6. IMPROVISATIONS OF RANKINE CYALE
1. Reheating
• Flue gas reheating
• Live steam reheating
• Combined flue gas and live steam reheating
2. Regeneration
• Ideal
• Single Stage
• Two Stage
3. Combined Reheating and Regeneration
13. 1. coal and ash circuit
2. Air and flue gas circuit
3. Feed water and steam flow circuit
4. Cooling water circuit
Four Main Circuit
14. Advantages
Plant location
Construction and commissioning
Power generation
Fuel
Less space
Initial cost
Disadvantages
Fuel
Efficiency
Life
Air pollution
Transportation
Power generation cost
16. Range: 125 atm and 510°C to 300 atm and 660 °C
Super critical operation above 221.2 bar for steam
Latent heat of vapourisation zero
Supercritical Boilers
39. Governing of steam turbines
Methods of governing
1. Throttle governing
2. Nozzle control governing
3. By-pass governing
4. Combination of Throttle and Nozzle governing
5. Combination of Throttle and By-pass governing