in what areas
Unexpected delays or issues.
Synthesis, Miniaturization, and Remote Delivery
– Require a highly developed angular acuity.
– Remote Building requires a positional aspect
that has both reach and angular acuity.
6/22/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 16
V3 LENS EVOLUTION
Lens Status
Slide 19, Dig-P4;
885 Table
App IV, Ark-P4
5.78
7.76
Lens Acuity=
Lens and Window
relationships are a matter
of process associations
Events Compilation
Assists the compiled
form with metric
parameter, slide 17
New Form
7.07966
17. BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 17
Ring Test for digital/miniaturization
– Digital Standards built advanced to Ark
Reconcile Phases with Instances
– Ark Sciences advance
Simulate to advance agile designs
Varying States require variegated lens
– Discuss requirements for VRD on x products (planning of
instances)
– Use of compiled events produce objectives of new lens, etc..
To Do
Instances divide the load
and bifurcate the margin.
These are important clues in
finding simulation events. In
the affluent cloud they will
not be divided but in the
instances of forms and mix
this is a challenge.
764.6 x 2=
1529.3
- 1526.9=
2.8
-3.85 establishes unitary conversion
Events
Compilation
30.8
26.2
18.8 75.8
+3.6
Phase Compilation
-See digital ring slide 20
.00482391 x 2=
0.00964782-.00963409 = .00001373
Critical Path
Goal: Fabrication
at the Construction Site
.963409 -.960734214 = .002674786
411 = ROI, slide 22
18. BRIJ CONSULTING, LLC JEAN MARSHALL 6/20/2023 18
Detail by Phase and System Task Detail of Phase and System Features
19. Related Documents
• Perform with each advancing stage
Marketing Plan
• Perform to forecast each LIFE cycle
Phase Budget
• Events preceding the LIFT requirement
Pre-Evident
• Results Assimilated and Variegated
Post-Actuated
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 19
When is it necessary to recertify LIFT and LIFE
requirements? When the stratifications shift
significantly to change the relevant range. These
views will be explored in upcoming papers
20. Digital Ring Test
BRIJ CONSULTING, LLC JEAN MARSHALL 6/18/2023 20
P
App IV, see Ark-P4
Agreed to the Yield Parameters
Variegated Lens Assimilation
21. Simulation Vectors
Part of preparation for each phase is
identification of the intricate requirements
for lens and table arrangements as well as
adequate windows and portals and other
system requirements. The table has to be
ready for miniaturization of scientific assets
where the “M” sits or approximately. This
is from “our” point of view and partners
may have a different set of requirements.
This is also why simulations are group or
multi-agency events.
BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 21
Componentization
Solid State (SSE)
Remote Partnering
Local Glass Industry
M
The Almighty
answered Her: “My
Dove, do not fear, for I
will assist thee and
guide thee, directing
thee in all things
necessary for the
service of my only-
begotten Son.”
Componentization Solid State (SSE) Remote/Branch
Digital to Ark Builds
Actual work results will change the
simulation outcome and the dates,
so that lens arrangements in the
supply chain need to be consistently
tested for changes and reported.
22. 12 Vector, 4 Strata
The Splice Vector approach uses
both digital splice and ark splice
factors
BRIJ CONSULTING, LLC JEAN MARSHALL 6/22/2023 22
Componentization
Solid State (SSE)
Remote Partnering
Local Glass Industry Legacy Glass Industry Architectural Glass Industry
Componentization and the
development of models for solid
state development will help to settle
issues of synergy between
compositional layers
M
City Scale Remote Scale Confluent
7.07966 x 1000 – 4.11 ROI
885 Table See Slide 23
Simulation Strategy
23. Summary
The compilations here will be finished in our next paper to show
how the various forms will produce new and active facts for the
cases presented to the model for each phase. As products advance
new requirements are found.
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 23
z
Each Phase will have its own
commutative properties
Lens and Window
relationships are a matter
of process associations
1392.744 x 2 = 2784
Documents
V3 LENS EVOLUTION
V2 INTEROPERABILITY
V1 MULTI-AGENCY
Actual work results will change the
simulation outcome and the dates, so
that lens, windows, tooling
arrangements in the supply chain need
to be consistently tested for changes
and reported.
• Correcting the Agile
composition of the work-
flow and life cycle
• Associating the Supply Chain
in the Simulation to assess
timing, scope and expediting
delivery
• Supplying new tooling to the
job
LIFE and LIFT Assessments
See App II
26. T h i s P a p e r i n D e s i g n S e r i e s
Devising a Test Strategy to find
Markers for the Moments in the
Captivation of the Project that
define the wall migration, the
uplift, the distinct change in the
arrays that point to the position
of the project from
componentization to solid state
and other chores that make a
simulation modeling strategy a
great venture for investors and
stakeholders to the project, to
take hold of the imminent
domain.
SSE
Ring Test Background
Appendix III
Reasons for Simulation of Phase Mechanics
BRIJ CONSULTING, LLC JEAN MARSHALL
6/15/2023 26
28. 6/19/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 28
Next Paper in Design Ser ies
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green Wall
and the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance mined
and delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
Three parts of the
Simulations project
explore cloud depth,
cloud reach and cloud
layers
SIMULATIONS
Part I: City Scale
Part II: Remote Scale
The New Earth
29. 1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
6/15/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 29
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
30. Simulations
Project
Glass Systems| Brij Consulting, LLC
| Jean A. Marshall
Part II: Remote Scale
SIMULATIONS
6/20/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 30