1. PURPOSE:
These instructions describe the general Circle/Slash/Initial instructions to be used for place
keeping.
2. REFERENCES:
DOE-HDBK-1028-2009 DOE Standard: Human Performance Improvement Handbook2.1
Volume 1: Concepts and Principles, Place-Keeping, June 2009.
3. INSTRUCTIONS:
WHY CIRCLE/SLASH/INITIAL PROCESS:3.1
This process is used to for place keeping and to verify and validate that the steps were
performed in an operating instruction. These steps are noted by having UPPERCASE
and BOLDED words that note actions to be taken by the Operator is the following
steps, see Figure 1: Circle/Slash/Initial Example.
Figure 1: Circle/Slash/Initial Example
Writers Note: Please note that the roles that are used should be substituted for
the actual roles with in your organization. If they do not apply then
eliminate the position/role.
Circle/Slash/Initial Process WI 001
By RBarnes Page 2 of 4
Rev. A 12/16/15
Circle/Slash is used so steps are not accidentally omitted or repeated.
Initialing the step states which Operator has completed and signed off on the step.
This process also addresses when suspending a step or handing off the Operating
Instruction prior to finishing to another Operator.
CIRCLE/SLASH/INITIAL PROCESS:3.2
3.2.1 CLEARLY CIRCLE the instruction step number or place a circle in the left
margin of the document next to the item/step to be performed. See Figure 2:
Circle.
Figure 2: Circle
3.2.2 READ and UNDERSTAND the entire item/step.
3.2.3 PERFORM the item/step as written.
3.2.4 SLASH the Circle after you’ve completed the item/step. See Figure 3:
Circle/Slash.
Figure 3: Circle/Slash
3.2.5 INITIAL the step on the right hand margin. See Figure 4: Circle/Slash/Initial.
Figure 4: Circle/Slash/Initial
NOTE: Do not slash continuous steps – only one item (step) at a time.
Circle/Slash/Initial Process WI 001
By RBarnes Page 3 of 4
Rev. A 12/16/15
SUSPENDING OR CONTINUATION BY ANOTHER OPERATOR:3.3
3.3.1 When suspending the Operational Instruction or not finishing a step the step
number is CIRCLED and text is UNDERLINED. In the left hand margin WRITE
‘COMPLETE THIS STEP” and INITIAL.
 It is permissible to USE colored adhesive page markers (such as Post-it
Notes ®) to help trace progress through the instruction or to denote
reference sections.
 Use this step when you are passing an Operational Instruction to another
Operator to be completed.
3.3.2 When resuming an activity that has been SUSPENDED or PASSED from one
Operator to another, CONFIRM that Precautions and Limitations conditions
and Requirements are met and that any required approvals are obtained before
proceeding.
COMPLETED Operating Instructions are to be SUBMITTED to the Manager. WRITE3.4
comments on any issues or problems encountered.
4. RECORDS:
Completed Operating Instructions are to be submitted to the Manager.4.1
Retain the most recent review signature page in a local file. Older copies are4.2
shredded.
5. CHANGE MANAGEMENT:
Responsibility for Procedure5.1
Address all questions on this procedure to the Manager. The Manager will be
responsible for engaging the appropriate subject matter experts (SMEs) in developing
proposed revisions. Quality Assurance must approve the revisions prior to publishing.
Revision History5.2
Revision history to include revision number, date, details of changes, and initials of the
Manager signifying revision approval.
Rev. A 12/16/15 – Final.
6. SIGN-OFF AND REVIEW:
Not required for this procedure.6.1
7. ATTACHMENTS:
Training.7.1
Circle/Slash/Initial Process WI 001
By RBarnes Page 4 of 4
Rev. A 12/16/15
ATTACHMENT 7.1
Training/Confirmation Page
1) Review the steps with the trainee. Have the trainee perform the Circle/Slash/Initial after
each noted step.
2) Upon Completion, have Trainee SIGN here: ____________________.
3) This can be used as a training record.
Writers Note: Depending on your organization a work instruction should be able
to be used for training. A simple attachment can be added to
document and record the training.

More Related Content

What's hot

Infertility Hysteroscopy
Infertility HysteroscopyInfertility Hysteroscopy
Infertility Hysteroscopy
guest9dc181
 
Hysteroscopic endometial resection
Hysteroscopic endometial resectionHysteroscopic endometial resection
Hysteroscopic endometial resection
Dr. Aisha M Elbareg
 
EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI
EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI
EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI
DR SHASHWAT JANI
 
CS scar niche.
CS scar niche.CS scar niche.
CS scar niche.
magdy abdel
 
HYSTEROSCOPY
HYSTEROSCOPYHYSTEROSCOPY
HYSTEROSCOPY
Khushbu Agrawal
 
Adnexal Masses
Adnexal MassesAdnexal Masses
Adnexal Masses
NARENDRA C MALHOTRA
 
Stress urinary incontinance
Stress urinary incontinanceStress urinary incontinance
Stress urinary incontinance
Mohit Agrawal
 
Recent advances in gynecologic usg
Recent advances in gynecologic  usg Recent advances in gynecologic  usg
Recent advances in gynecologic usg
Bharti Gahtori
 
Endometriosis
EndometriosisEndometriosis
Endometriosis
Dr. Md Razi Ahmad
 
Endometrial Ablation
Endometrial AblationEndometrial Ablation
Endometrial Ablation
Galal Lotfi
 
Sperm retrieval techniques
Sperm retrieval techniques Sperm retrieval techniques
Sperm retrieval techniques
Sandro Esteves
 
Uterine-Sparing Surgery for Adenomyosis Prof. Aboubakr Elnashar
Uterine-Sparing Surgery for Adenomyosis  Prof. Aboubakr ElnasharUterine-Sparing Surgery for Adenomyosis  Prof. Aboubakr Elnashar
Uterine-Sparing Surgery for Adenomyosis Prof. Aboubakr Elnashar
Aboubakr Elnashar
 
USG WATCH DOG IN PREGNANCY
USG WATCH DOG IN PREGNANCYUSG WATCH DOG IN PREGNANCY
USG WATCH DOG IN PREGNANCY
NARENDRA C MALHOTRA
 
Cesarean scar endometriosis
Cesarean scar endometriosisCesarean scar endometriosis
Cesarean scar endometriosis
Andrei Dumitrescu
 
Hysteroscopy
HysteroscopyHysteroscopy
Hysteroscopy
Gururaj Deshpande
 
NIPD
NIPDNIPD
MESA, TESE, MicroTESE
MESA, TESE, MicroTESEMESA, TESE, MicroTESE
MESA, TESE, MicroTESE
Sandro Esteves
 
Hysteroscopy overview
Hysteroscopy overviewHysteroscopy overview
Hysteroscopy overview
Aboubakr Elnashar
 
Subtle Endometriosis
Subtle EndometriosisSubtle Endometriosis
Subtle Endometriosis
Aboubakr Elnashar
 
Infertility (evaluation and management)
Infertility (evaluation and management)Infertility (evaluation and management)
Infertility (evaluation and management)
Hale Teka
 

What's hot (20)

Infertility Hysteroscopy
Infertility HysteroscopyInfertility Hysteroscopy
Infertility Hysteroscopy
 
Hysteroscopic endometial resection
Hysteroscopic endometial resectionHysteroscopic endometial resection
Hysteroscopic endometial resection
 
EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI
EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI
EVIDENCE BASED PRACTICAL TIPS FOR OFFICE HYSTEROSCOPY BY DR SHASHWAT JANI
 
CS scar niche.
CS scar niche.CS scar niche.
CS scar niche.
 
HYSTEROSCOPY
HYSTEROSCOPYHYSTEROSCOPY
HYSTEROSCOPY
 
Adnexal Masses
Adnexal MassesAdnexal Masses
Adnexal Masses
 
Stress urinary incontinance
Stress urinary incontinanceStress urinary incontinance
Stress urinary incontinance
 
Recent advances in gynecologic usg
Recent advances in gynecologic  usg Recent advances in gynecologic  usg
Recent advances in gynecologic usg
 
Endometriosis
EndometriosisEndometriosis
Endometriosis
 
Endometrial Ablation
Endometrial AblationEndometrial Ablation
Endometrial Ablation
 
Sperm retrieval techniques
Sperm retrieval techniques Sperm retrieval techniques
Sperm retrieval techniques
 
Uterine-Sparing Surgery for Adenomyosis Prof. Aboubakr Elnashar
Uterine-Sparing Surgery for Adenomyosis  Prof. Aboubakr ElnasharUterine-Sparing Surgery for Adenomyosis  Prof. Aboubakr Elnashar
Uterine-Sparing Surgery for Adenomyosis Prof. Aboubakr Elnashar
 
USG WATCH DOG IN PREGNANCY
USG WATCH DOG IN PREGNANCYUSG WATCH DOG IN PREGNANCY
USG WATCH DOG IN PREGNANCY
 
Cesarean scar endometriosis
Cesarean scar endometriosisCesarean scar endometriosis
Cesarean scar endometriosis
 
Hysteroscopy
HysteroscopyHysteroscopy
Hysteroscopy
 
NIPD
NIPDNIPD
NIPD
 
MESA, TESE, MicroTESE
MESA, TESE, MicroTESEMESA, TESE, MicroTESE
MESA, TESE, MicroTESE
 
Hysteroscopy overview
Hysteroscopy overviewHysteroscopy overview
Hysteroscopy overview
 
Subtle Endometriosis
Subtle EndometriosisSubtle Endometriosis
Subtle Endometriosis
 
Infertility (evaluation and management)
Infertility (evaluation and management)Infertility (evaluation and management)
Infertility (evaluation and management)
 

Viewers also liked

Fotos
FotosFotos
Inspectie van het dijkpatrimonium
Inspectie van het dijkpatrimoniumInspectie van het dijkpatrimonium
Inspectie van het dijkpatrimonium
Waterbouwkundig Laboratorium
 
Fanzine and Magazine Article Plan
Fanzine and Magazine Article PlanFanzine and Magazine Article Plan
Fanzine and Magazine Article Plan
cloestead
 
cuentos cerreños
cuentos cerreñoscuentos cerreños
cuentos cerreños
tauren-cris10
 
México: Los rarámuris, la resistencia que no viaja en teleférico
México: Los rarámuris, la resistencia que no viaja en teleféricoMéxico: Los rarámuris, la resistencia que no viaja en teleférico
México: Los rarámuris, la resistencia que no viaja en teleférico
Crónicas del despojo
 
Universidad tecnica de la salud 2
Universidad tecnica de la salud 2Universidad tecnica de la salud 2
Universidad tecnica de la salud 2
Mileynaru
 
Campana Zanussi ZHC62661XA
Campana Zanussi ZHC62661XACampana Zanussi ZHC62661XA
Campana Zanussi ZHC62661XA
Alsako Electrodomésticos
 
Ripley Utility Tool WS 68 - Power Driven Cable End Stripper
Ripley Utility Tool WS 68 - Power Driven Cable End StripperRipley Utility Tool WS 68 - Power Driven Cable End Stripper
Ripley Utility Tool WS 68 - Power Driven Cable End Stripper
Thorne & Derrick International
 
Revista noviembre
Revista noviembreRevista noviembre
Revista noviembre
Utrera AL Dia
 
Productividad y calidad al estilo japones
Productividad y calidad al estilo japonesProductividad y calidad al estilo japones
Productividad y calidad al estilo japones
Alfonso de León
 
Nmr spectroscopy
Nmr spectroscopyNmr spectroscopy
Nmr spectroscopy
TATHAGATA CHAKRABORTY
 
Enfermedades de transmision sexual
Enfermedades de transmision sexualEnfermedades de transmision sexual
Enfermedades de transmision sexual
jessica2479
 
Evolution of Drawing as an Engineering Discipline
Evolution of Drawing as an Engineering DisciplineEvolution of Drawing as an Engineering Discipline
Evolution of Drawing as an Engineering Discipline
Anindya Sundar Paul
 
Cyprus oil & gas association clng
Cyprus oil & gas association clngCyprus oil & gas association clng
Cyprus oil & gas association clng
Andy Varoshiotis
 
Apresentação feira de ciencias 2013
Apresentação feira de ciencias 2013Apresentação feira de ciencias 2013
Apresentação feira de ciencias 2013
Escola Municipal de Ensino Fundamental Campos do Cristal
 

Viewers also liked (17)

Detalle constructivo
Detalle constructivoDetalle constructivo
Detalle constructivo
 
Fotos
FotosFotos
Fotos
 
certificate
certificatecertificate
certificate
 
Inspectie van het dijkpatrimonium
Inspectie van het dijkpatrimoniumInspectie van het dijkpatrimonium
Inspectie van het dijkpatrimonium
 
Fanzine and Magazine Article Plan
Fanzine and Magazine Article PlanFanzine and Magazine Article Plan
Fanzine and Magazine Article Plan
 
cuentos cerreños
cuentos cerreñoscuentos cerreños
cuentos cerreños
 
México: Los rarámuris, la resistencia que no viaja en teleférico
México: Los rarámuris, la resistencia que no viaja en teleféricoMéxico: Los rarámuris, la resistencia que no viaja en teleférico
México: Los rarámuris, la resistencia que no viaja en teleférico
 
Universidad tecnica de la salud 2
Universidad tecnica de la salud 2Universidad tecnica de la salud 2
Universidad tecnica de la salud 2
 
Campana Zanussi ZHC62661XA
Campana Zanussi ZHC62661XACampana Zanussi ZHC62661XA
Campana Zanussi ZHC62661XA
 
Ripley Utility Tool WS 68 - Power Driven Cable End Stripper
Ripley Utility Tool WS 68 - Power Driven Cable End StripperRipley Utility Tool WS 68 - Power Driven Cable End Stripper
Ripley Utility Tool WS 68 - Power Driven Cable End Stripper
 
Revista noviembre
Revista noviembreRevista noviembre
Revista noviembre
 
Productividad y calidad al estilo japones
Productividad y calidad al estilo japonesProductividad y calidad al estilo japones
Productividad y calidad al estilo japones
 
Nmr spectroscopy
Nmr spectroscopyNmr spectroscopy
Nmr spectroscopy
 
Enfermedades de transmision sexual
Enfermedades de transmision sexualEnfermedades de transmision sexual
Enfermedades de transmision sexual
 
Evolution of Drawing as an Engineering Discipline
Evolution of Drawing as an Engineering DisciplineEvolution of Drawing as an Engineering Discipline
Evolution of Drawing as an Engineering Discipline
 
Cyprus oil & gas association clng
Cyprus oil & gas association clngCyprus oil & gas association clng
Cyprus oil & gas association clng
 
Apresentação feira de ciencias 2013
Apresentação feira de ciencias 2013Apresentação feira de ciencias 2013
Apresentação feira de ciencias 2013
 

Similar to Circle Slash Rev1

Accomplishments take out STD TIS
Accomplishments take out STD TISAccomplishments take out STD TIS
Accomplishments take out STD TIS
Victoria Blackmer
 
Glen &dimplex Process improvements
Glen &dimplex Process improvementsGlen &dimplex Process improvements
Glen &dimplex Process improvements
Nigel Charles
 
glendimplex manufacturing improvement change
glendimplex manufacturing improvement  changeglendimplex manufacturing improvement  change
glendimplex manufacturing improvement change
Nigel Charles
 
Acceptance test plan_4-24-07
Acceptance test plan_4-24-07Acceptance test plan_4-24-07
Acceptance test plan_4-24-07
Virgiawan Lakstianto
 
IRRICAD HELP.pdf
IRRICAD  HELP.pdfIRRICAD  HELP.pdf
IRRICAD HELP.pdf
Kamel Hebbache
 
Kaizen
KaizenKaizen
Kaizen
mandlikanil
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
ssuser72b8e8
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
IRJET Journal
 
Troubleshooting.pdf
Troubleshooting.pdfTroubleshooting.pdf
Troubleshooting.pdf
www.thepetrosolutions.com
 
0.1. NP QC Tool n techniques.ppt
0.1. NP QC Tool n techniques.ppt0.1. NP QC Tool n techniques.ppt
0.1. NP QC Tool n techniques.ppt
ssuser09fd94
 
Training Within Industry Program: TWI Frameworks
Training Within Industry Program: TWI FrameworksTraining Within Industry Program: TWI Frameworks
Training Within Industry Program: TWI Frameworks
Operational Excellence Consulting
 
Lean Management
Lean ManagementLean Management
Lean Management
Ashish Dev
 
Toy ship assembly - Methods Engineering
Toy ship assembly - Methods EngineeringToy ship assembly - Methods Engineering
Toy ship assembly - Methods Engineering
Angelica Angelo Ocon
 
Ergonomics in apparel manufacturing
Ergonomics in apparel manufacturingErgonomics in apparel manufacturing
Ergonomics in apparel manufacturing
Shubham Singh
 
Types of Wastes in Manufacturing
Types of Wastes in ManufacturingTypes of Wastes in Manufacturing
Types of Wastes in Manufacturing
Sisubalan Selvan
 
standardoperatingproceduresop-180310100856.pdf
standardoperatingproceduresop-180310100856.pdfstandardoperatingproceduresop-180310100856.pdf
standardoperatingproceduresop-180310100856.pdf
HariharanB30
 
Maintenance Management - Project
Maintenance Management - ProjectMaintenance Management - Project
Maintenance Management - Project
Abhishek Raj
 
2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues
Amber Joan Wood
 
8D Problem Solving
8D Problem Solving8D Problem Solving
8D Problem Solving
Ajay Garg
 
Standard operating procedure (sop)
Standard operating procedure (sop)Standard operating procedure (sop)
Standard operating procedure (sop)
Md. Shahin Mia, CSSBB (ASQ, USA)
 

Similar to Circle Slash Rev1 (20)

Accomplishments take out STD TIS
Accomplishments take out STD TISAccomplishments take out STD TIS
Accomplishments take out STD TIS
 
Glen &dimplex Process improvements
Glen &dimplex Process improvementsGlen &dimplex Process improvements
Glen &dimplex Process improvements
 
glendimplex manufacturing improvement change
glendimplex manufacturing improvement  changeglendimplex manufacturing improvement  change
glendimplex manufacturing improvement change
 
Acceptance test plan_4-24-07
Acceptance test plan_4-24-07Acceptance test plan_4-24-07
Acceptance test plan_4-24-07
 
IRRICAD HELP.pdf
IRRICAD  HELP.pdfIRRICAD  HELP.pdf
IRRICAD HELP.pdf
 
Kaizen
KaizenKaizen
Kaizen
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
 
Troubleshooting.pdf
Troubleshooting.pdfTroubleshooting.pdf
Troubleshooting.pdf
 
0.1. NP QC Tool n techniques.ppt
0.1. NP QC Tool n techniques.ppt0.1. NP QC Tool n techniques.ppt
0.1. NP QC Tool n techniques.ppt
 
Training Within Industry Program: TWI Frameworks
Training Within Industry Program: TWI FrameworksTraining Within Industry Program: TWI Frameworks
Training Within Industry Program: TWI Frameworks
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Toy ship assembly - Methods Engineering
Toy ship assembly - Methods EngineeringToy ship assembly - Methods Engineering
Toy ship assembly - Methods Engineering
 
Ergonomics in apparel manufacturing
Ergonomics in apparel manufacturingErgonomics in apparel manufacturing
Ergonomics in apparel manufacturing
 
Types of Wastes in Manufacturing
Types of Wastes in ManufacturingTypes of Wastes in Manufacturing
Types of Wastes in Manufacturing
 
standardoperatingproceduresop-180310100856.pdf
standardoperatingproceduresop-180310100856.pdfstandardoperatingproceduresop-180310100856.pdf
standardoperatingproceduresop-180310100856.pdf
 
Maintenance Management - Project
Maintenance Management - ProjectMaintenance Management - Project
Maintenance Management - Project
 
2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues
 
8D Problem Solving
8D Problem Solving8D Problem Solving
8D Problem Solving
 
Standard operating procedure (sop)
Standard operating procedure (sop)Standard operating procedure (sop)
Standard operating procedure (sop)
 

Circle Slash Rev1

  • 1. Circle/Slash/Initial Process WI 001 By RBarnes Page 1 of 4 Rev. A 12/16/15 1. PURPOSE: These instructions describe the general Circle/Slash/Initial instructions to be used for place keeping. 2. REFERENCES: DOE-HDBK-1028-2009 DOE Standard: Human Performance Improvement Handbook2.1 Volume 1: Concepts and Principles, Place-Keeping, June 2009. 3. INSTRUCTIONS: WHY CIRCLE/SLASH/INITIAL PROCESS:3.1 This process is used to for place keeping and to verify and validate that the steps were performed in an operating instruction. These steps are noted by having UPPERCASE and BOLDED words that note actions to be taken by the Operator is the following steps, see Figure 1: Circle/Slash/Initial Example. Figure 1: Circle/Slash/Initial Example Writers Note: Please note that the roles that are used should be substituted for the actual roles with in your organization. If they do not apply then eliminate the position/role.
  • 2. Circle/Slash/Initial Process WI 001 By RBarnes Page 2 of 4 Rev. A 12/16/15 Circle/Slash is used so steps are not accidentally omitted or repeated. Initialing the step states which Operator has completed and signed off on the step. This process also addresses when suspending a step or handing off the Operating Instruction prior to finishing to another Operator. CIRCLE/SLASH/INITIAL PROCESS:3.2 3.2.1 CLEARLY CIRCLE the instruction step number or place a circle in the left margin of the document next to the item/step to be performed. See Figure 2: Circle. Figure 2: Circle 3.2.2 READ and UNDERSTAND the entire item/step. 3.2.3 PERFORM the item/step as written. 3.2.4 SLASH the Circle after you’ve completed the item/step. See Figure 3: Circle/Slash. Figure 3: Circle/Slash 3.2.5 INITIAL the step on the right hand margin. See Figure 4: Circle/Slash/Initial. Figure 4: Circle/Slash/Initial NOTE: Do not slash continuous steps – only one item (step) at a time.
  • 3. Circle/Slash/Initial Process WI 001 By RBarnes Page 3 of 4 Rev. A 12/16/15 SUSPENDING OR CONTINUATION BY ANOTHER OPERATOR:3.3 3.3.1 When suspending the Operational Instruction or not finishing a step the step number is CIRCLED and text is UNDERLINED. In the left hand margin WRITE ‘COMPLETE THIS STEP” and INITIAL.  It is permissible to USE colored adhesive page markers (such as Post-it Notes ®) to help trace progress through the instruction or to denote reference sections.  Use this step when you are passing an Operational Instruction to another Operator to be completed. 3.3.2 When resuming an activity that has been SUSPENDED or PASSED from one Operator to another, CONFIRM that Precautions and Limitations conditions and Requirements are met and that any required approvals are obtained before proceeding. COMPLETED Operating Instructions are to be SUBMITTED to the Manager. WRITE3.4 comments on any issues or problems encountered. 4. RECORDS: Completed Operating Instructions are to be submitted to the Manager.4.1 Retain the most recent review signature page in a local file. Older copies are4.2 shredded. 5. CHANGE MANAGEMENT: Responsibility for Procedure5.1 Address all questions on this procedure to the Manager. The Manager will be responsible for engaging the appropriate subject matter experts (SMEs) in developing proposed revisions. Quality Assurance must approve the revisions prior to publishing. Revision History5.2 Revision history to include revision number, date, details of changes, and initials of the Manager signifying revision approval. Rev. A 12/16/15 – Final. 6. SIGN-OFF AND REVIEW: Not required for this procedure.6.1 7. ATTACHMENTS: Training.7.1
  • 4. Circle/Slash/Initial Process WI 001 By RBarnes Page 4 of 4 Rev. A 12/16/15 ATTACHMENT 7.1 Training/Confirmation Page 1) Review the steps with the trainee. Have the trainee perform the Circle/Slash/Initial after each noted step. 2) Upon Completion, have Trainee SIGN here: ____________________. 3) This can be used as a training record. Writers Note: Depending on your organization a work instruction should be able to be used for training. A simple attachment can be added to document and record the training.