SlideShare a Scribd company logo
1 of 54
Download to read offline
GLASS BIG PUSH
Architectural Instances and Remote Building
MDIA
V3 Glass Package
V2 Synergy Modifications
V1 Map Testing
Glass
System
Ark/Digital
Plan
Startups
Build
Requirements
Infra-
structure
9/25/2023 1
Of Pillars and Pipes, Portals and Plaits,
Part I:
Columns and Beams
Impact on Simulations Model
Part II: Coming
next!
Here!
1
Summary of Comments on Glass Big Push
Page: 1
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:14 PM
Pillars and Pipes, Portals and Plaits and Columns and Beams in Architectural Instances and Remote Building are broadly discussed, in order to see glass
system capability.
Testing Theory
PIPES AND MAPPING STREAM-LINE BRANCH
V3 Glass Package
V2 Synergy Modifications
V1 Map Testing
• Walking through the Multiform
delivery to instances and fully
Assimilated Glass Process
9/25/2023 Brij Consulting, LLC Jean Marshall 2
Pipe delivery systems give way to
streamline warehouse and branching for
remote building.
Architectural Instances and Remote Building
Portals will change the
outcome
Pipes are the first
Streamline lesson
Stars to Branch and facilitate
the glass table and modeling
design for simulations
1
Page: 2
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:14 PM
Testing to ensure green home capability is sure to require energy star components and the glass system infrastructure. As we build up Intellectual
Properties the team is able to participate in management benefits from team and individual performance metrics related to the profit-sharing plan. By
taking on more responsibility in the partnering plan individuals may receive highly visible roles in making judgement calls based on years of delivering
certifiable experience.
Glass
System
Ark/Digital
Plan
Startups
Build
Requirem
ents
Infrastruct
ure
Startups
Ark/Digital
Plan
Build
Infrastructure Imputed payback
196.5 payback
Gap Analysis on slide 4
V1 Map Testing
9/25/2023 Brij Consulting, LLC Jean Marshall 3
slide 24
1
Page: 3
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:15 PM
The various sides of the Economic means of the Glass System begin to produce the payback, and to the investors by the end of our paper. The Covenant
guided process ensures compliance with best practices and lawful conditions.
Payback on Investment: Building a Bridge
■ Our project is layered and
produces several version of the
payback based on what layer we
are addressing. Here we
compared the final forward for
the entire project.
■ We would not want to depend
on metrics without the glass
system to build a bridge,
because in some ways we can
only compare constructively but
not determine the right fit.
Actual glass metrics will conform to
the precise measure and mechanic
necessary to build a structure.
.2414 x 2 = .4828 critical path
Clock key ROI PI Yield Transit-Y-Yield
Transit-Secant
V1 Map Testing
9/25/2023 Brij Consulting, LLC Jean Marshall 4
1
Page: 4
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:15 PM
Exploring our metrics, we derive the overall payback for the project and sponsor payback to investors.
Performance String
From Home and Foundation Test
Source of clock key
^y = Build Equation
There are many more
distributive properties found
forward in the project from
remote building, branch and
partnering arrangements
520-411= 109 x8 =(872+4)/10= 87.6 Final Omega
y = -56.9022x + 14,557,227,025,214.9000
R² = 0.0609
(20,000,000,000,000.00)
(10,000,000,000,000.00)
-
10,000,000,000,000.00
20,000,000,000,000.00
30,000,000,000,000.00
40,000,000,000,000.00
50,000,000,000,000.00
60,000,000,000,000.00
70,000,000,000,000.00
80,000,000,000,000.00
(200,000,000,000.00) - 200,000,000,000.00 400,000,000,000.00
87.6 Final Omega- 82 Interim Walk Omega= 5.6 Billion
V1 Map Testing
5
9/25/2023
Trig for Events
1
Page: 5
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:15 PM
Metrics with finely tuned string variables according to Number Theory help to define the productive nature of the enterprise. Clock Keys tie the process to
the production book and are essential facts in encryptions.
Mapping the Project y = -56.9022x +
14,557,227,025,214.9000
R² = 0.0609
(20,000,000,000,000.00)
(10,000,000,000,000.00)
-
10,000,000,000,000.00
20,000,000,000,000.00
30,000,000,000,000.00
40,000,000,000,000.00
50,000,000,000,000.00
60,000,000,000,000.00
70,000,000,000,000.00
80,000,000,000,000.00
(200,000,000,000.00) - 200,000,000,000.00
400,000,000,000.00
V1 Map Testing
This mechanic operates not only the
car and road but the appliances in the
home that will branch from the
streamline warehouse
Localized
Map
9/25/2023 Brij Consulting, LLC Jean Marshall 6
Slide 12
Trig for Events
Bridge Gate Graph Metric
SA Slide 16
1
Page: 6
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:16 PM
The Branch Mechanic is synchronous with the candle stone operation of the glass car and the house operation of appliances, as well. The energy star is
supplying lift for the car so that it rides on a wave. The Streamline Warehouse is the IP signal
concerning the location of all Intellectual properties and their ownership.
LOCALIZED SIMULATIONS
USING TEST INSTRUCTIONS
CAN PARALLEL VENDOR TEST
■ Using interior product menus
within the product package
the vendor can conduct on-
site testing
■ Later when the remote
delivery capability is
available the entire process
can be conducted from the
streamline warehouse
■ Ark Media is shown in its
infancy as flags and
counters
■ The Pipe Walk lets you
assimilate a pipe and install
a column or a beam without
any shoe leather involved.
V1 Map Testing
Simulating a Pipe Walk for product complexity
9/25/2023 Brij Consulting, LLC Jean Marshall 7
Complex Instances
Use Multiple
Productions
1
Page: 7
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:16 PM
Complex Instancing begins as a pipe walk of multiple productions. Assembling architectural structures begins to take on new technologies, which
advance the process to new types of reporting.
Pipe Testing
■ The number of pipes needed to cure
pre-specified land conditions can be
required based on the need to hit
another pipe combination at the 7
thru 10 instance.
■ If pipes operate in pairs the
requirement to split the operation
between a set or use the pair as a
double for some combined effect of
secant and glass assemblies.
■ Doubling the pipe combination can be
soft situation where the land condition
may double back after the first
treatment.
■ A Similar operation can be conducted
with build pipe. If the pipe is no longer
necessary, it can be crushed and
taken out of the warehouse, with
notations. Permanent pipe
assimilations should be locked so that
this can not happen. And a Land
Lease arrangement is required.
9/25/2023 Brij Consulting, LLC Jean Marshall 8
Simulating a Pipe Test for Land based conditions
Land
Conditions
Configure Pipe
Hit = pipe combo
Stand = this pipe
Split = defined pair
Double = Ops x 2
Model simulation testing
is required
1
Page: 8
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:16 PM
Pipe and secant engineering are closely tied for the field enterprise of many types of land and building management. Threads that operate in the pipe
carry signals, particularly in road and house conveyance.
PIPES, THE SECRET TO
MAPPING AND TO THE
STREAMLINE WAREHOUSE
■ Pipes are a conveyance for the
product. Often pipes are found in
the ground, the road and the home
within the candle stone surface.
■ The Streamline Warehouse
conducts product through
replications to various sites and
activities, allowing for branching of
vendor products to assimilate and
engage the process.
■ The Streamline Warehouse also
repeatedly pings the status of the
product and tracks ownership, title
transfer and assimilations.
■ Repairs, upgrades and removal all
can occur within the warehouse
process. The first notable
requirement for Streamline
Warehouse is Land Pipe Lease
V1 Map Testing
Streaming Warehouse follows pipe theory
9/25/2023 Brij Consulting, LLC Jean Marshall 9
Magi and Marcus transfer title of Science
Building to begin remote Glass Industry
see slide14
1
Page: 9
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:17 PM
The start of the Streaming Warehouse is the Transfer of the Title to the Science Building and its glass assets. Since it is componentized, it is later sold as a
legacy asset.
Land Leveling
■ Various land operations can
be conducted using pipes
and streaming method but
should be tested in small
areas first
■ The varying land conditions
may require different pipe
packages and also require a
certified pipe engineer to run
the operation
V1 Map Testing
Pipes do complex tasks based on glass acclimation
to land structures and eventually remote capability
9/25/2023 Brij Consulting, LLC Jean Marshall 10
Inserting land fill pipes can be like calculating
A cubic volume of fill in a land interior space
Convergence begins to reveal
portal theory & four power lens req
.
^see slide 13>>
100x
ϕϕ
Slide 21
1
Page: 10
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:17 PM
The relationship of pipes to ground acclimation is discussed as well as a view of the Lift association between combined bridge gates and cloud star
approbation in the advancing project toward portals and cloud fluency, at the end of the 50 year project. The view of these metrics is primarily for the
simulations process.
Build Concept
■ The Same Concept Machine
for Glass Mix is at work in all
builds but becomes more
complex for multi-form
materials.
■ The way the product is
packaged has to do with its
granular layers and
requirements
■ Packaged in candle stone at
its lowest mass glass level it
can gain full stature as a
product by package menu
instructions
V1 Map Testing
Pipes do dimensional and densifying tasks
within the glass mix forms & content
9/25/2023 Brij Consulting, LLC Jean Marshall 11
1
Page: 11
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:18 PM
Architectural columns and beams were a topic for complex instancing and the need to supply architectural know-how to the science center for material
testing safety. Later remote instancing was studied ,and the idea configured and tested by vendors. These projects began with testing material plaits and
then plait unions and various mix/form arrangements.
Product
Certification
■ Once the product is certified
the manufacturer’s test and
instruction are part of the
carton for delivery of the
product.
■ The process here is building
synergy toward the solid-
state engineering process
and lending its capability to
remote actualization of the
content on a miniaturized
scale.
■ So, while still a two-lens
process we have energy star
LIFT capability and we’re on
our way.
V1 Map Testing
Pipe Index
9/25/2023 Brij Consulting, LLC Jean Marshall 12
1
Page: 12
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:18 PM
While testing order fulfillment with the vendor an order fulfillment calculator was developed to determine % of completion of the job. The results of
manufacturer test is used to compare values derived by the vendor and reported back to the company to agree or disagree with compliance. Eventually
this can be converted to a remote process, when it is understood competently through all process requirements
Site Development
■ Acquisition of the energy star
and the synergy of glass to
fulfill table requirements
raises potential for remote
development.
■ Does portal theory work better
in place of pipe theory? We
must look at that. But we need
to understand portals first.
V1 Map Testing
9/25/2023 Brij Consulting, LLC Jean Marshall 13
During this interim position,
the use of 7WW (write to
production) is now locally
available; Still at 3x Lens; 4x
Lens are available with
Scientific Assets… next.
The Confluent Cloud is
developed from portal
knowledge and is not known
until the end of the project
Scientific Notes
^See
^see slide 10
simulation
ϕ
ϕ
Slide 17 78.683 x 2 = 156.766
1
Page: 13
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:19 PM
Models and Instancing begin the process of synergizing glass to solid state engineering. Comparing to our final Scrum Metric statement of performance
standards we can see clearly that the yield from graphic metrics produce good results.
Big Builds
Requirement
9/25/2023 Brij Consulting, LLC Jean Marshall 14
Surcharge on sales is average
glass mass requirement
Gate Delivery is new
IP for streamline
delivery and tracking
The first thing we notice about big
builds for architectural services is
the need for a streamline
warehouse to track and record
deliveries and product in service
at sites. This at first is
understood by the pipe
arrangement but eventually
portals take the place of pipes all
together. This is gradual learning
process over time.
V2 Synergy Modifications The need to operate and
streamline delivery for big
builds reconfigures the
business of Magi and
Marcus; the Glass Mass
team is put in charge of the
portal-based warehouse.
Solid State
Should surcharge be
adjusted?
No: Models affect the
glass mass surcharge at
rate of payback on glass
cost see slide 16
SSE
No moving parts
98.70846162-
98.889603 =
.1811414 x 2
=
.3622828
Build Equation-
Load-Omega
see slide17
.47414884 Fin. Rate Slide 17
Trig for Events
see slide 16
1
Page: 14
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:19 PM
Statement comparisons show that Streamline IP is related to the gate metrics and corresponds to the Trig facts introduced into the model. This is
important to all underlying production.
■ The theory of putting SSE or
Solid-State Engineering to work
with big architectural products
is to plait the beam to the wall
and join at either end with
reinforcing rods. There is no
better method than glass. The
composition is either site
delivery or remote depending
on the phase of the overall
glass project. Through
replication at the granular-level
it can be joined remotely to the
wall and produced specifically
through mobile portals or pipes
removed after construction.
9/25/2023 Brij Consulting, LLC Jean Marshall 15
The method of glass plaiting and
multiform characteristic of the build
along with production instancing
give new adhesion and strength to
cantilever apparatus that are part of
a building design.
V2 Synergy Modifications
Engineering
Fabrications in Ark
Mode of Glass
Lens compositions must be of 3xL or 4xL to
accommodate the intrinsic SSE or Remote
development
1
Page: 15
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:20 PM
Engineering Fabrications in the Ark Mode of Glass prove themselves to be a successful build method over time, acquiring methods that gain traction
across the length of the project.
9/25/2023 Brij Consulting, LLC Jean Marshall
16
Scientific Assets
■ Scientific Assets are
miniaturized and packaged
for remote operations
■ Community lands, buildings
and road systems are built
remotely with 4 power lens
*9.0836652-9.00=.836652-.816=
.020652/.0114 = 1.81157895 x2 =
3.62315789
Glass Mass
Deduct
Lens
2 x
Compare to Build Equation
.3622828 - .362315789 = .00032989 x2= .00065979 - .0006445=
.00001529 Burden Pickup – [3.624703 = .00154511] = .00001611 Labor
^y = Build Equation
98.5 C.F.
V2 Synergy Modifications
*Compare 9.08~ to Trig Events Slide 17
Slide 6
1
Page: 16
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:20 PM
The scientific assets are those build cases and other equipment that must be delivered to a remote site and built or installed there. The Build equation
recognized site labor, while additional burden was recognized from the rate difference to the build equation.
Push Compare
9/25/2023
Brij Consulting, LLC Jean Marshall
17
410,599,637 – 410,923,581 = -333,944 GATE/3 = 111,314,667 KEY
Scientific Assets Slide 16
.47113-.47414884 Fin. Rate = .000301884 x2 =.000603768 e
V2 Synergy Modifications
75.833 2x2 =
151.666 –
151.757 = .91
What do promotions
to the streamline
warehouse mean to
the team? See next
205.602 – 205.61587
= .01387-.0134433
=.0004267 y
Change in
property
arrangements
for Warehouse
association.
Sale of Legacy
Property of
Science Building
TT Fee
Impact
Critical path assoc.
Slide 14
Financial Rate Slide 14
*Compare 9.08~ to Trig Slide 16
920-329 =
.00000591
^see slide 10>>
Trig for Table
Whse. Fee>>
Trig for Events
e
Whse. Fee>>Affil. Discount
Whse IP + Conversion
Slide 19 Gate
205.602 x 2=
411.204-411.98589=
-.78189
Slide 13 78.683 x 2 = 156.766 -
(78.189 x 2 156.378) = .388 x 2 = .776 + 2
TT
TT
1
Page: 17
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:21 PM
Financial comparison to graphic relational tasks and corresponding trig relationships prove very beneficial to outlining the project. We will be studying
the relational impacts in Part II to determine what may happen to STRABO.
WAREHOUSE
MANAGEMENT
TEAM
9/25/2023 Brij Consulting, LLC Jean Marshall 18
Warehouse Team R & D Team
Virtual products live
in a Virtual Warehouse
New Roles are assigned
What do new Benefits look like?
See next…
1
Page: 18
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:21 PM
Explanations of the Product Backlog in comparison with the Sprint Backlog as well as the Scrum-ban combination are helpful to see that the metrics used
are different and that the production-based scrum + kanban combination is helpful to the inventory relationship of delivery. Can the team keep up and
what are the benefits if they do? See next.
Financial
Change in Roles
■ The Team has acquired Pipe Engineering
Roles in a Master Builder Setting, as their
salaries have doubled
■ They have conducted material testing for
industrial physics products for 15+ years
with glass mass packaging knowledge and
the role of pipes in land and building
management.
■ At the granular glass level of production,
they are moving along into glass systems
that conduct business via star-cloud portals.
This type of engineering will become
prevalent in 50 years with cloud fluency
engineering. (This is Post-Forms and Matrix
Alignments.)
■ Notice that second or third generation glass
homes will cost at least half of the new solid
state glass composition. Profit sharing
affords savings contribution towards home.
Brij Consulting, LLC Jean Marshall 9/25/2023 19
Reg. Earnings
paid out with
administration
time. Profit
sharing
distributive
wages can be
saved towards
home
purchase.
The TT Manager
is training part
time for the
Installer
Business in the
Field. He can
purchase for
$410k down.
Whse. Fee>>Affil. Discount
TT
1
Page: 19
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:22 PM
This specific Team is not the only ones who profit from the scientific technology that keeps up a continuous benefit. The investors are paid back from
customers billed at the full rate of which Magi and Marcus are investors. The individual worker is capable to easily save toward the value of a house with
other new technologies and continue to progress in their roles toward portal sciences. The Installer Business begun by Magi and Marcus is seen on
Appendix II. The Impact Factor (IF) is used to compare with cycles in the process and the company outcome. The Impact Factor is important in the SCOPE
REQUIREMENT and the market determination.
Complex
Instancing
■ The glass mass ratio will correspond
to packaging requirements and will
enable the candle-stone packaging
which is nearly weightless in
relationship to its mass to produce
a replication product remotely and
to be then attributed with densifying
product. It is thus equally necessary
to miniaturize scientific assets for
their use in corresponding building
applications remotely.
Source of Glass-Mass
Weight (Pounds per
Kilogram) and inverse
.908
+.001
Maximum
Resource
attributable to an
equity object by
weight equivalency
■ An Example of this calculation follows:
given a load ROI of:
The remainder of
the load according
to the build ratio is
plait able and
Branch able in a
separate container
9/25/2023 Brij Consulting, LLC Jean Marshall 20
V3 Glass Package
1
Page: 20
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:22 PM
The complex instancing requires careful watch on the glass mass ratio which this slide demonstrates. The branching capability of the cloud-star
arrangement keeps the partnering relationships alive and profitable. Installers are a group trained for appliance installation in the home.
Phase III
Graphics
■ The graphics for Branch and Finish seem
to have less bearing on the project than
the Phase II aspects of T1 & T2 where
most of the engineering occurs for secants
and lens.
■ Streaming Media has a large bearing on
Partnering for the Remote Building. We are
unable to develop the plethora of products
that develop in that composition so that
the project is weighted in the middle,
rather than the market that develops at
the end.
Brij Consulting, LLC Jean Marshall 9/25/2023 21
This page contains no comments
9/25/2023 Brij Consulting, LLC Jean Marshall 22
1
Page: 22
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:23 PM
Encryption notes borrowed from earlier papers checked for duplicate keys in this paper.
9/25/2023 Brij Consulting, LLC Jean Marshall 23
Encrypted Process (Continuous)
Changing the fingerprint for a three-step walk
BRANCHING IN APPLIANCE PROCESSES
0
5
10
15
20
25
30
35
40
45
50
Encrypt Calc1 Calc2 Calc3
It is necessary to branch in appliances
and to switch appliances in a continuous
process; this encrypt mechanic aids a
three-step operation and in the last two
steps allows for a more deliberated output
in accepting three digits.
Extra key
Using 1.11 as
the foot will
convert our
encryptions to
keys for the
next walk
111024
111250
111045
111243 root
New keys
Slide 6
Compare
Original
Keys from
Phase III
Partner Key: Slide9 111,983,524,909
External
Internal
111,314,667 KEY Scientific Assets
From “Converge III”
1
Page: 23
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:23 PM
Encryption notes developed for continuous deployment
Partner Investments
y = -15,411,230,860.11020ln(x) +
32,523,480,785.48410
R² = 0.15180
y = 906,677,539,722.99600ln(x) -
235,989,460,005.27100
R² = 0.22145
-
10,000,000,000
20,000,000,000
30,000,000,000
40,000,000,000
50,000,000,000
60,000,000,000
70,000,000,000
(500,000,000,000)
-
500,000,000,000
1,000,000,000,000
1,500,000,000,000
2,000,000,000,000
2,500,000,000,000
3,000,000,000,000
3,500,000,000,000
ARK GLASS COMMUNITY
9/25/2023 Brij Consulting, LLC, Jean Marshall 24
^Oversight Committee LOC (Morningstar)
m
513,292,157,466
From “Converge III”
Payoff is 1000 x
1,223,425,910
Whse. Fee>>Affil. Discount
Whse. Fee>>Affil. Discount
Whse IP + Conversion
Gate
Encryption
Charges
1
Page: 24
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:23 PM
Partner notes are revealing about business relationships and metric requirements.
Brij Consulting, LLC Jean Marshall
9/25/2023 25
P a p e r s i n T e s t S e r i e s
1. The Car and Road Test: Simulating Glass Cars and Candlestone Roads
Brij Consulting, LLC | SlideShare
V3 Glass Package
V2 Synergy Modifications
V1 Digital Testing
Strabo
Tying projects back to the Strabo Omega
allows for Simulations Cloud to orchestrate
outcomes
From Slide 13
2. Home and Foundation Test: Simulating Glass Instances of Candle
stone and Thread in Componentizations utilizing a legacy form of Glass
3. Glass Big Push: Legacy Glass gives way to Solid State Engineering,
Instancing and Building with remote synchronization
Of Pillars and Pipes, Portals and Plaits
Part I:
1
Page: 25
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:24 PM
We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of
car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for
the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid-
state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the
types of events or changes that impact the Simulation of the Project Performance.
Brij Consulting, LLC Jean Marshall
9/25/2023 26
P a p e r s i n D e s i g n S e r i e s
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green
Wall and the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance
mined and delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
Three parts of the
Simulations project explore
cloud depth, cloud reach
and cloud layers
SIMULATIONS
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
V3 VAULTING
V2 WORLDS W/IN WORLDS
V1 MOBILE CITY
1
Page: 26
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:25 PM
Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to
highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations
reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come.
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
9/25/2023
Brij Consulting, LLC Jean Marshall 27
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
1
Page: 27
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:28 PM
The Learning Series

More Related Content

Similar to Summary of Comments on Glass Big Push.pdf

The Glass House V1 Building with Synthesis
The Glass House V1 Building with SynthesisThe Glass House V1 Building with Synthesis
The Glass House V1 Building with SynthesisBrij Consulting, LLC
 
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdfTime and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdfBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Summary of Comments on SSE- The Remote End.pdf
Summary of Comments on SSE- The Remote End.pdfSummary of Comments on SSE- The Remote End.pdf
Summary of Comments on SSE- The Remote End.pdfBrij Consulting, LLC
 
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdfPartners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdfBrij Consulting, LLC
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfBrij Consulting, LLC
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfJeanMarshall8
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBrij Consulting, LLC
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversBrij Consulting, LLC
 
Bridging the Instance V1 Marks and Encryptions
Bridging the Instance V1 Marks and EncryptionsBridging the Instance V1 Marks and Encryptions
Bridging the Instance V1 Marks and EncryptionsBrij Consulting, LLC
 
Crossover Conveyance V1 Glass Path
Crossover Conveyance V1 Glass PathCrossover Conveyance V1 Glass Path
Crossover Conveyance V1 Glass PathBrij Consulting, LLC
 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfBrij Consulting, LLC
 

Similar to Summary of Comments on Glass Big Push.pdf (20)

The Glass House V1 Building with Synthesis
The Glass House V1 Building with SynthesisThe Glass House V1 Building with Synthesis
The Glass House V1 Building with Synthesis
 
SSE THE REMOTE END.pdf
SSE THE REMOTE END.pdfSSE THE REMOTE END.pdf
SSE THE REMOTE END.pdf
 
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdfTime and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Home and Foundation Test.pdf
Home and Foundation Test.pdfHome and Foundation Test.pdf
Home and Foundation Test.pdf
 
Summary of Comments on SSE- The Remote End.pdf
Summary of Comments on SSE- The Remote End.pdfSummary of Comments on SSE- The Remote End.pdf
Summary of Comments on SSE- The Remote End.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdfPartners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
The Corner of Mu Sic (Addendum 1)
The Corner of Mu Sic (Addendum 1)The Corner of Mu Sic (Addendum 1)
The Corner of Mu Sic (Addendum 1)
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and Drivers
 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
 
Bridging the Instance V1 Marks and Encryptions
Bridging the Instance V1 Marks and EncryptionsBridging the Instance V1 Marks and Encryptions
Bridging the Instance V1 Marks and Encryptions
 
Crossover Conveyance V1 Glass Path
Crossover Conveyance V1 Glass PathCrossover Conveyance V1 Glass Path
Crossover Conveyance V1 Glass Path
 
Glass Mix Z-Form V1 thru V3
Glass Mix Z-Form V1 thru V3Glass Mix Z-Form V1 thru V3
Glass Mix Z-Form V1 thru V3
 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdf
 

More from Brij Consulting, LLC

Comments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdfComments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdfBrij Consulting, LLC
 
Maker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdfMaker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 

More from Brij Consulting, LLC (20)

Comments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdfComments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdf
 
Maker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdfMaker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdf
 
Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 

Recently uploaded

Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...pr788182
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
BADDI 💋 Call Girl 9827461493 Call Girls in Escort service book now
BADDI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowBADDI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
BADDI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableSolan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableChandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSJHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSkajalroy875762
 

Recently uploaded (20)

Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
BADDI 💋 Call Girl 9827461493 Call Girls in Escort service book now
BADDI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowBADDI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
BADDI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableSolan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableChandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSJHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
 

Summary of Comments on Glass Big Push.pdf

  • 1. GLASS BIG PUSH Architectural Instances and Remote Building MDIA V3 Glass Package V2 Synergy Modifications V1 Map Testing Glass System Ark/Digital Plan Startups Build Requirements Infra- structure 9/25/2023 1 Of Pillars and Pipes, Portals and Plaits, Part I: Columns and Beams Impact on Simulations Model Part II: Coming next! Here! 1
  • 2. Summary of Comments on Glass Big Push Page: 1 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:14 PM Pillars and Pipes, Portals and Plaits and Columns and Beams in Architectural Instances and Remote Building are broadly discussed, in order to see glass system capability.
  • 3. Testing Theory PIPES AND MAPPING STREAM-LINE BRANCH V3 Glass Package V2 Synergy Modifications V1 Map Testing • Walking through the Multiform delivery to instances and fully Assimilated Glass Process 9/25/2023 Brij Consulting, LLC Jean Marshall 2 Pipe delivery systems give way to streamline warehouse and branching for remote building. Architectural Instances and Remote Building Portals will change the outcome Pipes are the first Streamline lesson Stars to Branch and facilitate the glass table and modeling design for simulations 1
  • 4. Page: 2 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:14 PM Testing to ensure green home capability is sure to require energy star components and the glass system infrastructure. As we build up Intellectual Properties the team is able to participate in management benefits from team and individual performance metrics related to the profit-sharing plan. By taking on more responsibility in the partnering plan individuals may receive highly visible roles in making judgement calls based on years of delivering certifiable experience.
  • 5. Glass System Ark/Digital Plan Startups Build Requirem ents Infrastruct ure Startups Ark/Digital Plan Build Infrastructure Imputed payback 196.5 payback Gap Analysis on slide 4 V1 Map Testing 9/25/2023 Brij Consulting, LLC Jean Marshall 3 slide 24 1
  • 6. Page: 3 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:15 PM The various sides of the Economic means of the Glass System begin to produce the payback, and to the investors by the end of our paper. The Covenant guided process ensures compliance with best practices and lawful conditions.
  • 7. Payback on Investment: Building a Bridge ■ Our project is layered and produces several version of the payback based on what layer we are addressing. Here we compared the final forward for the entire project. ■ We would not want to depend on metrics without the glass system to build a bridge, because in some ways we can only compare constructively but not determine the right fit. Actual glass metrics will conform to the precise measure and mechanic necessary to build a structure. .2414 x 2 = .4828 critical path Clock key ROI PI Yield Transit-Y-Yield Transit-Secant V1 Map Testing 9/25/2023 Brij Consulting, LLC Jean Marshall 4 1
  • 8. Page: 4 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:15 PM Exploring our metrics, we derive the overall payback for the project and sponsor payback to investors.
  • 9. Performance String From Home and Foundation Test Source of clock key ^y = Build Equation There are many more distributive properties found forward in the project from remote building, branch and partnering arrangements 520-411= 109 x8 =(872+4)/10= 87.6 Final Omega y = -56.9022x + 14,557,227,025,214.9000 R² = 0.0609 (20,000,000,000,000.00) (10,000,000,000,000.00) - 10,000,000,000,000.00 20,000,000,000,000.00 30,000,000,000,000.00 40,000,000,000,000.00 50,000,000,000,000.00 60,000,000,000,000.00 70,000,000,000,000.00 80,000,000,000,000.00 (200,000,000,000.00) - 200,000,000,000.00 400,000,000,000.00 87.6 Final Omega- 82 Interim Walk Omega= 5.6 Billion V1 Map Testing 5 9/25/2023 Trig for Events 1
  • 10. Page: 5 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:15 PM Metrics with finely tuned string variables according to Number Theory help to define the productive nature of the enterprise. Clock Keys tie the process to the production book and are essential facts in encryptions.
  • 11. Mapping the Project y = -56.9022x + 14,557,227,025,214.9000 R² = 0.0609 (20,000,000,000,000.00) (10,000,000,000,000.00) - 10,000,000,000,000.00 20,000,000,000,000.00 30,000,000,000,000.00 40,000,000,000,000.00 50,000,000,000,000.00 60,000,000,000,000.00 70,000,000,000,000.00 80,000,000,000,000.00 (200,000,000,000.00) - 200,000,000,000.00 400,000,000,000.00 V1 Map Testing This mechanic operates not only the car and road but the appliances in the home that will branch from the streamline warehouse Localized Map 9/25/2023 Brij Consulting, LLC Jean Marshall 6 Slide 12 Trig for Events Bridge Gate Graph Metric SA Slide 16 1
  • 12. Page: 6 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:16 PM The Branch Mechanic is synchronous with the candle stone operation of the glass car and the house operation of appliances, as well. The energy star is supplying lift for the car so that it rides on a wave. The Streamline Warehouse is the IP signal concerning the location of all Intellectual properties and their ownership.
  • 13. LOCALIZED SIMULATIONS USING TEST INSTRUCTIONS CAN PARALLEL VENDOR TEST ■ Using interior product menus within the product package the vendor can conduct on- site testing ■ Later when the remote delivery capability is available the entire process can be conducted from the streamline warehouse ■ Ark Media is shown in its infancy as flags and counters ■ The Pipe Walk lets you assimilate a pipe and install a column or a beam without any shoe leather involved. V1 Map Testing Simulating a Pipe Walk for product complexity 9/25/2023 Brij Consulting, LLC Jean Marshall 7 Complex Instances Use Multiple Productions 1
  • 14. Page: 7 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:16 PM Complex Instancing begins as a pipe walk of multiple productions. Assembling architectural structures begins to take on new technologies, which advance the process to new types of reporting.
  • 15. Pipe Testing ■ The number of pipes needed to cure pre-specified land conditions can be required based on the need to hit another pipe combination at the 7 thru 10 instance. ■ If pipes operate in pairs the requirement to split the operation between a set or use the pair as a double for some combined effect of secant and glass assemblies. ■ Doubling the pipe combination can be soft situation where the land condition may double back after the first treatment. ■ A Similar operation can be conducted with build pipe. If the pipe is no longer necessary, it can be crushed and taken out of the warehouse, with notations. Permanent pipe assimilations should be locked so that this can not happen. And a Land Lease arrangement is required. 9/25/2023 Brij Consulting, LLC Jean Marshall 8 Simulating a Pipe Test for Land based conditions Land Conditions Configure Pipe Hit = pipe combo Stand = this pipe Split = defined pair Double = Ops x 2 Model simulation testing is required 1
  • 16. Page: 8 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:16 PM Pipe and secant engineering are closely tied for the field enterprise of many types of land and building management. Threads that operate in the pipe carry signals, particularly in road and house conveyance.
  • 17. PIPES, THE SECRET TO MAPPING AND TO THE STREAMLINE WAREHOUSE ■ Pipes are a conveyance for the product. Often pipes are found in the ground, the road and the home within the candle stone surface. ■ The Streamline Warehouse conducts product through replications to various sites and activities, allowing for branching of vendor products to assimilate and engage the process. ■ The Streamline Warehouse also repeatedly pings the status of the product and tracks ownership, title transfer and assimilations. ■ Repairs, upgrades and removal all can occur within the warehouse process. The first notable requirement for Streamline Warehouse is Land Pipe Lease V1 Map Testing Streaming Warehouse follows pipe theory 9/25/2023 Brij Consulting, LLC Jean Marshall 9 Magi and Marcus transfer title of Science Building to begin remote Glass Industry see slide14 1
  • 18. Page: 9 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:17 PM The start of the Streaming Warehouse is the Transfer of the Title to the Science Building and its glass assets. Since it is componentized, it is later sold as a legacy asset.
  • 19. Land Leveling ■ Various land operations can be conducted using pipes and streaming method but should be tested in small areas first ■ The varying land conditions may require different pipe packages and also require a certified pipe engineer to run the operation V1 Map Testing Pipes do complex tasks based on glass acclimation to land structures and eventually remote capability 9/25/2023 Brij Consulting, LLC Jean Marshall 10 Inserting land fill pipes can be like calculating A cubic volume of fill in a land interior space Convergence begins to reveal portal theory & four power lens req . ^see slide 13>> 100x ϕϕ Slide 21 1
  • 20. Page: 10 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:17 PM The relationship of pipes to ground acclimation is discussed as well as a view of the Lift association between combined bridge gates and cloud star approbation in the advancing project toward portals and cloud fluency, at the end of the 50 year project. The view of these metrics is primarily for the simulations process.
  • 21. Build Concept ■ The Same Concept Machine for Glass Mix is at work in all builds but becomes more complex for multi-form materials. ■ The way the product is packaged has to do with its granular layers and requirements ■ Packaged in candle stone at its lowest mass glass level it can gain full stature as a product by package menu instructions V1 Map Testing Pipes do dimensional and densifying tasks within the glass mix forms & content 9/25/2023 Brij Consulting, LLC Jean Marshall 11 1
  • 22. Page: 11 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:18 PM Architectural columns and beams were a topic for complex instancing and the need to supply architectural know-how to the science center for material testing safety. Later remote instancing was studied ,and the idea configured and tested by vendors. These projects began with testing material plaits and then plait unions and various mix/form arrangements.
  • 23. Product Certification ■ Once the product is certified the manufacturer’s test and instruction are part of the carton for delivery of the product. ■ The process here is building synergy toward the solid- state engineering process and lending its capability to remote actualization of the content on a miniaturized scale. ■ So, while still a two-lens process we have energy star LIFT capability and we’re on our way. V1 Map Testing Pipe Index 9/25/2023 Brij Consulting, LLC Jean Marshall 12 1
  • 24. Page: 12 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:18 PM While testing order fulfillment with the vendor an order fulfillment calculator was developed to determine % of completion of the job. The results of manufacturer test is used to compare values derived by the vendor and reported back to the company to agree or disagree with compliance. Eventually this can be converted to a remote process, when it is understood competently through all process requirements
  • 25. Site Development ■ Acquisition of the energy star and the synergy of glass to fulfill table requirements raises potential for remote development. ■ Does portal theory work better in place of pipe theory? We must look at that. But we need to understand portals first. V1 Map Testing 9/25/2023 Brij Consulting, LLC Jean Marshall 13 During this interim position, the use of 7WW (write to production) is now locally available; Still at 3x Lens; 4x Lens are available with Scientific Assets… next. The Confluent Cloud is developed from portal knowledge and is not known until the end of the project Scientific Notes ^See ^see slide 10 simulation ϕ ϕ Slide 17 78.683 x 2 = 156.766 1
  • 26. Page: 13 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:19 PM Models and Instancing begin the process of synergizing glass to solid state engineering. Comparing to our final Scrum Metric statement of performance standards we can see clearly that the yield from graphic metrics produce good results.
  • 27. Big Builds Requirement 9/25/2023 Brij Consulting, LLC Jean Marshall 14 Surcharge on sales is average glass mass requirement Gate Delivery is new IP for streamline delivery and tracking The first thing we notice about big builds for architectural services is the need for a streamline warehouse to track and record deliveries and product in service at sites. This at first is understood by the pipe arrangement but eventually portals take the place of pipes all together. This is gradual learning process over time. V2 Synergy Modifications The need to operate and streamline delivery for big builds reconfigures the business of Magi and Marcus; the Glass Mass team is put in charge of the portal-based warehouse. Solid State Should surcharge be adjusted? No: Models affect the glass mass surcharge at rate of payback on glass cost see slide 16 SSE No moving parts 98.70846162- 98.889603 = .1811414 x 2 = .3622828 Build Equation- Load-Omega see slide17 .47414884 Fin. Rate Slide 17 Trig for Events see slide 16 1
  • 28. Page: 14 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:19 PM Statement comparisons show that Streamline IP is related to the gate metrics and corresponds to the Trig facts introduced into the model. This is important to all underlying production.
  • 29. ■ The theory of putting SSE or Solid-State Engineering to work with big architectural products is to plait the beam to the wall and join at either end with reinforcing rods. There is no better method than glass. The composition is either site delivery or remote depending on the phase of the overall glass project. Through replication at the granular-level it can be joined remotely to the wall and produced specifically through mobile portals or pipes removed after construction. 9/25/2023 Brij Consulting, LLC Jean Marshall 15 The method of glass plaiting and multiform characteristic of the build along with production instancing give new adhesion and strength to cantilever apparatus that are part of a building design. V2 Synergy Modifications Engineering Fabrications in Ark Mode of Glass Lens compositions must be of 3xL or 4xL to accommodate the intrinsic SSE or Remote development 1
  • 30. Page: 15 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:20 PM Engineering Fabrications in the Ark Mode of Glass prove themselves to be a successful build method over time, acquiring methods that gain traction across the length of the project.
  • 31. 9/25/2023 Brij Consulting, LLC Jean Marshall 16 Scientific Assets ■ Scientific Assets are miniaturized and packaged for remote operations ■ Community lands, buildings and road systems are built remotely with 4 power lens *9.0836652-9.00=.836652-.816= .020652/.0114 = 1.81157895 x2 = 3.62315789 Glass Mass Deduct Lens 2 x Compare to Build Equation .3622828 - .362315789 = .00032989 x2= .00065979 - .0006445= .00001529 Burden Pickup – [3.624703 = .00154511] = .00001611 Labor ^y = Build Equation 98.5 C.F. V2 Synergy Modifications *Compare 9.08~ to Trig Events Slide 17 Slide 6 1
  • 32. Page: 16 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:20 PM The scientific assets are those build cases and other equipment that must be delivered to a remote site and built or installed there. The Build equation recognized site labor, while additional burden was recognized from the rate difference to the build equation.
  • 33. Push Compare 9/25/2023 Brij Consulting, LLC Jean Marshall 17 410,599,637 – 410,923,581 = -333,944 GATE/3 = 111,314,667 KEY Scientific Assets Slide 16 .47113-.47414884 Fin. Rate = .000301884 x2 =.000603768 e V2 Synergy Modifications 75.833 2x2 = 151.666 – 151.757 = .91 What do promotions to the streamline warehouse mean to the team? See next 205.602 – 205.61587 = .01387-.0134433 =.0004267 y Change in property arrangements for Warehouse association. Sale of Legacy Property of Science Building TT Fee Impact Critical path assoc. Slide 14 Financial Rate Slide 14 *Compare 9.08~ to Trig Slide 16 920-329 = .00000591 ^see slide 10>> Trig for Table Whse. Fee>> Trig for Events e Whse. Fee>>Affil. Discount Whse IP + Conversion Slide 19 Gate 205.602 x 2= 411.204-411.98589= -.78189 Slide 13 78.683 x 2 = 156.766 - (78.189 x 2 156.378) = .388 x 2 = .776 + 2 TT TT 1
  • 34. Page: 17 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:21 PM Financial comparison to graphic relational tasks and corresponding trig relationships prove very beneficial to outlining the project. We will be studying the relational impacts in Part II to determine what may happen to STRABO.
  • 35. WAREHOUSE MANAGEMENT TEAM 9/25/2023 Brij Consulting, LLC Jean Marshall 18 Warehouse Team R & D Team Virtual products live in a Virtual Warehouse New Roles are assigned What do new Benefits look like? See next… 1
  • 36. Page: 18 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:21 PM Explanations of the Product Backlog in comparison with the Sprint Backlog as well as the Scrum-ban combination are helpful to see that the metrics used are different and that the production-based scrum + kanban combination is helpful to the inventory relationship of delivery. Can the team keep up and what are the benefits if they do? See next.
  • 37. Financial Change in Roles ■ The Team has acquired Pipe Engineering Roles in a Master Builder Setting, as their salaries have doubled ■ They have conducted material testing for industrial physics products for 15+ years with glass mass packaging knowledge and the role of pipes in land and building management. ■ At the granular glass level of production, they are moving along into glass systems that conduct business via star-cloud portals. This type of engineering will become prevalent in 50 years with cloud fluency engineering. (This is Post-Forms and Matrix Alignments.) ■ Notice that second or third generation glass homes will cost at least half of the new solid state glass composition. Profit sharing affords savings contribution towards home. Brij Consulting, LLC Jean Marshall 9/25/2023 19 Reg. Earnings paid out with administration time. Profit sharing distributive wages can be saved towards home purchase. The TT Manager is training part time for the Installer Business in the Field. He can purchase for $410k down. Whse. Fee>>Affil. Discount TT 1
  • 38. Page: 19 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:22 PM This specific Team is not the only ones who profit from the scientific technology that keeps up a continuous benefit. The investors are paid back from customers billed at the full rate of which Magi and Marcus are investors. The individual worker is capable to easily save toward the value of a house with other new technologies and continue to progress in their roles toward portal sciences. The Installer Business begun by Magi and Marcus is seen on Appendix II. The Impact Factor (IF) is used to compare with cycles in the process and the company outcome. The Impact Factor is important in the SCOPE REQUIREMENT and the market determination.
  • 39. Complex Instancing ■ The glass mass ratio will correspond to packaging requirements and will enable the candle-stone packaging which is nearly weightless in relationship to its mass to produce a replication product remotely and to be then attributed with densifying product. It is thus equally necessary to miniaturize scientific assets for their use in corresponding building applications remotely. Source of Glass-Mass Weight (Pounds per Kilogram) and inverse .908 +.001 Maximum Resource attributable to an equity object by weight equivalency ■ An Example of this calculation follows: given a load ROI of: The remainder of the load according to the build ratio is plait able and Branch able in a separate container 9/25/2023 Brij Consulting, LLC Jean Marshall 20 V3 Glass Package 1
  • 40. Page: 20 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:22 PM The complex instancing requires careful watch on the glass mass ratio which this slide demonstrates. The branching capability of the cloud-star arrangement keeps the partnering relationships alive and profitable. Installers are a group trained for appliance installation in the home.
  • 41. Phase III Graphics ■ The graphics for Branch and Finish seem to have less bearing on the project than the Phase II aspects of T1 & T2 where most of the engineering occurs for secants and lens. ■ Streaming Media has a large bearing on Partnering for the Remote Building. We are unable to develop the plethora of products that develop in that composition so that the project is weighted in the middle, rather than the market that develops at the end. Brij Consulting, LLC Jean Marshall 9/25/2023 21
  • 42. This page contains no comments
  • 43. 9/25/2023 Brij Consulting, LLC Jean Marshall 22 1
  • 44. Page: 22 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:23 PM Encryption notes borrowed from earlier papers checked for duplicate keys in this paper.
  • 45. 9/25/2023 Brij Consulting, LLC Jean Marshall 23 Encrypted Process (Continuous) Changing the fingerprint for a three-step walk BRANCHING IN APPLIANCE PROCESSES 0 5 10 15 20 25 30 35 40 45 50 Encrypt Calc1 Calc2 Calc3 It is necessary to branch in appliances and to switch appliances in a continuous process; this encrypt mechanic aids a three-step operation and in the last two steps allows for a more deliberated output in accepting three digits. Extra key Using 1.11 as the foot will convert our encryptions to keys for the next walk 111024 111250 111045 111243 root New keys Slide 6 Compare Original Keys from Phase III Partner Key: Slide9 111,983,524,909 External Internal 111,314,667 KEY Scientific Assets From “Converge III” 1
  • 46. Page: 23 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:23 PM Encryption notes developed for continuous deployment
  • 47. Partner Investments y = -15,411,230,860.11020ln(x) + 32,523,480,785.48410 R² = 0.15180 y = 906,677,539,722.99600ln(x) - 235,989,460,005.27100 R² = 0.22145 - 10,000,000,000 20,000,000,000 30,000,000,000 40,000,000,000 50,000,000,000 60,000,000,000 70,000,000,000 (500,000,000,000) - 500,000,000,000 1,000,000,000,000 1,500,000,000,000 2,000,000,000,000 2,500,000,000,000 3,000,000,000,000 3,500,000,000,000 ARK GLASS COMMUNITY 9/25/2023 Brij Consulting, LLC, Jean Marshall 24 ^Oversight Committee LOC (Morningstar) m 513,292,157,466 From “Converge III” Payoff is 1000 x 1,223,425,910 Whse. Fee>>Affil. Discount Whse. Fee>>Affil. Discount Whse IP + Conversion Gate Encryption Charges 1
  • 48. Page: 24 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:23 PM Partner notes are revealing about business relationships and metric requirements.
  • 49. Brij Consulting, LLC Jean Marshall 9/25/2023 25 P a p e r s i n T e s t S e r i e s 1. The Car and Road Test: Simulating Glass Cars and Candlestone Roads Brij Consulting, LLC | SlideShare V3 Glass Package V2 Synergy Modifications V1 Digital Testing Strabo Tying projects back to the Strabo Omega allows for Simulations Cloud to orchestrate outcomes From Slide 13 2. Home and Foundation Test: Simulating Glass Instances of Candle stone and Thread in Componentizations utilizing a legacy form of Glass 3. Glass Big Push: Legacy Glass gives way to Solid State Engineering, Instancing and Building with remote synchronization Of Pillars and Pipes, Portals and Plaits Part I: 1
  • 50. Page: 25 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:24 PM We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid- state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the types of events or changes that impact the Simulation of the Project Performance.
  • 51. Brij Consulting, LLC Jean Marshall 9/25/2023 26 P a p e r s i n D e s i g n S e r i e s 1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope determination of Glass and STRABO serialization for Agile 2. Glass Impact: Streaming the Engineering of Components, Solid State Assemblage, Table Design Outcomes 3. Cascading in Green: The theories and concepts related to the Green Wall and the starting compositing of green energy and wall migrations. 4. SSE: The Remote End: How Solid-State Engineering is Performance mined and delivered remotely 5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency 6. Simulations in Diminishing Scale: The use of Ring and Lens SSE CASCADE IMPACT SCOPE CLOUD-STAR Brij Consulting, LLC | SlideShare Part I: City Scale Part II: Remote Scale Part III: Confluent Scale Three parts of the Simulations project explore cloud depth, cloud reach and cloud layers SIMULATIONS Part I: City Scale Part II: Remote Scale Part III: Confluent Scale V3 VAULTING V2 WORLDS W/IN WORLDS V1 MOBILE CITY 1
  • 52. Page: 26 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:25 PM Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come.
  • 53. 1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property reconcilement for Conveyance 2. Crossover Conveyance: Beginning with Remote Signature, threading the advancing fingerprint with a glass path and integral site management, moving into SIMULATIONS in Real Time 3. Converge- The Remote Build: Tasks to consider the process of converging to the Remote Build Site and what considerations are given to producing a remote service or build out of a productive requirement, introducing sandbox theory. Phase I only considers the Kitchen Tech. Phase II is involved in whole home Media and Tech in Glass. Phase III develops the land and its attributes. This is three separate papers. 9/25/2023 Brij Consulting, LLC Jean Marshall 27 1. Studying T&MM: the requirement for certification of mobility for competent conveyances 2. Portal Projects: the evidence, timing and intelligent use of portals 3. Calling it Green: Components of Green Energy, short review: Calling it Green requires new uses of potential and ^studies in wave glass and graphical relationships can raise up a green energy fluency that will lead to energy self-sufficiency 4. Dimensions in Multivariant Fabrications: Determining Forms and Contents of Green Energy and Blue Wave Cascade; relating elements to current science and future requirements 5. Wave and Lens Assimilation: The means to compile and to build in Glass Systems is described. The use of secant math. 6. Math Solutions for Wave and Lens Assimilations: See also Commentary for Math Solutions 7. Supply Side Portfolio: Timing and Model of Glass and Green events to fulfill path… Does the Tan Line help? 8. Partners in T Pluribus Unum: Measuring with Diacritical Marks 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process 13. Branch- Sound and Image Construction: Characterizing the branch capability of new applications, appliances and mode[ls] of operations 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) Motion Projects-8 Remote Theory-5 Ark Model-13 Digital-20 Go to https://www.slideshare.net/Marshallja/presentations https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for- wave-and-lens-assimilationpdf Roadmap: #47 & #48 & #49 Dimensional Building in Ark Design Glass Cars and New Product Roadmap Calendar Cartography Building with Glass #50 New Remote Theory Ark Model Motion Projects Building 1
  • 54. Page: 27 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 9/25/2023 10:14:28 PM The Learning Series