The document discusses Aberdeen, Scotland's deployment of a hydrogen fuel cell bus fleet, the largest in Europe. The project aims to cement Aberdeen as a leader in hydrogen and fuel cells by outlining actions over 10 years, including deploying the first 10 fuel cell buses, building a hydrogen production and refueling station, and supporting Aberdeen as an early adopter. The £20 million demonstration project works with partners and funders to establish hydrogen infrastructure and deploy zero-emission vehicles to improve air quality and reduce carbon emissions.
Bridges on Kapchorwa – Suam Road_UgandaJavad Akhtar
This document summarizes a feasibility study and design work for bridges along the Kapchorwa – Suam Road in Uganda. The study evaluated upgrading the deteriorated mud track road, which passes through a national park, to an all-weather route. Due to limited traffic and funds, a strategy was adopted to rehabilitate suitable existing bridges and replace severely deficient structures. Typical modifications to the 6 existing bridges included re-kerbing, reconstructing parapets and resurfacing. Some steel beam bridges were converted to composite steel-concrete structures. Replacement bridges used reinforced concrete box or beam and slab designs to facilitate simple local construction.
The document summarizes a $307 million investment in nine road-rail improvement projects along the Roberts Bank Rail Corridor by 2014. The projects are aimed at improving safety, reducing delays, and increasing efficiency of the growing road and rail networks to support international trade. By separating road and rail traffic with overpasses and sidings, the number of level crossings will be reduced from 66 to improve traffic flow for over 338,000 vehicles and increase rail capacity from 18 to 38 trains per day. The projects are part of larger trade infrastructure plans and will provide local and regional economic benefits by enhancing transportation of goods and people.
This document provides information about a project to improve the Devore Interchange on I-15 in San Bernardino County, California. The project aims to address current and future traffic congestion issues by adding lanes, improving local interchanges, and separating truck and automobile traffic. It will be delivered using a design-build approach and is expected to be completed by 2016 after right of way acquisitions and design work are finished by 2014. Public outreach efforts will provide ongoing information to local communities during the project.
Railway infrastructure construction and upgrading in india and the middle eas...Business Finland
The document summarizes major railway infrastructure projects underway or planned in India and the Middle East. It outlines opportunities for Finnish companies to participate, including in upgrading outdated Indian infrastructure and developing new rail networks in Gulf countries worth over $100 billion. Specific multi-billion dollar projects are mentioned for Saudi Arabia, Qatar, the UAE, Kuwait, and Oman, as well as conferences where companies can learn more. Indian Railways' modernization plans are also summarized.
This document discusses the need for a second harbour crossing in Auckland to alleviate traffic congestion on the existing Auckland Harbour Bridge and support future growth. Three options for a new crossing are presented - a passenger-only crossing between Esmonde and Britomart, a combined passenger and vehicle crossing between those points, and a third option connecting Esmonde and Britomart to Grafton. The options aim to provide more transport options across the harbour while supporting regional development goals. Further study will refine the options to identify a preferred crossing route.
The document provides an overview of the A556 Project in North West England. The A556 is a strategic trunk road linking North Cheshire and Southern Greater Manchester. The project involves upgrading a 6.5km non-motorway section to a dual carriageway with 7 new bridges to improve safety and traffic flow. Construction began in 2010 and involves moving over 1 million cubic meters of earth, providing environmental mitigations, and collaborating across multiple organizations using BIM and other digital technologies. The presentation emphasizes the importance of designing for safety and managing residual hazards through modeling and linking to hazard logs.
Ten t corridors forerunners of a sustainable mobility system - e. bergkvistEuropean Commission
Erik Bergkvist discussed the importance of the Bothnian Corridor, which connects northern Sweden and Finland. The corridor is part of the TEN-T Core Network and connects the Northern Axis to other major corridors. Fulfilling the corridor through projects like the North Bothnia Line and connecting it to the Scandinavian-Mediterranean Corridor are important issues. The Kvarken Multimodal Link aims to strengthen transport between Vaasa and Umeå through a fully integrated solution that provides wider benefits to the Baltic Sea Region.
STEP on the Bus - Session 2.2 - Hydrogen Fuel Cell Bus Fleet in Aberdeen_Andr...STEP_scotland
The document discusses Aberdeen, Scotland's deployment of a hydrogen fuel cell bus fleet, the largest in Europe. The project aims to cement Aberdeen as a leader in hydrogen and fuel cells by outlining actions over 10 years, including deploying the first 10 fuel cell buses, building a hydrogen production and refueling station, and supporting Aberdeen as an early adopter. The £20 million demonstration project works with partners and funders to establish hydrogen infrastructure and deploy zero-emission vehicles to improve air quality and reduce carbon emissions.
Bridges on Kapchorwa – Suam Road_UgandaJavad Akhtar
This document summarizes a feasibility study and design work for bridges along the Kapchorwa – Suam Road in Uganda. The study evaluated upgrading the deteriorated mud track road, which passes through a national park, to an all-weather route. Due to limited traffic and funds, a strategy was adopted to rehabilitate suitable existing bridges and replace severely deficient structures. Typical modifications to the 6 existing bridges included re-kerbing, reconstructing parapets and resurfacing. Some steel beam bridges were converted to composite steel-concrete structures. Replacement bridges used reinforced concrete box or beam and slab designs to facilitate simple local construction.
The document summarizes a $307 million investment in nine road-rail improvement projects along the Roberts Bank Rail Corridor by 2014. The projects are aimed at improving safety, reducing delays, and increasing efficiency of the growing road and rail networks to support international trade. By separating road and rail traffic with overpasses and sidings, the number of level crossings will be reduced from 66 to improve traffic flow for over 338,000 vehicles and increase rail capacity from 18 to 38 trains per day. The projects are part of larger trade infrastructure plans and will provide local and regional economic benefits by enhancing transportation of goods and people.
This document provides information about a project to improve the Devore Interchange on I-15 in San Bernardino County, California. The project aims to address current and future traffic congestion issues by adding lanes, improving local interchanges, and separating truck and automobile traffic. It will be delivered using a design-build approach and is expected to be completed by 2016 after right of way acquisitions and design work are finished by 2014. Public outreach efforts will provide ongoing information to local communities during the project.
Railway infrastructure construction and upgrading in india and the middle eas...Business Finland
The document summarizes major railway infrastructure projects underway or planned in India and the Middle East. It outlines opportunities for Finnish companies to participate, including in upgrading outdated Indian infrastructure and developing new rail networks in Gulf countries worth over $100 billion. Specific multi-billion dollar projects are mentioned for Saudi Arabia, Qatar, the UAE, Kuwait, and Oman, as well as conferences where companies can learn more. Indian Railways' modernization plans are also summarized.
This document discusses the need for a second harbour crossing in Auckland to alleviate traffic congestion on the existing Auckland Harbour Bridge and support future growth. Three options for a new crossing are presented - a passenger-only crossing between Esmonde and Britomart, a combined passenger and vehicle crossing between those points, and a third option connecting Esmonde and Britomart to Grafton. The options aim to provide more transport options across the harbour while supporting regional development goals. Further study will refine the options to identify a preferred crossing route.
The document provides an overview of the A556 Project in North West England. The A556 is a strategic trunk road linking North Cheshire and Southern Greater Manchester. The project involves upgrading a 6.5km non-motorway section to a dual carriageway with 7 new bridges to improve safety and traffic flow. Construction began in 2010 and involves moving over 1 million cubic meters of earth, providing environmental mitigations, and collaborating across multiple organizations using BIM and other digital technologies. The presentation emphasizes the importance of designing for safety and managing residual hazards through modeling and linking to hazard logs.
Ten t corridors forerunners of a sustainable mobility system - e. bergkvistEuropean Commission
Erik Bergkvist discussed the importance of the Bothnian Corridor, which connects northern Sweden and Finland. The corridor is part of the TEN-T Core Network and connects the Northern Axis to other major corridors. Fulfilling the corridor through projects like the North Bothnia Line and connecting it to the Scandinavian-Mediterranean Corridor are important issues. The Kvarken Multimodal Link aims to strengthen transport between Vaasa and Umeå through a fully integrated solution that provides wider benefits to the Baltic Sea Region.
The document discusses opportunities in the offshore industry in East and Southeast Asia. It notes that US and European companies dominate high-end offshore technologies while Singaporean and South Korean companies lead in assembly construction. China is increasing its role in general contracting and deep-water equipment. The value chain and key players in offshore industries in China, Australia, Singapore, and Malaysia are described. Business opportunities for foreign companies are highlighted in the Malaysian oil and gas industry through various Entry Point Projects.
This document provides a progress report on improvements being made to the Woden Bus Interchange. Over the past three years, discussions have focused on modernizing the area through demolition works to improve lines of sight and safety. Proposed improvements for 2015-2016 include demolishing part of the interchange and constructing stairs and a public lift to better connect the Town Square with the bus interchange. A program outlines the planned lodgement and approval of development applications, construction tenders, and completion of demolition and new works by August 2016.
Modes of transportation and its importance
Classification of roads
Types of pavements
Cross sections of road and railway
Causes of damage to roads
Traffic signs and signals
Significance of transportation in nation's development
Role of engineers in transportation.
Working in synergy with neighbouring countries to seamlessly transport coal o...Tristan Wiggill
Working in synergy with neighbouring countries to seamlessly transport coal on a national and international scale. Presented by Kgomotso Modise at the 2nd Annual Coal Transportation Africa Summit on 19 May 2015.
Waterfront for All Summit Workshop #1: Stewardship; how do we maintain and ac...Waterfront for All
This document discusses waterfront parks and open space in Central Waterfront. It outlines central waterfront parks projects that have been completed since 2001 as well as parks currently underway and future planned parks. It also discusses funds set aside for maintenance of items within the Queens Quay project and the results of operations and maintenance audits of three waterfront projects, including recommendations to include parks operations and maintenance staff in the design process and to create portable maintenance guides.
The document discusses the replacement of the Lake Champlain Bridge between New York and Vermont. It provides an agenda and background on the need to replace the 1929 bridge by 2009. It then details the replacement timeline from 2006 to the 2010 opening of a temporary ferry and the new bridge in 2017. The new bridge design incorporated pedestrian and bicycle accommodations, including 11-foot lanes and 5-foot shoulders, following public input and collaboration between agencies. The presentation concludes with information on NYSDOT's bicycle and pedestrian design policies.
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All
Workshop Themes
• Complex set of actors across the waterfront.
• Not always clear who is in charge.
• Not always acting with a shared vision.
• How can organizational priorities be better aligned to serve the
public interest?
• Who should be part of priority setting?
Panelists
• Adam Vaughan MP, Spadina-Fort York
• Geoff Wilson, CEO PortsToronto
• Janie Romoff, General Manager, Parks, Forestry and Recreation
• Chris Glaisek, Sr. VP Planning, Waterfront Toronto
• Lorna Day, Director, Urban Design, City of Toronto (TBC)
Group #12 presents information on the construction industry in Taiwan. They discuss two major construction firms, Fu Tsu Construction and Continental Engineering Corp, and some of their landmark projects like the Taipei MRT system and Taiwan High Speed Rail. They also analyze Taiwan's infrastructure status with examples of the Taoyuan International Airport expansion and Hsueh-shan Tunnel. Finally, they review Taiwan's construction climate and budget from 2008-2010 and how it relates to GDP.
Compiled Slide Presentation on the impact of Xayaburi dam on Lower Mekong downstream countries. Xayaburi, first of 11 large dams planned for the Lower Mekong River’s mainstream. 30 km East of Xayabouri town in the mountain valley in Northern Laos. The US$3.5 billion with 1,260MW Hydropower project is developed by Thai construction company, Ch Karnchang. 95% of power will be exported to Thailand. Cambodia and Vietnam will be strongly impacted from the dams.
The Kenya Rural Roads Authority has made significant progress in improving rural road infrastructure over the past five years. They have upgraded over 2,500km of roads to bitumen standard under the Low Volume Sealed Roads Programme, with over 6,000km of ongoing road works. Maintenance of over 30,000km of roads was carried out in the 2018/19 financial year. As a result of these infrastructure improvements, access to amenities and economic development has increased in many rural areas.
The document discusses the rehabilitation of aging bridges through innovative engineering techniques. It focuses on the rehabilitation of the Angus L. Macdonald Bridge in Halifax, Nova Scotia. The rehabilitation involved replacing the entire suspended structure of the bridge in segments over 10.5-hour nightly closures. This allowed for a brand new suspended structure with increased service life and reduced maintenance costs. The rehabilitation also improved traffic flow and increased shipping clearances under the bridge. Through continuous development of innovative rehabilitation techniques, owners can address aging infrastructure issues and provide long-term solutions.
Padma Bridge is the highest priority and largest investment Project of Bangladesh.
The Asian Highway Priority Route No.1 and Trans Asian Railway will be established through Padma Bridge.
Padma Bridge will establish National, Regional and International connectivity through our national road corridors.
After completion of the Padma Bridge, the National GDP of Bangladesh will be increased by 1.26% and Southwest regional GDP will be increased by 2.3% ( incredible )
The document proposes a railway link between the LAPSSET corridor railway line and the existing East African Railway in Kenya. It describes the design of the Tana Railway Bridge, which would carry two railway tracks, six pipelines, and a walkway across the Tana River. The benefits of the proposed Lamu-Mombasa Railway Link include linking the port of Lamu to Nairobi via the East African Railway, introducing a double track railway system, boosting regional business, and providing an economical transport system for infrastructure growth. Structural drawings and details are presented for the bridge truss, piers, abutments, and piles.
The Mahatma Gandhi Setu bridge over the Ganges River in Patna, India is the longest river bridge in India at 5,575 meters long. It took 10 years to construct from 1972 to 1982 to connect North Bihar to the rest of the state. However, the bridge is now under stress from heavy traffic and two pillars developed cracks only 26 years after opening. Efforts are underway to repair the bridge's superstructure through external pre-stressing of steel cables to reinforce the structure and extend its lifespan.
Metrolinx was created in 2006 by the Province of Ontario to serve as the regional transportation agency for the Greater Toronto and Hamilton Area (GTHA). The Eglinton Crosstown Light Rail Transit project is a key part of Metrolinx's plan to build a regional rapid transit network across the GTHA to address traffic congestion. The 25-kilometer Eglinton Crosstown will include 10 kilometers of twin bore tunnels, 21 underground and surface stations, and 76 light rail vehicles to be operated by the TTC. Construction is being carried out through an alternative financing and procurement contract awarded to Crosslinx Transit Solutions, and is scheduled to be completed in 2021.
The Cleveleys Promenade project in Lancashire, England transformed over 2 miles of coastline through the construction of new sea defenses and enhancements to the promenade. Key aspects included a cafe, water play area, helical turbines to generate renewable energy, and protection for over 7,600 local properties from flooding risks. The multi-million pound project received 17 awards for its environmental and community benefits. Future phases will continue upgrading remaining sections to complete the revitalization of Cleveleys seafront.
Rockhurst University developed a 20-year master plan to improve its campus through strategic planning with the community. The plan includes (1) constructing a parking garage with retail space to move cars off-campus streets, (2) building a new academic building with classrooms and a theatre and a connected residence hall to house more students, and (3) renovating the historic first building, Sedgwick Hall, to house administrative offices. These campus improvements support Rockhurst's strategic plan to transform lives through education and build its identity and awareness in the community.
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
The document proposes improvements to connectivity between Southampton and the Isle of Wight through the Solent Gateways project. This includes enhancing the public areas around the Red Funnel ferry terminals in East Cowes and Southampton to improve the transport interchanges and stimulate regeneration. Specific proposals for East Cowes include upgrading Bridge Square, York Square, and Trinity Wharf near the ferry terminal with new public spaces, pedestrian priority areas, and a cohesive waterfront design using materials like stone, timber and steel. The project aims to complete an existing masterplan and improve traffic flow, public transport access, and the quality of the town center environment.
Liverpool Local Enterprise Partnership head of key sector growth explored the meaning of the SuperPort brand in Liverpool City Region and issued a passionate call to businesses to make the most of the opportunity it presents.
Mobility and transport in New Zealand - Leading to the FutureNERI_NZ
This document summarizes the current state of mobility and transport in New Zealand. It discusses facts about New Zealand's population and transportation network. It also examines sustainability issues and challenges facing New Zealand's transport sector, including heavy reliance on private vehicles, lack of public transportation infrastructure and culture, and impacts of natural disasters like earthquakes. The document proposes strategies to improve sustainability, such as increasing density near public transit corridors, investing in light rail, and changing policies and incentives to reduce vehicle use.
The document discusses opportunities in the offshore industry in East and Southeast Asia. It notes that US and European companies dominate high-end offshore technologies while Singaporean and South Korean companies lead in assembly construction. China is increasing its role in general contracting and deep-water equipment. The value chain and key players in offshore industries in China, Australia, Singapore, and Malaysia are described. Business opportunities for foreign companies are highlighted in the Malaysian oil and gas industry through various Entry Point Projects.
This document provides a progress report on improvements being made to the Woden Bus Interchange. Over the past three years, discussions have focused on modernizing the area through demolition works to improve lines of sight and safety. Proposed improvements for 2015-2016 include demolishing part of the interchange and constructing stairs and a public lift to better connect the Town Square with the bus interchange. A program outlines the planned lodgement and approval of development applications, construction tenders, and completion of demolition and new works by August 2016.
Modes of transportation and its importance
Classification of roads
Types of pavements
Cross sections of road and railway
Causes of damage to roads
Traffic signs and signals
Significance of transportation in nation's development
Role of engineers in transportation.
Working in synergy with neighbouring countries to seamlessly transport coal o...Tristan Wiggill
Working in synergy with neighbouring countries to seamlessly transport coal on a national and international scale. Presented by Kgomotso Modise at the 2nd Annual Coal Transportation Africa Summit on 19 May 2015.
Waterfront for All Summit Workshop #1: Stewardship; how do we maintain and ac...Waterfront for All
This document discusses waterfront parks and open space in Central Waterfront. It outlines central waterfront parks projects that have been completed since 2001 as well as parks currently underway and future planned parks. It also discusses funds set aside for maintenance of items within the Queens Quay project and the results of operations and maintenance audits of three waterfront projects, including recommendations to include parks operations and maintenance staff in the design process and to create portable maintenance guides.
The document discusses the replacement of the Lake Champlain Bridge between New York and Vermont. It provides an agenda and background on the need to replace the 1929 bridge by 2009. It then details the replacement timeline from 2006 to the 2010 opening of a temporary ferry and the new bridge in 2017. The new bridge design incorporated pedestrian and bicycle accommodations, including 11-foot lanes and 5-foot shoulders, following public input and collaboration between agencies. The presentation concludes with information on NYSDOT's bicycle and pedestrian design policies.
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All
Workshop Themes
• Complex set of actors across the waterfront.
• Not always clear who is in charge.
• Not always acting with a shared vision.
• How can organizational priorities be better aligned to serve the
public interest?
• Who should be part of priority setting?
Panelists
• Adam Vaughan MP, Spadina-Fort York
• Geoff Wilson, CEO PortsToronto
• Janie Romoff, General Manager, Parks, Forestry and Recreation
• Chris Glaisek, Sr. VP Planning, Waterfront Toronto
• Lorna Day, Director, Urban Design, City of Toronto (TBC)
Group #12 presents information on the construction industry in Taiwan. They discuss two major construction firms, Fu Tsu Construction and Continental Engineering Corp, and some of their landmark projects like the Taipei MRT system and Taiwan High Speed Rail. They also analyze Taiwan's infrastructure status with examples of the Taoyuan International Airport expansion and Hsueh-shan Tunnel. Finally, they review Taiwan's construction climate and budget from 2008-2010 and how it relates to GDP.
Compiled Slide Presentation on the impact of Xayaburi dam on Lower Mekong downstream countries. Xayaburi, first of 11 large dams planned for the Lower Mekong River’s mainstream. 30 km East of Xayabouri town in the mountain valley in Northern Laos. The US$3.5 billion with 1,260MW Hydropower project is developed by Thai construction company, Ch Karnchang. 95% of power will be exported to Thailand. Cambodia and Vietnam will be strongly impacted from the dams.
The Kenya Rural Roads Authority has made significant progress in improving rural road infrastructure over the past five years. They have upgraded over 2,500km of roads to bitumen standard under the Low Volume Sealed Roads Programme, with over 6,000km of ongoing road works. Maintenance of over 30,000km of roads was carried out in the 2018/19 financial year. As a result of these infrastructure improvements, access to amenities and economic development has increased in many rural areas.
The document discusses the rehabilitation of aging bridges through innovative engineering techniques. It focuses on the rehabilitation of the Angus L. Macdonald Bridge in Halifax, Nova Scotia. The rehabilitation involved replacing the entire suspended structure of the bridge in segments over 10.5-hour nightly closures. This allowed for a brand new suspended structure with increased service life and reduced maintenance costs. The rehabilitation also improved traffic flow and increased shipping clearances under the bridge. Through continuous development of innovative rehabilitation techniques, owners can address aging infrastructure issues and provide long-term solutions.
Padma Bridge is the highest priority and largest investment Project of Bangladesh.
The Asian Highway Priority Route No.1 and Trans Asian Railway will be established through Padma Bridge.
Padma Bridge will establish National, Regional and International connectivity through our national road corridors.
After completion of the Padma Bridge, the National GDP of Bangladesh will be increased by 1.26% and Southwest regional GDP will be increased by 2.3% ( incredible )
The document proposes a railway link between the LAPSSET corridor railway line and the existing East African Railway in Kenya. It describes the design of the Tana Railway Bridge, which would carry two railway tracks, six pipelines, and a walkway across the Tana River. The benefits of the proposed Lamu-Mombasa Railway Link include linking the port of Lamu to Nairobi via the East African Railway, introducing a double track railway system, boosting regional business, and providing an economical transport system for infrastructure growth. Structural drawings and details are presented for the bridge truss, piers, abutments, and piles.
The Mahatma Gandhi Setu bridge over the Ganges River in Patna, India is the longest river bridge in India at 5,575 meters long. It took 10 years to construct from 1972 to 1982 to connect North Bihar to the rest of the state. However, the bridge is now under stress from heavy traffic and two pillars developed cracks only 26 years after opening. Efforts are underway to repair the bridge's superstructure through external pre-stressing of steel cables to reinforce the structure and extend its lifespan.
Metrolinx was created in 2006 by the Province of Ontario to serve as the regional transportation agency for the Greater Toronto and Hamilton Area (GTHA). The Eglinton Crosstown Light Rail Transit project is a key part of Metrolinx's plan to build a regional rapid transit network across the GTHA to address traffic congestion. The 25-kilometer Eglinton Crosstown will include 10 kilometers of twin bore tunnels, 21 underground and surface stations, and 76 light rail vehicles to be operated by the TTC. Construction is being carried out through an alternative financing and procurement contract awarded to Crosslinx Transit Solutions, and is scheduled to be completed in 2021.
The Cleveleys Promenade project in Lancashire, England transformed over 2 miles of coastline through the construction of new sea defenses and enhancements to the promenade. Key aspects included a cafe, water play area, helical turbines to generate renewable energy, and protection for over 7,600 local properties from flooding risks. The multi-million pound project received 17 awards for its environmental and community benefits. Future phases will continue upgrading remaining sections to complete the revitalization of Cleveleys seafront.
Rockhurst University developed a 20-year master plan to improve its campus through strategic planning with the community. The plan includes (1) constructing a parking garage with retail space to move cars off-campus streets, (2) building a new academic building with classrooms and a theatre and a connected residence hall to house more students, and (3) renovating the historic first building, Sedgwick Hall, to house administrative offices. These campus improvements support Rockhurst's strategic plan to transform lives through education and build its identity and awareness in the community.
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
The document proposes improvements to connectivity between Southampton and the Isle of Wight through the Solent Gateways project. This includes enhancing the public areas around the Red Funnel ferry terminals in East Cowes and Southampton to improve the transport interchanges and stimulate regeneration. Specific proposals for East Cowes include upgrading Bridge Square, York Square, and Trinity Wharf near the ferry terminal with new public spaces, pedestrian priority areas, and a cohesive waterfront design using materials like stone, timber and steel. The project aims to complete an existing masterplan and improve traffic flow, public transport access, and the quality of the town center environment.
Liverpool Local Enterprise Partnership head of key sector growth explored the meaning of the SuperPort brand in Liverpool City Region and issued a passionate call to businesses to make the most of the opportunity it presents.
Mobility and transport in New Zealand - Leading to the FutureNERI_NZ
This document summarizes the current state of mobility and transport in New Zealand. It discusses facts about New Zealand's population and transportation network. It also examines sustainability issues and challenges facing New Zealand's transport sector, including heavy reliance on private vehicles, lack of public transportation infrastructure and culture, and impacts of natural disasters like earthquakes. The document proposes strategies to improve sustainability, such as increasing density near public transit corridors, investing in light rail, and changing policies and incentives to reduce vehicle use.
The document discusses several major rail projects in Finland. It describes projects to increase rail capacity between Helsinki and surrounding areas, including the Ring Rail Line connecting Helsinki to the airport, extensions to the metro westward, and the proposed City Rail Loop underground railway circling central Helsinki. The projects aim to improve public transportation, reduce traffic congestion, and support development around new stations. Key details are provided on route lengths, number of new stations, estimated costs, and projected ridership increases for the proposed City Rail Loop stations.
This document discusses European Union funding programs for business development and financing of liquefied natural gas (LNG) investments in the energy and transport sectors. It outlines various EU funding mechanisms like the Connecting Europe Facility (CEF) program for transport and energy, the European Fund for Strategic Investments, and the European Bank for Reconstruction and Development. It also describes Ocean Finance's methodology for developing LNG infrastructure projects and provides an example large-scale LNG project in Cyprus called CYnergy.
APM webinar held on 15 April 2021, hosted by Katherine Hanratty, Chair of the Northern Ireland Branch.
Presenters: Gary McCluskey, Lisa McFadden and Paul Denvir
The planning and delivery for the new North-West Multi-Modal Transport Hub in Derry~Londonderry from concept to handover.
The new multi-modal North-West Transport Hub in Derry~Londonderry aims to create a gateway with enhanced connectivity to the north west region. Located at the former Waterside train station, an 1852 Grade B-listed building, the project integrates rail services with local, inter-urban and cross border bus services as well as cycle and walking routes and supports wider regeneration.
https://youtu.be/rFkxsJrnGIs
https://www.apm.org.uk/news/north-west-multi-modal-transport-hub-nwmth-derry-londonderry-webinar/
APM webinar held on 15 April 2021, sponsored by the Northern Ireland Branch.
The planning and delivery for the new North-West Multi-Modal Transport Hub in Derry~Londonderry from concept to handover.
The new multi-modal North-West Transport Hub in Derry~Londonderry aims to create a gateway with enhanced connectivity to the north west region. Located at the former Waterside train station, an 1852 Grade B-listed building, the project integrates rail services with local, inter-urban and cross border bus services as well as cycle and walking routes and supports wider regeneration.
The £28m project has received funding from the EU’s INTERREG VA Programme, managed by the Special EU Programmes Body (SEUPB) as well as support from the Department for Infrastructure (NI), Department Transport, Tourism and Sport (Ireland) as well as Derry City and Strabane Council.
The first phase of the project, completed in October 2019 includes 1.8km of new railway track, signaling systems, new platforms and canopies as well as the re-development and restoration of the listed building and links to the city Greenway.
Phase two of the project which comprised a new Park and Ride facility, bus turning facilities and public realm space was completed in November 2020.
The event gave an insight to the challenges of planning and delivery of a complex multi-disciplinary transport project, including the restoration of a listed building.
https://www.apm.org.uk/news/north-west-multi-modal-transport-hub-nwmth-derry-londonderry-webinar/
https://youtu.be/rFkxsJrnGIs
Risavika Harbor in Norway welcomes an EU delegation to discuss innovative port development that merges traditional industry with new concepts. The port aims to become the premier logistics hub for Western Norway by simplifying cargo transport. Since 1999 over 200 million euros have been invested, creating 2500 jobs and developing 1200 acres of land with 2000 meters of dock and 14.3 meters depth. The vision is for Risavika to be the central cargo transit point in the region through cooperation with other local ports, moving freight off congested roads and onto the sea.
This document summarizes key aspects of sustainable development in Turku, Finland. It discusses Turku's history and population growth. It also outlines Turku's strategies to become a sustainable city, including expanding green space and developing an intelligent, environmentally friendly transportation system focused on walking, cycling, and public transit. The document further explains Turku's sustainable energy development through solar power and decentralized energy management.
Turku, Finland is working towards becoming a more sustainable city through various initiatives:
1) The city is focusing development along pedestrian-friendly and public transportation corridors to reduce car dependency.
2) Turku is implementing an intelligent electric grid and encouraging renewable and local energy production such as solar panels to reduce energy consumption.
3) Transportation plans include expanding light rail and bus networks to make public transportation more convenient than private vehicles.
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
The document provides information on Metrolinx's Draft 2041 Regional Transportation Plan, as well as details about the Crosstown LRT project including construction updates and milestones. Key points include:
- Metrolinx is updating its Regional Transportation Plan and is seeking public input on the Draft 2041 Plan.
- The Crosstown LRT will be a 19-kilometer light rail line with underground and surface stations, linking to other transit systems.
- Construction updates are provided for 2017 milestones and activities at various stations along the route.
- Community benefits programs are aimed at positively impacting disadvantaged communities through employment, social procurement, and community investments.
Lisää kaupunkia Helsinkiin accomplishments - Stockholm 6.9.2014Otso Kivekäs
The document discusses urban planning efforts in Helsinki, Finland. It outlines proposals to convert highways inside the city's ring road into boulevards, with half of new development planned along these routes. It also mentions regulations on building near roads to limit noise and smoke pollution, with extra measures required for buildings near roads. Finally, it notes challenges around maintaining influence for urban planning efforts and steering public discussion on these issues going forward.
This presentation covers the thematic framework of the Interreg Baltic Sea Region Programme 2021-2027, which was approved by the Joint Programming Committee in December 2020. The Programme document is still subject to approval by all Programme countries and the European Commission.
Learnings from a programme business case JumpingJaq
The document summarizes the learnings from a multi-agency programme business case for future urban growth areas in Auckland, New Zealand. Key points include:
- The programme business case involved Auckland Transport, Auckland Council, and New Zealand Transport Agency working together over 9 months to develop a $7.6-9.7 billion transport network plan for new urban growth areas.
- A programme business case approach was used due to the large geographic areas, need for a coordinated agency response, and scale of planned land use changes without prior assessments.
- Benefits of the partnership included improved land use and transport integration, mutual understanding between agencies, and knowledge sharing.
- The programme is now moving forward with indicative
Status of roads in nairobi by ps mo r 2nd august 2012Functional Eco
The document summarizes the status of roads in Nairobi, Kenya. It outlines ongoing and planned road projects in the city including the Thika Road Project, Nairobi Eastern and Northern Bypass, Nairobi Western Ring Roads, upgrading of Langata Road, and the Nairobi Southern Bypass. It also discusses opportunities for private sector participation in road infrastructure development through funding models like public-private partnerships. The way forward outlined includes enhancing investment in roads, maintaining existing roads, improving public transport, and encouraging private sector financing of infrastructure projects.
The document discusses opportunities for decarbonizing India's transport sector to meet its climate commitments. It outlines that road transport accounts for most emissions, while rail presents opportunities for increasing low-carbon mobility. Integrating more renewables into rail through large-scale solar and rooftop projects could help reduce costs and meet climate targets. Water management is also essential given rail's large water needs, with potential for conservation and wastewater reuse. Overall, the document argues for more sustainable, integrated solutions that balance development and affordability concerns while lowering emissions.
Turku, Finland is looking to develop sustainable best practices for its transportation and energy infrastructure. Some immediate solutions proposed include promoting green logistics, traffic management, biogas, and building controls. Longer term projects include developing a light rail transit system and smart grid. A light rail network could reduce carbon emissions by 11% by 2035 and increase property values by €480-850 million. It would also cut NOx emissions and increase public transportation ridership by 40%. Implementing sustainable infrastructure aligns with Turku's goals of reducing emissions and improving competitiveness.
Keynote presentation given by Gyda Grendstad of the Norwegian Public Road Administration at the 2010 CABE Urban Design Summer School in Birmingham, UK.
Auckland Transport is proposing a simpler, more integrated public transport network which enables improved access to more destinations through better connections and, on key routes, a regular frequent all day service. Find out more at http://www.aucklandtransport.govt.nz/newnetwork
Similar to #NLC3 Northern Lights Corridor Seminar Comments by Jorma Leskinen Lapin ELY-keskus 26112014 Olos Muonio (20)
#NLC3 HSEQ by Kari Poikela 26.11.2014 Olos Northern Lights CorridorKatri Rantakokko
The document discusses a pilot project to develop a standardized HSEQ (Health, Security, Environment, Quality) approach for quality management in industrial subcontracting networks in Lapland, Finland. The pilot will test an HSEQ concept with service suppliers and one or two mines. It aims to identify suppliers' management gaps, create improvement plans, and develop a toolkit to help suppliers meet various mine customers' qualifications. The expected results are improved cost-quality relationships, better value chain management, access to new customers and markets, and continuous quality improvement for suppliers. The region aims to demonstrate sustainable natural resource utilization as part of the EU's new cluster policy.
#NLC3 CEO Reija Viinanen, Tunturi-Lapin Kehitys ry 26.11.2014 OlosKatri Rantakokko
#NLC3 Reija Viinasen esitys Northern Lights Corridor -seminaarissa 26.11.2014.
Läntinen kehityskäytävä yhdistää valtiot, yritykset ja ihmiset.
#NLC3 by Reija Viinanen at Northern Lights Corridor seminar at 26.11.2014 Olos Finland.
How MJ Global Leads the Packaging Industry.pdfMJ Global
MJ Global's success in staying ahead of the curve in the packaging industry is a testament to its dedication to innovation, sustainability, and customer-centricity. By embracing technological advancements, leading in eco-friendly solutions, collaborating with industry leaders, and adapting to evolving consumer preferences, MJ Global continues to set new standards in the packaging sector.
Structural Design Process: Step-by-Step Guide for BuildingsChandresh Chudasama
The structural design process is explained: Follow our step-by-step guide to understand building design intricacies and ensure structural integrity. Learn how to build wonderful buildings with the help of our detailed information. Learn how to create structures with durability and reliability and also gain insights on ways of managing structures.
SATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSS
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
buy old yahoo accounts buy yahoo accountsSusan Laney
As a business owner, I understand the importance of having a strong online presence and leveraging various digital platforms to reach and engage with your target audience. One often overlooked yet highly valuable asset in this regard is the humble Yahoo account. While many may perceive Yahoo as a relic of the past, the truth is that these accounts still hold immense potential for businesses of all sizes.
Part 2 Deep Dive: Navigating the 2024 Slowdownjeffkluth1
Introduction
The global retail industry has weathered numerous storms, with the financial crisis of 2008 serving as a poignant reminder of the sector's resilience and adaptability. However, as we navigate the complex landscape of 2024, retailers face a unique set of challenges that demand innovative strategies and a fundamental shift in mindset. This white paper contrasts the impact of the 2008 recession on the retail sector with the current headwinds retailers are grappling with, while offering a comprehensive roadmap for success in this new paradigm.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
3 Simple Steps To Buy Verified Payoneer Account In 2024
#NLC3 Northern Lights Corridor Seminar Comments by Jorma Leskinen Lapin ELY-keskus 26112014 Olos Muonio
1. Development of International
Corridors in Lapland
Comments by Jorma Leskinen,
Finnish regional road authority
in Lapland
Jorma Leskinen
26.11.2014
2. Focus on Roads
The need for good road connections is obvious
Improving present roads is environmentally sustainable
and serves the whole community
Reconstruction work can be done even with a limited
financing section by section, although it takes time
Social acceptance for improving is easier to achieve than
that for building new transport infrastructure
Border crossing roads should be planned together with
authorities on both side
2
3. E8 Tornio - Skibotn
Important connection between Norway and Finland
Parts of the road date back to the World War II
The Northernmost 200 km in Finland need repairing
• Should be widened to 8 m
• Geometry needs to be improved in many places
• Bearing capacity should be improved
Plans have been
ready for 10 years
Financing is the
problem
3
4. Finnish initiatiative to the NDPTL
Proposal of new roads to
added to the Northern
Dimension road maps
Together with Norway
Railway projects included
Approval would make it
possible to use Northern
Dimension financing
instruments
4
5. Conclusions
A railway may be a solution in the long term, but it
needs a continuous large cargo volumes to be viable
- Roads can serve with reasonable transport volumes
Only the largest transporters will benefit from a railway,
the small and medium size enterprises can not use it
- Everyone can use the roads
Railway construction takes most of a decade or more
- A road can be reconstructed within a year or two
Railways maybe needed by regional mega-size projects
- Roads are essential to all regional development
5
6. THANK YOU FOR YOUR ATTENTION!