INTRODUCTION
 The underlying concept of cloud computing dates back to 1960, when
John McCarthy opined that "computation may someday be organized
as a public utility"; indeed it shares characteristics with service bureaus
that date back to the 1960s.
 The actual term "cloud" borrows from telephony in that
telecommunications companies, who until the 1990s primarily offered
dedicated point-to-point data circuits, began offering “VIRTUAL
PRIVATE NETWORK (VPN)” services with comparable quality of
service but at a much lower cost.
 The cloud symbol was used to denote the demarcation point between
that which was the responsibility of the provider from that of the user.
Cloud computing extends this boundary to cover servers as well as the
network infrastructure.
 Cost is claimed to be greatly reduced and capital expenditure is
converted to operational expenditure. Device and location
independence enable users to access systems using a web browser
regardless of their location or what device they are using.
4
USES
 Helps to use applications without installations.
 Access the personal files at any computer with
internet access.
 This technology allows much more efficient
computation by centralizing storage, memory,
processing and band width.
5
SURVEY
 Based on a study conducted in June 2009 by version one,
41% of IT senior professionals doesn’t have sound
knowledge on cloud computing.
 In September 2009, Aberdeen Group found that 18%
reduction in there IT budget and a 16% reduction in data
center power costs.
6
LAYERS

open
use
close
A cloud client consists of
computer hardware and/or
computer software that relies on
cloud computing for application
delivery.
APPLICATIONS
 Cloud application services or "Software as a Service
(SaaS)" deliver ‘software’ as a service over the Internet,
eliminating the need to install and run the application on
the customer's own computers and simplifying
maintenance and support.
8
PLATFORM
 Cloud platform services or "Platform as a Service
(PaaS)" deliver a computing platform and/or
solution stack as a service, often consuming cloud
infrastructure and sustaining cloud applications. It
facilitates deployment of applications without the
cost and complexity of buying and managing the
underlying hardware and software layers.
9
INFRASTRUCTURE
Cloud infrastructure services or "Infrastructure as a
Service (IaaS)" delivers computer infrastructure,
typically a platform virtualization environment,
as a service. Rather than purchasing servers,
software, data center space or network equipment,
clients instead buy those resources as a fully
outsourced service. The service is typically billed
on a utility computing basis and amount of
resources consumed (and therefore the cost) will
typically reflect the level of activity. It is an
evolution of virtual private server offerings.
10
SERVER
 The servers layer consists of computer hardware
and/or computer software products that are
specifically designed for the delivery of cloud
services, including multi-core processors, cloud-
specific operating systems and combined offerings
11
DEPLOYMENT MODELS
COMMUNITY CLOUD:
A community cloud may be established where
several organizations have similar requirements and seek to
share infrastructure so as to realize some of the benefits of
cloud computing. With the costs spread over fewer users
than a public cloud, this option is more expensive but may
offer a higher level of privacy, security and/or policy
compliance.
Examples of community cloud include Google's "Gov
Cloud".
12
HYBRID CLOUD & PRIVATE CLOUD
HYBRID CLOUD:
A hybrid cloud environment consists of multiple internal
and/or external providers "will be typical for most enterprises". By
integrating multiple cloud services, users may be able to ease the
transition to public cloud services.
PRIVATE CLOUD:
Private cloud and Internal cloud are expressions that
some vendors have recently used to describe offerings that emulate cloud
computing on private networks. These products claim to "deliver some
benefits of cloud computing without the pitfalls", capitalizing on data
security, corporate governance, and reliability concerns. They have been
criticized on the basis that users "still have to buy, build, and manage
them" and as such do not benefit from lower up-front capital costs and
less hands-on management
CRITICISM
 Richard Stallman, founder of the Free Software Foundation and
creator of the computer operating system GNU, said that cloud
computing was simply a trap aimed at forcing more people to buy
into locked, proprietary systems that would cost them more and
more over time. "It's stupidity. It's worse than stupidity: it's a
marketing hype campaign," he told The Guardian.
"Somebody is saying this is inevitable – and whenever you
hear somebody saying that, it's very likely to be a set of
businesses campaigning to make it true." "The interesting
thing about cloud computing is that we've redefined cloud
computing to include everything that we already do," he
said.
 The main drawback behind the concept of Cloud Computing is
we can’t completely rely on third party when we are transmitting
sensitive data.
13
ISSUES
PRIVACY:
The Cloud model has been criticized by privacy advocates for the
greater ease in which the companies hosting the Cloud services
control, and thus, can monitor at will, lawfully or unlawfully, the
communication and data stored between the user and the host
company.
Instances such as the secret NSA program, working with AT&T, and
Verizon, which recorded over 10 million phone calls between
American citizens, causes uncertainty among privacy advocates,
and the greater powers it gives to telecommunication companies to
monitor user activity.
LEGAL
 In March 2007, Dell applied to trademark the term "cloud computing" (
U.S. Trademark 77,139,082) in the United States. The "Notice of
Allowance" the company received in July 2008 was cancelled in
August, resulting in a formal rejection of the trademark application less
than a week later.
 Since 2007, the number of trademark filings covering cloud computing
brands, goods and services has increased at an almost exponential rate.
As companies sought to better position themselves for cloud computing
branding and marketing efforts, “cloud computing trademark
filings increased by 483% between 2008 and 2009.” In
2009, 116 cloud computing trademarks were filed, and trademark
analysts predict that over “500 such marks could be filed during
2010.”
SECURITY
 The relative security of cloud computing services is a
contentious issue which may be delaying its adoption. Some
argue that customer data is more secure when managed
internally, while others argue that cloud providers have a
strong incentive to maintain trust and as such employ a
higher level of security.
CONCLUSION
 Cloud computing is a better way to run your
business. Instead of running your apps yourself,
they run on a shared data center. When you use any
app that runs in the cloud, you just log in, customize
it, and start using it. That’s the power of cloud
computing.
 Finally, cloud apps don’t eat up your valuable IT
resources, so your CFO will love it. This lets you
focus on deploying more apps, new projects, and
innovation
THE BOTTOM LINE
Cloud computing is a simple idea, but it can have a
huge impact on your business.
Dr. Kamal Gulati
Associate Professor |
University Quality Support Head |
Mentoring Programme Coordinator
[Ph. D., M.Sc. (Computer Science), M.C.A., M.B.A]
Professional Certifications:
Certified Microsoft Innovative Educator
Data Science 101 Certification from Big Data University
R Language 101 Certification from Big Data University
SQL Certification from SOLOLEARN.com
Certified IBM Big Data 101 from Big Data University
R Program & Python Certified from DataCamp
Wiley Certified Big Data Analyst [WCBDA]
Certification on DBMS from IIT Mumbai
Certified Cisco Certified Network Associate [CCNA]
Certified Microsoft Certified Professional [MCP]
Certified Brainbench in Computer Fundamentals, Microsoft Access, MySQL 5.7 Administration &
Microsoft Project
• Worked as Visiting Professor with Stratford University, USA for six months from
Jan’2016 to June’2016.
• Also worked at Bahrain University in Kingdom of Bahrain Sr. I.T. Faculty (Computer
Science Department) for Period of 2 Years.
• Have rich experience in the field of teaching and research in Computer Science and
Information Technology for almost 15+ years in Academia.
• Having experience of working with both private and public institutions and universities
as the lecturer and self-instruction material writer for Information Technology courses.
• Had number of research papers published in national and international journals and
conference proceedings in IEEE and Scopus Index.
• Also chaired various National and International Conferences of repute and associated
with various International Journals as Editorial Board Member for International and
National, Academic Adviser and Research Paper Reviewer.
 My current area of interest: Big Data Analytics, R Software, Management Information
System, IT Project Management, Decision Support System, Business Analytics,
Database Management System, Data Networking and Advanced Excel with Visual
Basic Macros.
 Country Visited: USA, Canada, UK, UAE, Bahrain, Oman (Mostly for Teaching and
Research Purpose)
Profile of Dr. Kamal Gulati
 Technical Program Committee for International Conference on Data, Engineering and Applications
2017 (IDEA-2k17) which would be on October 28-29, 2017 at Bhopal. http://www.ideaconference.in
 Advisory Board Committee Member for International Conference on Energy, Communication, Data
Analytics and Soft Computing (ICECDS) which would be on 1-2 August 2017 at SKR Engineering
College, Poonamallee, Tamil Nadu, India. http://ecds.org.in
 Advisory Committee Member for International Conference on Innovative Research in Engineering
and Science which would be on 16-17 June 2017 at Asian Institute of Technology Conference Center
Thailand. http://www.iresconf.org
 Advisory Committee Member for International Conference on Cloud Computing and Internet of
everything which held on 10-11 Feb’2016 at Delhi-NCR. http://www.ccioet.org
 Technical Committee member for InCITe-2016 (International Conference on Information
Technology) Theme - Internet of Things: Connect Your Worlds, IT Summit, Amity University 2016
which held on 06-07 Oct, 2016. http://www.amity.edu/incite2016
 Technical Speaker for Global perspective on IT business “The Changing Scenario” – Big Data on
International Students Conference New Delhi (ISCND) which held on 14-15 Oct, 2016
http://iscnd.com
 Advisory Committee Member for International Conference on Sustainable Computing Techniques in
Engineering, Science and Management which has held on 09-10 Sep’2016 at Delhi-NCR.
http://www.scesm.org
 Technical Program Committee Member for Program Committee Member for International Conference
on Recent Trends IN ICT, Jaipur, India, Aug 18-19, 2017 http://rtict.org
 Program Committee Member for International Conference on Recent Advancement in Computer and
Communication Bhopal, India, (IC-RAC-2017) May 26-27, 2017 http://www.icrac.co.in
Profile Contd….
 Editorial Board member for the following International
Journals:
 International Journal of Computer Science and Innovation
http://www.infinitysciences.org
 International Journal of Latest Research in Engineering and Technology
http://www.ijlret.com
 International Journal of Latest Trends in Engineering and Technology
http://www.ijltet.org
 International Journal of Application or Innovation
in Engineering & Management http://www.ijaiem.org
 International Journal for Management http://www.ijm-apm.com
 ITM International Journal of Innovations in Science, Engineering &
Management www.iijisem.org
 The International Journal of Emerging Engineering and Embedded Systems
http://www.ijeees.org
 Conference Info http://conferenceinfo.org/tpc.php
 International Journal of Computer Engineering in Research Trends (IJCERT)
http://www.ijcert.org
 Expert Speaker for Program “Insurance Beyond Doubt” Presented by Oriental Insurance
Co Ltd. https://www.youtube.com/watch?v=GrvJkN_Zn3Q
Profile Contd….
BOOK, CHAPTER, and CASE STUDY Published
 Published Book on “A Study of Changing Trends in E-CRM of
Indian Insurance Industry” Published by LAP Lambert Academic
Publishing, one of the top researchers and renowned scientists of
Germany with ISBN: 3330009543, 9783330009547. The Book
available at Amazon.com.
 Published Real Case Study on “IoT Security Considerations for
Higher Education” published on Business Cases - RENVOI 2017
BOOK (The Case Centre, UK) with ISBN: 978-1-4828-8840-9,
Page 63-70. The Book available at the various online website:
Amazon, AbeBooks, Chegg, Barnes & Noble.
 Published Chapter on "Role of eWorld in Insurance Innovation"
Published by Insurance Institute of India (III), 60 Years Diamond
Jubilee, Compendium, Nov 2016 – (Magazine) – One of the
premium Insurance Institute of India.
Contact Details
 Email : drkamalgulati@gmail.com
 Website : http://mybigdataanalytics.in
 LinkedIn : https://in.linkedin.com/in/drkamalgulati

Cloud Computing in Laymen terms

  • 1.
  • 2.
    “Cloud computing isan emerging computing technology that uses the internet and central remote servers to maintain data and applications”.
  • 3.
    INTRODUCTION  The underlyingconcept of cloud computing dates back to 1960, when John McCarthy opined that "computation may someday be organized as a public utility"; indeed it shares characteristics with service bureaus that date back to the 1960s.  The actual term "cloud" borrows from telephony in that telecommunications companies, who until the 1990s primarily offered dedicated point-to-point data circuits, began offering “VIRTUAL PRIVATE NETWORK (VPN)” services with comparable quality of service but at a much lower cost.  The cloud symbol was used to denote the demarcation point between that which was the responsibility of the provider from that of the user. Cloud computing extends this boundary to cover servers as well as the network infrastructure.  Cost is claimed to be greatly reduced and capital expenditure is converted to operational expenditure. Device and location independence enable users to access systems using a web browser regardless of their location or what device they are using.
  • 4.
    4 USES  Helps touse applications without installations.  Access the personal files at any computer with internet access.  This technology allows much more efficient computation by centralizing storage, memory, processing and band width.
  • 5.
    5 SURVEY  Based ona study conducted in June 2009 by version one, 41% of IT senior professionals doesn’t have sound knowledge on cloud computing.  In September 2009, Aberdeen Group found that 18% reduction in there IT budget and a 16% reduction in data center power costs.
  • 6.
    6 LAYERS  open use close A cloud clientconsists of computer hardware and/or computer software that relies on cloud computing for application delivery.
  • 7.
    APPLICATIONS  Cloud applicationservices or "Software as a Service (SaaS)" deliver ‘software’ as a service over the Internet, eliminating the need to install and run the application on the customer's own computers and simplifying maintenance and support.
  • 8.
    8 PLATFORM  Cloud platformservices or "Platform as a Service (PaaS)" deliver a computing platform and/or solution stack as a service, often consuming cloud infrastructure and sustaining cloud applications. It facilitates deployment of applications without the cost and complexity of buying and managing the underlying hardware and software layers.
  • 9.
    9 INFRASTRUCTURE Cloud infrastructure servicesor "Infrastructure as a Service (IaaS)" delivers computer infrastructure, typically a platform virtualization environment, as a service. Rather than purchasing servers, software, data center space or network equipment, clients instead buy those resources as a fully outsourced service. The service is typically billed on a utility computing basis and amount of resources consumed (and therefore the cost) will typically reflect the level of activity. It is an evolution of virtual private server offerings.
  • 10.
    10 SERVER  The serverslayer consists of computer hardware and/or computer software products that are specifically designed for the delivery of cloud services, including multi-core processors, cloud- specific operating systems and combined offerings
  • 11.
    11 DEPLOYMENT MODELS COMMUNITY CLOUD: Acommunity cloud may be established where several organizations have similar requirements and seek to share infrastructure so as to realize some of the benefits of cloud computing. With the costs spread over fewer users than a public cloud, this option is more expensive but may offer a higher level of privacy, security and/or policy compliance. Examples of community cloud include Google's "Gov Cloud".
  • 12.
    12 HYBRID CLOUD &PRIVATE CLOUD HYBRID CLOUD: A hybrid cloud environment consists of multiple internal and/or external providers "will be typical for most enterprises". By integrating multiple cloud services, users may be able to ease the transition to public cloud services. PRIVATE CLOUD: Private cloud and Internal cloud are expressions that some vendors have recently used to describe offerings that emulate cloud computing on private networks. These products claim to "deliver some benefits of cloud computing without the pitfalls", capitalizing on data security, corporate governance, and reliability concerns. They have been criticized on the basis that users "still have to buy, build, and manage them" and as such do not benefit from lower up-front capital costs and less hands-on management
  • 13.
    CRITICISM  Richard Stallman,founder of the Free Software Foundation and creator of the computer operating system GNU, said that cloud computing was simply a trap aimed at forcing more people to buy into locked, proprietary systems that would cost them more and more over time. "It's stupidity. It's worse than stupidity: it's a marketing hype campaign," he told The Guardian. "Somebody is saying this is inevitable – and whenever you hear somebody saying that, it's very likely to be a set of businesses campaigning to make it true." "The interesting thing about cloud computing is that we've redefined cloud computing to include everything that we already do," he said.  The main drawback behind the concept of Cloud Computing is we can’t completely rely on third party when we are transmitting sensitive data. 13
  • 14.
    ISSUES PRIVACY: The Cloud modelhas been criticized by privacy advocates for the greater ease in which the companies hosting the Cloud services control, and thus, can monitor at will, lawfully or unlawfully, the communication and data stored between the user and the host company. Instances such as the secret NSA program, working with AT&T, and Verizon, which recorded over 10 million phone calls between American citizens, causes uncertainty among privacy advocates, and the greater powers it gives to telecommunication companies to monitor user activity.
  • 15.
    LEGAL  In March2007, Dell applied to trademark the term "cloud computing" ( U.S. Trademark 77,139,082) in the United States. The "Notice of Allowance" the company received in July 2008 was cancelled in August, resulting in a formal rejection of the trademark application less than a week later.  Since 2007, the number of trademark filings covering cloud computing brands, goods and services has increased at an almost exponential rate. As companies sought to better position themselves for cloud computing branding and marketing efforts, “cloud computing trademark filings increased by 483% between 2008 and 2009.” In 2009, 116 cloud computing trademarks were filed, and trademark analysts predict that over “500 such marks could be filed during 2010.”
  • 16.
    SECURITY  The relativesecurity of cloud computing services is a contentious issue which may be delaying its adoption. Some argue that customer data is more secure when managed internally, while others argue that cloud providers have a strong incentive to maintain trust and as such employ a higher level of security.
  • 17.
    CONCLUSION  Cloud computingis a better way to run your business. Instead of running your apps yourself, they run on a shared data center. When you use any app that runs in the cloud, you just log in, customize it, and start using it. That’s the power of cloud computing.  Finally, cloud apps don’t eat up your valuable IT resources, so your CFO will love it. This lets you focus on deploying more apps, new projects, and innovation
  • 18.
    THE BOTTOM LINE Cloudcomputing is a simple idea, but it can have a huge impact on your business.
  • 19.
    Dr. Kamal Gulati AssociateProfessor | University Quality Support Head | Mentoring Programme Coordinator [Ph. D., M.Sc. (Computer Science), M.C.A., M.B.A] Professional Certifications: Certified Microsoft Innovative Educator Data Science 101 Certification from Big Data University R Language 101 Certification from Big Data University SQL Certification from SOLOLEARN.com Certified IBM Big Data 101 from Big Data University R Program & Python Certified from DataCamp Wiley Certified Big Data Analyst [WCBDA] Certification on DBMS from IIT Mumbai Certified Cisco Certified Network Associate [CCNA] Certified Microsoft Certified Professional [MCP] Certified Brainbench in Computer Fundamentals, Microsoft Access, MySQL 5.7 Administration & Microsoft Project
  • 20.
    • Worked asVisiting Professor with Stratford University, USA for six months from Jan’2016 to June’2016. • Also worked at Bahrain University in Kingdom of Bahrain Sr. I.T. Faculty (Computer Science Department) for Period of 2 Years. • Have rich experience in the field of teaching and research in Computer Science and Information Technology for almost 15+ years in Academia. • Having experience of working with both private and public institutions and universities as the lecturer and self-instruction material writer for Information Technology courses. • Had number of research papers published in national and international journals and conference proceedings in IEEE and Scopus Index. • Also chaired various National and International Conferences of repute and associated with various International Journals as Editorial Board Member for International and National, Academic Adviser and Research Paper Reviewer.  My current area of interest: Big Data Analytics, R Software, Management Information System, IT Project Management, Decision Support System, Business Analytics, Database Management System, Data Networking and Advanced Excel with Visual Basic Macros.  Country Visited: USA, Canada, UK, UAE, Bahrain, Oman (Mostly for Teaching and Research Purpose) Profile of Dr. Kamal Gulati
  • 21.
     Technical ProgramCommittee for International Conference on Data, Engineering and Applications 2017 (IDEA-2k17) which would be on October 28-29, 2017 at Bhopal. http://www.ideaconference.in  Advisory Board Committee Member for International Conference on Energy, Communication, Data Analytics and Soft Computing (ICECDS) which would be on 1-2 August 2017 at SKR Engineering College, Poonamallee, Tamil Nadu, India. http://ecds.org.in  Advisory Committee Member for International Conference on Innovative Research in Engineering and Science which would be on 16-17 June 2017 at Asian Institute of Technology Conference Center Thailand. http://www.iresconf.org  Advisory Committee Member for International Conference on Cloud Computing and Internet of everything which held on 10-11 Feb’2016 at Delhi-NCR. http://www.ccioet.org  Technical Committee member for InCITe-2016 (International Conference on Information Technology) Theme - Internet of Things: Connect Your Worlds, IT Summit, Amity University 2016 which held on 06-07 Oct, 2016. http://www.amity.edu/incite2016  Technical Speaker for Global perspective on IT business “The Changing Scenario” – Big Data on International Students Conference New Delhi (ISCND) which held on 14-15 Oct, 2016 http://iscnd.com  Advisory Committee Member for International Conference on Sustainable Computing Techniques in Engineering, Science and Management which has held on 09-10 Sep’2016 at Delhi-NCR. http://www.scesm.org  Technical Program Committee Member for Program Committee Member for International Conference on Recent Trends IN ICT, Jaipur, India, Aug 18-19, 2017 http://rtict.org  Program Committee Member for International Conference on Recent Advancement in Computer and Communication Bhopal, India, (IC-RAC-2017) May 26-27, 2017 http://www.icrac.co.in Profile Contd….
  • 22.
     Editorial Boardmember for the following International Journals:  International Journal of Computer Science and Innovation http://www.infinitysciences.org  International Journal of Latest Research in Engineering and Technology http://www.ijlret.com  International Journal of Latest Trends in Engineering and Technology http://www.ijltet.org  International Journal of Application or Innovation in Engineering & Management http://www.ijaiem.org  International Journal for Management http://www.ijm-apm.com  ITM International Journal of Innovations in Science, Engineering & Management www.iijisem.org  The International Journal of Emerging Engineering and Embedded Systems http://www.ijeees.org  Conference Info http://conferenceinfo.org/tpc.php  International Journal of Computer Engineering in Research Trends (IJCERT) http://www.ijcert.org  Expert Speaker for Program “Insurance Beyond Doubt” Presented by Oriental Insurance Co Ltd. https://www.youtube.com/watch?v=GrvJkN_Zn3Q Profile Contd….
  • 23.
    BOOK, CHAPTER, andCASE STUDY Published  Published Book on “A Study of Changing Trends in E-CRM of Indian Insurance Industry” Published by LAP Lambert Academic Publishing, one of the top researchers and renowned scientists of Germany with ISBN: 3330009543, 9783330009547. The Book available at Amazon.com.  Published Real Case Study on “IoT Security Considerations for Higher Education” published on Business Cases - RENVOI 2017 BOOK (The Case Centre, UK) with ISBN: 978-1-4828-8840-9, Page 63-70. The Book available at the various online website: Amazon, AbeBooks, Chegg, Barnes & Noble.  Published Chapter on "Role of eWorld in Insurance Innovation" Published by Insurance Institute of India (III), 60 Years Diamond Jubilee, Compendium, Nov 2016 – (Magazine) – One of the premium Insurance Institute of India.
  • 24.
    Contact Details  Email: drkamalgulati@gmail.com  Website : http://mybigdataanalytics.in  LinkedIn : https://in.linkedin.com/in/drkamalgulati