SlideShare a Scribd company logo
Civil Construction Project Manager
The company has a reputed name in catering to clients across the world and it
welcomes candidates who believe in making something new out of ordinary things.
Position summary:
The working of a project manager will be supervised by an executive management team
and senior PM?s who are handling the distribution of assignments according to the
objectives required to be reached, responsibilities and authorities
A Project Manager is an essential part of a team who will take care of every detail of a
project with his knowledge and ability.
He works as a coordinator with the project team and ensures that the work goes
according to the plan. He maintains a cordial communication with the corporate staff
and is responsible for completing a project as per the scheduled time. Accuracy and
punctuality are tow most important qualities a Project Manager must have.
Job Duties of a Construction Project Manager:
 Maintain a project schedule and budget.
 Develop a project schedule that should be met in future.
 Attend project meeting.
 Need to handle out of the project office periodically. Field visits are required for
verifying scope, schedule and quality of a project.
 Monitor and review daily reports of works.
~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Pandu
www. qtoconstruction.com
~~~~~~~~~~~~~~~~~~~~~~~~

More Related Content

What's hot

Role of the Project Manager in Agile
Role of the Project Manager in AgileRole of the Project Manager in Agile
Role of the Project Manager in Agile
Darren Wilmshurst
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cvMadhu Civil
 
CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
Durairaj Samikkannu
 
Key Responsibility
Key ResponsibilityKey Responsibility
Key ResponsibilityAnas Addas
 
Faber, Brittany D. Resume - General
Faber, Brittany D. Resume - GeneralFaber, Brittany D. Resume - General
Faber, Brittany D. Resume - GeneralBrittany Moreland
 
Project Management Training
Project Management TrainingProject Management Training
Project Management Training
Maliha Mehr
 
Need and Role of Project Management
Need and Role of Project ManagementNeed and Role of Project Management
Need and Role of Project Management
TarriqALVI
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008
HaythamZidan1
 
EPC PLANNER
EPC PLANNEREPC PLANNER
EPC PLANNER
HRD ENPLG Sumatera
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life CycleOdekunle Sakiru
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution TrainingAminuddin Seth
 
Hiren_Resume neww - 12.5.16
Hiren_Resume neww - 12.5.16Hiren_Resume neww - 12.5.16
Hiren_Resume neww - 12.5.16Hiren Chauhan
 
LynnMassieonResume122015
LynnMassieonResume122015LynnMassieonResume122015
LynnMassieonResume122015Lynn Massieon
 
What does a construction manager do
What does a construction manager do What does a construction manager do
What does a construction manager do
Alice Wilson
 
How to become a Successful Project Manager
How to become a Successful Project ManagerHow to become a Successful Project Manager
How to become a Successful Project Manager
SaviNaitame1
 
Responsible for overall project management
Responsible for overall project managementResponsible for overall project management
Responsible for overall project management
Rajiv Singh
 

What's hot (20)

Role of the Project Manager in Agile
Role of the Project Manager in AgileRole of the Project Manager in Agile
Role of the Project Manager in Agile
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
Resume - Philip 2016
Resume - Philip 2016Resume - Philip 2016
Resume - Philip 2016
 
CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
 
Key Responsibility
Key ResponsibilityKey Responsibility
Key Responsibility
 
Faber, Brittany D. Resume - General
Faber, Brittany D. Resume - GeneralFaber, Brittany D. Resume - General
Faber, Brittany D. Resume - General
 
MEP Summery
MEP SummeryMEP Summery
MEP Summery
 
Project Management Training
Project Management TrainingProject Management Training
Project Management Training
 
Need and Role of Project Management
Need and Role of Project ManagementNeed and Role of Project Management
Need and Role of Project Management
 
Abdulla Massri - CV-
Abdulla Massri - CV-Abdulla Massri - CV-
Abdulla Massri - CV-
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008
 
EPC PLANNER
EPC PLANNEREPC PLANNER
EPC PLANNER
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution Training
 
Hiren_Resume neww - 12.5.16
Hiren_Resume neww - 12.5.16Hiren_Resume neww - 12.5.16
Hiren_Resume neww - 12.5.16
 
LynnMassieonResume122015
LynnMassieonResume122015LynnMassieonResume122015
LynnMassieonResume122015
 
What does a construction manager do
What does a construction manager do What does a construction manager do
What does a construction manager do
 
How to become a Successful Project Manager
How to become a Successful Project ManagerHow to become a Successful Project Manager
How to become a Successful Project Manager
 
Rakshan Amin
Rakshan AminRakshan Amin
Rakshan Amin
 
Responsible for overall project management
Responsible for overall project managementResponsible for overall project management
Responsible for overall project management
 

Similar to Civil construction project manager

Project Engineer and Deputy project manger
Project Engineer and Deputy project manger Project Engineer and Deputy project manger
Project Engineer and Deputy project manger
Adil Mehmoood
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
kanti choudhary
 
Project Planning & Management
Project Planning & Management Project Planning & Management
Project Planning & Management
Kashif-khan
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf
AikaterineSmith
 
Unit 8 Careers Booklet 2
Unit 8 Careers Booklet 2Unit 8 Careers Booklet 2
Unit 8 Careers Booklet 2
Chelsie Brandrick
 
ASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICE
Michele Thomas
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan
Pracas Infosys
 
Resume
ResumeResume
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
Saqib Imran
 
Session four- project execution.pptx
Session four- project execution.pptxSession four- project execution.pptx
Session four- project execution.pptx
yuduf1
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
Resume Raza Baloch
Resume Raza BalochResume Raza Baloch
Resume Raza BalochRaza Baloch
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
EPC Group
 
Project mgt
Project mgtProject mgt
Project mgt
Ravi Joon
 
How to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterHow to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer Mitter
Sameer Mitter
 
Project Managementintroduction.pptx
Project Managementintroduction.pptxProject Managementintroduction.pptx
Project Managementintroduction.pptx
raman326079
 
Another way to look at project management
Another way to look at project managementAnother way to look at project management
Another way to look at project management
Richard O'Connell
 

Similar to Civil construction project manager (20)

Project Engineer and Deputy project manger
Project Engineer and Deputy project manger Project Engineer and Deputy project manger
Project Engineer and Deputy project manger
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
 
Project Planning & Management
Project Planning & Management Project Planning & Management
Project Planning & Management
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf
 
Unit 8 Careers Booklet 2
Unit 8 Careers Booklet 2Unit 8 Careers Booklet 2
Unit 8 Careers Booklet 2
 
ASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICE
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan
 
Resume
ResumeResume
Resume
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Session four- project execution.pptx
Session four- project execution.pptxSession four- project execution.pptx
Session four- project execution.pptx
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Resume Raza Baloch
Resume Raza BalochResume Raza Baloch
Resume Raza Baloch
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
Project mgt
Project mgtProject mgt
Project mgt
 
How to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterHow to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer Mitter
 
Project Managementintroduction.pptx
Project Managementintroduction.pptxProject Managementintroduction.pptx
Project Managementintroduction.pptx
 
Another way to look at project management
Another way to look at project managementAnother way to look at project management
Another way to look at project management
 

More from Alice Patterson

Project Estimating for Scoping
Project Estimating for ScopingProject Estimating for Scoping
Project Estimating for Scoping
Alice Patterson
 
Concrete Footing Worksheet
Concrete Footing WorksheetConcrete Footing Worksheet
Concrete Footing Worksheet
Alice Patterson
 
Important rules for making any column layout
Important rules for making any column layoutImportant rules for making any column layout
Important rules for making any column layout
Alice Patterson
 
Bar Bending Schedule Spreadsheet
Bar Bending Schedule SpreadsheetBar Bending Schedule Spreadsheet
Bar Bending Schedule Spreadsheet
Alice Patterson
 
Electrical estimating sheets
Electrical estimating sheetsElectrical estimating sheets
Electrical estimating sheets
Alice Patterson
 
Worksheet for Estimating Labor Costs
Worksheet for Estimating Labor CostsWorksheet for Estimating Labor Costs
Worksheet for Estimating Labor Costs
Alice Patterson
 
Estimation Form for Painting
Estimation Form for PaintingEstimation Form for Painting
Estimation Form for Painting
Alice Patterson
 

More from Alice Patterson (7)

Project Estimating for Scoping
Project Estimating for ScopingProject Estimating for Scoping
Project Estimating for Scoping
 
Concrete Footing Worksheet
Concrete Footing WorksheetConcrete Footing Worksheet
Concrete Footing Worksheet
 
Important rules for making any column layout
Important rules for making any column layoutImportant rules for making any column layout
Important rules for making any column layout
 
Bar Bending Schedule Spreadsheet
Bar Bending Schedule SpreadsheetBar Bending Schedule Spreadsheet
Bar Bending Schedule Spreadsheet
 
Electrical estimating sheets
Electrical estimating sheetsElectrical estimating sheets
Electrical estimating sheets
 
Worksheet for Estimating Labor Costs
Worksheet for Estimating Labor CostsWorksheet for Estimating Labor Costs
Worksheet for Estimating Labor Costs
 
Estimation Form for Painting
Estimation Form for PaintingEstimation Form for Painting
Estimation Form for Painting
 

Recently uploaded

CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 

Recently uploaded (20)

CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 

Civil construction project manager

  • 1. Civil Construction Project Manager The company has a reputed name in catering to clients across the world and it welcomes candidates who believe in making something new out of ordinary things. Position summary: The working of a project manager will be supervised by an executive management team and senior PM?s who are handling the distribution of assignments according to the objectives required to be reached, responsibilities and authorities A Project Manager is an essential part of a team who will take care of every detail of a project with his knowledge and ability. He works as a coordinator with the project team and ensures that the work goes according to the plan. He maintains a cordial communication with the corporate staff and is responsible for completing a project as per the scheduled time. Accuracy and punctuality are tow most important qualities a Project Manager must have. Job Duties of a Construction Project Manager:  Maintain a project schedule and budget.  Develop a project schedule that should be met in future.  Attend project meeting.  Need to handle out of the project office periodically. Field visits are required for verifying scope, schedule and quality of a project.  Monitor and review daily reports of works. ~~~~~~~~~~~~~~~~~~~~~~~~ Published By Pandu www. qtoconstruction.com ~~~~~~~~~~~~~~~~~~~~~~~~